Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project RP785 v12 GOVERNMENT OF ANDHRA PRADESH ROADS & BUILDINGS DEPARTMENT ANDHRA PRADESH ROAD SECTOR PROJECT Feasibility Study, Design and Detailed Engineering DETAILED PROJECT REPORT UPGRADING OF PEDANA – NUZVID – VISSANNAPETA ROAD VOLUME – VIII – ANNEXURES FOR RESETTLEMENT ACTION PLAN ANDHRA PRADESH ROAD DEVELOPMENT CORPORATION JUNE – 2012 Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 1 Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project CONTENTS S.No Description Page.No 1 ANNX-1.1, AP R&R POLICY 2005 3 2 ANNX-1.2: MODIFIED R&R POLICY PROVISIONS 26 3 ANNX-1.3 : R&R ENTITLEMENT FRAMEWORK 30 4 ANNX-2.1: LIST OF PROJECT AFFECTED FAMILIES AND PROJECT DISPLACED FAMILIES 33 5 ANNX-2.2 PROJECT DISPLACED FAMILIES 57 6 ANNX- 2.3: COMMUNITY PROPERTY RESOURCES OF PEDNA- NUZVID- VISANNAPETA ROAD 72 7 ANNX-2.4: CONSULTATION FINDINGS 79 8 ANNX-3.1: CHAINAGE WISE ENCUMBRANCE DETAILS 80 9 ANNX-5.1 : G.O Rt No. 1615 : PLMC CONSTITUTION 82 10 ANNX-5.2: G O Rt. No. 167 – APPOINTMENT OF PROJECT ADMINISTRATOR 84 Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 2 Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project ANNEXURE 1.1 – AP R&R POLICY -2005 G.O.Ms.No.68 Rehabilitation and Resettlement (R&R) Policy for Government of Andhra Pradesh - Issued. Irrigation & CAD (Project Wing-LA-IV-R&R) Department G.O.Ms.No.68 Dated the 8th April, 2005 ORDER: 1.Compulsory acquisition of land for implementation of development and infrastructure projects displaces people from their homes, land and/or their means of livelihood. Apart from depriving them of their land, livelihood and resources base, displacement has other psychological, social and cultural consequences also. The Government recognize the need to minimize large scale displacement to the extent possible and where displacement is inevitable, the need to address the Issue of displacement with utmost care human touch and forethought. Such an approach is especially necessary in respect of Tribal, Small and Marginal farmers. 2. Various policies persons have been in district. The need has uniformity of benefits manner. relating to the Resettlement and the Rehabilitation (R&R) of displaced place from time to time, varying 'Tom project to project and district to been felt for the evolution of a comprehensive policy on R& R to ensure across the State and also to ensure the delivery of benefits in a transparent 3. A Committee was constituted by the Government vide G.O. Ms. No.70, irrigation & CAD (Projects Wing) Department, dated 15-07-2004 for preparation of draft R&R Policy for Government of Andhra Pradesh, The recommendations of the Committee were discussed in a State Level meeting comprising of major stake holders in the policy like the Department of Energy, Industries, Roads & Buildings, Environment, Forest, Science & Technology, Finance, Tribal Welfare, Law and Revenue. The State Level Meeting endorsed the recommendations of the Committee. 4. Government after careful examination of the Committee recommendations as endorsed by State Level meeting hereby approve the Rehabilitation & Resettlement Policy for Government of Andhra Pradesh enclosed to this order for implementation by all the Departments for Government of Andhra Pradesh. 5. It is further ordered that as per Section 8.5 of this Policy the provisions of G.O. Ms. No. 98, Irrigation & CAD (Projects Wing) Department, dated 15-04-1986 and G.O. Ms. No. 64, Social Welfare (T) Department, dated 18-04-1990 and any other Government order/Memo Instructions issued by any other Department of" Government of Andhra Pradesh shall cease to operate as far as those Projects are concerned that are notified under this Policy. Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 3 Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project (BY ORDER AND IN THE NAME OF GOVERNOR OF ANDHRA PRADESH) MOHAN KANDA CHIEF SECRETARY TO GOVERNMENT To : All the Departments of Secretariat All the District Collectors in the State. All the Special Collectors of Irrigation Projects. The Engineer-in-Chief (AW)/(Irrigation), Errum Manzil, Hyderabad All the Chief Engineers of the Projects. Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 4 Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project CHAPTER –I 1.0 POLICY PREAMBLE 1.1 Compulsory acquisition of land for public purpose including infrastructure projects displaces people, forcing them to give up their home, assets and means of livelihood, a part from depriving them of their lands, livelihoods and resource-base, displacement has other traumatic psychological and socio-cultural consequences. The Government of Andhra Pradesh recognizes the need to minimize large-scale displacement to the extent possible and, where displacement is inevitable, the need to handle with utmost care, human touch and forethought, issues relating to Resettlement & Rehabilitation of Project Affected Families. Such an approach is especially necessary in respect of tribal, small & marginal farmers and women. 1.2 The system of extending cash compensation does not, by itself, in most cases, enable the affected families to obtain cultivable agricultural land, homestead and other resources, which they have to surrender to the State. The difficulties are more acute for persons who are critically dependent on the acquired assets for their subsistence/ livelihoods, such as landless agricultural workers, forest dwellers, tenants and artisans, as their distress and destitution is more severe, and, yet they are not eligible for compensation. 1.3 The Policy essentially addresses the need to provide succour to the asset less rural poor, support the rehabilitation efforts of the resource poor section, namely, small and marginal farmers, SCs/STs and women who have been displaced, besides, it seeks to provide a broad canvas for an effective dialogue between the Project Affected Families and Project Displaced. Families and the Administration for Resettlement & Rehabilitation. Such a dialogue is expected to enable timely completion of projects with a sense of definiteness as regards costs and adequate attention to the needs of the displaced persons especially the resource poor sections. The intention is to impart greater flexibility for interaction and negotiation so that the resultant Package gains all-round acceptability in the shape of a workable instrument providing satisfaction to all stakeholder/ Requiring bodies. 1.4 The GOAP Policy on the Resettlement & Rehabilitation of Project Affected Families and Project Displaced Families will be applicable to the projects as defined in this policy and upon notification under this policy. 1.5 Administrator for Resettlement & Rehabilitation shall implement this Policy in letter and spirit in order to ensure that the benefits envisaged under the Policy reaches the Project Affected and Displaced Families, especially resource poor sections including SCs/STs. Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 5 Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project CHAPTER –II: 2.0 OBJECTIVES OF THE POLICY The objectives of the Policy are as follows: 2.1 To minimize displacement and to identify non- displacing or least- displacing alternatives: 2.2 To Plan the resettlement and rehabilitation of Project Affected and Displaced Families, (PAFs/ PDFs) including special needs Tribals and vulnerable section; 2.3 To provide better Standard of living to PAFs; and 2.4 To facilitate harmonious relationship between the Requiring Body and PAFs through mutual cooperation. Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 6 Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project CHAPTER –III 3.0 DEFINITIONS: The definition of various terms used in this Policy Document are as follows: 3.1 “Administrator for Resettlement and Rehabilitation” means an officer not below the rank of Joint Collector of the State Government appointed by it for the purpose of resettlement and rehabilitation of the Project Affected Families of the Project concerned provided that if the appropriate Government in respect of the Project is the Central Government, Such appointment shall be made in consultation with the Central Govt. 3.2“Affected Zone”, in relation to a project, means declaration under Para 5.1 of this policy by the appropriate Government area of Villages or locality under a project for which the Land is being acquired under Land Acquisition Act, 1894 or any other Act in force for the following areas: a. Area falling under FRL contour b. Dwelling House (S) falling within 100 meters of surface distance from FRL water line 3.3 “Agricultural family” means a family whose primary mode of livelihood is agriculture and includes family of owners as well as tenants / sub-tenants of agricultural land, agricultural labourers, occupiers of forest lands and of Collectors of minor forest produce; 3.4 “Agricultural labourers” means a person normally resident in the affected zone for a period of not less than three years immediately before the declaration of the affected zone who does not hold any land in the affected zone but who earns his livelihood principally by manual labour on agricultural land therein immediately before such declaration and who has been deprived of his livelihood as ascertained through enquiry in the gram sabha; 3.5 “Agricultural Land” includes lands uses or capable of being used for the purpose ofa. agriculture or horticulture; b. diary farming, poultry farming, pisciculture, breeding or livestock and nursery growing medical herbs; c. raising of crops, grass or garden produce; and d. Land used by an agriculturist for the grazing of cattle, but does not include land used for the cutting of wood only; 3.6 “Appropriate Government” means: a. in relation to acquisition of land for the purposes of the Union, the Central Government; Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 7 Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project b. in relation to a project which is executed by Central Government agency/ Central Government undertaking or by any other agency of the orders/ directions of Central Government, the Central Government, otherwise the State Government and c. in relation to acquisition of land for other purposes, the State Government. 3.7 “BPL Family”: The Below Poverty Line Families shall be those as defined by the planning Commission of India from time to time. 3.8 “Project” means the project(S) notified under this Policy and displacing: a. 100 or more families en- mass under this policy and displacing: b. 25 or more families en- mass in Tribal areas or in areas mentioned in Schedule V of the constitution India from their Lands or houses. 3.9 “Commissioner for Resettlement & Rehabilitation”, means the Commissioner for Resettlement & Rehabilitation appointed by the State Government not below the rank of Commissioner/ Secretary of that Government. 3.10 “a)Family” means Family consisting of such persons as his or her spouse, minor sons, unmarried daughters, minor brothers or unmarried sisters, fathers, mother and other members residing with him and dependent on him for their livelihood 1 “and each major son residing with such person will be treated as a separate family ”1 b)1a“Vulnerable persons” means the disabled, destitute, orphans, widows, major unmarried daughter,abandoned/ divorced women or persons above fifty years of age, who are not provided or can not immediately be provided with alternative livelihood, and who are not otherwise covered as part of a family 1a 3.11 “Holding”: means the total land held by a person as an occupant or tenant or as both; 3.12 “Marginal farmer”: means a cultivator with an un-irrigated land holding up to one hectare or irrigated land holding up to half hectare or combination of both on same principle; 3.13 “Non-agricultural Labourer”: means a person who is not an agricultural labourer but is normally residing in the affected zone for a period of not less than three years immediately before the declaration of the affected zone and who does not hold any land under the affected zone but who earns his livelihood principally by manual labour or as a rural artisan immediately before such declaration and who has been deprived of earning his livelihood principally by manual labour or as such artisan in the affected zone; 3.14 “Notification”: means a notification published in the Official Gazette; 3.15 “Occupiers”: Means members of Scheduled Tribe community in possession of forest land prior to 25th October, 1980. Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 8 Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project 3.16 “Project Affected Family” Means and displacing: a. a family whose source of livelihood are substantially affected by the process of acquisition of land for the project and who has been residing continuously for a period of not les than three years preceding the date of declaration of the affected zone or practicing any trade, occupation or vocation continuously for a period of not less than three years in the affected zone regardless of the fact whether they owned land or not b. family whose more than 50% of land is acquired and left over land after acquisition is below Ac.5.0 dry Ac. 2.5 wet or combination of both on above principle c. a Project Displaced Family 3.17 “Project Displaced family”: means any family, who on account of acquisition of his dwelling house in the village in the affected zone for the purpose of the project, has been displaced from such dwelling house. 3.18 “Resettlement Zone”, in relation to a project, means the declaration of any area under Para 5.12 of this Policy by the appropriate Government acquired or proposed to be acquired for resettlement of Project Displaced Families as a resettlement zone: 3.19 “Requiring Body” ” shall mean any company, a body corporate, an institution, or any other Organization for whom land is to be acquired by the appropriate Government, and includes the appropriate Government if the acquisition of land is for such Government either for its own use or for subsequent allotment of such land in public interest to a body corporate, institution, or any other organization or to any company under lease, license or through any other system of transfer of land to such company, as the case may be; 3.20 “Small farmer”: means a cultivator with an un-irrigated land holding of more than one hectare and up to two hectares or with an irrigated land holding of more than half hectare and up to one hectare or combination of both on same principle 3.21 “Substantially affected”: ” means where average annual income of PAF is likely to be more than 50% and is likely to become BPL family due to acquisition of his land or other’s land for the project, as compared to his average annual income in last three years preceding the date of notification, from land and or other sources of incomes 3.22 “Tribal Areas”: means areas declared so by the Tribal Welfare Government of Andhra Pradesh from time to time. 1. Added by vide G.O.Ms.No.76, I & CAD(PW-LA-IV, R&R.I) Dept., dt:13-4-2006. 1a. Added to para 3.10 as 3.10( b)vide G.O.Ms.No.46 I & CAD(PW:LA- IV-R&R)Dept., dt:28-2-2009,G.O.MS.No 77 I & CAD(PW-LA-IV, R&R.I) Dept., dt:10-7-2009.& Para 3.10 shall be treated as Para 3.10(a). Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 9 Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project CHAPTER-IV 4.0 Appointment of Administrator And Commissioner For Resettlement And Rehabilitation And Their Powers & Functions 4.1 Where the appropriate Government is satisfied that acquisition of land for any project involves displacement of families from their lands and or houses as a result of acquisition of land, it shall, by notification, appoint in respect of that project an officer not below the rank of Joint Collector of the state Government to be the Administrator for R&R in respect of that project. Provided that if the appropriate Government in respect of the project is the Central Government, such appointment shall be made in consultation with the Central Government. 4.2 The Administrator for Resettlement & Rehabilitation shall be assisted by such officers and employees as the appropriate Government may provide 4.3 Subject to the superintendence, directions and control of the appropriate Government and Commissioner for R&R, the Administrator for Resettlement & Rehabilitation shall take all measures for the Rehabilitation and Resettlement of all Project Affected Families (PAF) in respect of that project. 4.4 The overall control and superintendence of the formulation of resettlement & rehabilitation plan and execution of the same shall vest in the Administrator, Resettlement & Rehabilitation. 4.5 Subject to any general or special order of the appropriate a. Minimize displacement of persons and identify non- displacing or least displacing alternatives in consultation with the requiring body. b. Hold consultation with the Project Affected Families while preparing a resettlement and rehabilitation Scheme /plan; c. Ensure that interest of the adversely Project Affected Families of Scheduled Tribes and weaker sections are protected. d. Prepare a draft Plan/Scheme of resettlement and rehabilitations as required under Chapter V and VI of this Policy. Wherever tribal PAPs are involved, the draft plan/ scheme shall be prepared in consultation with respective area Project officer ITDA/DTWO. . e. Prepare a budget including estimated expenditure of various components of acquisition of Land, Resettlement and Rehabilitation activities or programmes in consultation with representatives of the Project Affected Families and requiring body for whom the land is acquired; f. Acquired adequate land for the Project and also for Resettlement and Rehabilitation of the Project Affected Families; Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 10 Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project g. Allot Land and sanction benefits to Project Affected Families; h. Perform such other function as the appropriate Government may, form time to time, by order in writing, assign. 4.6 Administrator for Resettlement & rehabilitation may, by order in writing, delegates such of the administrative powers conferred and duties imposed on him by or under this policy to any officer not below the rank of RDO/ Sub Collector or equivalent who will be called as R&R officer for the said project 4.7 All officers and staff appointed by the appropriate Government under this policy shall be subordinate to the Administrator for Resettlement & Rehabilitation. 