Document of The World Bank OFFICIAL USE ONLY Report No: 72121-RO RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF MODERNIZING AGRICULTURAL KNOWLEDGE AND INFORMATION SYSTEMS (P086949) LOAN 4758 RO NOVEMBER 16, 2004 IN THE INITIAL AMOUNT OF 41.40 MILLION EURO (US$ 49.85 MILLION EQUIVALENT) AND A RESTRUCTURED AMOUNT OF 30.40 MILLION EURO (US$ 38.07 MILLION EQUIVALENT) TO ROMANIA FEBRUARY 9, 2016 Sustainable Development Department Central Europe and Baltic Countries Department Europe and Central Asia Region This document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization. ABBREVIATIONS AND ACRONYMS APIA BIP(s) CAP EC EU EUR GPS IACS MAKIS MARD MPF NRI(s) PDO PMU RISSA RON Agricultural Paying and Intervention Agency Border Inspection Post(s) (EU) Common Agricultural Policy European Commission European Union Euro (currency) Global Positioning System Integrated Administration and Control System Modernizing Agricultural Knowledge and Information Systems Ministry of Agriculture and Rural Development Ministry of Public Finance National Research Institute(s) Project Development Objective Project Management Unit Research Institute for Soil Science and Agro-chemistry Romanian Lei (currency) Regional Vice President: Country Director: Sector Manager / Director: Task Team Leader: Philippe H. Le Houerou Peter C. Harrold Dina Umali-Deininger / Laszlo Lovei Gabriel Ioniţă ROMANIA Modernizing Agricultural Knowledge and Information Systems Project P086949 CONTENTS Page A. SUMMARY ........................................................................................................................... 1 B. PROJECT STATUS ............................................................................................................. 1 C. PROPOSED CHANGES ...................................................................................................... 2 ANNEX 1: RESULTS FRAMEWORK AND MONITORING ................................................. 5 Restructuring Status: Draft Restructuring Type: Level two Last modified on date : 08/29/2012 1. Basic Information Project ID & Name P086949: MOD AGR KNOWLEDGE & INFORM SYST (MAKIS) Romania Gabriel Ionita Dina Umali-Deininger Peter C. Harrold 11/16/2004 09/30/2010 09/25/2012 03/25/2013 B-Partial Assessment B-Partial Assessment-Partial Assessment 07/05/2004 Country Task Team Leader Sector Manager/Director Country Director Original Board Approval Date Original Closing Date: Current Closing Date Proposed Closing Date [if applicable] EA Category Revised EA Category EA Completion Date Revised EA Completion Date 2. Revised Financing Plan (US$m) Source BORR IBRD Total Original 22.02 50.00 72.02 Revised 15.27 40.60 55.87 3. Borrower Organization Ministry of Public Finance Department Location Romania 4. Implementing Agency Organization Ministry of Agriculture and Rural Development Department Project Management Unit i Location Romania 5. Disbursement Estimates (US$m) Actual amount disbursed as of 08/29/2012 Fiscal Year 2012 2013 29.89 Annual Cumulative 0.00 6.91 Total 29.89 36.80 36.80 6. Policy Exceptions and Safeguard Policies Does the restructured project require any exceptions to Bank policies? N Does the restructured project trigger any new safeguard policies? If yes, please select from the checklist below and update ISDS accordingly before submitting the package. N 7a. Project Development Objectives/Outcomes Current Project Development Objectives/Outcomes To help Romania comply with the agricultural acquis communautaire and to help the agro-food sector take advantage of the benefits and opportunities arising from EU membership. 7b. Revised Project Development Objectives/Outcomes [if applicable] ii Modernizing Agricultural Knowledge and Information Systems Project RESTRUCTURING PAPER A. SUMMARY Project restructuring is proposed for the Romania, Modernizing Agricultural Knowledge and Information Systems Project (MAKIS), Loan no. 4758 RO to (i) drop two activities from Component 2 and correspondingly, cancel €6.7 million from the loan, (ii) modify one intermediate results indicator, and (iii) extend the current Closing Date by six months, from September 25, 2012 to March 25, 2013, resulting in a cumulative extension of 30 months from the original closing date of September 30, 2010. This would be the third restructuring of the Project and in line with BP 13.30, seeks RVP approval given the cumulative extension exceeding 24 months beyond the original closing