Results of the bidding for Wastewater Network Projects, Central Tenders No. (83-2011)-MCC, (84-2011)-MCC and (85-2011)-MCC Contract (Package) 1, Central Tender No. (38-2011) - MCC: Wastewater Network for East Zarqa Zone. Name Bidders who submitted a Bid Name of the winning Bidder The winning Bid Price $ 1 Bosheh Contracting Establishment 2 Hussein and Jamal AlArmouti Co./ Muthalath Foundation for Contracting 3 Wade Adams Contracting (L.L.C) Bosheh Contracting Establishment 13,940,015.00 4 Haymoor Cousins & Partner Co and Al-Omaria Contracting Co. JV 5 United Enterprises Co. Duration and the summary scope of the Contract awarded Time for completion from the commencement date is: 1095 days. The total length of proposed secondary sewers (200 to 1200mm) is approximately 52 km and covers both new expansion areas and filling gaps within the existing system, in addition to 7-km of house connections (150 mm) up to 1m outside the plot boundaries that is required for all expansion of collection networks. In addition, there is an optional items composed of around 18-km of sewer pipelines (150-300). Contract (Package) 2, Central Tender No. (84-2011) - MCC: Wastewater Network for West Zone – Zarqa. Name Bidders who submitted a Bid Name of the winning Bidder The winning Bid Price $ Haymoor Cousins & Partner Co and Al-Omaria Contracting Co. JV 13,368,785.00 1 Bosheh Contracting Establishment 2 Hussein and Jamal AlArmouti Co./ Muthalath Foundation for Contracting 3 Wade Adams Contracting (L.L.C) 4 Haymoor Cousins & Partner Co and Al-Omaria Contracting Co. JV 5 United Enterprises Co. Duration and the summary scope of the Contract awarded Time for completion from the commencement date is: 1095 days. The total length of new proposed secondary sewers is about 56- km to cover both new expansion areas and filling gaps within the existing system, in addition to 11km of house connections (150 mm) up to 1m outside the plot boundaries that are required for expansion throughout the system. In addition, there is an optional items composed of around 9-km of sewer pipelines (150-300) Contract (Package) 3, Central Tender No. (38-2011) - MCC: Wastewater Network for West Zone – Russeifa. Name Bidders who submitted a Bid Name of the winning Bidder The winning Bid Price $ Bosheh Contracting Establishment 14,265,067.00 1 Bosheh Contracting Establishment 2 Hussein and Jamal AlArmouti Co./ Muthalath Foundation for Contracting 3 Wade Adams Contracting (L.L.C) 4 Haymoor Cousins & Partner Co and Al-Omaria Contracting Co. JV 5 United Enterprises Co. Duration and the summary scope of the Contract awarded Time for completion from the commencement date is: 1095 days. The total length of new proposed secondary sewers and the rehabilitation and reinforcement of existing sewer lines is approximately 39 km and covers both new expansion areas and existing systems, and this includes the construction of trunk sewer lines (1000 to 1200mm) 10km length approximately. The work includes 5 km of house connections (150mm) up to 1m outside the plot boundaries. In addition, there is an optional items composed of around 22-km of sewer pipelines (150-400)