4.8 The State Government shall appoint an officer of the rank of Commissioner/ Secretary of that Government for Resettlement and Rehabilitation in respect of such projects to which this Policy applies to be called the Commissioner for Resettlement & Rehabilitation 4.9 For the purposes of this Policy, the Administrator the Resettlement & Rehabilitation and other officers and employees appointed for the purposes of Resettlement and Rehabilitation of PAF shall be subordinate to the Commissioner for Resettlement and Rehabilitation 4.10 The Commissioner shall be responsible for supervising the formulation of resettlement and rehabilitation plans/ schemes, proper implementation of such plans/ schemes and redressal of grievances as mentioned in Chapter VII of this Policy. Wherever tribal PAPs are involved, commissioner, TW shall also be involved in above responsibilities and functions. Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 11 Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project CHAPTER-V 5.0 Schemes/PlansFor Resettlement And Rehabilitation; The procedure mentioned in this Chapter shall be followed for declaration of Affected Zone, carrying out survey & census of Project Affected Families, Assessment of Government Land available and land to be acquired for the purpose of Resettlement and Rehabilitation, preparation of draft scheme/plan for R&R and its final publication. 5.1 The appropriate Government may, if it is of the opinion that acquisition of land for a project is likely to displace families from their lands and or houses, declare, by notification in the Official Gazette, area of villages or localities as an affected zone of the project and thereupon the contents of this Policy shall apply to the project involved. 5.2 Every declaration made under Para 5.1 of the Policy shall be published in at least two daily newspapers one of them should be in the local vernacular having circulation in villages or areas which are likely to be affected and also by affixing a copy of the notification on the Notice Board of the concerned Gram Panchayats and other prominent place or places in the affected zone. 5.3 Once the declaration is made under para 5.1 of the Policy, the Administrator for Resettlement and Rehabilitation shall undertake a socio- Economic survey for identification of the persons and their families likely to be affected by the project 5.4 Every survey shall contain the following village-wise information of the project Affected Families:a. Members of families who are permanently residing, practicing any trade, occupation or vocation in the Project Affected Area; b. Project Affected Families ho are likely to lose their house, agricultural land, employment a or are alienated wholly or substantially from the main source of their trade/ occupation or vocation c. Agricultural labourers and non- agriculture laborers d. Project Affected Families who are having possession of forestlands prior to 25th October, 1980, that are prior to the commencement of the Forest (Conservation) Act, 1980. 5.5 Every survey undertaken under Para 5.4 shall be completed within a maximum period of ninety days from the date of declaration made under para 5.1. 5.6 On the expiry of the period of ninety days as aforesaid or as earlier as possible, the Gram Panchayat concerned the details of the findings of the survey conducted by him for inviting objections and suggestions form all persons likely to be affected thereby. 5.7 2 “On the expiry of thirty days from the date of publication of the draft of the details of survey and after considering the objections and suggestions received by him on this behalf, the Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 12 Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project Administrator for Resettlement & Rehabilitation shall submit the final details of survey with his recommendations to the District Collector for approval. After approval by the District Collector necessary funds may be obtained from the relevant Head of Accounts for allotment from the Chief Engineer of concerned Irrigatio n Project.” 2 5.8 3 “Within forty-five days from the date of receipt of recommendations of the Administrator for Resettlement & Rehabilitation, the District Administration shall publish the final details of survey in the District Gazette. A copy of such publication shall also be published in the Gram Panchayat concerned.” 3 5.9 The Administrator for Resettlement & Rehabilitation shall ensure that the Project Displaced Families may be settled preferably in group or groups and such sites should form a part of existing Gram Panchayat as far as possible. However it has to ensured that the PDFs may be Resettlement with the host community on the basis of equality and mutual understanding, Consistent with the desire of each group to preserve its own identify and culture. 5.10 For the purposes of para 5.9 above, the Administrator for Resettlement & Rehabilitation shall draw up a list of lands, which may be available in any existing Gram Panchayat or neighbouring Gram Panchayat for Resettlement of Project displaced families. 5.11 The Lands drawn up under para 5.10 shall consist of:a. Government wastelands or any other land vesting in the Government available for Resettlement or project displaced families. b. If sufficient Government land is not available there, then land to be acquired for the purposes of Resettlement (R&R centre) Scheme/Plan. However, the Administrator for R&R should ensue that such acquisition of land should not lead to another list of affected families. 5.12 The appropriate Government shall, by notification, declare any area acquired or proposed to be acquired for Resettlement of Project-displaced families, as a resettlement zone. 5.13 The Administrator for R&R or any other officer empowered by Government, on behalf of the appropriate Government, may compulsorily acquire lands required for re-settlement and rehabilitation of PAFs under the Provisions of Land Acquisition Act, 1894. 5.14 After completion of base line survey and census of Project Affected Families and project Displaced Families and assessment of requirement of land for resettlement of land for resettlement and rehabilitation, the Administrator for R&R shall prepare a draft scheme/ plan for the Resettlement & Rehabilitation of the Project Affected Families and project Displaced Families in consultation with representatives of Project Affected Families and Project Displaced Families including women, Chairpersons of elected Panchayati Raj Institutions within which the project area is situated. 5.15 While preparing a draft scheme/ Plan, the Administrator for R&R shall ensure that the cost of R&R scheme/ plan should be an integral part of the cost of the Project for which the land is Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 13 Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project being acquired and the entire expenditure for resettlement and rehabilitation of PAFs are to be borne by the requiring body for which the area is being acquired 5.16 It shall be the responsibility of the requiring body to provide sufficient funds to the administrator for R&R for proper implementation of resettlement & Rehabilitation scheme/ plan of Project Affected Families. 5.17 The Administrator for R&R shall keep proper books of accounts and records of the funds placed at his disposal and submit periodical returns to the Appropriate Government in this behalf. 5.18 Every drafts Scheme/ Plan of resettlement and rehabilitation prepared shall contain the following particulars, namely: a. the extent of area to be acquired for the project and the name(S) of the corresponding village (S) b. a Village - Wise list of Project Affected Families and likely number of displaced persons, family- wise and the extent and nature of land and immovable property in their possession indicating the survey numbers thereof held by such person in the affected Zone prior to acquisition of lands for the project and after acquisition of lands for the project; c. a list of persons who have lost or are likely to lose their employment or livelihood or who have been alienated wholly and substantially from their main sources o occupation or vocation consequent to the acquisition of land for the project; d. a list of occupiers, if any, e. a list of public utilities and Government buildings which are likely to be affected; f. a comprehensive list of benefits and packages which are to be provided to project affected families; g. details of the extent of land available which may be acquired in settlement area for resettling of the project displaced families; h. Details of the extent of Government land available which may be allotted to PAFs in lieu of land acquired for the project. i. Details of the extent of patta land available in project benefited area that can be acquired for allotment of PAFs in lieu of land acquired for the project. j. detailed of the basic amenities and infrastructure facilities which are to be provided for resettlement; k. the time schedule for shifting and resettling the displaced families in resettlement zones; l. Such other particular as the Administrator for Resettlement & Rehabilitation ma think fit to include. Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 14 Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project 5.19 4 “The Administrator for Resettlement & Rehabilitation shall submit the draft scheme/ plan for R&R to the District Administration for its approval. The draft scheme/ plan shall be published in the village/locality concerned. The draft scheme/plan may also be published in the District Gazette to give wide publicity to the same in the affected zone.” 4 5.20 Upon notification of such scheme/ plan, the same shall come into force 3. Substituted for para 5.8 vide G.O.Ms.No.120, I & CAD (PW- LA.IV, R&R-II) Dept., DT: 26.6.2006. 4. Substituted for Para 5.19 vide G.O.Ms.No.120 I & CAD (PW- LA.IV, R&R-II) Dept., DT: 26.6.2006. Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 15 Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project CHAPTER –VI 6.0 R&R benefits for Project Affected Families 6.1 The Resettlement and Rehabilitation (R&R) benefits shall be extended to all the Project Affected Families and Project Displaced Families (PDF) whether belonging to below poverty line (BPL) or non- BPL except to the extent where specifically restrictions mentioned in the policy. 6.2 5"Allotment of house site/ payment of exgratia a. Any Project Displaced Family (PDF) holding upto an area of 5 Cents of village site and whose site has been acquired shall be allotted house site of an extent of 202 square meters (5 Cents) of land in rural areas or 75 square meters of land in Urban areas in the Resettlement zone besides payment of compensation for the structures if any therein; b. In case if any Project Displaced Family (PDF) holds village site of more than 5 Cents, such holder shall be allotted village house site of an extent of 202 Square Meters (5 cents) of land in rural areas or 75 Square Meters of land in Urban areas in the Resettlement zone and also be paid exgratia for the site in excess of 5 Cents ( for example if a family holds village site of 20 Cents in Project Affected Zone and have two major sons, residing with such person in case, they take 3 house sites of 5 Cents each in Resettlement zone, they will get exgratia for the balance of 5 Cents (20 Cents – 3x5 cents = 15 cents); and c. The exgratia payable as above shall be on par with the package deal payable in case of acquisition of private / patta lands” 5 6.3 Grant for House construction: “One time financial assistance of Rs.40,000/-(Rupees Forty thousand only) shall be increased to Rs.50,000/- (Rupees Fifty thousand only). This increase will have prospective effect. A sum of Rs.5,000/- (Rupees Five thousand only) is granted to those who have already shifted houses from 8-4-2005 to 10-12-2007. Apart from the above, a sum of Rs.3,000/- (Rupees Three thousand only) would be allowed in addition to the housing grant as per G.O.Ms.No.68, dt:8-4-2005. The above increase shall come into force with retrospective effect i.e., the date of issue of G.O.Ms.No.68, dt:8-4-2005.” 6 6 6.4 Allotment of Government land to PAFs, who become Small, or Marginal farmers or Landless after acquisition in lieu of Acquired land: in case of allotment of waste/ degraded or agricultural Government land, if available with in the District, in lieu of acquired land and if agreed by PAF for allotment of such land, each such PAF shall also get financial assistance of Rs.10,000 per hectare or as fixed by Government from time to time for land development and in case of allotment of agricultural land, Rs.5,000 per PAF or as fixed by Government from time to time for agricultural production shall be given. However such allotment of Government land will be restricted to an extent of land acquired from PAF or 2.5 Ha of dry or 1.25Ha wet land which ever is lesser. Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 16 Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project Provided further that in such cases, a. no compensation will be payable for the lands acquired from the PAF for the Project, to the extent of Government land is allotted. b. No exgratia will be payable for the lands resumed from PAF for the project, to the extent of Government land is allotted Land Acquisition officer shall pass the award for the lands acquire or resumed from PAF accordingly if such PAFs so desire, 6.5 Allotment of land acquired by Government from the project benefited area to Schedule Tribe PAFs, who become Small, or Marginal farmers or landlsess after acquisition, in lieu of Acquired land from them: 7 “Government shall acquire land with in the project benefited area, as per guidelines issued by the Government from time to time such that no person should become small or marginal farmer or land less due such acquisition, for allotment of such land to ST PAFs(who become small or marginal farmers or landless due to acquisition of their land for the project), in lieu of lands acquired from them. However such allotment will be restricted to the extent of land acquired from such PAFs or 2.5 Ha dry land or 1.25Ha wet land which ever is lower. Further provided that in such cases, a. no compensation will be payable for the lands acquired from the PAF for the project, to the extent of such land is allotted b. No exgratia will be payable for the lands resumed from PAF for the project, to the extent of such land is allotted Land Acquisition officer shall pass the award for the lands acquired or resumed from PAF accordingly.”7 6.6 The land allotted under Para 6.2, 6.4 and 6.5 shall be free from all encumbrances. The land allotted may be in the joint names of wife and husband of PAP. 6.7 Grant for cattle shed: Each PAF having cattle, at the time of acquiring his house, shall get financial assistance of Rs.15000/- or as fixed by Government from time to time for construction of cattle shed in new settlement. Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 17 Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project 6.8 Grant for Transporting materials: Each PAF shall get lump sum one time financial assistance of Rs.5000/- or as fixed by Government from time to time for transportation / shifting of his building materials, belongings and cattle etc. from the affected zone to the resettlement zone. 6.9 6.9 Income Generating Scheme Grant: Each PAF comprising of rural artisan/ small trader and self employed person shall get one – time lump sum financial assistance of Rs.25,000 or as fixed by Government from time to time for construction of working shed / shop. 6.10 Wages if after acquisition land owner becomes land less: Each PAF owning agricultural land in the affected zone and whose entire land has been acquired shall get one – time financial assistance equivalent to 750 days minimum agricultural wages for “loss of livelihood” if no land is allotted in lieu of acquired land. 6.11 Wages if after acquisition land owner becomes marginal farmer 8“or continues to be a marginal farmer even after acquisition”8 : Each PAF owning agriculture land in the affected zone and who consequently becomes a marginal farmer 8a“or continues to be a marginal farmer even after acquisition”8a shall get one time financial assistance equivalent to 500 days minimum agriculture wages if no land is allotted in lieu of acquired land. 6.12 Wages if after acquisition land owner becomes small farmer 8b“or continues to be a small farmer even after acquisition”8b: Each PAF owning agriculture land in this affected zone and who consequently becomes a small farmer 8c“or continuous to be a small farmer even after acquisition”8c shall get one time financial assistance equivalent to 375 days minimum agricultural wages if no land is allotted in lieu of acquired land. 6.13 Wages to Labourers: Each PAF belonging to the category of “agricultural labourer’ or “nonagricultural labourer" shall be provided a one time financial assistance equivalent to 625 days of the minimum agricultural wages. 6.14 (a) Subsistence allowance to displaced family Each PAF who is also a project displaced family shall at a one time subsistence allowance equivalent to 240 days of minimum agricultural wages. It will be in addition to any other benefit available to him as PAF. 6.14 (b) 9 “Each vulnerable person as defined at Para -3.10(b) will be paid a pension of Rs.500/(Rupees Five hundred only) a moth for life by arranging the necessary annuity policies by the Project Administrator at its cost.”9 6.15 In the case of acquisition of land in emergent situation such as under Section 17 of the Land Acquisition Act 1894 or similar provision of other Act in force, each PAF shall be provided with transit accommodation, pending resettlement and rehabilitation scheme. Such families shall also get R&R benefits as mentioned in above Paras under the Policy. 6.16 The Project Affected Families who were in possession of forest lands prior to 25th October, 1980 shall get all the benefits of R&R as given in above paras under the Policy. Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 18 Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project 6.17 The PAFs enjoying reservation benefits in the affected zone shall be entitled to get the same reservation benfits at the resettlement zone. 6.18 Basic Amenities To Be Provided At Resettlement Centre For Projects: While shifting the population of the Affected zone to the Resettlement zone, the Administrator for R&R may far as possible, ensure that: a. In case the entire population of the Village / area to be shifted belongs to a particular community, such population/ families may be resettled enmasse in a compact area so that socio- cultural relations (social harmony) a amongst shifted families are not disturbed b. The Re- settlement Center shall be provided with the basic amenities and infrastructure facilities of drinking water, Internal roads, Drainage Electricity, primary School building, playground, Community Center and access road to the resettlement site. In addition to these facilities, the other community center and access road to the resettlement site. In addition t these facilities, the other community facilities which were available in the village, at the time of acquisition, shall also be provided. 