Packages for Gray Structure GREY FINISHES Material Used Specifications A=950/- A++=1050/-A+++=1150/sft sft sft MB7 / 25 / S (P) / RS7/MDS/ (Barshi for 77/MPS/Y/ Equalient walls & Equalient (Awal for Khingar For (Awal for walls walls & Foundation) & Foundation) Foundation) Bricks Grade A Cement PS-232-2008 (R) Grade 43 fujji Steel Reinforcement Grade 40 Deform Bar Local Sand in Roof Slab Grade A Ravi Chenab Lawrencepur Sand in Wall Masonry Grade A Ravi Chenab Lawrencepur Sand in Wall Plaster (External) Grade A Ravi Chenab Lawrencepur Ravi Chenab Lawrencepur Ali Akbar Bouncer Ali Akbar Mirage Walls & Roof Plaster Ratios (Internal & (1:5) Cement: sand external) Termite Proofing Foundation and Before Gray Local Brand flooring on ground floor D.G / Best way Pak-Cem / Mappel / Payedaar G.S./ Kasur Model/ Ittefaq Foundation Wall Footings Foundation wall footings PCC 1:4:8 PCC 1:4:8 PCC 1:4:8 DPC (1:2:4) DOUBLE 1:2:4 with fine aggregate 2" Thick 3" Thick 3" Thick Plaster Plaster Plaster Vertical Foundation 1:2:4 Cement: Zero Plaster inner sides size marble crush: (1:2:4) Sand Foundation Infill (Ghusso) Ghusso layered up Ravi Ghusso Ravi Ghusso Ravi Ghusso to 2nd DPC Masonry Walls 9” Masonry with Cement: Sand (1:6) (1:6) (1:6) Masonry walls 4” Masonry with Cement: Sand (1:5) (1:5) (1:4) Horizontal RCC Slab Cement: sand Crush vibrated concrete using mixer (1:2:4) (1:2:4) (1:2:4) Vertical RCC Slab (As per drawings) same as above same as above same as above same as above Beams and Lintels (As per drawings) same as above same as above same as above same as above Window Shades 2’’ Thickness same as above same as above same as above same as above 2" Slabs for Storage/Counters same as above same as above same as above same as above Round / 2’’’ / 1’’ 3’’’down / 1’’ 3”’ full / 1’’ Rectangular steel Window Safety Grills Patti/ 20 Patti/ 18 Patti/ 16 gauge bar with outer Pipe gauge Pipe gauge Pipe Pipe / Iron Patti frame Dead Wall – Bitumen Cold bitumen 1 coat 2 coat 2 coat Top Roof Insulation Heat Proofing Local Jombolon Sheet 1’’ Thick Diamond Jombolon Sheet Polyurethane Spray Coating 1”.5”’ Thick Roof Wall – Polythene Building grade polythene Low / recycled plastic Quality Medium Quality High quality Roof Earth filling Mud Mud Mud Mud Brick Roof Tiles 1.5"x4.5"x9" tile 25 / S MB7 / RS7 77/MPS Gray floor– under floor Gray Floor on first floors PCC 1:4:8 PCC 1:4:8 PCC 1:4:8 Gray floor – under floor Over ground floor compacted earth PCC 1:4:8 PCC 1:4:8 PCC 1:4:8 Internal & External Sewage Hot & Cold Water Supply (External Vertical) Hot & Cold Water Supply (Internal Horizontal) Overhead Water Tank (UPVC) Ducting Local / National Pipes G.M / TurkPopular Pipes Plast Pipes PPRC / GI) PPRC PPRC Turkey PPRC Local (Popular/ (Berke / Class Advance), GI FIRAT), (GI) (PPI) ILL-M Karachi PPRC / GI) PPRC PPRC Turkey PPRC Local (Popular/ (Berke / Class Advance), GI FIRAT) (PPI) 4”brick wall 4” RCC 1000 gallons wall with internal 500 gallons 1000 gallons with plaster of marble Insulation crush As per Drawing In Bricks wall Masonry only 4”brick wall 4” 4”brick wall RCC wall with 4” RCC wall internal with internal plaster of plain plaster marble crush Underground Water Tank As per Drawing 500 gallons In Bricks wall Masonry only 500 gallons 500 gallons 4”brick wall 4” 4”brick wall RCC wall with 4” RCC wall internal with internal plaster of plaster marble crush Boundary Wall 6’ Hieght from road level 4” wall Septic Tank 4” wall 4” wall Then grey finish cost will be (A standard@=950/-), (A+ standard @ =1050/-) and (A++ standard @ =1150/-) for ground floor and first floor.