date. B. PROJECT STATUS The Project was approved on November 16, 2004 and became effective on June 24, 2005. Since February 2009, progress towards achieving the Project Development Objective has been rated Moderately Satisfactory, and in June 2011, Implementation Progress was upgraded to Moderately Satisfactory from a rating of Moderately Unsatisfactory. In part, the Moderately Satisfactory ratings are due to the risk that the original investment program for rehabilitation of the national institutes for research and development in agriculture under Component 2 would not be implemented on time. To date, most Project activities have been completed and in some areas, Project results have exceeded initial expectations. The Project was restructured two times. The first restructuring (level 1) was conducted in September 2010 to (i) align the Project Development Objective (PDO) to more precisely reflect the current post-accession EU integration challenges facing the Borrower; (ii) discontinue the Food Safety Component 1 (whose unsatisfactory performance was a risk to achievement of PDOs); (iii) revise Project activities; (iv) revise the Results Framework and Monitoring; and (v) extend the Project closing date by 12 months to September 30, 2011. In addition, an amount of €0.8 million was cancelled from the Loan and the Loan amount became €40.6 million. The second restructuring (level 2) was conducted in September 2011 to (i) extend the current Closing Date by about 12 months, from September 30, 2011 to September 25, 2012; (ii) cancel an amount of €3.5 million from the loan; and (iii) introduce required changes to project costs and implementation schedule resulting from the restructuring. The project has progressed since the second extension, albeit at a slower pace than expected mainly because of the slow decision making process in the Ministry of Agriculture and Rural Development (MARD) triggered by frequent changes of high-level management (ministers and deputies). In addition, the continued financial crisis prevented the allocation of sufficient budget funds to the Project in the first half of 2012, slowing down payments and thus implementation of ongoing contracts and procurement of new contracts. However, following budget adjustments, MARD has provided all funds required for completion of the ongoing contracts. 1 The financial management arrangements are moderately satisfactory because of the insufficient funds allocated to the project in the first half of 2012. All audits have been prepared on time, with a clean audit opinion and no internal control issues mentioned. C. PROPOSED CHANGES Components One change is proposed under Component 2 “Support for Agricultural Research”: to drop the construction of a new insect-proof greenhouse at the National Research and Development Institute for Potatoes and Sugar Beet (INCDCSZ) after two unsuccessful attempts to procure the civil works. The other activities supported under Component 2 remain unchanged, and these changes will not prevent the Project from achieving its PDO. Financing o Cancellation As a result of the proposed changes to Component 2 above, it is proposed to cancel €6.7 million from the loan, reducing the total component allocation from €18.97 million to €12.27. €6,700,000 would be cancelled from Category (5)(b). This change is reflected in the revised allocation of loan funds by category of expenditure presented below (Table 1). Table 1 – Revised allocation of Loan by expenditure category Euro Category of Expenditure Current Revised (1) Goods (1) Goods (a) under Parts A.1, (a) under Parts A.1, A.2, A.3, and A.2, A.3 and A.5 of the Project A.5 of the Project (b) under Parts A.4, (b) under Parts A.4, B.1, C and D of B.1, C and D of the Project the Project (2) Consultants’ services, including audit (a) under Parts A.1, A.2, A.3, and A.5 of the Project (b) under Parts A.4, B.1, C and D of the Project (3) Training (a) under Parts A.1, A.2, A.3, and A.5 of the Allocation Current Revised 254,689 254,689 5,195,000 5,195,000 % of Financing Current Revised 100% of 100% of foreign foreign expenditures expenditures, , 100% of 100% of local local expenditures expenditures (ex-factory (ex-factory costs) and costs) and 80% of local 80% of local expenditures expenditures for other for other items items procured procured locally locally (2) Consultants’ services, including audit (a) under Parts A.1, A.2, A.3 and A.5 of the Project (b) under Parts A.4, B.1, C