6.19 R&R Benefits Project Affected Families Of Scheduled Tribes : a. Each project Affected Family of ST category shall be given preference in allotment of land. b. Each Tribal PAF shall get additional Financial assistance equivalent to 500 days minimum agriculture wages b 10“(i)Each non tribal PAF who is a member of a registered Fishermen Cooperative Society/Fishing license holders in the affected zone and who lost fishing rights and livelihood shall get additional financial assistance equivalent to 500 days minimum agricultural wages for loss of fishing rights.”10 c. Tribal PAF s will be re- settled close to their natural habitat of their choice, to the extent possible, in a compact block so that they can retain their ethnic, linguistic and cultural identify d. Tribal PAFs resettled out of the district or out side tribal area will get 25% higher R&R benefits in monetary terms. e. The Tribal families residing in the Project Affected Area having fishing rights in the river/ Pond/ dam shall be given fishing rights in the reservoir area. f. The Tribal land Alienated in violation of the laws and regulation in force on the subject would be treated as null and void and the R&R benefits would be available only to the original tribal landowner. f 11“i)The Non tribal families residing in the project affected areas having fishing rights in the river /pond/dam who is a member of a registered Fishermen Cooperative Society/Fishing license holders shall be given fishing rights in the reservoir area. Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 19 Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project g. All the Fishermen PAFs will be accorded priority in extending benefits under various schemes/programmes being implemented by the state fisheries Department in consultation with R&R authorities. h. Newly impounded/completed Reservoirs under jalayagnam shall be stocked with Fish Seed on priority basis by the state Fisheries Department by utilizing funds available under different schemes with the Fisheries Department/DRDA/ITDA/SC Corporation/MADA/BC Corporation or by seeking provision of funds under R7R package as per requirement”11 6.20 Constitutional benefits to ST/SC/BC PAPs at the Re-settlement centre: The PAPs shall enjoy all the constitutional benefits at new settlement also to which they were entitled to at the village that was acquired for the project. 5. Substitued for Para 6.2 vide G.O.Ms.No.76, I & CAD (PW.LA.IV- R&R.I)Dept., dt:13-42006. 6. Substituted for Para 6.3 vide G.O.MS.No.271, I & CAD (PW.LA.IV- R&R)Dept., dt:11-122007. 7. The word “shall” incorporated substituting the word “may” vide G.O.MS.No. 119, I & CAD (PW-LA-IV, R&R.II) Dept., DT: 26-6-2006. 8. Substitued for Para 6.11 vide G.O.Ms.No.46, I & CAD (PW:LA- IV-R&R)Dept., dt:28-2-2009. 8a Substitued for Para 6.11 vide G.O.Ms.No.46, I & CAD (PW:LA- IV-R&R)Dept., dt:28-22009 8b. Substitued for Para 6.12 vide G.O.Ms.No.46, I & CAD (PW:LA- IV-R&R)Dept., dt:28-22009. 8c. Substitued for Para 6.12 vide G.O.Ms.No.46, I & CAD (PW:LA- IV-R&R)Dept., dt:28-22009. 9. Substitued for Para 6.14 as Para 6.14(b) vide G.O.Ms.No.46, I & CAD (PW:LA- IV-R&R) Dept., dt:28-2-2009 & Para 6.14 shall be treated as Para6.14(a) vide G.O.Ms.No.46,I&CAD (PW:LA-IV-R&R)Dept., dt:28-2-2009. 10 &11. Added vide G.O.Ms.No.114 DEPARTMENT dt:08-09-2009. IRRIGATION Detailed Project Report VIII: Resettlement Action Plan (Annexures) & C.A.D.(PW: LA.IV-R&R) Page 20 Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project CHAPTER – VII 7.0 Dispute Redressal Mechanism 7.1 R&R Committee at Project level: a. in respect of every project to which this Policy applies, the State Government shall constitute a Committee under the Chairmanship of the Administrator of that Project to be called the Resettlement and Rehabilitation Committee to monitor and review the progress of implementation of scheme/ plan of resettlement and rehabilitation of the Project Affected Families. b. The Resettlement & Rehabilitation Committee constituted as above shall inter-alia include as one of its members: 1. a representative of women PAP residing in the affected zone; 2. a representative each of the Scheduled Castes and Scheduled Tribes, PAPs residing in the affected zone; 3. a representative of a voluntary organization; 4. a representative of the lead bank; 5. Chairperson of the PRIs located in the affected zone 6. MPs/MLAs of the area included in the affected zone c. Procedure regulating the business of the Resettlement & Rehabilitation Committee shall be framed by the Appropriate Government 7.2 Grievance Redressal Cell: a. In respect of every project to which this Policy applies, the State Government shall constitute a Grievance Redressal Mechanism under the Chairmanship of the Commissioner for Resettlement & Rehabilitation for redressal of grievances of the PAFs. b. The composition, powers, functions and other matters relating to the functioning of the Grievance Redressal Mechanism shall be such as may be prescribed by the Appropriate Government. c. Any Project Affected Family, if aggrieved, for not being offered the admissible R&R benefits as provided under this Policy, may move an appropriate petition for redressal of his grievances to the Grievance Redressal Mechanism. d. The form and manner in which and the time within which complaints may be made to the Grievance Redressal Mechanism and disposed of shall be such as may be prescribed by the appropriate Government. Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 21 Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project 7.3 The Grievance Redressal Mechanism shall have the power to consider and dispose of all complaints relating to resettlement and rehabilitation against the decision of the Administrator / R&R Committee at Project Level and issue such directions to the Administrator for Resettlement & Rehabilitation as it may deem proper for the Redressal of such grievances. 7.4 Commissioner for Resettlement and Rehabilitation may, by order in writing, delegate such of the administrative powers conferred and duties imposed on him by or under this policy to any officer not below the rank of Joint Collector. 7.5 INTER-STATE PROJECTS: a. In case a project covers an area in more than one state or Union territory where the Project Affected Families and Project Displaced Families are or had been residing, or proposed to be resettled, the states and or GOI in consultation with each other, may appoint the Administrator for Resettlement & Rehabilitation and the Commissioner for Resettlement and Rehabilitation for the purposes of this Policy. b. The method of implementation of plans schemes for resettlement and rehabilitation shall be mutually discussed by the State Governments and the Union territory administration and the common plan/ Schemes shall be notified by the Administrator for Resettlement & Rehabilitation in the State or Union territory administration, as agreed to, in Accordance with the procedure laid down in this policy. c. If any difficulty arises in the implementation of the scheme/ plans, the matter shall be referred to the Central Government in the ministry of Rural Development (Department of Land Resources) for its decision and the decision of the Central Government shall be binding on the concerned States and Union territory. Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 22 Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project CHAPTER-VIII 8.0 MONITORING MECHANISM AND APPLICABILITY 8.1 STATE LEVEL MONITORING COMMITTEE: “The GOAP, Department of Revenue, Shall constitute a State Level Monitoring Committee, to be chaired by the Principle Secretary/ Secretary, Department of Revenue for reviewing and monitoring the progress of implementation of resettlement and rehabilitation scheme/ plan relating to all projects to which this policy applies. The committee shall meet at lest once in three months to review and monitor the implementation of R&R plan in all projects. The committee will have the following or his nominee not below the rank of Joint Secretary as its Members: 12 1. Special C.S. & CCLA, Chairman 2. Commissioner for R&R & E.O.Secretary to Govt. 3. Prl. Secretary, Revenue 4. Secretary, Planning 5. Secretary, Social Welfare 6. Secretary, Tribal Welfare 7. Secretary, MA & UD 8. Secretary, PR & RD 9. Secretary, Housing 10. Secretary, Education 11. Secretary, Agriculture 12. Secretary, Women and Child Welfare 13. Secretary, Energy 14. Secretary, Law 15. Secretary, Finance 16. State Level N.G.O 17. Chief Engineer/ Project Administrator Special invitee 18. Secretary, Requisition Department”12 Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 23 Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project 8.2 THIRD PARTY CONCURRENT AUDIT OF IMPLEMNTATION: Chairman State level committee shall put in place mechanism for each project for third party concurrent audit of implementation of R&R plan. The audit report of such concurrent audit shall be placed before state level committee form time to time. 8.3 PROJECT LEVEL MONITORING COMMITTEE: The Administrative Department of the project for which land is being acquired, shall constitute a Project Level Monitoring Committee, to be chaired by the District Collector of the district in whose jurisdiction the main component of the project lies, in case main component projects spreads over more than one district, senior most of the District Collectors shall chair the committee for reviewing and monitoring the progress of implementation of resettlement and rehabilitation scheme/ plan relating to the project to which this Policy applies. The committee shall meet at least once in two months to review and monitor the implementation of R&R plan The Committee will have following as its members” 13 “Joint Collector/ P.O ITDA- Convener R&R officer- RDO/ Sub Collector of the division SDC/ RDO/ Sub Collector, Land Acquisition Project Director, DRDA Chief Executive Officer, Zilla Parishad District Panchayat Officer District Education Officer District Medical and Health Officer District Level representative of DISCOM Superintendent Engineer, RWS PanchayatRaj Department Three members from PAPs, one at least women One member from local NGO Superintendent Engineer, Project site Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 24 Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project Superintendent Engineer, Panchayat Raj Superintendent Engineer, R&B Executive Engineer, Social Welfare Department.”13 APPLICABILITY OF POLICY: 8.4 THE POLICY ON THE RESETTLEMENT AND REHABILITATION OF PROJECT AFFECTED FAMILIES AND PROJECT DISPLACED FAMILIES (PRR-2005) SHALL COME INTO EFFECT FROM THE DATE OF ISSUE OF GOVERNEMNT ORDER. 8.5 The Project to which this policy is made applicable, the provisions of G.O. Ms 98 Irrigation (Project Wing) Department Dated:15.4.1986 and G.O.Ms.No.64 Social Welfare (T) Department, Dated: 18-4-1990 or any other order issued by any other department on this subject shall cease to operate form the date of commencement of this policy. 12. . Substituted for para 8.1 vide G.O.Ms.No.184, I & CAD (PW:LA-IV- R&R) Dept, DT: 0909-2008. 13. Added vide G.O.Ms.No.101, I & CAD (PW: LA-IV- R&R) Dept, DT: 24-08-2009. Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 25 Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project ANNEXURE 1.2: MODIFIED R&R POLICY PROVISIONS – VIDE G.O R T No. 1059 GOVERNMENT OF ANDHRA PRADESH ABSTRACT R & B Department – R & R Policy on Resettlement and Rehabilitation for Project Affected Families. 2005 – Certain modifications – Accepted – Orders – Issued. TRANSPORT, ROADS & BUILDINGS (R.IV) DEPARTMENT G.O.Rt.No. 1059 Dated:20-11-2010. Read the following: 1. Govt. Memo No.13236/Roads.IV.2/07, Dated 25.01.2008. 2. From the Chief Engineer(R&B)CRN & M.D., No.1/APRDC/APRSP/R&R/NGO/2007, Dated 10.11.2010. APRDC Letter -: xxxx :O R D E R:In supersession of the orders issued in the memo 1st read above, Government after careful examination of the matter approve the modifications proposed by the Chief Engineer (R&B) CRN & Managing Director. Andhra Pradesh Road Development Corporation appended to this order. 2. The Chief Engineer (R&B) CRN & Managing Director. Andhra Pradesh Road Development Corporation shall take necessary action accordingly. (BY ORDER AND IN THE NAME OF THE GOVERNOR OF ANDHRA PRADESH) S.P. SINGH PRINCIPAL SECRETARY TO GOVERNMENT To The Chief Engineer (R&B) CRN & Managing Director Andhra Pradesh Road Development Corporation, Hyderabad(w.e). Copy to:The Engineer-in-Chief (Admn. & NH ), A.P., Hyderabad./ The Engineer-in-Chief ( State Roads), A.P., Hyderabad. The Chief Engineer, NABARD, Hyderabad. The Chief Engineer, Buildings, Hyderabad. The Chief Engineer, HUDCO, Hyderabad. //FORWARDED BY ORDER// Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 26 Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project ANNEXURE TO G.O Rt. NO. 1059/Roads.IV/2/2007, T (R&B) DEPT., Dt: 20.11.2010 MODIFICATIONS IN THE AP R&R POLICY FOR ROAD SECTOR PROJECTS S. No 1 2 3 4 Provisions under the Modifications proposed by Modifications present AP R&R Policy Managing Director, APRDC, APRDC accepted by Govt. 2005 Para 1.3: ‘…. Provide Add “ and /or affected “ after displaced Accepted succor to the assets less rural poor. Who have been displaced Para 3.2 : The definition of Add one more parameter “( c ) for Accepted affected zone refers to linear projects area falling within the water sector projects project corridor of impact” Para 3.8: Project means the Replace the definition of the project as: Accepted project(s) notified under this “Project means the project(s) notified policy and displacing. under this policy and resulting in partial a) 100 or more losses and/or displacing”. families en-mass in Add one more parameter as (c) for plain areas linear project displacement is not en b) 25 or more families mass but scattered en mass in tribal areas or in areas mentioned in Schedule V of the constitution of India from their lands and or houses Para 3.0: There is no Add the following efinition: Accepted mention under the policy of Families with no legal titles are the families with no legal title persons and non – agricultural (i)Occupying families. government/other land for cultivation to earn their living (ii)Residing or carrying out economic activity in structures built within the affected zone/corridor of impact Non agricultural families: means whose primary source of livelihood is from non agricultural source (like trading, business and manufacturing etc.) within the affected zone/corridor of impact Para 3.16: A Project Under Para 3.16 (b) replace 50% by Accepted Displaced Family is defined 25% and add (d) families losing more as one whose more than than25% of their 50% of land is required residential/commercial structures. Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 27 Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project 5 Para 3.17 project displaced Family is defined as “means any family. Dwelling house in the village in the affected. …Dwelling house” Revise the definition as follows: Accepted “Project Displaced family“ means any family, who on account of acquisition of dwelling house and structures used for commercial purposes including business/trade in the affected zone for the purpose of the project, has been displaced from such dwellings and/or commercial structures. 6 The notification under section 4(i) of LA Act pertains to those whose lands/other immovable properties are acquired Add: under Chapter III, the following Cut off date: For the legal owners of the land and structures the date of land acquisition notification will be the cut off date. For squatters/encroachers the date of social survey will be the cut off date for R&R entitlements. 7 Para 5.4: Procedure to be followed for survey and census of PAFs and PDFs etc. Revise Para 5.4 (b) as follows: Accepted “Project affected families… agriculture land business/work place, employment…. Or vocation. Also add the following: (e). The project affected persons who have unauthorized occupied the land /structures in the affected area. 8 Para 5.14: After completion…. In consultation with. …Project area is situated. 9 10 Accepted Revise Para 5.14 as under: Accepted After completion. In consultation with Project Affected families and Project Displaced families and their representatives, women, Chairpersons…Area is situated. Para 5.18: Contents of Add the following: Accepted Draft Scheme/Plan of R&R n) The time schedule to extend R&R entitlements to project affected / displaced families Para 6.2: Free house sites: This is presently available to losing their private properties Add: Any project displaced family (including squatters losing dwelling/shops/work place) has been acquired should be allotted site for (i) Dwelling house site free of cost (ii) Site for shop 30 sq.m in rural areas 25 sq.m in urban areas, free of cost. Detailed Project Report VIII: Resettlement Action Plan (Annexures) Accepted suggested: “Any according to eligibility will suitably compensated”. as PDF their be Page 28 Pedana-Nuzvid-Visannapeta 11 Para 6.3: The provides construction grant Policy house Andhra Pradesh Road Sector Project Include the following: As above Project displaced families including squatters who are of BPL category would get house construction grant. Any displaced person (including squatters) losing shop/work place should be allotted a site for shop free of cost 30 Sq.m. in rural areas, 25 Sq.m in urban areas. Each of the displaced families would also been given a grant of Rs. 10,000/- towards construction of alternate shop/work place. S.P. SINGH PRINCIPAL SECRETARY TO GOVERNMENT //FORWARDED:: BY ORDER// Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 29 Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project ANNEXURE 1.3: R&R ENTITLEMENT FRAMEWORK Type of Loss Agricultural land Unit of Entitlement Titleholder Family R&R Entitlement Framework (i) Compensation as per the LA Act through consent award. (ii) If consent award fails to reach agreement the difference between replacement value and market value (approved by the Government) will be paid in the form of rehabilitation assistance. (iii) If alternate land is provided under section 6.4 of APRRP, the cost of land will be deducted from the compensation amount and the rehabilitation grant will be proportionately reduced, however other R&R entitlements will be extended as per APRRP 2005 (iv) At least 3 months notice will be given in advance of crop harvest, failing which compensation for crop lost will be paid. (v) A one time lump sum amount equal to 750 days, 500 days and 375 days of minimum agricultural wages will be paid to those (owner) PAFs who after LA become landless, marginal, small farmers respectively. Training will be arranged for income generation activities (IGA) to one member of such PAFs in suitable IG activities. Special benefit to ST families Share Cropper Homestead (or non-agril. land) Titleholder Preference in allotment of land A lump sum amount equal to 500 days minimum wages for lost customary rights or use of forest produce (if any) An affected share cropper will get a sum equal to the un-expired lease period (i) Compensation as per LA Act for the loss of homestead land (ii) If more than 25% of the structure is lost, such affected people will be categorized as ‘displaced’ (iii) Those affected but not displaced will get compensation for the portion of homestead land and structure affected by the project and permission to salvage construction material. (iv) Those displaced will get Compensation for the structure affected (part or full) computed at BSR without deducting depreciation Permission to salvage construction material Alternate house site (to a maximum extent of 150 sqm in rural areas and 75 sqm. in urban areas) or cash in lieu of site to those getting physically displaced. A sum total of Rs 50,000 as one time financial assistance to BPL for house construction and 3000 for lavatory construction. Subsistence allowances equal to 240 days of minimum agriculture wages. Grant for a cattle shed equivalent to a sum total of Rs 15000. Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 30 Pedana-Nuzvid-Visannapeta Type of Loss Andhra Pradesh Road Sector Project Unit of Entitlement R&R Entitlement Framework Tenant/ Lease holder Land under commercial use IGA grant to affected artisans, small traders, and self employed persons at Rs 25,000 per PDF Grant for transporting materials at Rs 5,000 per PDF Only displaced tenant will get: Titleholder A sum equal to two months rental in consideration of the disruption caused. Transportation allowance of Rs. 5,000 towards shifting household materials. (i) Compensation for the loss of land (commercial). (Owner and occupier) (ii) For the structure affected (part or full), compensation will be computed at BSR without deducting depreciation (iii) Permission to salvage construction material (iv) If more than 25% of the structure is lost, the affected business/work place will be categorized as ‘displaced’. (v) PAFs affected but not displaced will get compensation for the portion of land lost and the structure (at BSR without depreciation) affected by the project. (vi) Those displaced will get An alternate site (40 sq.mtr in rural areas or 25 sq.mtr. in urban areas) free of cost or cash equivalent in lieu there of. A construction assistance of Rs 10,000 for each PDF (v) If alternate shop/work place is allotted by the project, those displaced will not be eligible for alternate site and construction assistance. (v) Other assistance: Titleholder (Absentee Land Lord) Tenant/Lease holder Subsistence allowances equal to 240 days of minimum agriculture wages. A transportation allowance of Rs 7,000 to Residence cum commercial. A transportation allowance of Rs 2,000 to commercial units. (i) Only compensation for both land and structure (owned) (ii) Permission to salvage materials from demolished structure. Only displaced tenant will get: Other assets Owner affected family A sum equal to two months rental in consideration of the disruption caused. Transportation allowance of Rs. 1,000 towards shifting. Loss of other assets (including wells, trees) will be compensated equivalent to their replacement value. Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 31 Pedana-Nuzvid-Visannapeta Type of Loss Andhra Pradesh Road Sector Project Unit of Entitlement R&R Entitlement Framework Encroachers (Agril. land) Family If a PAF is dependent on the public land required for the project for the livelihood and belongs to ‘vulnerable’ groups he/she will get assistance to take up self-employment activities by dovetailing government programs or providing an assistance of Rs 25,000 to take up IG Activity. Encroachers (Non-agril. land) Family If encroached land is used for housing and/or commercial purpose and if the affected person loses more than 25% of the built up structure (including one’s own portion) and if physically displace will be given the same R&R assistance as available to a displaced family. However, such PAFs will not get the compensation for the encroached land. Squatters (for homestead purpose) Vulnerable Family If the public land is occupied for homestead purpose and if the affected person has no alternate housing he/she will get: Squatters (for commercial) Vulnerable Family Notice to remove the structure An alternate site of 150 sq.mtr in rural areas or 75 sq.mtr. in urban areas or cash equivalent and compensation for lost structure without depreciation. If the family is allotted alternate weaker section housing, he/she will not be eligible for compensation and assistance or alternate housing equivalent to IAY. House construction grant Rs 10,000 A transportation assistance of Rs 2,000 If the PDF has no alternate place, he/she will get: Notice to remove the structure An alternate site of 40 sq.mtr in rural areas or 25 sq.mtr. in urban areas or cash equivalent and compensation for lost structure without depreciation. If the project allots an alternate commercial place developed by it, the PDF will not be eligible for neither compensation nor house construction assistance or Rs 10,000 for shop construction as per amended policy for APRSP. Kiosks Vendor A transportation assistance of Rs 1,000 A maintenance allowance of Rs 2,000 (one time) PAFs from vulnerable sections will be provided training to take up self employment activity by dovetailing ongoing Government schemes Ambulatory vendors licensed for fixed locations will be considered as kiosks and each affected vendor will get Alternate site for kiosks or a sum of Rs.5000 for self relocation NOTE: Vendors in groups (of more than 50) will be considered for relocating in a commercial complex, if developed by the project. Those allotted space there will not get any assistance. Common infrastructure and common Property Resources Community Common properties will be replaced in consultation with the community Civic infrastructure will be replaced in consultation with the affected community and the local administration Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 32 Pedana-Nuzvid-Visannapeta Type of Loss Any Unforeseen Impacts Unit of Entitlement Affected community and/persons Andhra Pradesh Road Sector Project R&R Entitlement Framework Any unforeseen impact would be mitigated/enhance as per the APRRP 2005 or through any additional measures as may be required Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 33 Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project ANNEXURE 2.1: LIST OF PROJECT AFFECTED FAMILIES AND PROJECT DISPLACED FAMILIES Father\husba nd name Chanage Sl.N o L-1 TH 4 R-1 TH 5 Kalkimurthy R-1 TH 4 Madisetty Maruthi Late Satyanarayana R-1 TH 5 Semipucc a Com Machilipatnam Varudhu malleswararao Subbarao R-3 TH 3 Katcha Res 7+020 Machilipatnam Varudhu Ramachandrarao Subbarao R-3 TH 3 7+120 Machilipatnam jonabattula koteswaramma Nancharayya R-2 NTH 5 Katcha Cattle Shed Cattle Shed 9 7+120 Machilipatnam jonabattula koteswaramma Nancharayya R-3 NTH 6 Katcha Res 10 7+140 Machilipatnam Garikimukkala Sriramulu Mahamkali R-4.5 NTH 3 Katcha Res 7+140 Machilipatnam Chinnam Suramraju Person not Available L-4 TH 0 4 Moganti Prasad 7+000 Machilipatnam Moganti Prasad 7+000 Machilipatnam Varudhu Balaji Kumar 7+000 Machilipatnam Dinduluri Srinivasarao 7+000 Machilipatnam 7+020 Narayanna Rao Narayanna Rao Narayanna Rao 4 3 Machilipatnam Nature of House TH 2 7+000 Type of House Semipucc a L-1 1 Pedna No of Family Members Name of the HouseHold Head(HHH) Location Division Title holder(TH)/NonTitleHold er(NTH) Name of the Village (Left\Right) Machilipatnam Division Project Affected Famalies(PAF'S) of PEDNA - NUZVID -VISANNAPETA Road. 5 6 7 8 11 12 14 15 16 17 18 19 20 21 22 23 24 Machilipatnam Varudhu Venkateswararo Govind L-2 NTH 4 7+200 Machilipatnam Varudhu Nagamalleswaramma Venkateswarul u R-6 TH 4 7+220 Machilipatnam Varudhu Nancharayya Subbarao R-4.5 TH 6 7+220 Machilipatnam Varudhu Nancharayya Subbarao R-4.5 TH 6 7+240 Machilipatnam Bulusuru Symalarao Subramanyam L-7 TH 4 7+260 Machilipatnam maddemsetty Rambabu Nancharayya R-6 TH 5 7+280 Machilipatnam Varudhu Venkaranarayana Marillu L-3 TH 2 7+280 Machilipatnam Varudhu Venkateswararo Subbayya R-5 NTH 3 7+280 Machilipatnam Varudhu Ragavayya Subbayya R-6 NTH 3 7+300 Machilipatnam Varudhu kondayya Krishana R-6 TH 6 7+310 Machilipatnam Varudhu Venkataswamy Krishana R-6 TH 3 7+320 Machilipatnam Varudhu Venkanna Nageswarao R-2 TH 4 7+320 Machilipatnam Varudhu Balaji Kumar Nageswarao R-2 TH 5 Detailed Project Report VIII: Resettlement Action Plan (Annexures) Katcha Res Com Com Res Pucca 7+200 13 Katcha Semipucc a Semipucc a Com Pucca Res Res Katcha Semipucc a Katcha Res Cattle Shed Katcha Semipucc a Semipucc a Res Katcha Res Katcha Cattle Shed Res Res Katcha Semipucc a Res Pucca Semipucc a Res Page 34 Res Res Pedana-Nuzvid-Visannapeta 7+325 Machilipatnam 25 Andhra Pradesh Road Sector Project Maruboiena Naga malleswararao Nageswarao R-5 TH 4 Res Katcha 7+325 Machilipatnam Maruboiena SriniVasarao Nageswarao R-5 TH 5 7+325 Machilipatnam Maruboiena Srinivasarao Nageswarao R-6 TH 6 7+325 Machilipatnam Koutarapu Naga Durga Bhavani Ganapathi L-3 TH 4 Semipucc a Res 29 7+350 Machilipatnam Varudhu Baburao Seetayya L-3 TH 2 Pucca Res 30 7+360 Machilipatnam Varudhu Venkateswararo Koteswararo L-4 NTH 4 Katcha Res 7+360 Machilipatnam Varudhu Venkateswararo Koteswararo L-5 NTH 5 Katcha Cattle Shed 7+420 Machilipatnam Maddisetty Anasuya Koteswararo R-5 TH 7 7+430 Machilipatnam Varudhu Suryachanrraro R-7 NTH 11 7+430 Machilipatnam Varudhu Suryachanrraro R-8 NTH 12 7+430 Machilipatnam Varudhu Suryachanrraro R-9 NTH 13 36 7+450 Machilipatnam Varudhu Durgarao Madavarao R-6 NTH 37 7+450 Machilipatnam Varudhu Subbarao Madavarao R-6 7+450 Machilipatnam Varudhu Subbarao Madavarao 7+450 Machilipatnam Varudhu Venkata Ramanjeyaneyulu 40 7+500 Machilipatnam 41 9+650 Machilipatnam 42 9+850 26 27 28 31 32 33 34 35 38 Res 6 Katcha Res R-6 NTH 7 Katcha Cattle Shed Nageswarao L-2 TH 4 Semipucc a Res Varudhu Pitchemma Narasimharao R-2 TH 8 Katcha Res MD.Sardhar Awa L-5 NTH 3 Kisok Kiosk Machilipatnam Vanka Rani Subbayya L-7.5 NTH 3 Katcha Res Machilipatnam Parusa Pandurangarao Durgarao L-6.2 NTH 2 Machilipatnam Pamarthi Bramajirao Narasimharao R-6.3 NTH 4 Machilipatnam Rajulapati Gowri rajulu Gurunadham L-6 NTH 5 Machilipatnam Polagiri Jaganadham Srimanrao L-7.8 NTH 4 Machilipatnam Polagiri nageswararao Srimahathi R-6.5 NTH 4 Machilipatnam Yarlagedda Sethratnam Venkataratnam R-6.5 NTH 1 Machilipatnam Gandikota Dhanaraju Kotayya L-7 NTH 7 Vallaba Pamulu L-7.2 NTH 3 Machilipatnam 51 11+66 0 11+67 0 Machilipatnam 48 Res NTH Machilipatnam 47 Katcha Res Res 11+65 0 46 Katcha Semipucc a Pucca 50 45 Cattle Shed 3 49 44 Katcha Cattle Shed 10+70 0 10+80 0 10+80 0 10+90 0 10+93 0 10+94 0 11+02 0 Nadupuru Res Katcha 39 43 Venkatasubba yya Venkatasubba yya Venkatasubba yya Katcha Katcha Katcha Katcha Katcha Katcha Katcha Katcha Benarji Res&Co m Res&Co m Res Cattle Shed Res Res &Com Katcha Laxmayya kanakavalli Subadra Res Res R-6.5 NTH 2 Res Katcha Nimmagedda Rajarao 52 53 11+75 0 Machilipatnam 54 11+76 0 11+80 0 Machilipatnam 55 Machilipatnam NTH Person not Available L-7 Venkateswrulu L-7.2 Kandara Anjeneyulu L-8.5 Sitaramayya R-8.2 4 Katcha 4 Semipucc a Res Katcha Res Res NTH Subbarao Katcha Res NTH Davu Ramakrishana 2 2 Ede.Sobanadri Detailed Project Report VIII: Resettlement Action Plan (Annexures) NTH Page 35 Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project 11+82 0 Machilipatnam 56 Machilipatnam 57 12+05 0 58 12+05 0 Machilipatnam Sammeta Nagasehagirirao Veerabadrayya R-8.3 59 12+00 0 12+05 0 Machilipatnam Tontipakala.Lalitamba Person not Available 12+10 0 Machilipatnam Bellamkonda Tatayya H/o mastanamma 60 61 4 Borra Haribabu Veraraghavulu R-9 NTH Parasa Gopalkrishana Nancharayya R-4.5 NTH Katcha Res 5 Kiosk 3 Semipucc a Com NTH 5 Semipucc a Res&Co m R-7.8 NTH 1 Katcha Res &Com L-8.5 NTH 3 Katcha Kiosk Machilipatnam Parasa Ramachandrarajulu Nancharayya R-4.5 NTH Res Name of the HouseHold Head(HHH) Father\husband name Location(Lef t\Right) Chanage Sl. No 1 Division Reddipalae m Title holder(TH)/NonTitleHolde r(NTH) Name of the Village No of Family Members Gudivada Division Project Affected Famalies(PAF'S) PEDNA - NUZVID -VISANNAPETA Road. Type of Structur e Nature of Stucture 13+400 Gudivada Bojana Nagayya Veeraswamy L-7.8 NTH 3 Katcha Res 2 13+400 Gudivada Madamala Ramarao Nancharayya L-8 NTH 2 Katcha Res 3 13+410 Gudivada B.Nancharayya H|0 Venkamma L-6.2 NTH 3 Katcha Res 4 13+410 Gudivada Bojana Lazar Nagayya R-7.5 NTH 5 Katcha Res 5 13+420 Gudivada Modugummdi Veramma pandurangarao R-8 NTH 2 Katcha Subbayya R-8.2 Res Cattle Shed 6 13+420 Gudivada Katta Laxminarayana TH 5 Katcha 7 13+420 Gudivada ponki nagaraju verayya R-8.2 NTH 3 Katcha Res 8 13+420 Gudivada Chittibomma Nagababu Srinivasarao L-7.5 NTH 4 Katcha Res 9 13+420 Gudivada Chittibomma Srinivasarao Subramanyam R-6.4 NTH 5 Katcha Mallikarjunarao L-7.5 NTH 4 Katcha Mallikarjunarao L-7.5 NTH 3 Katcha Res Cattle Shed Cattle Shed L-8.2 NTH 3 Katcha 10 13+425 Gudivada 11 13+425 Gudivada Bellamkonda Venkateswarao Bellamkonda Sahademudu 12 13+500 Gudivada Panku Chinaveerayya Gudivada Pamarthi VeeraVenkateswarao Rangarao R-8 13 13+510 Subbarao NTH 5 Katcha Res Cattle Shed 14 13+510 Gudivada Kandula Sesayya Nancharayya R-6.4 NTH 6 Katcha Res 15 13+520 Gudivada Botla Koteswaerarao Anjayya R-8.2 NTH 1 Katcha 16 13+525 Gudivada Pamarthi Venkataswamy Ramayya R-7 NTH 4 Katcha Res Cattle Shed 17 13+530 Gudivada Bethapudi Srinivasarao R-6.2 NTH 4 Katcha Res 18 13+550 Gudivada Katta Srinivasarao L-7.2 NTH 3 Katcha Res 19 13+420 Gudivada Katta Laxminarayana Subbayya L-7.5 TH 5 Katcha Res 20 13+550 Gudivada Kagitha Pabma Nancharayya Anjeneya Swamy L-6.5 TH 2 4 S Katcha Res SemiPucc a Com 21 13+700 Gudivada Shop related to Temple pandu Nancharayya Detailed Project Report VIII: Resettlement Action Plan (Annexures) L-7.5 NTH Page 36 Pedana-Nuzvid-Visannapeta 13+750 22 13+790 23 13+790 24 13+750 25 Gudivada Gudivada Gudivada Gudivada Andhra Pradesh Road Sector Project Sodagani laxmarao Modugumudi Mallikarjunarao Modugumudi Harikrishana Modugumudi Haribabu Veeraswamy Laxmipathi Buchiyya R-7.7 L-7.6 R-8 NTH NTH NTH 1 2 3 Katcha Katcha Katcha Ramachandrarao L-5.7 L-7.2 NTH 3 SemiPucc a SemiPucc a R-7 NTH 4 Katcha NTH 4 Res Com Res Res 26 13+800 Gudivada Bellamkonda Srininvasarao 27 13+890 Gudivada Pamarthi Ramesh Mallikarjunarao Dasaradharamay ya 28 13+900 Gudivada Pamarthi Ankalarao Ragavulu R-7.5 NTH 2 Katcha 29 14+400 Gudivada Parasa Reddemma Durgayya L-8 NTH 2 Katcha 14+400 Gudivada Parasa Reddemma Durgayya L-9 NTH 3 Katcha 15+190 Gudivada Abdhul Azeez Basha R-6.8 32 15+160 Gudivada AvarlanDammidayya Veerayya R-6.5 NTH 33 15+400 Gudivada Kolusu Reddayya L-6.5 TH 15+400 Gudivada Kolusu Reddayya 35 15+400 Gudivada Kolusu Veraraju 36 15+400 Gudivada Kolusu Koteswarararo 37 15+420 Gudivada Pari devamani 15+420 Gudivada Madamala Sivaleela Venkateswararao R-5 39 15+430 Gudivada Iku Adilaxmi Late)Gopayya L-5.2 TH 1 Katcha Res 40 15+430 Gudivada S.Bayrasi Not Available R-5.6 NTH 0 Katcha Res 4 SemiPucc a Com 0 Kiosk Kiosk 0 Kiosk Kiosk 30 31 34 38 Vaddlamann adu Veraraju Veraraju Ragavulu Veraraju Late)Yakobu L-6.5 L-5.5 L-6.5 NTH L-6.5 TH Gudivada Jakkula Sureshbabu 42 15+440 Gudivada Sk.Raheman 43 15+450 Gudivada N.Sambasivarao Not Available L-5.5 15+450 Gudivada Gudivada Venkateswarao Person Not Available R-6.2 Venkateswarulu R-6.5 Person Not Available R-6.5 44 15+480 Gudivada 45 15+480 Gudivada 46 47 Vallabapurapu nancharayya Udayagiri Venkateswararao 15+520 Gudivada Thota Laxmayya 15+520 Gudivada Thota Umashankar 48 49 50 15+550 Gudivada 15+560 Gudivada 15+560 Gudivada Thota venkatanagaanjeneyulu Penneru jayapattabiramayya G.Nageswararao 51 52 15+560 Gudivada Gandam Rangarao Balayya Not Available TH TH 15+440 41 NTH L-5 L-5 NTH NTH NTH NTH Res 4 Katcha Res Cattle Shed 5 2 Katcha Res 4 Katcha Res 6 Katcha Res Cattle Shed 2 Person Not Available L-7 Hunumantharao L-6.8 Venugopalarao Person Not Available Venkatakrishana rao Com Katcha 3 Com Kiosk 0 4 Kiosk SemiPucc a Com Kiosk L-6.8 NTH NTH NTH 3 2 2 Kiosk Kiosk SemiPucc a Kiosk Com Kiosk L-6.5 NTH 0 R-6.5 NTH 0 Gudivada Garikipathi Tulasiram Ragavulu R-6.8 54 15+560 Gudivada Garikipati laxmayya Ragavayya R-6.8 NTH 55 15+560 Gudivada Meda Venkateswarao Adinarayana R-7.2 NTH Detailed Project Report VIII: Resettlement Action Plan (Annexures) Katcha Katcha NTH R-6.8 Katcha 0 NTH Res Katcha NTH krishanamurthy Katcha Res Cattle Shed 2 NTH 15+560 53 3 Res Cattle Shed Cattle Shed NTH Kiosk Kiosk 4 Kiosk SemiPucc a 4 Kiosk Kiosk 4 Katcha Com Page 37 Com Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project 15+560 Gudivada Yadaala Ramarao 57 15+560 Gudivada 58 15+580 59 56 Katcha Cattle Shed 3 Katcha Com NTH 4 Kiosk Kiosk R-6.6 NTH 2 Katcha Com R-5.9 NTH 3 Katcha Res R-6.5 NTH 4 Katcha Res R-6.2 NTH 4 Katcha Res Durgapraasad R-6.5 NTH 3 Katcha Res Person Not Available R-4.4 Nancharayya L-5.1 TH L-5.3 NTH NTH Rajarao L-6.2 manda prasad Ramarao L-7 NTH Gudivada NKV Subbarao Venu R-6.8 15+590 Gudivada kundeti Verayya Ramayya 60 15+600 Gudivada Atchuta jaganmohanarao 61 15+650 Gudivada Degala Srinu 62 15+650 Gudivada Degala Venkataswamy 63 15+660 Gudivada Maddela Veramma 15+670 Gudivada Atchuta kasturi 64 Subbarao Venkataswamy Rammurthy NTH 15+670 Gudivada Atchuta Srinivasarao 66 15+750 Gudivada Atchuta Sivashankararo 67 15+750 Gudivada Penta Ramu Laxmayya R-5.5 NTH 15+360 Gudivada DegalanSubbarao Chinnappayya R-6.2 16+740 Gudivada Parasa Venkatasubbamma Krishanamurthy L-4.7 68 Vemavaram 69 70 16+780 Gudivada Padamata Pandu 71 16+785 Gudivada Venka Nageswarao 72 16+785 Gudivada Veranji Kanakam 73 16+785 74 16+820 75 16+880 Gudivada Gudivada Gudivada Chillimuntha Badrachalam Yarlagadda hunumantharao Katcha 1 65 Subbarao 2 Res 3 Katcha Res 4 Katcha Res 3 Katcha Res NTH 2 Katcha Res NTH 4 Katcha Basavayya Rammurthy L-6.9 L-6.3 TH TH Res 4 Katcha Res 3 Katcha Res