Results of the bidding for Wastewater Network Projects, Central Tenders No. (83-2011)-MCC, (84-2011)-MCC and (85-2011)-MCC
Contract (Package) 1, Central Tender No. (38-2011) - MCC: Wastewater Network for East Zarqa Zone.
Name Bidders who submitted a Bid
Name of the winning Bidder
The winning
Bid Price $
1 Bosheh Contracting Establishment
2 Hussein and Jamal AlArmouti Co./ Muthalath Foundation for Contracting
3 Wade Adams Contracting (L.L.C)
Bosheh Contracting
Establishment
13,940,015.00
4 Haymoor Cousins & Partner Co and Al-Omaria Contracting Co. JV
5 United Enterprises Co.
Duration and the summary scope of the Contract
awarded
Time for completion from the commencement date is:
1095 days.
The total length of proposed secondary sewers (200 to
1200mm) is approximately 52 km and covers both new
expansion areas and filling gaps within the existing
system, in addition to 7-km of house connections (150
mm) up to 1m outside the plot boundaries that is required
for all expansion of collection networks. In addition, there
is an optional items composed of around 18-km of sewer
pipelines (150-300).
Contract (Package) 2, Central Tender No. (84-2011) - MCC: Wastewater Network for West Zone – Zarqa.
Name Bidders who submitted a Bid
Name of the winning Bidder
The winning
Bid Price $
Haymoor Cousins & Partner
Co and Al-Omaria Contracting
Co. JV
13,368,785.00
1 Bosheh Contracting Establishment
2 Hussein and Jamal AlArmouti Co./ Muthalath Foundation for Contracting
3 Wade Adams Contracting (L.L.C)
4 Haymoor Cousins & Partner Co and Al-Omaria Contracting Co. JV
5 United Enterprises Co.
Duration and the summary scope of the Contract
awarded
Time for completion from the commencement date is:
1095 days.
The total length of new proposed secondary sewers is
about 56- km to cover both new expansion areas and
filling gaps within the existing system, in addition to 11km of house connections (150 mm) up to 1m outside the
plot boundaries that are required for expansion throughout
the system. In addition, there is an optional items
composed of around 9-km of sewer pipelines (150-300)
Contract (Package) 3, Central Tender No. (38-2011) - MCC: Wastewater Network for West Zone – Russeifa.
Name Bidders who submitted a Bid
Name of the winning Bidder
The winning
Bid Price $
Bosheh Contracting
Establishment
14,265,067.00
1 Bosheh Contracting Establishment
2 Hussein and Jamal AlArmouti Co./ Muthalath Foundation for Contracting
3 Wade Adams Contracting (L.L.C)
4 Haymoor Cousins & Partner Co and Al-Omaria Contracting Co. JV
5 United Enterprises Co.
Duration and the summary scope of the Contract
awarded
Time for completion from the commencement date is:
1095 days.
The total length of new proposed secondary sewers and
the rehabilitation and reinforcement of existing sewer
lines is approximately 39 km and covers both new
expansion areas and existing systems, and this includes
the construction of trunk sewer lines (1000 to 1200mm)
10km length approximately. The work includes 5 km of
house connections (150mm) up to 1m outside the plot
boundaries. In addition, there is an optional items
composed of around 22-km of sewer pipelines (150-400)
Download