and D of the Project (3) Training (a) under Parts A.1, A.2, A.3 and A.5 of the Project 2 91,517 91,517 1,335,000 1,335,000 103,630 103,630 85% of foreign expenditures; and 75% of local expenditures 85% of foreign expenditures ; and 75% of local expenditures 100% 100% Category of Expenditure Current Revised Project (b) under Parts A.4, (b) under Parts A.4, B.1, C and D of B.1, C and D of the Project the Project (4) Civil Works (4) Civil Works (a) under Parts A.1, (a) under Parts A.1, A.2, A.3, and A.2, A.3 and A.5 A.5 of the of the Project Project (b) under Parts A.4, (b) under Parts A.4, B.1, C and D of B.1, C and D of the Project the Project (5) (a) Research (5) (a) Research Institute Institute Program Program Development Development under Part B.2 under Part B.2 of the Project of the Project (b) Research (b) Research Institute Institute Program Program Implementatio Implementation n under Part under Part B.2 B.2 of the of the Project Project (6) Research Grants (6) Research Grants under the under the Competitive Grant Competitive Grant Scheme under Part Scheme under Part B.3 of the Project B.3 of the Project (7) Incremental Operating Costs Allocation Current Revised 7,489,999 2,724,688 0 (a) under Parts A.1, A.2, A.3 and A.5 of the Project (b) under Parts A.4, B.1, C and D of the Project TOTAL Cancellation as of July 6, 2012 7,489,999 2,724,688 0 100% of foreign expenditures; and 80% of local expenditures 100% of foreign expenditures ; and 80% of local expenditures 150,000 150,000 85% of foreign expenditures; and 75% of local expenditures 13,940,000 7,240,000 80% 80% 3,920,000 3,920,000 49% 49% (7) Incremental Operating Costs (a) under Parts A.1, A.2, A.3, and A.5 of the Project (b) under Parts A.4, B.1, C and D of the Project % of Financing Current Revised 85,477 85,477 1,810,000 1,810,000 37,100,000 30,400,000 6,700,000 85% until December 31, 2007; 70% until December 31, 2009; and 25% thereafter 85% of foreign expenditures and 75% of local expenditures 85% until December 31, 2007; 70% until December 31, 2009; and 25% thereafter Closing date The team proposes an extension of the Closing Date from September 25, 2012 to March 25, 2013 to enable completion of the rehabilitation of the laboratory/institutes buildings under Component 2. The limited extension would enable the Borrower to complete the rehabilitation of selected research institutes and procurement of essential IT equipment for the Agricultural Payment and Intervention Agency (APIA). While these are important to 3 achieving the PDO, more importantly, the server procurement and installation for APIA is a core element of a reform action plan for the Integrated Administration and Control System for EU CAP funds, and represents an activity in support of an EC-GOR agreed action plan towards improving the administration of EU rural funds. This critical procurement was completed but delivery and installation would not be completed without an extension. At the same time, given insufficient time to initiate and complete new activities (e.g procurement of new equipment for the institutes for research and development in agriculture), despite the proposed closing date extension, the team will remind the Borrower that the loan will finance only the good and services delivered and accepted, and works completed before the closing date, while any such deliverables received after the closing date will remain to be financed by the Borrower. Implementation schedule The implementation schedule for rehabilitation of the national laboratories and institutes under component 2 is proposed to be extended by six months to March 25, 2013. The Procurement Plan has been revised to fit the new extended implementation schedule. Results Framework and Monitoring One modification of the results framework is proposed to be change the final target of the intermediate results indicator (for component 2) regarding the number of laboratories able to carry out the required analyses for soils (for compliance with the nitrates and sludge EU directives) and GMO testing. Because the construction of a new building and procurement of the required equipment to establish the national reference laboratory for soil testing (to confirm compliance with the EU directives on nitrates and sludge) at the Research Institute for Soil Science and Agro-chemistry (RISSA) were dropped from the project, the target indicator cannot be met. Therefore, only one national reference laboratory (for GMO testing) will be the target value for this indicator. The indicators dropped at previous restructuring have been removed from the table. All other indicators will remain unchanged. The table of Results Framework and Monitoring is attached as Annex 1. 