Res Krishanamurthy R-4.5 NTH 2 Katcha Gangadaram L-5.8 NTH 0 Katcha Rammurthy L-4.5 NTH 4 Katcha Pamarthi Samrajam Rangarao L-4.5 NTH 2 Katcha Res Cattle Shed Cattle Shed 76 16+880 Gudivada Padamati Veraswamy Venkanna L-4.3 NTH 3 Katcha Res 77 16+890 Gudivada Madugu Pedaverayya Subbarao R-4.5 NTH 0 Katcha Res 78 16+900 Gudivada Vemula Srinivasarao Veraragavulu R-4.3 NTH 5 Katcha Com 79 16+900 Gudivada Mannem Venkateswarama Venkateswaralu L-5.2 NTH 2 Katcha 80 16+900 Yaragani Mohanarao Mamillu L-5.2 NTH 4 Katcha Res Res&Co m Mannem Basavayya Yarlagadda Nagapanindhra Yarlagadda Nagapanindhra Laxmayya L-6.2 NTH 2 Katcha Res M/o Vijayamma L-5.5 NTH 3 Veraswamy L-5.2 TH 4 Veraswamy L-5.2 TH 5 81 82 83 84 85 86 87 88 89 90 91 92 Gudivada 16+900 Gudivada 16+900 Gudivada 16+900 Gudivada 17+050 Gudivada Sonti Venkateswarao 17+050 Gudivada Sonti Venkateswarao 17+050 Gudivada Mulala edukondalu Pakeer R-5.1 NTH 8 Katcha Res 17+060 Gudivada Borra Durgamma Ragavulu L-6.2 NTH 1 Katcha Res 17+070 Gudivada pandiri Kurmarao narasimharao L-5.3 NTH 3 Katcha Vemula Durgarao Danayya H\o Haseenabegum L-4.5 NTH 2 Katcha Res Cattle Shed L-4.3 NTH 5 Venkateswaralu L-4.5 NTH 2 Daharmayya L-4.5 NTH 3 17+100 Gudivada 17+120 Gudivada Shaik Adem 17+140 Gudivada Vemula Veraanjeneyulu 17+140 Gudivada Mannem Gopalarao M/o Vijayamma Detailed Project Report VIII: Resettlement Action Plan (Annexures) L-5.5 NTH 2 Katcha Katcha Katcha Katcha Katcha Katcha Katcha Page 38 Res Cattle Shed Res Cattle Shed Res Cattle Shed Cattle Shed Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project 17+150 Gudivada Mannem ChinaRagavulu 17+160 Gudivada Mannem Nageswararao 17+180 Gudivada Mannem Pedaragavayya 17+200 Gudivada 97 17+200 Gudivada 98 17+630 Gudivada M.Ismail Kondayya L-4.2 17+690 Gudivada Mannem Srinu Venkateswaralu 100 17+690 Gudivada Mannem Somulu 101 17+690 Gudivada Mannem Ragavulu 102 17+690 Gudivada 17+690 Gudivada 17+690 Gudivada 17+690 Gudivada 17+690 Gudivada 17+700 Gudivada 93 94 95 96 99 103 104 105 106 107 Gudivada Katcha Cattle Shed Cattle Shed Cattle Shed Daharmayya L-4.5 NTH 2 Venkateswaralu L-4.5 NTH 4 Venkateswaralu L-4.5 NTH 5 Abdhul Baseer Sattar L-4.1 NTH 1 Katcha Res Naragani Venugopal Ankinaidu L-4.5 NTH 5 Katcha Res NTH 6 Kisosk Kiosk l-4.5 NTH 4 Katcha Com Venkateswaralu l-4.6 NTH 5 Katcha Com Anjayya L-4.5 NTH 5 Katcha Com Bolla Ankalu nageswarrao L-4.6 NTH 5 Katcha Com Mannem Ramachandrudu Subbayya L-4.6 NTH 5 Katcha Com Matta Ragavayya Saianna L-4.6 NTH 4 Katcha Com Chettibomma Tulasamma Malleswararao L-4.5 NTH 4 Katcha Com Mannem Nageswararao Venkateswaralu L-4.5 NTH 1 Kisosk Kiosk Pappula Peramma L-4.5 NTH 1 Katcha Com Mannem Nageswararao Nancharayya Person Not Available L-4.5 NTH 2 Kisosk Kiosk Katcha Katcha 108 17+700 109 17+710 Gudivada Tammisetty nookalu nookalu L-4.5 NTH 3 Kisosk Kiosk 17+710 Gudivada Tammisetty nookalu nookalu L-4.5 NTH 3 Katcha Com 17+720 Gudivada Tammisetty Durgarao Suryanarayana L-4.5 NTH 4 Katcha Com 17+730 Gudivada Matta Ragavayya Saianna L-4.5 NTH 4 Katcha Com 17+730 Gudivada Akurathi hema Srinivasarao L-4.5 NTH 4 Kisosk Kiosk 17+730 Gudivada mannem Pitchemma pothuraju L-4.5 NTH 4 Katcha Com 115 17+730 Gudivada Munagala Pramela Danumjay L-4.5 NTH 4 Kisosk Kiosk 116 17+730 Person Not Available L-4.5 NTH 3 117 17+750 Suryanarayana L-4.5 NTH 4 Kisosk SemiPucc a Kiosk Res &Com Narepalli Srinivasarao Rangarao L-4.5 NTH 4 Katcha Com Srisylam Person Not Available L-4.5 NTH 3 Kiosk Manda Nagamani Ramanjeneyulu R-4.5 NTH 5 Kisosk SemiPucc a Sarveswararao Person Not Available L-4.5 NTH 0 Kisosk Kiosk Basaveswararao Person Not Available L-4.6 NTH 0 Kisosk Kiosk Tammisetty Suryanarayana Person Not Available R-6 NTH 0 Kisosk Kiosk kagita Veranjeneyulu Person Not Available R-6 NTH 0 Kisosk Kiosk Bapanayya Person Not Available R-6 NTH 0 Kisosk Kiosk Chetturu jaganadharao nageswarrao R-6 NTH 4 Kisosk Kiosk 110 111 112 113 114 Gudivada 118 17+750 119 17+780 120 17+780 121 17+810 122 17+810 123 17+820 124 17+820 125 17+830 Gudivada Gudivada Satyanarayana Tammesetti Satyanarayana Gudivada Gudivada Gudivada Gudivada Gudivada Gudivada Gudivada 126 17+830 Gudivada Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 39 Com Pedana-Nuzvid-Visannapeta 127 128 129 kowthvaram -Gv-1 17+840 Gudivada Narapalem krishana Rangarao L-6 NTH 5 Kiosk Kiosk 17+840 Gudivada Bodda Romahanaramesh pullarao L-6 NTH 3 Kiosk Kiosk koreni Appayamma Chittibabu L-4.4 NTH 3 Kiosk Allu suryanarayana W/o Atchinaidu L-6 NTH 3 Katcha SemiPucc a Allu Apparao Adinarayana L-7.5 NTH 4 Katcha Jakka Nagamani S/o Sanganna R-5.3 NTH 2 Katcha Allu Narasamma Apparao R-6.8 NTH 1 Katcha Geduturi Rajarao Yarayya R-6.6 NTH 2 Res Tummala Rajarao Suryanarayana L-7.3 TH 2 22+065 130 22+070 131 22+090 132 Andhra Pradesh Road Sector Project 22+090 133 22+100 134 22+100 135 22+100 136 22+120 Gudivada Gudivada Gudivada Gudivada Gudivada Gudivada Gudivada Gudivada Juvvadi Edukondalu Venkateswarao L-6.9 NTH 3 Katcha SemiPucc a SemiPucc a Kiosk Res&Co m Res&Co m Res&Co m res Com 137 22+120 Gudivada Sonayala Suryanarayan a Satyam R-6.8 NTH 1 Kiosk Kiosk 138 22+120 Gudivada Nasethi Ramesh Subbarao R-6.8 TH 3 Katcha Res 139 22+120 Gudivada koripalli Sanyasirao Appannna R-6.7 NTH 12 Katcha Res 140 22+140 Gudivada Javvari Nageswarao Venkateswarao R-6.8 NTH 5 Katcha Res 141 22+140 Gudivada Kasani Sowbagyarao Edukondalu L-8 NTH 3 Com 142 22+140 143 144 Paramati Sitaramamma Venkataramana L-8 NTH 3 Katcha SemiPucc a 22+200 Gudivada Muttireddy Pichheswarao hunumantarao R-7.3 NTH 5 Katcha Res 22+200 Gudivada Allu Bullemma Appalaswamy R-6.3 NTH 2 Katcha Res Com 145 22+200 146 22+200 147 22+200 148 22+125 Gudivada Gudivada Gudivada Atmakuri Nagaprasad hunumantarao L-7.5 NTH 4 SemiPucc a malireddy Srinivasarao Suribabu R-7.3 NTH 4 Katcha Com Person Not Available R-6.3 NTH 5 Katcha Res Satyanarayana R-5.3 NTH 4 Katcha Res Gudivada Gudivada Com muttireddy Srinivasarao Ramabalapala Durgaprasad 149 22+200 Gudivada Arji Applanarasamma Laxmayya(late0 R-7.3 NTH 2 Katcha Res 150 22+200 Gudivada Kagitha Gangadhararao narasimharao R-8.1 NTH 4 Katcha Res 151 22+200 Gudivada matireddy Suribabu hunumantarao L-7.5 NTH 5 Katcha Res 22+200 Gudivada Nekipeti Chinayya Janayya R-8 NTH 2 Katcha Res 22+200 Gudivada Dokku Durgarao Subbarao R-8 NTH 4 Katcha Res 154 22+200 Gudivada Doddi Ramu Paidayya R-7.8 NTH 0 Katcha Res Gudivada 155 22+200 Vinshuntumurthula. Simhachalam Srinivasarao R-7.8 NTH 0 Katcha Res Erupuganti Umamaheswarrao Sitarama Brahmam L-8 TH 0 Semi Com 152 153 156 Gudlavaller u-2 Gudivada 22+760 157 22+780 Gudivada Alajangi Lingamurthy Sambayya R-9 NTH 0 Kiosk kiosk 158 23+000 Gudivada Ch.Krishana Musalayya R-8 NTH 4 Kiosk kiosk 159 23+000 Gudivada Miriyala veranjeneyulu Veravenkayya R-8 NTH 6 Kiosk kiosk 23+030 Gudivada Mukkudi Rajasekhar Setti narayana R-6 NTH 2 Kiosk kiosk 23+220 Gudivada kaja pandu Gangayya R-7 NTH 5 Kiosk kiosk 160 161 Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 40 Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project Gudivada 162 23+220 163 23+790 164 23+990 165 23+995 Gudivada katuri Arjunrao Person Not Available R-7 NTH 4 Kiosk kiosk Jupudi Krishana mohanarao Person Not Available R-6 TH 2 Pucca Res Mutthireddy Sekhar Nagamalleswarar ao L-6 NTH 4 Kiosk kiosk Nara janardhanarao Sobanadri L-6 TH 0 SemiPucc a Com Gudivada Gudivada 166 23+800 167 23+800 168 23+800 169 23+810 170 23+950 171 23+980 172 24+000 173 24+000 174 24+000 175 24+000 Gudivada Gudivada Gudivada Gudivada Paruchuri Tripurantharao R-5.6 TH 4 Pucca Res vallabhapurapu Eswararao Ramachandarara o R-4.6 TH 5 Pucca Sonti Amareswari Venkanna R-5.2 NTH 4 Pucca MD.Muzeeurrab Abdhullah R-6.2 TH 5 Pucca Res Res&Co m Res&Co m A.A.Seshacharyulu Person Not Available L-7.3 NTH 0 Pucca Res Kunchapati Venkateswwarao Pandurangarao R-4.6 TH 3 K.Kameswaramma KVKrishanarao R-5.7 TH 4 Pucca SemiPucc a Res Res&Co m V.Narasimharao Person Not Available R-4.8 TH 1 Pucca Res Polavarapu Rajeswarao Person Not Available R-5.5 TH 1 Pucca Res Gudlavalleti Venkateswarao Gangajalam R-4.5 TH 4 SemiPucc a Res Res Gudivada Gudivada Gudivada Gudivada Gudivada Gudivada Bulla Ravibabu Koteswararao L-6.8 TH 5 SemiPucc a S.Venkanna Person Not Available R-6.3 NTH 1 Pucca Res &Com v.laxmiPrasadarao Person Not Available L-7.2 NTH 0 Kiosk Kiosk Vadladi Jagadish Dhulupudi Nagamalleswar Subbarao R-7.3 NTH 4 Kiosk Kiosk Venkataramana R-7.3 NTH 2 kiosk Kiosk Gudivada Kodali Madhu Venkataratnam L-6.7 NTH 5 Kiosk kiosk Gudivada Veeramasineni Jaganmohanrao Person Not Available L-9.5 TH 3 SemiPucc a com 27+850 Gudivada Merugumalla Srinivasarao Bheemarao R-8.8 NTH 4 Katcha Kiosk 27+860 Gudivada Rajulapati Srinivasarao Merugumalla Durgamaheswararao Subbarao L-6.75 NTH 5 Katcha com Venkataratnam L-6.75 NTH 4 com Lingam Venkataratnam Merugamalla Visweswara Rao Nagabhushanam L-8.85 NTH 3 Katcha SemiPucc a L-7.5 TH 2 L-8.5 TH 4 Katcha SemiPucc a Res Kaja Jhansi Laxmi Nageswarao Mallikarjuna (Late) Jonnalagadda Tirupathirao Venkataramaiah L-8.5 TH 6 Katcha Res 176 24+050 177 23+834 178 23+860 Gudivada Gudivada Gudivada 179 Angalur 27+820 180 27+820 181 27+830 182 27+840 183 184 185 27+875 186 27+880 187 27+900 188 27+900 189 28+010 Gudivada Gudivada Gudivada Gudivada Gudivada Gudivada Gudivada Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 41 Res Res Pedana-Nuzvid-Visannapeta 28+010 Gudivada 31+100 Gudivada 192 31+100 193 190 Andhra Pradesh Road Sector Project Venketeswararao R-9.5 TH 1 Katcha Venkata swamy R-7 NTH 4 Gudivada Jonnalagadda Chittamma Gutta jagadesh chandrachowdary Gutta Venuprasad Chowdary Venkata swamy R-7 NTH 4 Katcha Semipucc a 31+150 Gudivada Gutta krishana narayana R-5.5 TH 2 Pucca Res 194 31+200 Gudivada Cheboiena Umadevi Venkateswararao R-8 NTH 2 kiosk kiosk 195 31+430 Gudivada Rangula Raju Tadayya R-8.5 NTH 4 kiosk kiosk 196 31+550 Gudivada Penumarthi Srinu nagendrudu L-5.6 NTH 4 Katcha Res 197 31+600 Gudivada Pallakattu veeraragavulu venkatasubbayya L-5.6 NTH 4 Katcha Com 198 31+600 Gudivada Late)Harinadh R-8.8 NTH 3 Kiosk Kiosk 199 31+610 Gudivada Sonti Dhanalaxmi Chilakabatthina Chinakoteswararao padalalu L-7.3 NTH 3 Kiosk Kiosk 200 31+620 Gudivada Chilakabatthula nagaraju Sreeramulu L-6.1 NTH 4 Kiosk Kiosk 201 31+620 Gudivada Talaie Satyanarayana Venkateswararo R-7.2 NTH 4 Katcha 202 31+620 Gudivada Uyyapatti koteswararo Duravasulu R-9 NTH 6 Katcha Res Cattleshe d 203 31+700 Gudivada Madda Sorojini Subhakararao L-8.5 NTH 4 Katcha Res 204 31+710 Gudivada Lankapalli Raju Musalayya L-7.8 NTH 5 Katcha Res 205 31+710 Gudivada Madda Mosayya Bhushanam L-8.1 NTH 2 Katcha Res 206 31+790 Gudivada Saradala Nagaraju Brahmayya L-6.5 NTH 0 Katcha Res 207 31+790 Gudivada Mocherla mamatha Srinu R-4.5 NTH 4 Katcha Res 208 31+790 Gudivada Vara samual Mosa R-5.2 NTH 0 Katcha Res 209 31+790 Gudivada Ganta Israyulu peddiraju L-5.9 TH 2 Katcha Res 210 31+800 Gudivada Akunoori Yesobu Eliya R-5.1 NTH 3 Katcha Res 211 31+800 Gudivada Chebrolu Ramarao Ramayya L-5.7 NTH 2 Katcha Res 212 31+800 Gudivada Sura Apparao Tatabbie L-5.8 NTH 3 Katcha Res 213 31+815 Gudivada Kandavalli Edukondalu Adishesu L-6.6 NTH 5 Katcha Res 214 31+820 Gudivada Usalla Devakanya Krishana L-6.8 NTH 3 Katcha Res 215 31+840 Gudivada Varigani Devamatha Adama L-4.6 NTH 2 Katcha Res 216 31+600 Gudivada Bura Srininvasarao L-5.1 NTH 5 Katcha Res 37+220 Gudivada Ramanapudi Suresh l-8 NTH 5 Kiosk Kiosk 37+400 Gudivada Painapurla Pothuraju Dasu(samual) Venkateshswarar ao Anantharamurth y l-8.5 NTH 4 Katcha Com 39+400 Gudivada Godavalli Sambasivarao Parasuramayya L-5 NTH 2 Kiosk Kiosk 220 40+800 Gudivada Kandepalli Saritha Kiranreddy L-7.3 NTH 0 Pucca 221 40+800 Gudivada NTH 0 Katcha 40+800 Gudivada Sattemma Ramakridhanare ddy L-7.2 222 Devireddy Radharani Vangapati Nageswaramma Res Res&Co m R-8.2 NTH 0 Katcha Res 223 40+800 Gudivada Manda Srinu Kasimreddy L-6.6 NTH 4 Semi Com 224 40+810 Gudivada Savireddy R-8.2 NTH 0 Katcha Res 225 40+810 Gudivada Alla Sundaramma Kandavalli Ramakrishanareddy Venkareddy L-8 TH 6 Pucca 226 40+820 Gudivada Kondapalli Ravi Akiripalli R-7 NTH 4 Katcha Res Cattleshe d 227 40+820 Gudivada Pullareddy Rangareddy Person Not Available L-6 TH 0 Pucca res 191 217 Bommuluru Gudiwada-1 218 219 Janardhana puram Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 42 Res Cattleshe d Res Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project 228 40+840 Gudivada NVS Nagireddy Rammohnareddy L-6.5 TH 0 Pucca res 229 40+840 Gudivada Konapalli narayanareddy Narayanaereddy L-6.5 TH 2 Pucca res 230 40+880 Gudivada Marikayalareddy L-9.5 NTH 0 Kiosk Kiosk 231 40+890 Gudivada Chinna L-8.2 NTH 0 Kiosk Kiosk 232 41+000 Gudivada Tammi Narapureddy Bommanapalli Venkataswamy kokkerapati Subbaramayya krishana L-9.5 NTH 0 Kiosk Kiosk 233 41+080 Gudivada Annem koteswararao iyyanna R-6 NTH 5 Kiosk Kiosk 234 41+080 Gudivada Venkdaru mallikarjunarao Ramarao R-9 TH 5 Semi Com 235 41+080 Gudivada Swarna Vani Ramakrishana L-9 TH 3 Semi Com 236 41+080 Gudivada Gantala krishanarao Person Not Available L-9 TH 5 Semi Com 237 41+080 Gudivada Karamsetty Koteswararao Subbarao L-9 TH 4 Semi Com 238 41+080 Gudivada Karamsetty jagadeesh Subbarao L-9 TH 2 Semi Com 239 41+080 Gudivada Ponnati Babji Person Not Available L-9 TH 6 Semi Com 240 41+100 Gudivada Galla Dhanalaxmi Narasimharao L-9 NTH 2 Semi Com 241 41+100 Gudivada Puttalamm Ammavari Shoping complex Person Not Available R-6.3 NTH 0 Pucca Com 242 41+100 Gudivada Pavisa Rammohanarao Venkatanarayana L-6.9 NTH 2 Kiosk Kiosk 243 41+100 Gudivada Manepalli subbarao Adinarayana R-6 NTH 2 Kiosk Kiosk 244 41+110 Gudivada Muddula Gopalakrishana Ramanjaneyulu R-6.5 NTH 4 Kiosk Kiosk 245 41+125 Gudivada Veruvada NarayanaNagabhusanam Venkateshawarar ao L-6 NTH 4 246 41+150 Gudivada Manepalli Subramanyam Adinarayana L-6 NTH 6 Katcha semiPucc a res Res&Co m 247 41+150 Gudivada Vempala Venkatalaxmi Person Not Available L-5 NTH 0 Kiosk Kiosk 248 41+150 Gudivada C.Vijaya Person Not Available R-7 NTH 0 Kiosk Kiosk 249 41+150 Gudivada Vanapalli Adilaxmi Laxmanarao L-6.5 NTH 2 Res 250 41+150 Gudivada Saripalli Rameshreddy L-5.9 TH 3 251 41+155 Gudivada S.Venkatasitaramayya Rangareddy Amba lakshmaiah Katcha semiPucc a L-6.8 NTH 0 Kiosk Kiosk 252 41+160 Gudivada Malleboiena pitchayy Narasimha R-8.9 NTH 4 Katcha Res 253 41+170 Gudivada Malliboiena Anjeneyulu Chinaramulu R-7.8 NTH 5 Res 254 41+170 Gudivada Girijala Rammurthy Apparao R-7.2 NTH 0 Katcha SemiPucc a 255 41+200 Gudivada Malliboiena Devakamma Pandu L-7.5 NTH 2 Katcha Res 256 41+200 Gudivada Awalomdhar Ajibabau Hoozoor L-7 NTH 2 Kiosk Kiosk 257 41+210 Gudivada Mekala laxmi kanakapothuraju L-8 NTH 3 Kiosk Kiosk 258 41+220 Gudivada Badam Venkatanarayana Ragavayya L-7 NTH 3 Com 259 41+230 Gudivada Alugolu Rangachari Ramamurthy L-8 NTH 5 Katcha semiPucc a 260 41+240 Gudivada Tallaparthi Ramarao Appalasuri R-7.1 NTH 3 Katcha Res 261 41+240 Gudivada malliboiena Lingayya Chinaramulu R-7.2 NTH 4 Katcha Res Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 43 Res Com Com Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project 262 41+240 Gudivada Nakka Narasimharao Mahalaxmayya L-6.8 NTH 0 Katcha Res 263 41+245 Gudivada laveti Durgarao Venkateswararao R-6.5 NTH 2 Res 264 41+310 Gudivada Suroju Nageswararao Laxmayya L-9 NTH 6 Katcha semiPucc a 265 41+400 Gudivada Chegandi Kanakamma Krishanamurthy L-7.2 NTH 2 Katcha 266 41+400 Gudivada Subbarao L-7 NTH 4 Katcha 267 41+400 Gudivada Pilli Srinivasaarao Devarapalli Satyanarayana Res Cattleshe d Nomulu L-6.1 NTH 3 Katcha Res 268 41+450 Gudivada Vanam Venkateseararao Durgamma R-6.8 NTH 3 Katcha Res 269 41+460 Gudivada Katari Kotayya Anjeneyulu R-6.1 NTH 4 Katcha Res 270 41+500 Gudivada pattumuri Satyanarayana Krishana L-7.2 NTH 4 Kiosk Kiosk 271 41+500 Gudivada Gurram Nagaraju Sriramulu R-7.8 NTH 2 Katcha Res 272 41+515 Gudivada Nanganama bujjibabu Chitayya R-8.3 TH 4 Katcha Res 273 41+515 Gudivada Ekba Peddirajulu Ramayya L-6.4 NTH 0 Katcha Res 274 41+550 Gudivada Nagaram Laxmana Krishanamurthy R-7.5 NTH 0 Katcha Res 275 41+550 Gudivada Kadekollu Nagaraju Nallayya L-5.6 TH 4 Katcha Res 276 41+550 Gudivada Jalasuthram Rangamma Baskararao L-6.2 NTH 2 Katcha Res 277 41+550 Gudivada Ambaru R-7.5 NTH 3 Katcha Res 278 41+550 Gudivada Gurram Srinu Kadavakollu tungabadrayya Nallayya R-7.3 NTH 7 Katcha Res 279 41+565 Gudivada Nakka Puttalamma Late) Bodayya L-6.4 TH 4 Katcha Res 280 41+600 Gudivada Kotaru Nagaraju Sitayya L-6.8 NTH 0 Katcha Res 281 41+600 Gudivada Nakka Venkateswararao Gopalam R-7.5 NTH 2 Katcha Res 282 41+600 Gudivada Ebba Srinivasu Ramayya R-7.2 NTH 4 Katcha Res 283 41+600 Gudivada Kataru Adinarayana Anjeneyulu R-7.4 NTH 10 Katcha Res 284 41+620 Gudivada Katari Suramma Srinu R-7.8 NTH 4 Katcha Res 285 41+620 Gudivada Kataru Demuduvenkanna Badraju R-7.5 NTH 6 Katcha Res 286 41+555 Gudivada Incha Narashima Rao Ramaiah R-7.5 TH 0 Katcha Res 287 41+650 Gudivada Narapareddy Person Not Available R-8 NTH 3 Katcha Cattleshe d 288 41+650 Gudivada Person Not Available R-8 NTH 4 Katcha Cattleshe d 289 41+770 Gudivada Rajarao Nagalam Venkateswararao Krishanamurthy R-6.2 NTH 5 Katcha Res 290 41+770 Gudivada Srinu R-6.8 NTH 4 Katcha Res 291 41+770 Gudivada Kagga Padma Nangalam Venkatarammayya Krishanamurthy R-6.8 NTH 3 Katcha Res 292 Puttagunta res 45+200 Gudivada Ranchari Laxmi Nageswararao L-6.6 NTH 0 Katcha Res 293 45+600 Gudivada Vinjavarapu Appalachari Bhrahmam R-5.5 TH 2 Pucca res 294 45+630 Gudivada Pamulapati Ramireddy Person Not Available R-5.8 TH 2 Res 295 45+650 Gudivada Valiveti Purna Subbarao R-6.5 NTH 0 Pucca Semipucc a 296 45+650 Gudivada Vankayalapati Murali Person Not Available R-7 TH 0 Pucca res 297 45+650 Gudivada Ravulapati Mangireddy Tatireddy L-7.2 NTH 0 Katcha Res Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 44 Res Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project 298 45+700 Gudivada Barapureddy Satyanarayana Dalayya L-6.8 NTH 0 299 45+720 Gudivada Sammangi Ramarao Appalaswamy R-6 NTH 0 300 45+800 Gudivada Valiveti Satyanarayana Jayaharinadh L-6.2 TH 2 301 45+800 Gudivada Oleti Satyavathi Apparao R-7 NTH 0 302 45+800 Gudivada maddala Venkateswararo Person Not Available L-8 NTH 0 303 45+800 Gudivada Pokuri Balakrishanarao Perisetty L-7.5 NTH 304 45+800 Gudivada Visnepalli Sitaravamma Yesudas R-8 305 45+810 Gudivada Valiveti Seshagirirao Jayaharinadh 306 45+820 Gudivada Pakuri Laxmanarao 307 46+180 Gudivada 308 46+200 309 Katcha Semipucc a Katcha Semipucc a Res Com Res&Co m Com Kiosk 2 Kiosk Semipucc a NTH 0 Kiosk L-6.9 TH 5 Katcha Kiosk Res&Co m Perisetty L-8 NTH 3 Pucca Res Sarasamma Person Not Available R-8 NTH 0 Katcha Res Gudivada Juturi Durgarao Srinivasarao R-9 NTH 4 Katcha res 46+220 Gudivada Rajasani mutyalu Sancharao R-9 NTH 2 Katcha res 310 46+240 Gudivada Ramakuri Ragavulu parasaram R-8 NTH 2 Katcha res 311 46+400 Gudivada Kollu Someswararao Mallikarjunarao L-6.7 NTH 0 Katcha Res 46+400 Gudivada Mukkala Yesuamma Yesu R-7 NTH 1 res 48+700 Gudivada Suvari Narasimhamurthy Ramachandrarao R-6.2 NTH 0 Katcha SemiPucc a 48+700 Gudivada Thota Chinayya Ramachandrarao R-6.7 NTH 0 Kiosk Kiosk 312 313 314 Shivayyapak alu Shivayyapak alu Com Com 2 HouseHold Father\husband name Arugolanu 50+500 50+520 Nuzvid Nuzvid Thota Venkataramana Anjayya(Late) R-7.2 koturi Srinivasarao Kanakarao` L-8.8 3 50+600 Nuzvid Reddysobhana chalapathirao Atchiyya L-7.8 4 50+610 Nuzvid Betha Rangamma Rangarao R-8.2 5 50+630 Nuzvid Kunuku Sivashankararao Mohanarao L-8.5 6 50+650 Nuzvid Chukkapu Nageswararo L-5.8 7 50+700 Nuzvid Veeram Samrajayyam Atchiyya Venkateswararao(lat e) 8 50+720 Nuzvid Chekati Chnnabbie Late)Chettemma R-8.5 9 50+740 Nuzvid V.Kesavarao Varalaxmi R-6.2 Detailed Project Report VIII: Resettlement Action Plan (Annexures) L-8.6 No of Family Members Name of the Head(HHH) Chanage Sl.No 1 Division Title holder(TH)/NonTitleHold er(NTH) Name of the Village Location (Left\ Right) Nuzvid Division Project Affected Famalies(PAF'S) of PEDNA - NUZVID -VISANNAPETA Road. NT H NT H NT H NT H NT H NT H NT H NT H NT H Type of Structure Nature of Structure Res &Com 6 Katcha 5 Katcha 2 Kiosk Kiosk 1 Katcha Com 4 Katcha Com 4 Com 1 Katcha Semipucc a Semipacc a 3 Kiosk Kiosk 1 Page 45 Res &Com Res Res Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project 7 Semipucc a Res TH NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H 4 Pucca Semipucc a 5 Katcha Com Katcha Com 2 Katcha Com 6 Katcha Semipucc a Res &Com Com 7 Katcha Semipacc a Semipucc a 3 Katcha Res 6 Katcha Com Katcha Com Katcha Res & Com Com TH NT H 2 Katcha Semipucc a Semipucc a Res &Com TH NT H NT H NT H 2 Katcha Semipucc a Semipacc a Semipucc a Kiosk Kiosk 10 50+740 Nuzvid Dogga Chinabbaie Rangayya(Late) R-8.6 TH 11 50+750 Nuzvid Chekka Chandrayya Bapujirao R-8 TH 12 50+760 Nuzvid Nadendla Chandram R-7.5 13 50+780 Nuzvid Veeram Nageswararo Venkataratnam(late) Venkateswararao(lat e) 14 50+790 Nuzvid Gottapu Sivanagamani Apparao R-6.5 15 50+810 Nuzvid Balagam Satyanarayana Papa R-7.2 16 50+810 Nuzvid Nalla Sivanagaraju krishana` R-9 17 50+820 Nuzvid Kunuku Sivashankararao Mohanarao L-7.8 18 50+820 Nuzvid Dokala Apparao Appalaswamy L-8.3 19 50+820 Nuzvid Gottapu Simhachalam Paprao R-7.5 20 50+830 Nuzvid Punuku Sitamahalaxmi koteswararao L-8.5 21 50+840 Nuzvid Belagam Srinivasarao Sitaramayya L-8.5 22 50+850 Nuzvid Terli Venkateswararao Pentayya(late) L-8.5 23 50+850 Nuzvid Gottapu Kormaiah Paprao R-7.3 24 50+900 Nuzvid Cheera Anilkumar swamy Shankararao R-7.3 25 50+900 Nuzvid Arisimilli Prasad Venkateswarao R-8 26 51+000 Nuzvid Sk Kareemulla Murella(late) L-8 27 51+000 Nuzvid Pasupuleti Subbarao Nagayya L-8 28 51+010 Nuzvid Shaik Bharani meerasaheb L-8 29 51+050 Nuzvid Poteneni lalithakumari Sambasivarao R-7 30 51+110 Nuzvid Devarakonda Subbarao Pitchayya L-9 31 51+120 Nuzvid Teku nagaraju Dharmarao L-8 32 51+150 Nuzvid Vadavalli Sivabully challyya Manikyarao L-6.5 33 51+150 Nuzvid Pamarthi Sudharani Sivaramaprasad(late) L-7.8 34 51+180 Nuzvid Naraharasetty Somayya Laxmeswari(late) L-7.2 35 51+180 Nuzvid katuri Venkatarao H/0 babysorojini L-8.8 36 51+180 Nuzvid Katuri Sivanageswararao Venkateswararao L-9 37 51+180 Nuzvid Visaie Parvathi Durgarao(Late) L-8 38 51+180 Nuzvid Geddala Sugunarao Subbarao L-9 39 51+200 Nuzvid Padurthi Venkatasubbayya Chenyyasetti R-8.3 40 51+200 Nuzvid Padurthi Chenyyasetti Satyanarayana R-8.3 Detailed Project Report VIII: Resettlement Action Plan (Annexures) L6.2 NT H NT H NT H NT H NT H NT H NT H NT H 4 2 2 9 1 4 3 1 2 3 Semipucc a Semipacc a Semipacc a Semipucc a Semipacc a Res &Com Res &Com Com Res & Com Res &Com Com Com Res Com Res Res Res Res & Com Res & Com Res & Com Katcha Res Katcha Res Katcha Res Page 46 Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project R-8.2 NT H NT H Applaswamy(late) R-7 TH 7 Poteneni Sivaramaprasad Nagabhusan R8.3 2 Nuzvid Mulipudi Venkateswararao Sesayya L-8.5 4 Katcha Com 51+400 Nuzvid Batula venkateswararao 2 Katcha Res 47 51+400 Nuzvid Mulupudi Butciyyachowdari Ramayya(late) R-7.8 Katcha Com 48 53+650 Nuzvid Varri Chakravarthi Rajarao R-8 4 Katcha Res&Com 49 53+650 Nuzvid Varri Chakravarthi Rajarao R-8 5 Katcha Cattele shed 55+410 Nuzvid Ramalle Chinna DaVid R-5 2 Katcha Com 51 55+420 Nuzvid Bethapudi Pramila Villasambabu R-4.5 2 Katcha Com 52 55+420 Nuzvid Katumalla Kishorebabu Bisuff R-5.3 4 Katcha Res 53 55+430 Nuzvid Dodda Koteswrarao Ratnam L-6 6 Katcha Cattleshed 54 55+640 Nuzvid Shaik Mohhidin Meerasaheb R-8.5 2 Katcha Res & Com 55 55+645 Nuzvid Chintapalli Prasannakumari Prabhakar(late) R-8 3 Kiosk Kiosk 56 55+650 Nuzvid Darmavarapu Sambhasivarao Ramudu L-8 2 55+655 Nuzvid Nerella sarveswarao Narayana R-7 Katcha Semipucc a Res 57 58 55+670 Nuzvid Chinnam Siyyaon Somayya R-7 55+670 Nuzvid Turak Esobu Karunavaraprasad L-8.3 60 55+670 Nuzvid Kandhula Kesavarao Venkateswararao R-8.6 TH 3 Kiosk Semipucc a Semipucc a Kiosk 59 TH NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H Katcha Semipucc a 61 55+680 Nuzvid Kandula veeravenkatanagaprasad Chinavenkateswarao L-6.2 3 55+700 Nuzvid Gopalarao OLD BUILDING L-6.2 Pucca Semipucc a Res 62 63 55+740 Nuzvid kattumala Adrutstarao Imannual R-5.5 1 Kiosk Kiosk 64 55+780 Nuzvid Narikimalli Seshachalam Suryanarayana L-5.5 TH NT H NT H NT H 4 Katcha Res 65 55+780 Nuzvid Karamsetti sikshamani Denoji R-8.8 1 Katcha Res 66 55+790 Nuzvid Polimetta vijayaratna kumari Chinni(late) R-8.5 2 55+795 Nuzvid Kurupati parisuddam Gonnaprakash R-6.2 68 55+800 Nuzvid Bejwada Nageswararao Hanumantharao L-6.3 69 55+800 Nuzvid Matta Narayanarao Venkataswamy L-6.3 Pucca Semipucc a Semipucc a Semipucc a Res 67 TH NT H NT H NT H NT H 70 55+810 Nuzvid Chamarthi Subbarajamma Vekateswararao(late) L-7.3 71 55+810 Nuzvid Pilli Edukondalu Srinivasarao L-7.3 72 55+820 Nuzvid Chalamarasetty Suryaprakasarao Ramayya L-6 41 51+200 Nuzvid Pedarthi Venkateswararao 42 51+200 Nuzvid Chippada Papayamma 43 51+250 Nuzvid Singanapalli Venkateswararao 44 51+250 Nuzvid 45 51+370 46 50 Kanumolu chanchayya R-8.3 6.8 Detailed Project Report VIII: Resettlement Action Plan (Annexures) NT H NT H NT H 1 1 1 5 2 1 4 3 Katcha Semipacc a Res & Com Res Semipucc a Semipucc a Pucca Page 47 Res & Com Res &com Res Res Res Res Res Com Com Res Com Res Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H 73 55+820 Nuzvid Chamarthi venkatanarasimharao Viswanadham R-6.2 74 55+820 Nuzvid Chamarthi Venkateswarao Viswanadham R-5.5 75 55+830 Nuzvid Chamarthi Anjeneyulu venkatappayya R-6.2 76 55+860 Nuzvid Allamuri Murali Krishana Prasadarao L-6.2 77 55+870 Nuzvid Chamarthi Venketeswararao Rammohanarao R-5 78 55+870 Nuzvid Chamarthi Anjeneyulu Venkatappayya R-5 79 55+870 Nuzvid Mareedu Subbarao Chalapathirao(late) L-8 80 55+880 Nuzvid Majjiga Nagraju Keratalu L-8 81 55+890 Nuzvid Garikipati Umamaheswarao Venkateswararao L-5.2 82 55+900 Nuzvid Vanamala Eswararao Nageswararao R-6.5 83 55+930 Nuzvid Vemulapalli Subramanyam Srivenkataramalinga charya R-5.7 84 55+930 Nuzvid Morla Venkateswramma Vasantharao R-5.5 85 55+930 Nuzvid polasi Pothuraju Abimanyarao R-5.5 86 55+940 Nuzvid Maredu Rambabu Sobhanachalam R-5.7 87 55+940 Nuzvid Suri Satyanarayana Venkoji L-6 88 55+950 Nuzvid Tavva Badrinadh Krishana murthy L-7.3 89 55+950 90 55+960 Nuzvid Bhemavarapu Rangarao mangayya R-5 TH NT H 91 55+960 Nuzvid Chintala Ravivenkatasatyanarayana Satyavenkataramara o R-5.7 92 55+960 Nuzvid China Srinivasarao Ramarao 93 55+980 Nuzvid Reddi Chinalaxmayya 94 55+980 Nuzvid 95 56+980 96 NT H NT H NT H NT H NT H NT H 2 Pucca Res&Com 2 Pucca Res 7 Pucca Res 4 Pucca Res&Com Pucca Res&Com Katcha Semipucc a Semipucc a Res Com 4 Pucca Semipucc a 1 Semipucc a Semipucc a 7 2 3 2 Com Res&Com Com Res&Com Res&Com 4 Pucca Semipucc a Semipucc a 3 Pucca Com 3 Pucca Com 3 Pucca Res&Com NT H 4 Pucca Res&Com R-5.7 TH 4 Pucca Com Chittemma L-5.7 TH 2 Pucca Res Chinta Muralikrishana Satyavenkataramara o R-5.5 Pucca Com Nuzvid Panchakarla Satyanarayana Venkataramana R-8 4 Kiosk Kiosk 56+980 Nuzvid Lingamallu veravenkata jaganmohanarao Venkataratnam L-5.5 3 Pucca Res 97 56+980 Nuzvid Vijayakumar Bhyragi R-4.2 56+000 Chinta Apparao Swamulu L-5.5 5 99 56+000 Nuzvid N.V.Ramanarao ChinaSurayya R-4 TH Kiosk Semipucc a Semipucc a Kiosk 98 NT H NT H NT H 100 56+000 Nuzvid Nanduri Venkatamma Krishana murthy(late) R-5 TH 101 56+000 Nuzvid Volusuri Venugopal L-4.2 102 56+000 Nuzvid Anisetty Timmaraju Boogeswararao L-5 103 56+050 Nuzvid Gandimeda Venkatasivarao kottayya(late) R-8 TH NT H NT H 104 56+050 Nuzvid Rellu Subbarao Ngeswrarao R-6.2 TH Dondi Durgarao L-7 Detailed Project Report VIII: Resettlement Action Plan (Annexures) NT H NT H 4 Res&Com 4 4 Res&Com Com Res Res Semipucc a Res 5 Pucca Res&Com 4 Pucca Res 3 Pucca Res&Com 7 Pucca Com Page 48 Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project 105 56+060 Nuzvid Rellu nageswararao Bhemayya R-9 106 56+070 Nuzvid Vaddi Venkateswararo Sobhanachalam L-8 TH NT H 107 56+070 Nuzvid Pulla Nageswarrao R-9 TH 108 56+070 109 56+200 110 7 Pucca Res&Com 3 Katcha Com Pucca Res Kiosk Semipucc a Kiosk Vanukuri Edukondalu Satyanarayana(late) L-10 Nuzvid Bandili Satyanarayana singh Subbisingh L-6 NT H NT H 56+210 Nuzvid Bayya Ratnagandi Ranganayakulu R-8 TH 6 Pucca Res 111 56+210 Nuzvid Bayya Ramamohanarao Ranganayakulu R-8 TH 4 Pucca Res 112 56+210 Nuzvid Sunkara Laxmanarao Surayya L-5.5 2 56+300 Nuzvid Moganti Chandra sekhar krishanarao R-6 Pucca Semipucc a Res 113 TH NT H 114 56+320 Nuzvid Chamarthi Anjeneyulu laxminarayana R-8 TH 5 Pucca Res&Com 115 56+340 Nuzvid Chamarthi Sambasivarao Venkatakrishanarao R-9 TH 5 Pucca Res 116 56+340 Nuzvid Chamathi mallikarjunarao Venkatakrishanarao R-9 TH Semipucc a Res&Com 117 56+340 Nuzvid Chintapalli Umameheaswararao Venkatakanadurgara o L-7.5 NT H 4 118 56+350 Nuzvid Naraharasetty Venkateswraro Venkataratnam R-7 TH 2 119 56+350 Nuzvid Venkataratnam R-7 TH 4 120 56+350 Nuzvid Naraharasetty Gangadhar Naraharasetty Venkatasatya Gangadhar Venkataratnam R-7 4 121 56+360 Nuzvid Sunkara Laxmanarao Surayya L-5.5 122 56+370 Nuzvid MD.Salem,Jafarali,Halem Bro's (Reg.off) R-7.5 TH NT H NT H 123 56+390 Nuzvid Naraharasetty Prabhavathi Venkataratnam R-7 TH 2 124 56+390 Nuzvid Naraharasetty Gangadhar Venkataratnam R-9 125 56+450 Nuzvid Badicherla Narasimharao Koteswararo R-7.5 126 56+450 Nuzvid Badicherla Narasimharao Koteswararo R-7.5 127 56+460 Nuzvid Chintapalli Durgarao Venkateswarao R-9 TH NT H NT H NT H 56+950 Nuzvid Annala Bujji D/0.Krishana L-8.8 TH 2 129 56+975 Nuzvid Venkatakonda Gandhi Koteswararo L-6.8 TH 3 130 56+980 Nuzvid Kamella Satyanarayana Ragavayya L-7.8 7 131 57+300 Nuzvid Singireddy Narakumari Chennakesavarao L-7 132 57+300 Nuzvid Vegireddy Apparao Applaswamy R-8.7 133 57+300 Nuzvid Vegireddy Gandhi Applaswamy R-8.7 134 57+300 Nuzvid Vegireddy Suryanarayana Applaswamy R-8.7 135 57+300 Nuzvid Vegireddy Paparao Applaswamy R-8.7 136 57+300 Nuzvid Vegireddy Apparao Applaswamy R-8.7 137 57+300 Nuzvid Vegireddy Paparao Applaswamy R-8.7 TH NT H NT H NT H NT H NT H NT H NT H 128 Perikeedu Detailed Project Report VIII: Resettlement Action Plan (Annexures) Res&Com Res Katcha Semipucc a Semipucc a Semipucc a Com Com 4 Katcha Semipucc a Semipucc a Semipucc a 6 Katcha Res 6 Cattleshed 4 Katcha Semipucc a Semipucc a Semipucc a Semipucc a Semipucc a 7 Pucca Res 8 Pucca Res 9 Pucca Res 10 Pucca Semipucc a Semipucc a Res 2 3 7 10 Page 49 Res&Com Res Res&Com Com Res Com Res Res Res Res Res&Com Com Com Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project 138 57+310 Nuzvid Sammangi Sateshkumar Nageswararao L-7 TH 4 139 57+310 Nuzvid Sammangi Mohanasuresh kumar Nageswararao L-7 4 140 57+320 Nuzvid Gottapu Koteswararao Paparao L-7 141 57+320 Nuzvid Bandaru Swetha satyanarayana Krishanarao L-7 142 57+350 Nuzvid Maradani Sivanagaraju Tatayya L-7 143 57+350 Nuzvid Vankuri Hunumantharao Verayya L-7 144 57+360 Nuzvid Rajamahendravarapu satyaswathi Venkateswararaju L-7 145 57+360 Nuzvid Allu Trimurtulu Narayanarao L-6.5 146 57+360 Nuzvid Terli Puspalatha Venkateswarao R-8.5 147 57+365 Nuzvid Suggisetty tulasi Subbarao R-8.5 148 57+560 Nuzvid Tavva Suryaprakasarao Purnayya L-7.2 149 57+650 Nuzvid Lanka Gopalarao Appalarao L-6.5 150 57+650 Nuzvid Kella Apparao Satyanarayana R-7.5 151 57+650 Nuzvid Pabolu SS varaprasad Nageswararao L-6.5 152 57+650 Nuzvid Singarapu Durgarao Simhachalam R-7.5 153 57+650 Nuzvid Bayya Mohanarao Pitchiyya(late) L-7 TH NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H 154 57+700 Nuzvid Jalidi Balakrishana Raeddiyya R-6.5 155 57+700 Nuzvid Botcha.Krishanarao Venkayya R-7 156 57+720 Nuzvid Chintapenta krishanarao Seshagirirao R-8 157 57+720 Nuzvid Valiveti Anil(Naveen) 158 58+150 Nuzvid Akkubolu Koteswararao krishanamurthy R-7.5 159 58+400 Nuzvid Nagulapalli Edukondalu Nageswararao R-7 160 58+500 Nuzvid Maddila Ganga Venkateswarao R-7 161 58+550 Nuzvid Battu Manikyalarao Baskararao R-7 162 58+650 Nuzvid Partipati Agnesamma Prabakar L-7 163 58+660 Nuzvid Partipati Nageswararo manikayam R-8 164 58+670 Nuzvid Gujjala veraswamy(israyulu) Ramaswamy L-7 165 58+750 Nuzvid Partipati Vijaykumar Balaswamy R-6.5 166 58+880 Nuzvid Padmala Venkateswararo Venkatanarasayya L-7 58+880 Nuzvid Padmala Venkateswararo Venkatanarasayya L7 64+300 Nuzvid Pidugu Prasad Anjeneyulu R-7 169 64+500 Nuzvid Nadakudur Muttaiah Subbarao L-7 170 64+500 Nuzvid Nadakudur Chinabrahmam Subbarao R-9 171 64+530 Nuzvid Peddoji Rangachari Nagachari L-8 167 168 Marribanda m R-8.5 Detailed Project Report VIII: Resettlement Action Plan (Annexures) TH NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H Semipucc a Res 3 Semipucc a Semipucc a 5 Katcha Res 3 Katcha Res Kiosk Kiosk Katcha Semipucc a Res Com 5 Katcha Semipucc a 6 Katcha Cattleshed Katcha Com Katcha Semipucc a Com Kiosk Kiosk Res 2 Pucca Semipucc a Semipucc a Semipucc a Semipucc a Semipucc a 13 Katcha Com 4 Com 9 Katcha Semipucc a Semipucc a 3 Katcha Res 3 Katcha Res 8 Katcha Com 5 Katcha Res 6 Katcha Cattleshed 4 Katcha Com 3 Katcha Com 6 Katcha Com 4 Katcha Com 4 5 6 4 7 4 3 3 Page 50 Res Res&Com Res&Com Com Com Res Com Com Res Com Com Com Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project 172 64+500 Nuzvid Shaik Babji Mabu L-6.7 173 64+600 Nuzvid Kowkuri Soroja rimannarayana R-9 NT H NT H 174 64+680 Nuzvid Chandrakala Person Not Available R-9 NT H 175 64+680 Nuzvid Sk Baji Person Not Available L-8 176 64+700 Nuzvid Rayavarapu Swami Rangarao L-6.4 177 64+720 Nuzvid Aladangi Ugadi Chinnarao L-6 178 64+745 Nuzvid Vaddadi Trinadh Appalaswamy L-7 179 64+780 Nuzvid Rayavarapu Subbarao Person Not Available L-7 180 64+800 Nuzvid Vajja Someswararo Subbarao R-8.2 181 64+800 Nuzvid Chirugudu Nagaraju Appalaswamy L-6.5 182 64+810 Nuzvid Ponikanti Ramarao Ragavayya R-8 183 64+810 Nuzvid Machavarapu Tirupatayya Ramdhar L-6 184 65+100 Nuzvid Podhuri Srinu Rattayya R-7 185 65+550 Nuzvid Kanikanti Prasad Nagabhusan R-8 186 65+800 Nuzvid Potakamuri Rajababu Gandhi L-7 187 65+850 Nuzvid Vadduluri Venkateswararo Raghavalu L-8.1 188 65+850 Nuzvid Vemuluri Nageswaramma Satyanarayana L-8.1 189 65+850 Nuzvid Jakkula Laxmi Venkataramana L-8.1 190 65+850 Nuzvid Chabathina Ratnasamual Samual R-8 191 65+850 Nuzvid Peddaji Ragavachari Person Not Available R-9 192 65+850 Nuzvid Palakurthi Ammulu Putalayya R-9 193 65+890 Nuzvid Chinathadu Bhupathi Varahalu L-8 65+900 Nuzvid Kombati Satyanarayana Gopalam R-6.8 67+450 Nuzvid Kota Simhachalam Krishana R-7 196 67+460 Nuzvid Vallepu Parameswararao Raju R-7.1 197 67+490 Nuzvid Merapadu Baskhararao Maranna L-6 198 67+500 Nuzvid Olipi Venkateswarrao Verayya R-6.4 199 67+500 Nuzvid Tegala Chittemma Verayya R-6 200 67+510 Nuzvid Garika Bhagyam Sambayya R-6 201 67+520 Nuzvid Busi Adam Prabhakararao R-6 202 67+540 Nuzvid Mindiya Venkateswararao Maddiramayya R-6 203 67+550 Nuzvid Tegala Guruvulu Veerayya R-5.4 194 195 Meerjapura m Detailed Project Report VIII: Resettlement Action Plan (Annexures) NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H 10 3 Katcha Semipucc a 0 Semipucc a Res 0 Semipucc a Com 4 Kiosk Kiosk 4 Kiosk kiosk 0 Kiosk kiosk 4 Katcha Com 8 Katcha Com 4 Katcha Com 3 Katcha Com 2 Kiosk kiosk 3 Katcha cattleshed 4 Katcha Com Katcha Com 6 Kiosk Kiosk 4 Katcha Kiosk(2sh ops Res & Com Kiosk kiosk Semipucc a Com 2 Katcha Res 8 Katcha Res & Com Katcha Com 3 Katcha Res 6 Katcha Res 3 Katcha Com 3 Katcha Res 3 Katcha res 2 Katcha Res 2 Katcha Res 5 Katcha Res 6 Katcha Res 2 Page 51 Com Com Kiosk Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project NT H NT H NT H 204 67+550 Nuzvid Dasari Yesu Baalaraju R-5.4 205 67+560 Nuzvid Gandikota Anjeneyulu Venkateswararao R-6.5 206 67+570 Nuzvid Paramanthi Prabhakararao Sriramamurthy L-8 207 67+620 Nuzvid Badipati Isak Person Not Available L-6.2 208 67+620 Nuzvid Mareedu Nancharamma Nageswararao R-8 209 67+660 Nuzvid Rajulapati Nageswararo Venkateswararao L-6.9 210 67+700 Nuzvid Vaka Baskararao Venkateswararao L-8 211 67+740 Nuzvid Kothala Apparao Person Not Available L-8 212 67+785 Nuzvid Moduri Ranganadham Laxminarasimha L-7.2 213 67+790 Nuzvid Tegala Chantibabu Ramulu L-7 214 67+800 Nuzvid Tegala Tirupathirao Ramulu L-7 215 67+801 Nuzvid Tegala Tirupathirao Ramulu L-7 216 68+480 Nuzvid Mathina Subbarao Veerayya L-7 217 68+580 Nuzvid Seelam Sekhar Raghavayya l-8 218 68+800 Nuzvid Selam Satyanarayana Seshagirirao R-6 219 68+850 Nuzvid Pamidikondala Radhakrishana Ramachandrarao L-5 220 68+850 Nuzvid Gollapu Satyanarayanamma Venkateswarulu R-9 221 68+900 Nuzvid Varagala Prasad Subbarao R-9 222 68+905 Nuzvid Varala Nancharamma Sobhanadri R-8 223 68+910 Nuzvid Sk Hamid Abbulnabi R-7 224 68+910 Nuzvid Sedirala Koteswararao Venkatasubbarao L-8 225 68+910 Nuzvid SK Kadarvali Mastansaheb l-8 226 68+920 Nuzvid Sk Mastan Parisaheb L-6 227 68+940 Nuzvid Goduguri Sivaprasad Muralikrishana R-9 228 68+940 Nuzvid Sutrala Rangarao Subbarao R-7.3 229 68+940 Nuzvid Maragani Nehrukanth Ayanna R-9 230 68+940 Nuzvid Maragani Nehrukanth Ayanna R-9 231 68+960 Nuzvid Sk.Mastanvali Nagusaheb L-9 232 68+960 Nuzvid Sk.Anwar Hussain L-9 233 68+960 Nuzvid Sk.Kalishavali Person Not Available L-9 234 68+960 Nuzvid Maddirala NagaSriragavarao Venu L-9 235 68+960 Nuzvid Sk.Meera Sherlu L-9 NT H NT H NT H 236 68+960 Nuzvid Jogi Venkateswarao Gurumurthy L-9 NT Detailed Project Report VIII: Resettlement Action Plan (Annexures) NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H 4 Katcha Res 3 Katcha Res 4 Katcha Res 5 Katcha Res & Com 1 Katcha Res & Com 10 Katcha Semipucc a Res Res 4 Katcha Semipucc a 2 Katcha Res 6 Katcha Res 7 Katcha Cattleshed 2 Com 4 Katcha Semipucc a Semipucc a 2 Katcha Res & Com 3 Katcha Com 2 Katcha Com 2 Katcha Com 2 Katcha Com kiosk Kiosk Katcha Com Katcha Com Katcha Com kiosk Kiosk 5 kiosk Kiosk 6 Katcha Semipucc a Res & Com Katcha Com Katcha Res & Com