4 ANNEX 1: Results Framework and Monitoring Romania: Modernizing Agricultural Knowledge and Information System Project Project Development Objective (as revised in October 2010): PDO Level Results Indicators* Increase in agri-food export to EU 27 relative to Gross Value Added Increase in CAP funding committed to beneficiaries under EAGF and EAFRD Core To help Romania comply with the agricultural acquis communautaire and to help the agro-food sector take advantage of the benefits and opportunities arising from EU membership D=Dropped C=Continue N= New R=Revised Cumulative Target Values** Unit of Measure Baseline Frequency YR 1/2 YR 3/4 YR 5/6 YR7 Data Source/ Methodology Responsibility for Data Collection Continued 3.6% (200204 avrg) Year 3: 4.5% Year 5: 5.0% Year 7: 5.5% Annually EUROSTAT MARD PMU Continued 90% of EAGF allocation and 20% of EAFRD allocation … … 95% of EAGF allocation and 40% of EAFRD allocation Annually APIA & MARD records MARD PMU INTERMEDIATE RESULTS Intermediate Result (Component One): 1. Functional network of ANSVSA's Regional Laboratories Continued (achieved) 2. Functional network of Border Inspection Points to monitor food quality and movement of animals 3. Functional network of phytosanitary National Reference and Regional Laboratories - Year 1: 1 Year 2: 1 Year 3: 2 Year 4: 2 Year 5: 2 Year 6: 2 Year 7: 2 Annually Annual reports MARD/ PMU Continued (achieved) Number of regional labs Number of BIPs - Year 1: 1 Year 2: 2 Year 3: 3 Year 4: 3 Year 5: 3 Year 6: 3 Year 7: 3 Annually ANSVSA’s annual report ANSVSA Continued (achieved) Number of labs - Year 1: 1NR, 1RL Year 2: 2NR, 2RL Year 3: 2 NR, 3 RL Year 4: 2 NR, 3 RL Year 5: 2 NR, 3 RL Year 6: 2 NR, 3 RL Year 7: 2 NR, 3 RL Intermediate Result (Component Two): 4. Number of research institutes reformed 5. Laboratories (RISSA and NRDIBH) able to carry out the required analyses for soils (compliance with the nitrates and sludge EU directives) and GMO testing 5 6. Development of new technologies compatible with EU standards Revised Intermediate Result (Component Two): 4. Number of research institutes reformed Continued 5. Laboratory (NRDIBH) able Revised to carry out the required target value analyses for GMO testing 6. Development of new Continued technologies compatible with EU standards: a) New technologies developed b) Number of research contracts Revised Intermediate Result (Component Three): Continued 7. Functional training center able to train the following: a) trainers, b) extension staff, c) food safety inspectors, d) agro-processors and private sector, e) researchers 8. Number of farmers receiving information / training regarding EU accession and membership Continued Continued 9. Number of multi-media campaigns Number of institutes Number of labs - Year 1: 0 Year 2: 2 Year 3: 3 Year 4: 4 Year 5: 4 Year 6: 4 Year 7: 4 Annually - Year 1: 1 Year 2: 1 Year 3: 1 Year 4: 1 Year 5: 1 Year 6: 1 Year 7: 1 semi-annual reports Year 1: a) 1; b) 3 Year 3: a) 10;b) 15 Year 7: a) 20 b) 40 Year 2: a) 5; b) 8 Year 4: a) 12;b) 20 Year 5: a) 15; b) 30 Year 6: a) 20 b) 40 Year 1: a) 30 b) 300 c) 50 d) 100 e) 30 Year 3: a) 30 b) 1260 c) 200 d) 1350 e) 90 Year 5: a) 30 b) 1860 c) 350 d) 1750 e) 150 Year 7: a) 30 b) 2160 c) 400 d) 2050 e) 180 Year 2: a) 30 b) 960 c) 125 d) 500 e) 60 Year 1: 3,000 Year 4: a) 30 b) 1560 c) 275 d) 1350 e) 120 Year 3: 15,000 Year 6: a) 30 b) 2160 c) 400 d) 2050 e) 180 27,000 33,000 Year 2: 9,000 Year1: 1 Year 2: 2 Year 4: 21,000 Year 3: 2 Year 4: 2 2 2 Number of technolo gies Number of trainees - Number of beneficia ries - Number of campaig ns - 6 Annual reports from NRI and external reviews NRDIBH MARD / PMU semi-annually / annually Reports from TICs and ANSVSA TIC / PMU Annually PMU Reports based on agristatistics MARD/PMU MARD / PMU Continued - - - - a) 300 staff trained b) 100 GPS procured for the LPIS unit c) GAP analysis for reprogram ming of LPIS performed Year 1: S Year 2: MS Year 3: MS Year 4: MU Year 5: MU Year 6: MS Year 7: S 10. EU Compliant IACS Intermediate Result (Component Four): 11. Bank supervision ratings Revised Intermediate Result (Component Four): 11. Bank supervision ratings Continued (actual for years 1 to 6) 7 Reports from APIA MARD