kiosk Semipucc a Kiosk Semipucc Com 4 1 2 Page 52 Com Res & Com Com Com Com Com Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project H 237 68+990 Nuzvid Naidu Srininvasarao Venkateswararao R-7.8 238 68+995 Nuzvid Durga Person Not Available R-7 239 69+000 Nuzvid Maridu Rangamma Raghavulu L-8.8 240 69+000 Nuzvid Tellaboiena Srinivasarao Pedavenkanna L-8.8 241 69+030 Nuzvid Yarramsetty Loknadh Tirupatiayya L-8.5 72+000 Nuzvid Irrala Baskararao Pottiyya R-8 243 72+000 Nuzvid Pakandi Dhanalaxmi Laxmayya R-8 244 72+050 Nuzvid Pamarthi Venkamma Laxmayya R-8 245 72+050 Nuzvid Battula Srinivasarao Sriramulu R-8 246 72+050 Nuzvid Venula Durgaprasad kameswarao R-7 247 72+070 Nuzvid Pamarthi Kriskanakumari Radhakrishana L-7 Nuzvid Chodagani Laxmi Nani L-9 242 Gollapalli 248 249 72+100 Nuzvid Penumada Kalebu Venkataratnam L-9 250 72+100 Nuzvid Reddi Gopalarao Sriramulu R-8 251 72+100 Nuzvid Attili Brahmam Person Not Available R-6 252 72+100 Nuzvid Tata Pullarao Srirangam R-7 253 72+140 Nuzvid Boodu Nagaraju Ayodhayaramayya R-8 254 72+160 Nuzvid Vinnakota Veeraragavamma BalaramSwamy L-9 255 72+180 Nuzvid Tummala Ramakrishana Adinarayana R-8 256 72+180 Nuzvid Koduru Nageswararao Subbarao L-7 257 72+200 Nuzvid Owner not Available Person Not Available 258 72+210 Nuzvid Parusuri Vijayalaxmi Person Not Available R-8 259 72+210 Nuzvid Konda vaddikasulu Anjeneyulu R-7 260 72+220 Nuzvid Nandigama Ammaji Bhaskarrao R-8 261 72+220 Nuzvid Tata Rangarao Person Not Available R-6.1 262 72+220 Nuzvid Gollapalli Pothuraju Suryanarayana L-8 263 72+220 Nuzvid Tata Nageswararamma Venkateswararao L-8 264 72+230 Nuzvid Katta `Sakuntala Somulu R-8 265 72+265 Nuzvid Shaik Meerjavali Kaream R-6 266 72+380 Nuzvid Pamarthi Koteswararao Anjeneyulu L-8 Detailed Project Report VIII: Resettlement Action Plan (Annexures) NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H a 4 Katcha Res Katcha Res Katcha Com Katcha Res & Com kiosk Kiosk 5 Katcha Res 7 Katcha Res 2 Katcha Res 5 Katcha Res 3 Katcha Res 1 Katcha Res & com katcha Com 3 kiosk Kiosk 3 Katcha Res Katcha Com 4 Katcha Res 4 Res 1 Katcha Semipucc a 4 Katcha Res 2 kiosk Kiosk kiosk Kiosk 1 Katcha Res 4 Katcha Res 3 Katcha Res 2 Katcha Res 2 Katcha Res 1 Katcha Res 2 katcha Res 4 Kiosk Semipucc a Kiosk 5 NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H 0 Page 53 Com Res Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project 267 72+380 Nuzvid Pamarthi Srinivasarao Krinayya L-8 268 72+400 Nuzvid Shaik Dilshadbagem Munnabasha R-5.4 269 72+405 Nuzvid Valiveti Satyanarayana Venkatakrishana R-5.6 270 72+405 Nuzvid Shaik Babu Abdhul L-5.7 271 72+410 Nuzvid Seeram Shivashankaraaro Rosayya R-7.3 272 72+410 Nuzvid Mylavarapu Tirapatirao Raghunadam L-6.8 273 72+480 Nuzvid Bonala VijayaRangarao Gopayya R-9 274 72+500 Nuzvid Namala Jayaolaiah Rangarao R-6 275 72+530 Nuzvid Shaik Choti Mahaboob R-6.8 276 72+565 Nuzvid Talam Sriramulu Ramayya L-5.9 277 72+565 Nuzvid Taluri Prubudas Yesudas L-6 278 72+590 Nuzvid Aripalli Suryanarayana Veerayya L-5 279 72+600 Nuzvid Bokinala Subbarao Raghunadam L-6 280 72+610 Nuzvid Chittiboiena Rani Kittarao L-6 281 72+630 Nuzvid Gandikota Rajarao Ragunadam R-8 282 72+680 Nuzvid Kokilagedda Vajrakumari Kantharao L-8 283 72+680 Nuzvid Adumalli Venkatarao Subbarao R-9 284 72+680 Nuzvid Pallipamula Prakasam Venkateswararao L-8.7 285 72+710 Nuzvid Ulaga Krishana Venkayya L-5.7 286 72+720 Nuzvid Mohamad Basha Sulemansaheb L-7.7 287 72+720 Nuzvid Mylavarapu Venkateswararao Subbarao R-5.3 288 72+720 Nuzvid Kamaravalli Salman Jalachandrudu R-8 289 72+730 Nuzvid Ketineni Kasturamma Ramachandrarao L-7 290 72+730 Nuzvid Arepalli Bhushanam Nageswararao L-7.1 291 72+770 Nuzvid Arepalli mohanarao Chinaverayya L-4.9 292 72+770 Nuzvid Makaraju Rangaraju Subbaraju L-5.2 293 72+780 Nuzvid Mallavalli Rambabu Poturaju L-7.8 294 73+700 Nuzvid Sodagiri Vilasana Bhusanam R-9 75+040 Nuzvid Parasa Sesayya Sriramulu R-8 296 75+100 Nuzvid MD Yusuf Ibraheem L-5 297 75+110 Nuzvid Bejawada Bujji Rangarao R-5.5 298 75+120 Nuzvid Vamula Jayalaxmi Venkateswararao L-8.5 299 75+200 Nuzvid G.Apparao Person Not Available R-6.4 300 75+200 Nuzvid Buddala Prabhakararao Ramadasu W/0 R-6.4 295 Morsapudi Detailed Project Report VIII: Resettlement Action Plan (Annexures) NT H NT H 0 Katcha Res 3 Katcha Semipucc a Semipucc a Semipucc a Com Kiosk 4 kiosk Semipucc a 0 Katcha Res 4 Katcha Res 3 Katcha Res 6 katcha Res 2 Katcha Res 6 katcha Res 6 Katcha Res 3 katcha Res 3 Katcha Res 3 Katcha Res 5 Katcha Res TH NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H 2 4 Kiosk Kiosk TH NT H NT H NT H NT H NT H 5 Katcha Res 4 Kiosk Kiosk 0 Katcha Com 0 Katcha Res 0 Katcha Res 4 Res TH NT H NT H NT H NT H NT H NT H 2 Katcha Semipucc a 0 Katcha Com 3 Katcha Com 4 Katcha Com 4 Katcha Com 4 Katcha Com 2 Katcha Res & Com 4 Kiosk Kiosk 5 Katcha Res NT H NT H 6 3 0 Page 54 Res Res & Com Res & Com Res Com Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project 301 75+210 Nuzvid Boddupathi Sandya Apparao R-7.2 302 75+220 Nuzvid Mekhala Nagamma Sayilu R-6.6 303 75+220 Nuzvid Arepalli Bhushanam Sayidulu L-7.8 304 75+220 Nuzvid Devarakonda Mahalaxmi Darmayya L-7.5 305 75+220 Nuzvid Shaik Mastansaheb Hussainsaheb R-8.2 306 75+230 Nuzvid Chintala Nirma Mariyadas R-7.8 307 75+230 Nuzvid Poturu Rangamma Venkateswararao R-7.5 78+380 Nuzvid Polimetala Devasahayam Abraham R-6.5 309 78+410 Nuzvid Palagani Rangarao Peerayya L-7.2 310 78+420 Nuzvid Mohamad Kareemulla Ibraheem L-6.8 311 78+420 Nuzvid Sk Kalisha Ismail L-8 312 78+420 Nuzvid Gonduboiena Sekhar Venkatesh R-6 313 78+430 Nuzvid Badugu Venkateswararao Kondayya L-8 314 78+430 Nuzvid Kosuri Srinivasarao Venkateswararao R-6.8 315 78+430 Nuzvid Kosaraju Rajarao Person Not Available R-7.2 316 78+600 Nuzvid Kosaraju Ramesh Rajarao R-9 84+200 Nuzvid Polavarapu Narasimharao Rajasekar weigh bridge R-9 318 84+200 Nuzvid Puram Samrajyam Venkateswararo L-5 319 84+440 Nuzvid Bala Vijayalaxmi Rammohanarao R-6.2 320 84+440 Nuzvid Atluri Venugopalarao Amarayya R-6.2 321 84+415 Nuzvid Kandikatla Bullemma Ramarao R-5.5 322 84+415 Nuzvid Andela Kotamma Changayya R-6.2 323 84+480 Nuzvid Vanapalli Laxmanarao Narayana R-6.4 324 84+520 Nuzvid Balani Atcharao Gangaraju L-7.3 325 84+520 Nuzvid Balani Veerababu Atcharao L-8 326 84+600 Nuzvid Chikka Asirinaidu Appalaswamy L-6.5 327 84+610 Nuzvid Devarakonda Venkateswararo Late)Gurvayya L-8 328 84+615 Nuzvid Sriramulu Satyanarayana Sambayya L-8 329 85+400 Nuzvid Naradala Baskararao Venkataswamulu L-6.5 86+310 Nuzvid Mulugumati Subbarao Ramulu R-7 331 86+310 Nuzvid Chodapamula Maratamma (late) Esu R-8 332 86+310 Nuzvid Kanaparthi Vasantharao Nagindra R-7.2 333 86+310 Nuzvid SK Nanasaheb Ameersaheb L-5.6 308 317 330 Tukkuluru Nuzvid Annavaram Detailed Project Report VIII: Resettlement Action Plan (Annexures) NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H TH NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H TH NT H 4 Katcha Res 4 Katcha Res 4 Katcha Res 3 Katcha Res 0 Katcha Res 0 Katcha Res 0 Katcha Res 3 Res 0 Katcha Semipucc a Semipucc a Semipucc a 2 Katcha Com 5 Kiosk Kiosk 4 Kiosk Kiosk 6 Kiosk Kiosk 5 Pucca Res Com 3 2 Pucca Semipucc a Semipucc a Semipucc a Semipucc a 2 Katcha Res 5 Katcha Semipucc a Com Katcha Res 4 Katcha Res 3 Katcha Res 3 Katcha Res 5 Katcha Res 4 Katcha Res 0 Katcha Res 0 Katcha Semipucc a Res 6 4 2 2 0 Page 55 Com Com Com Com Res Res Res Res Res Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project NT H NT H 334 86+310 Nuzvid Sk Chandbasha Ameersaheb L-5.8 335 86+320 Nuzvid Pilli Venkateswararo Venkayya R-6.9 336 86+320 Nuzvid Sudagani Saibabu Gopiraju R-6.4 337 86+330 Nuzvid Bejawada Venkatanarasanna Koteswararao R-8 338 86+340 Nuzvid Modepalli Suryanarayana Person Not Available L-8.5 339 86+390 Nuzvid Chukkala Nageswarrao Kurmayya R-4.6 340 86+400 Nuzvid Abdurao(late) Person Not Available R-7 341 86+400 Nuzvid Kolusu Sambasivaraju Peddiraju L-7.5 NT H NT H 342 86+500 Nuzvid Yadala Rajarao Ramulu L-5.8 TH 343 86+505 Nuzvid P.Madhusudhanarao Person Not Available R-6.2 344 86+505 Nuzvid Kumpati Rajarao Veerayya R-8 345 86+505 Nuzvid Ede Savitri Sambasivarao R-5.4 346 86+520 Nuzvid Akula Srinivasarao Somayya(late) R-8 347 86+600 Nuzvid Ganapuvarapu Chinayya kotayya R-8 348 86+610 Nuzvid Katuri Laxmanarao Venkateswararao L-8 349 86+610 Nuzvid Shaik Lalahmad Ameersaheb L-7.8 350 86+630 Nuzvid Somu Nageswararao Kotiveraragavalu R-8.5 351 86+720 Nuzvid Ramisetti Venkateswararo Nageswararao L-6.3 352 86+720 Nuzvid Pamarthi Satyanarayana Ramaswamy R-9 353 86+720 Nuzvid Katuri Subbarao Venkayya L-6.7 354 86+750 Nuzvid Shaik Kaleeshavali Kasimsaheb R-6.7 355 86+750 Nuzvid Shaik Chanbasha Ameersaheb R-6.7 356 86+760 Nuzvid Nerusu Upendhra Koteswararao L-7 357 86+760 Nuzvid Gholla Laxmayya Chintayya L-7.2 358 86+770 Nuzvid Satyanarayana Jaganadham L-7.8 359 86+795 Nuzvid Ganduboiena Nagaraju Ramarao R-8 360 86+820 Nuzvid Kolusu Renukamma Kanakayya L-8 361 86+820 Nuzvid Koppakala Sitaramayya Venkateswrarao L-7.5 362 86+820 Nuzvid Ganduboiena Nagaraju Ramarao R-8 363 86+820 Nuzvid Indala Pullayyya Rajesh L-6.3 364 86+840 Nuzvid A.Krishanachai Badrayyya L-6.2 365 86+820 Nuzvid Mareedu Chennakesavarao Narayana L-5.9 366 87+020 Nuzvid Dasireddy Satyanarayana Venkatakrishana L-5.8 Detailed Project Report VIII: Resettlement Action Plan (Annexures) TH NT H NT H NT H 0 4 Semipucc a Res Res 3 Katcha Semipucc a 0 Katcha Res 4 Semipucc a Com 4 Katcha Com 3 Semipucc a Res 4 5 NT H NT H Res Katcha Semipucc a Com Katcha Res Katcha Res Com TH NT H NT H NT H NT H NT H NT H NT H NT H 4 Katcha Res & Com 0 Katcha Com 0 Katcha Res&Com 0 Res 0 Katcha Semipucc a 0 Katcha Res&Com 4 Katcha Res 0 Katcha Com 0 Res & Com TH NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H 6 4 Katcha Semipucc a Semipucc a 0 Katcha Com 0 Katcha Cattleshed 0 Kiosk Kiosk 3 Com 0 Katcha Semipucc a 0 Kiosk Kiosk 3 Katcha Cattleshed 0 Pucca Res 0 Katcha Semipucc a Semipucc a Res 5 3 Page 56 Res Com Com Com Res & Com Com Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project 367 87+190 Nuzvid Kota Suryanarayana Venkataswamy R-7 368 87+190 Nuzvid SK.Nagulu Daveed L-6.3 369 87+190 Nuzvid Ramadasu Narasimhapatrudu Ayyannapatrudu L-6.2 370 87+210 Nuzvid Modipalli Suryanarayana Ramakrishana R-6.5 NT H NT H NT H NT H NT H 371 Venkatadhr ipuram 88+350 Nuzvid Velpuri Ramarao Somayya R-8.5 372 Hunumuntu lagudem 89+700 Nuzvid Banavathi Symku Laxmayya(late) R-8 373 89+710 Nuzvid Ippagunta krishana Narasimharao R-6 374 89+880 Nuzvid Polapaka Sudhakar Prasadarao L-8 375 89+900 Nuzvid Polapaka nageswararo Pullayya L-8.5 376 90+100 Nuzvid Rankuri Puspa Asiyya L-7.2 377 90+350 Nuzvid Reddi Krishana Venkatadri L-8.5 378 90+350 Nuzvid Peddavarapu Venkateswarulu Laxmayya L-7.5 379 90+350 Nuzvid Nalliboiena Malleswararao Sriramulu L-7.3 380 90+400 Nuzvid Patra Balakrishana Sesayya R-8 381 90+400 Nuzvid Pilli Venkataraju Venkateswararao R-7.8 90+400 Nuzvid Vilavalli Muralikrishana Adinarayana L-8.2 383 90+680 Nuzvid Velivela Narasimharao Venkataratnam R-6 384 90+680 Nuzvid Velivela Gopalaswamy Venkataratnam R-8.8 385 90+700 Nuzvid Batta Lalitha Subbarao R-9 386 90+700 Nuzvid Palagi Rambabu Ayodya L-8.2 387 90+700 Nuzvid Palagani Ayodya Subbayya L-8.2 388 90+700 Nuzvid Ambati Srinu Kotesh L-9 389 90+705 Nuzvid Chalamala Sambasivarao Bulliramayya R-7.8 390 90+760 Nuzvid Jalasutram Pullarao Madiramayya R-8 391 90+795 Nuzvid Dovvadi Suseela narasingarao R-8 392 90+795 Nuzvid Mulagani Pitchayya Subbayya R-8 393 90+800 Nuzvid Konakala Krishana Rambabu R-7.3 394 90+900 Nuzvid Srihari 395 90+900 Nuzvid Janga Somasundhar Yakobu L-7.5 396 90+960 Nuzvid Kalangi Devid Kanakambaram L-8.3 92+180 Nuzvid Kethe Jaganadharao Seetayya L-8 398 92+180 Nuzvid Kethe Sheshamma Tirupatayya L-6.9 NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H NT H 399 92+240 Nuzvid Pilla Venkateswaramma Rangarao R-5.8 TH 382 397 Mittagudem Leelanager L-7.3 Detailed Project Report VIII: Resettlement Action Plan (Annexures) 2 Katcha Com 0 Katcha Res 3 Katcha Res 0 Katcha Res 4 Semipucc a Res&Com 0 Semipucc a Semipucc a 5 kiosk kiosk 2 Katcha Com 3 Katcha Res 6 Katcha Com 0 Katcha Com 0 Katcha Com 4 Katcha Res 4 Katcha Res & Com 0 Katcha Semipucc a Com Kiosk 0 Kiosk Semipucc a Semipucc a Semipucc a 2 Katcha Com 6 Kiosk 5 Kiosk Semipucc a 1 Katcha Res 0 Katcha Res 4 Katcha Com 0 Katcha Com 0 Kiosk Kiosk 0 Katcha Com 4 Kiosk Kiosk 5 Kiosk Kiosk 8 Katcha Res 0 4 2 0 0 Page 57 Res Com Res Com Res &Com Res &Com Res Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project 400 92+270 Nuzvid Simhadri Sitaramaya h/0Nagamalleswari R-5.9 401 92+300 Nuzvid J.Subramanneswararao 402 92+300 Nuzvid Dontu Sitaramayya Sobanachalam R-9 403 92+300 Nuzvid Doddula Satyanarayana Jaganadham R-9 404 92+300 Nuzvid Mustina Koteswararao Anjayya L-7.8 L-5.6 Detailed Project Report VIII: Resettlement Action Plan (Annexures) TH NT H NT H NT H NT H 2 Katcha Res 4 Katcha Com 0 Katcha Com 0 Katcha Com 0 Katcha Com Page 58 Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project ANNEXURE : 2.2 PROJECT DISPLACED FAMILIES 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 HouseHold Father\husband name Pedna 7+000 Pedna 7+020 Pedna 7+120 Pedna 7+140 Pedna 7+140 Pedna 7+200 Pedna 7+200 Pedna 7+220 Pedna 7+240 Pedna 7+260 Pedna 7+280 Pedna 7+280 Pedna 7+300 Pedna 7+310 Pedna 7+320 Pedna 7+320 Pedna 7+325 Pedna 7+325 Pedna 7+325 Pedna 7+350 Pedna 7+360 Pedna 7+420 Pedna 7+430 Pedna 7+450 Pedna 7+450 Pedna 7+450 Machilipat nam Machilipat nam Machilipat nam Machilipat nam Machilipat nam Machilipat nam Machilipat nam Machilipat nam Machilipat nam Machilipat nam Machilipat nam Machilipat nam Machilipat nam Machilipat nam Machilipat nam Machilipat nam Machilipat nam Machilipat nam Machilipat nam Machilipat nam Machilipat nam Machilipat nam Machilipat nam Machilipat nam Machilipat nam Machilipat nam No of Family Members Name of the Head(HHH) Title holder(TH)/NonTitleHolder(NTH) Sl.No 1 Revenue Division Chanage Name of the Village Location (Left\ Right) PDF LIST - Pedana - Nuzvid - Visannapeta ROAD - Residential Category Type of Structure Moganti Prasad Narayanna Rao L-1 TH 4 Varudhu malleswararao Subbarao R-3 TH 3 jonabattula koteswaramma Nancharayya R-3 NTH 6 Garikimukkala Sriramulu Mahamkali R-4.5 NTH 3 Chinnam Suramraju Person not Available L-4 TH 0 Varudhu Venkateswararo Govind L-2 NTH 4 Varudhu Nagamalleswaramma Venkateswarulu R-6 TH 4 Varudhu Nancharayya Subbarao R-4.5 TH 6 Bulusuru Symalarao Subramanyam L-7 TH 4 maddemsetty Rambabu Nancharayya R-6 TH 5 Varudhu Venkaranarayana Marillu L-3 TH 2 Varudhu Venkateswararo Subbayya R-5 NTH 3 Varudhu kondayya Krishana R-6 TH 6 Varudhu Venkataswamy Krishana R-6 TH 3 Varudhu Venkanna Nageswarao R-2 TH 4 Varudhu Balaji Kumar Nageswarao R-2 TH 5 Maruboiena Naga malleswararao Nageswarao R-5 TH 4 Maruboiena SriniVasarao Nageswarao R-5 TH 5 Koutarapu Naga Durga Bhavani Ganapathi L-3 TH 4 Varudhu Baburao Seetayya L-3 TH 2 Varudhu Venkateswararo Koteswararo L-4 NTH 4 Maddisetty Anasuya Koteswararo R-5 TH 7 Varudhu Suryachanrraro Venkatasubbayya R-7 NTH 1 1 Varudhu Durgarao Madavarao R-6 NTH 3 Varudhu Subbarao Madavarao R-6 NTH 6 Varudhu Venkata Ramanjeyaneyulu Nageswarao L-2 TH 4 Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 59 Katcha Katcha Katcha Katcha Pucca Pucca Katcha Semipucca Katcha Semipucca Semipucca Katcha Katcha Semipucca Pucca Semipucca Katcha Katcha Semipucca Pucca Katcha Katcha Semipucca Pucca Katcha Semipucca Pedana-Nuzvid-Visannapeta Machilipat nam Machilipat nam Machilipat nam Machilipat nam Machilipat nam Andhra Pradesh Road Sector Project Pedna 7+500 Nadupuru 10+700 Nadupuru 10+940 Nadupuru 11+660 Nadupuru 11+670 32 Reddipalaem 13+410 Gudivada B.Nancharayya 33 Reddipalaem 13+420 Gudivada Chittibomma Srinivasarao 34 Reddipalaem 13+510 Gudivada Kandula Sesayya 35 Reddipalaem 13+530 Gudivada 36 Reddipalaem 13+550 37 Reddipalaem 13+750 38 Vaddlamannadu 15+190 39 Vaddlamannadu 40 Vaddlamannadu 41 27 28 29 30 31 Varudhu Pitchemma Narasimharao R-2 TH 8 Parusa Pandurangarao Durgarao L-6.2 NTH 2 Yarlagedda Sethratnam Venkataratnam R-6.5 NTH 1 kanakavalli Subadra Benarji R-6.5 NTH 2 NTH 2 Katcha Nimmagedda Rajarao Katcha Katcha Katcha Katcha Person not Available L-7 H|0 Venkamma L-6.2 NTH 3 Katcha Subramanyam R-6.4 NTH 5 Nancharayya R-6.4 NTH 6 Katcha Katcha Bethapudi Srinivasarao pandu R-6.2 NTH 4 Katcha Gudivada Kagitha Pabma Nancharayya L-6.5 TH 2 Katcha Gudivada Gudivada Modugumudi Haribabu Ramachandrarao L-5.7 NTH 4 SemiPucca Abdhul Azeez Basha R-6.8 NTH 3 Katcha 15+160 15+400 Gudivada AvarlanDammidayya Kolusu Reddayya Veerayya R-6.5 Veraraju L-6.5 NTH TH 2 Gudivada 4 Katcha Katcha Vaddlamannadu 15+400 Gudivada Kolusu Veraraju Ragavulu L-5.5 TH 2 Katcha 42 Vaddlamannadu 15+400 Gudivada Kolusu Koteswarararo Veraraju L-6.5 NTH 4 Katcha 43 Vaddlamannadu 15+420 Gudivada Pari devamani Late)Yakobu L-6.5 TH 6 Katcha 44 Vaddlamannadu 15+430 Gudivada Iku Adilaxmi Late)Gopayya L-5.2 TH 1 Katcha 45 Vaddlamannadu 15+430 Gudivada S.Bayrasi Not Available R-5.6 NTH 0 Katcha 46 Vaddlamannadu 15+600 Gudivada Atchuta jaganmohanarao Subbarao R-5.9 NTH 3 Katcha 47 Vaddlamannadu 15+650 Gudivada Degala Srinu Venkataswamy R-6.5 NTH 4 Katcha 48 Vaddlamannadu 15+650 Gudivada Degala Venkataswamy Rammurthy R-6.2 NTH 4 Katcha 49 Vaddlamannadu 15+660 Gudivada Maddela Veramma Durgapraasad R-6.5 NTH 3 Katcha 50 Vaddlamannadu 15+670 Gudivada Atchuta kasturi Person Not Available R-4.4 NTH 1 Katcha 51 Vaddlamannadu 15+670 Gudivada Atchuta Srinivasarao Nancharayya L-5.1 TH 3 Katcha 52 Vaddlamannadu 15+750 Gudivada Atchuta Sivashankararo Subbarao L-5.3 NTH 4 Katcha 53 Vaddlamannadu 15+750 Gudivada Penta Ramu Laxmayya R-5.5 NTH 3 Katcha 54 Vaddlamannadu R-6.2 NTH 2 Gudivada DegalanSubbarao Parasa Venkatasubbamma Chinnappayya 55 15+360 16+740 Gudivada Vemavaram Krishanamurthy L-4.7 NTH 4 Katcha Katcha 56 Vemavaram 16+780 Gudivada Padamata Pandu Basavayya L-6.9 TH 4 Katcha 57 Vemavaram 16+785 Gudivada Venka Nageswarao Rammurthy L-6.3 TH 3 Katcha 58 Vemavaram 16+785 Gudivada Veranji Kanakam Krishanamurthy R-4.5 NTH 2 Katcha 59 Vemavaram 16+785 Gudivada Chillimuntha Badrachalam Gangadaram L-5.8 NTH 0 Katcha 60 Vemavaram 16+880 Gudivada Padamati Veraswamy Venkanna L-4.3 NTH 3 Katcha 61 Vemavaram 16+890 Gudivada Madugu Pedaverayya Subbarao R-4.5 NTH 0 Katcha 62 Vemavaram 16+900 Gudivada Mannem Venkateswarama Venkateswaralu L-5.2 NTH 2 Katcha 63 Vemavaram L-6.2 NTH 2 Vemavaram Gudivada Mannem Basavayya Yarlagadda Nagapanindhra Laxmayya 64 16+900 16+900 Gudivada M/o Vijayamma L-5.5 NTH 2 Katcha Katcha 65 Vemavaram 17+050 Gudivada Sonti Venkateswarao Veraswamy L-5.2 TH 4 Katcha 66 Vemavaram 17+050 Gudivada Mulala edukondalu Pakeer R-5.1 NTH 8 Katcha 67 Vemavaram 17+060 Gudivada Borra Durgamma Ragavulu L-6.2 NTH 1 Katcha 68 Vemavaram Gudivada L-5.3 NTH 3 69 Gudivada pandiri Kurmarao Shaik Adem narasimharao Vemavaram 17+070 17+120 H\o Haseenabegum L-4.3 NTH 5 Katcha Katcha 70 Vemavaram 17+200 Gudivada Abdhul Baseer Sattar L-4.1 NTH 1 Katcha 71 Vemavaram 17+200 Gudivada Naragani Venugopal Ankinaidu L-4.5 NTH 5 Katcha Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 60 Pedana-Nuzvid-Visannapeta 72 kowthvaram Andhra Pradesh Road Sector Project 22+100 Gudivada Geduturi Rajarao Yarayya R-6.6 NTH 2 Katcha Gudivada Nasethi Ramesh Subbarao R-6.8 TH Katcha 73 kowthvaram 22+120 74 kowthvaram 22+120 koripalli Sanyasirao Appannna R-6.7 NTH 3 1 2 75 kowthvaram 22+140 Gudivada Javvari Nageswarao Venkateswarao R-6.8 NTH 5 Katcha Gudivada Katcha 76 kowthvaram 22+200 Gudivada Allu Bullemma Appalaswamy R-6.3 NTH 2 Katcha 77 kowthvaram 22+200 Gudivada muttireddy Srinivasarao Person Not Available R-6.3 NTH 5 Katcha 78 kowthvaram 22+125 Gudivada Ramabalapala Durgaprasad Satyanarayana R-5.3 NTH 4 Katcha 79 Gudlavalleru 23+790 Gudivada Jupudi Krishana mohanarao Person Not Available R-6 TH 2 Pucca Paruchuri Tripurantharao 80 Gudlavalleru 23+800 Gudivada R-5.6 TH 4 Pucca 81 Gudlavalleru 23+800 Gudivada vallabhapurapu Eswararao Ramachandararao R-4.6 TH 5 Pucca 82 Gudlavalleru 23+980 Gudivada Kunchapati Venkateswwarao Pandurangarao R-4.6 TH 3 Pucca 83 Gudlavalleru 24+000 Gudivada V.Narasimharao Person Not Available R-4.8 TH 1 Pucca 84 Gudlavalleru 24+000 Gudivada Polavarapu Rajeswarao Person Not Available R-5.5 TH 1 Pucca 85 Gudlavalleru 24+000 Gudivada Gudlavalleti Venkateswarao Gangajalam R-4.5 TH 4 SemiPucca 86 Gudlavalleru 24+050 Gudivada Bulla Ravibabu Koteswararao L-6.8 TH 5 SemiPucca 87 Bommuluru 31+100 Gudivada Gutta Venuprasad Chowdary Venkata swamy R-7 NTH 4 Semipucca 88 Bommuluru 31+150 Gudivada Gutta krishana narayana R-5.5 TH 2 Pucca 89 Bommuluru 31+550 Gudivada Penumarthi Srinu nagendrudu L-5.6 NTH 4 Katcha 90 Bommuluru 31+620 Gudivada Talaie Satyanarayana Venkateswararo R-7.2 NTH 4 Katcha 91 Bommuluru 31+790 Gudivada Saradala Nagaraju Brahmayya L-6.5 NTH 0 Katcha 92 Bommuluru 31+790 Gudivada Mocherla mamatha Srinu R-4.5 NTH 4 Katcha 93 Bommuluru 31+790 Gudivada Vara samual Mosa R-5.2 NTH 0 Katcha 94 Bommuluru 31+790 Gudivada Ganta Israyulu peddiraju L-5.9 TH 2 Katcha 95 Bommuluru 31+800 Gudivada Akunoori Yesobu Eliya R-5.1 NTH 3 Katcha 96 Bommuluru 31+800 Gudivada Chebrolu Ramarao Ramayya L-5.7 NTH 2 Katcha 97 Bommuluru 31+800 Gudivada Sura Apparao Tatabbie L-5.8 NTH 3 Katcha 98 Bommuluru 31+815 Gudivada Kandavalli Edukondalu Adishesu L-6.6 NTH 5 Katcha 99 Bommuluru 31+820 Gudivada Usalla Devakanya Krishana L-6.8 NTH 3 Katcha 100 Bommuluru 31+840 Gudivada Varigani Devamatha Adama L-4.6 NTH 2 Katcha 101 Bommuluru 31+600 Gudivada Bura Srininvasarao Dasu(samual) L-5.1 NTH 5 Katcha 102 Janardhanapuram 40+820 Gudivada Pullareddy Rangareddy Person Not Available L-6 TH 0 Pucca 103 Janardhanapuram 40+840 Gudivada NVS Nagireddy Rammohnareddy L-6.5 TH 0 Pucca 104 Janardhanapuram 40+840 Gudivada Konapalli narayanareddy Narayanaereddy L-6.5 TH 2 Pucca 105 Janardhanapuram 41+125 Gudivada Veruvada NarayanaNagabhusanam Venkateshawararao L-6 NTH 4 Katcha 106 Janardhanapuram 41+150 Gudivada Vanapalli Adilaxmi Laxmanarao L-6.5 NTH 2 Katcha 107 Janardhanapuram 41+150 Gudivada Saripalli Rameshreddy Rangareddy L-5.9 TH 3 semiPucca 108 Janardhanapuram 41+240 Gudivada Tallaparthi Ramarao Appalasuri R-7.1 NTH 3 Katcha 109 Janardhanapuram 41+240 Gudivada malliboiena Lingayya Chinaramulu R-7.2 NTH 4 Katcha 110 Janardhanapuram 41+240 Gudivada Nakka Narasimharao Mahalaxmayya L-6.8 NTH 0 Katcha 111 Janardhanapuram 41+245 Gudivada laveti Durgarao Venkateswararao R-6.5 NTH 2 Katcha 112 Janardhanapuram 41+400 Gudivada Devarapalli Satyanarayana Nomulu L-6.1 NTH 3 Katcha 113 Janardhanapuram 41+450 Gudivada Vanam Venkateseararao Durgamma R-6.8 NTH 3 Katcha 114 Janardhanapuram 41+460 Gudivada Katari Kotayya Anjeneyulu R-6.1 NTH 4 Katcha 115 Janardhanapuram 41+515 Gudivada Ekba Peddirajulu Ramayya L-6.4 NTH 0 Katcha 116 Janardhanapuram 41+550 Gudivada Kadekollu Nagaraju Nallayya L-5.6 TH 4 Katcha 117 Janardhanapuram 41+550 Gudivada Jalasuthram Rangamma Baskararao L-6.2 NTH 2 Katcha Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 61 Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project 118 Janardhanapuram 41+565 Gudivada Nakka Puttalamma Late) Bodayya L-6.4 TH 4 Katcha 119 Janardhanapuram 41+600 Gudivada Kotaru Nagaraju Sitayya L-6.8 NTH 0 Katcha 120 Janardhanapuram 41+600 Gudivada Ebba Srinivasu Ramayya R-7.2 NTH 4 Katcha 121 Janardhanapuram 41+770 Gudivada Nagalam Venkateswararao Krishanamurthy R-6.2 NTH 5 Katcha 122 Janardhanapuram 41+770 Gudivada Kagga Padma Srinu R-6.8 NTH 4 Katcha 123 Janardhanapuram 41+770 Gudivada Nangalam Venkatarammayya Krishanamurthy R-6.8 NTH 3 Katcha 124 Puttagunta 45+200 Gudivada Ranchari Laxmi Nageswararao L-6.6 NTH 0 Katcha 125 Puttagunta 45+600 Gudivada Vinjavarapu Appalachari Bhrahmam R-5.5 TH 2 Pucca 126 Puttagunta 45+630 Gudivada Pamulapati Ramireddy Person Not Available R-5.8 TH 2 Pucca 127 Puttagunta 45+650 Gudivada Valiveti Purna Subbarao R-6.5 NTH 0 Semipucca 128 Puttagunta 45+650 Gudivada Vankayalapati Murali Person Not Available R-7 TH 0 Pucca 129 Puttagunta 45+700 Gudivada Barapureddy Satyanarayana Dalayya L-6.8 NTH 0 Katcha 130 Puttagunta 46+400 Gudivada Kollu Someswararao Mallikarjunarao L-6.7 NTH 0 Katcha 131 Puttagunta Arugolanu 46+400 Gudivada Mukkala Yesuamma Yesu R-7 NTH 1 Katcha 132 51+050 Nuzvid Poteneni lalithakumari Sambasivarao R-7 TH 2 Semipucca 133 Arugolanu 51+250 Nuzvid Singanapalli Venkateswararao Applaswamy(late) R-7 TH 7 Katcha 134 Kanumolu 55+420 Nuzvid Katumalla Kishorebabu Bisuff R-5.3 NTH 4 Katcha 135 Kanumolu 55+655 Nuzvid Nerella sarveswarao Narayana R-7 NTH 136 Kanumolu 55+680 Nuzvid Kandula veeravenkatanagaprasad Chinavenkateswarao L-6.2 TH 137 Kanumolu 55+700 Nuzvid Gopalarao OLD BUILDING L-6.2 NTH 138 Kanumolu 55+780 Nuzvid Narikimalli Seshachalam Suryanarayana L-5.5 NTH 4 Katcha 139 Kanumolu 55+795 Nuzvid Kurupati parisuddam Gonnaprakash R-6.2 NTH 2 Semipucca 140 Kanumolu 55+820 Nuzvid Chalamarasetty Suryaprakasarao Ramayya L-6 NTH 3 Pucca 141 Kanumolu 55+820 Nuzvid Chamarthi Venkateswarao Viswanadham R-5.5 NTH 2 Pucca 142 Kanumolu 55+830 Nuzvid Chamarthi Anjeneyulu venkatappayya R-6.2 NTH 7 Pucca 143 Kanumolu 55+870 Nuzvid Chamarthi Anjeneyulu Venkatappayya R-5 NTH 7 Katcha 144 Kanumolu 55+980 Nuzvid Chittemma L-5.7 TH 2 Pucca 145 Kanumolu 56+980 Nuzvid Reddi Chinalaxmayya Lingamallu veravenkata jaganmohanarao Venkataratnam L-5.5 NTH 3 Pucca 146 Kanumolu 56+000 Chinta Apparao Swamulu L-5.5 NTH 5 Semipucca 147 Kanumolu 56+000 Nuzvid N.V.Ramanarao ChinaSurayya R-4 TH 4 Semipucca 148 Kanumolu 56+000 Nuzvid Nanduri Venkatamma Krishana murthy(late) R-5 TH 149 Kanumolu 56+000 Nuzvid Anisetty Timmaraju Boogeswararao L-5 NTH 4 Pucca 150 Kanumolu 56+210 Nuzvid Sunkara Laxmanarao Surayya L-5.5 TH 2 Pucca 151 Kanumolu 56+300 Nuzvid Moganti Chandra sekhar krishanarao R-6 NTH 152 Kanumolu 56+350 Nuzvid Naraharasetty Gangadhar Venkataratnam R-7 TH 4 Semipucca 153 Kanumolu 56+390 Nuzvid Naraharasetty Prabhavathi Venkataratnam R-7 TH 2 Semipucca 154 Perikeedu 56+975 Nuzvid Venkatakonda Gandhi Koteswararo L-6.8 TH 3 Semipucca 155 Perikeedu 57+310 Nuzvid Sammangi Sateshkumar Nageswararao L-7 TH 4 Semipucca 156 Perikeedu 57+310 Nuzvid Sammangi Mohanasuresh kumar Nageswararao L-7 TH 4 Semipucca 157 Perikeedu 57+320 Nuzvid Bandaru Swetha satyanarayana Krishanarao L-7 NTH 5 Katcha 158 Perikeedu 57+350 Nuzvid Maradani Sivanagaraju Tatayya L-7 NTH 3 Katcha 159 Perikeedu 57+360 Nuzvid Rajamahendravarapu satyaswathi Venkateswararaju L-7 NTH 160 Perikeedu 57+650 Nuzvid Bayya Mohanarao Pitchiyya(late) L-7 NTH 161 Perikeedu 57+700 Nuzvid Jalidi Balakrishana Raeddiyya R-6.5 TH 162 Perikeedu 58+670 Nuzvid Gujjala veraswamy(israyulu) Ramaswamy L-7 NTH 3 Katcha 163 Perikeedu 58+880 Nuzvid Padmala Venkateswararo Venkatanarasayya L-7 NTH 5 Katcha Detailed Project Report VIII: Resettlement Action Plan (Annexures) Semipucca 3 Pucca Semipucca Semipucca Semipucca Katcha 7 Pucca Semipucca Page 62 Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project 164 Meerjapuram 67+450 Nuzvid Kota Simhachalam Krishana R-7 NTH 3 Katcha 165 Meerjapuram 67+460 Nuzvid Vallepu Parameswararao Raju R-7.1 NTH 6 Katcha 166 Meerjapuram 67+500 Nuzvid Olipi Venkateswarrao Verayya R-6.4 NTH 3 Katcha 167 Meerjapuram 67+500 Nuzvid Tegala Chittemma Verayya R-6 NTH 3 Katcha 168 Meerjapuram 67+510 Nuzvid Garika Bhagyam Sambayya R-6 NTH 2 Katcha 169 Meerjapuram 67+520 Nuzvid Busi Adam Prabhakararao R-6 NTH 2 Katcha 170 Meerjapuram 67+540 Nuzvid Mindiya Venkateswararao Maddiramayya R-6 NTH 5 Katcha 171 Meerjapuram 67+550 Nuzvid Tegala Guruvulu Veerayya R-5.4 NTH 6 Katcha 172 Meerjapuram 67+550 Nuzvid Dasari Yesu Baalaraju R-5.4 NTH 4 Katcha 173 Meerjapuram 67+560 Nuzvid Gandikota Anjeneyulu Venkateswararao R-6.5 NTH Katcha 174 Meerjapuram 67+660 Nuzvid Rajulapati Nageswararo Venkateswararao L-6.9 NTH 3 1 0 175 Meerjapuram 67+790 Nuzvid Tegala Chantibabu Ramulu L-7 NTH 2 Katcha 176 Meerjapuram 67+800 Nuzvid Tegala Tirupathirao Ramulu L-7 NTH 6 Katcha 177 Meerjapuram 68+995 Nuzvid Durga Person Not Available R-7 NTH 178 Gollapalli 72+050 Nuzvid Venula Durgaprasad kameswarao R-7 NTH 3 Katcha 179 Gollapalli 72+100 Nuzvid Tata Pullarao Srirangam R-7 NTH 4 Katcha 180 Gollapalli 72+210 Nuzvid Konda vaddikasulu Anjeneyulu R-7 NTH 4 Katcha 181 Gollapalli 72+220 Nuzvid Tata Rangarao Person Not Available R-6.1 NTH 2 Katcha 182 Gollapalli 72+405 Nuzvid Valiveti Satyanarayana Venkatakrishana R-5.6 TH 2 Semipucca 183 Gollapalli 72+500 Nuzvid Namala Jayaolaiah Rangarao R-6 NTH 0 Katcha 184 Gollapalli 72+530 Nuzvid Shaik Choti Mahaboob R-6.8 NTH 4 Katcha 185 Gollapalli 72+565 Nuzvid Talam Sriramulu Ramayya L-5.9 NTH 3 Katcha 186 Gollapalli 72+565 Nuzvid Taluri Prubudas Yesudas L-6 NTH 6 katcha 187 Gollapalli 72+590 Nuzvid Aripalli Suryanarayana Veerayya L-5 NTH 2 Katcha 188 Gollapalli 72+600 Nuzvid Bokinala Subbarao Raghunadam L-6 NTH 6 katcha 189 Gollapalli 72+610 Nuzvid Chittiboiena Rani Kittarao L-6 NTH 6 Katcha 190 Gollapalli 72+730 Nuzvid Ketineni Kasturamma Ramachandrarao L-7 NTH 0 Katcha 191 Gollapalli 72+730 Nuzvid Arepalli Bhushanam Nageswararao L-7.1 NTH 0 Katcha 192 Gollapalli 72+770 Nuzvid Arepalli mohanarao Chinaverayya L-4.9 NTH 4 Katcha 193 Morsapudi 75+200 Nuzvid Buddala Prabhakararao Ramadasu W/0 R-6.4 NTH 5 Katcha 194 Morsapudi 75+220 Nuzvid Mekhala Nagamma Sayilu R-6.6 NTH 4 Katcha 195 Tukkuluru 78+380 Nuzvid Polimetala Devasahayam Abraham R-6.5 NTH 3 Katcha 196 Nuzvid 84+440 Nuzvid Bala Vijayalaxmi Rammohanarao R-6.2 NTH 3 Semipucca 197 Nuzvid 84+440 Nuzvid Atluri Venugopalarao Amarayya R-6.2 NTH 2 Semipucca 198 Nuzvid 84+415 Nuzvid Kandikatla Bullemma Ramarao R-5.5 NTH 2 Semipucca 199 Nuzvid 84+415 Nuzvid Andela Kotamma Changayya R-6.2 NTH 2 Katcha 200 Nuzvid 84+600 Nuzvid Chikka Asirinaidu Appalaswamy L-6.5 NTH 4 Katcha 201 Nuzvid 85+400 Nuzvid Naradala Baskararao Venkataswamulu L-6.5 NTH 5 Katcha 202 Annavaram 86+310 Nuzvid Mulugumati Subbarao Ramulu R-7 NTH 4 Katcha 203 Annavaram 86+310 Nuzvid SK Nanasaheb Ameersaheb L-5.6 NTH 0 Semipucca 204 Annavaram 86+310 Nuzvid Sk Chandbasha Ameersaheb L-5.8 NTH 0 Semipucca 205 Annavaram 86+320 Nuzvid Pilli Venkateswararo Venkayya R-6.9 NTH 4 Katcha 206 Annavaram 86+320 Nuzvid Sudagani Saibabu Gopiraju R-6.4 TH 3 Semipucca 207 Annavaram 86+400 Nuzvid Abdurao(late) Person Not Available R-7 NTH 3 Semipucca 208 Annavaram 86+505 Nuzvid P.Madhusudhanarao Person Not Available R-6.2 NTH 209 Annavaram 86+720 Nuzvid Ramisetti Venkateswararo Nageswararao L-6.3 NTH Detailed Project Report VIII: Resettlement Action Plan (Annexures) Katcha Katcha Katcha 4 Page 63 Katcha Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project 210 Annavaram 86+820 Nuzvid Indala Pullayyya Rajesh L-6.3 NTH 0 Pucca 211 Annavaram 86+840 Nuzvid A.Krishanachai Badrayyya L-6.2 NTH 0 Katcha 212 Annavaram 87+190 Nuzvid SK.Nagulu Daveed L-6.3 NTH 0 Katcha 213 Annavaram 87+190 Nuzvid Ramadasu Narasimhapatrudu Ayyannapatrudu L-6.2 NTH 3 Katcha 214 Annavaram 87+210 Nuzvid Modipalli Suryanarayana Ramakrishana R-6.5 NTH 0 Katcha 215 Mittagudem 90+680 Nuzvid Velivela Narasimharao Venkataratnam R-6 NTH 4 Semipucca 216 Leelanager 92+240 Nuzvid Pilla Venkateswaramma Rangarao R-5.8 TH 8 Katcha 217 Leelanager 92+270 Nuzvid Simhadri Sitaramaya h/0Nagamalleswari R-5.9 TH 2 Katcha HouseHold Father\husband name Sl.No No of Family Members Name of the Head(HHH) Chanage Division Title holder(TH)/NonTitleHolder(N TH) Name of the Village Location (Left\ Right) PDF LIST - Pedana - Nuzvid - Visannapeta ROAD - Commercial Category Type of Structure 1 Pedna 7+000 Machilipatnam Moganti Prasad Narayanna Rao L-1 TH 4 Semipucca 2 Pedna 7+000 Machilipatnam Varudhu Balaji Kumar Narayanna Rao R-1 TH 5 Semipucca 3 Pedna 7+000 Machilipatnam Dinduluri Srinivasarao Kalkimurthy R-1 TH 4 Semipucca 4 Pedna 7+000 Machilipatnam Madisetty Maruthi Late Satyanarayana R-1 TH 5 5 Nadupuru 12+050 Machilipatnam Parasa Ramachandrarajulu Nancharayya R-4.5 NTH 3 Semipucca Semipucca 6 Vaddlamannadu 15+440 Gudivada Jakkula Sureshbabu Balayya L-5 NTH 4 SemiPucca 7 Vaddlamannadu 15+450 Gudivada Gudivada Venkateswarao Person Not Available R-6.2 NTH 0 Katcha 8 Vaddlamannadu 15+480 Gudivada Vallabapurapu nancharayya Venkateswarulu R-6.5 NTH 3 Katcha 9 Vaddlamannadu 15+520 Gudivada Thota Laxmayya krishanamurthy R-6.8 NTH 4 SemiPucca 10 Vaddlamannadu 15+560 Gudivada Penneru jayapattabiramayya Venugopalarao L-6.8 NTH 2 SemiPucca 11 Vaddlamannadu 15+560 Gudivada Garikipathi Tulasiram Ragavulu R-6.8 NTH 4 SemiPucca 12 Vaddlamannadu 15+560 Gudivada Meda Venkateswarao Adinarayana R-7.2 NTH 4 Katcha 13 Vaddlamannadu 15+560 Gudivada manda prasad Ramarao L-7 NTH 3 Katcha 14 Vaddlamannadu 15+590 Gudivada kundeti Verayya Ramayya R-6.6 NTH 2 Katcha 15 Vemavaram 16+900 Gudivada Vemula Srinivasarao Veraragavulu R-4.3 NTH 5 Katcha 16 Vemavaram 17+690 Gudivada Mannem Srinu Venkateswaralu l-4.5 NTH 4 Katcha 17 Vemavaram 17+690 Gudivada Mannem Somulu Venkateswaralu l-4.6 NTH 5 Katcha 18 Vemavaram 17+690 Gudivada Mannem Ragavulu Anjayya L-4.5 NTH 5 Katcha 19 Vemavaram 17+690 Gudivada Bolla Ankalu nageswarrao L-4.6 NTH 5 Katcha 20 Vemavaram 17+690 Gudivada Mannem Ramachandrudu Subbayya L-4.6 NTH 5 Katcha 21 Vemavaram 17+690 Gudivada Matta Ragavayya Saianna L-4.6 NTH 4 Katcha 22 Vemavaram 17+690 Gudivada Chettibomma Tulasamma Malleswararao L-4.5 NTH 4 Katcha 23 Vemavaram 17+700 Gudivada Pappula Peramma Nancharayya L-4.5 NTH 1 Katcha 24 Vemavaram 17+710 Gudivada Tammisetty nookalu nookalu L-4.5 NTH 3 Katcha 25 Vemavaram 17+720 Gudivada Tammisetty Durgarao Suryanarayana L-4.5 NTH 4 Katcha 26 Vemavaram 17+730 Gudivada Matta Ragavayya Saianna L-4.5 NTH 4 Katcha 27 Vemavaram 17+730 Gudivada mannem Pitchemma pothuraju L-4.5 NTH 4 Katcha 28 Vemavaram 17+750 Gudivada Narepalli Srinivasarao Rangarao L-4.5 NTH 4 Katcha 29 Vemavaram 17+780 Gudivada Manda Nagamani Ramanjeneyulu R-4.5 NTH 5 SemiPucca Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 64 Pedana-Nuzvid-Visannapeta 30 kowthvaram Andhra Pradesh Road Sector Project 22+120 Gudivada Juvvadi Edukondalu Venkateswarao L-6.9 NTH 3 SemiPucca Gudivada Nara janardhanarao Sobanadri TH 0 SemiPucca Rajulapati Srinivasarao Merugumalla Durgamaheswararao Subbarao NTH 5 Katcha Venkataratnam L-6 L6.75 L6.75 NTH 4 Katcha 31 Gudlavalleru 23+995 32 Angalur 27+860 Gudivada Gudivada 33 Angalur 27+875 34 Bommuluru 31+600 Gudivada Pallakattu veeraragavulu venkatasubbayya L-5.6 NTH 4 Katcha 35 Janardhanapuram 40+800 Gudivada Kasimreddy L-6.6 NTH 4 Semi 36 Janardhanapuram 41+100 Gudivada Manda Srinu Puttalamm Ammavari Shoping complex Person Not Available R-6.3 NTH 0 Pucca 37 Janardhanapuram 41+170 Gudivada Girijala Rammurthy Apparao R-7.2 NTH 0 SemiPucca 38 Janardhanapuram 41+220 Gudivada Badam Venkatanarayana Ragavayya L-7 NTH 3 Katcha 39 Puttagunta 45+720 Gudivada Sammangi Ramarao Appalaswamy R-6 NTH 0 Semipucca 40 Puttagunta 45+800 Gudivada Oleti Satyavathi Apparao R-7 NTH 0 Semipucca 41 Shivayyapakalu Arugolanu 48+700 Gudivada Suvari Narasimhamurthy Ramachandrarao R-6.2 NTH 0 SemiPucca 42 50+650 Nuzvid Chukkapu Nageswararo Atchiyya L-5.8 NTH 4 Katcha 43 Arugolanu 50+780 Nuzvid Veeram Nageswararo Venkateswararao(late) L6.2 NTH 5 Katcha 44 Arugolanu 50+790 Nuzvid Gottapu Sivanagamani Apparao R-6.5 NTH 45 Kanumolu 55+410 Nuzvid Ramalle Chinna DaVid R-5 NTH 2 Katcha 46 Kanumolu 55+420 Nuzvid Bethapudi Pramila Villasambabu R-4.5 NTH 2 Katcha 47 Kanumolu 55+800 Nuzvid Bejwada Nageswararao Hanumantharao L-6.3 NTH 1 Semipucca 48 Kanumolu 55+800 Nuzvid Matta Narayanarao Venkataswamy L-6.3 NTH 49 Kanumolu 55+890 Nuzvid Garikipati Umamaheswarao L-5.2 NTH 50 Kanumolu 55+930 Nuzvid Vemulapalli Subramanyam Venkateswararao Srivenkataramalingach arya R-5.7 NTH 51 Kanumolu 55+940 Nuzvid Suri Satyanarayana Venkoji L-6 NTH 4 Semipucca 52 Kanumolu 55+950 L-7 TH 3 Pucca 53 Kanumolu 55+960 Nuzvid China Srinivasarao Ramarao R-5.7 TH 4 Pucca 54 Kanumolu 55+980 Nuzvid Chinta Muralikrishana Satyavenkataramarao R-5.5 NTH 55 Kanumolu 56+050 Nuzvid Rellu Subbarao Ngeswrarao R-6.2 TH 7 Pucca 56 Kanumolu 56+360 Nuzvid Sunkara Laxmanarao Surayya L-5.5 NTH 2 Katcha 57 Perikeedu 57+650 Nuzvid Lanka Gopalarao Appalarao L-6.5 NTH 58 Perikeedu 57+650 Nuzvid Pabolu SS varaprasad Nageswararao L-6.5 NTH 4 Semipucca 59 Perikeedu 57+700 Nuzvid Botcha.Krishanarao Venkayya R-7 NTH 4 Semipucca 60 Perikeedu 58+400 Nuzvid Nagulapalli Edukondalu Nageswararao R-7 NTH 13 Katcha 61 Perikeedu 58+500 Nuzvid Maddila Ganga Venkateswarao R-7 NTH 4 Katcha 62 Perikeedu 58+550 Nuzvid Battu Manikyalarao Baskararao R-7 NTH 3 Semipucca 63 Perikeedu 58+650 Nuzvid Partipati Agnesamma Prabakar L-7 NTH 9 Semipucca 64 Perikeedu 58+750 Nuzvid Partipati Vijaykumar Balaswamy R-6.5 NTH 8 Katcha 65 Marribandam 64+300 Nuzvid Pidugu Prasad Anjeneyulu R-7 NTH 4 Katcha 66 Marribandam 64+500 Nuzvid Nadakudur Muttaiah Subbarao L-7 NTH 3 Katcha 67 Marribandam 64+500 Nuzvid Shaik Babji Mabu L-6.7 NTH 10 Katcha 68 Marribandam 64+780 Nuzvid Rayavarapu Subbarao Person Not Available L-7 NTH 4 Katcha 69 Marribandam 64+800 Nuzvid Chirugudu Nagaraju Appalaswamy L-6.5 NTH 4 Katcha 70 Marribandam 65+800 Nuzvid Potakamuri Rajababu Gandhi L-7 NTH 71 Marribandam 65+900 Nuzvid Kombati Satyanarayana Gopalam R-6.8 NTH 72 Meerjapuram 67+490 Nuzvid Merapadu Baskhararao Maranna L-6 NTH 3 Katcha 73 Meerjapuram 68+480 Nuzvid Mathina Subbarao Veerayya L-7 NTH 2 Katcha 74 Meerjapuram 68+800 Nuzvid Selam Satyanarayana Seshagirirao R-6 NTH 4 Semipucca Dondi Durgarao Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 65 Katcha Semipucca 2 Pucca Semipucca Pucca Katcha Katcha Katcha Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project 75 Meerjapuram 68+910 Nuzvid Sk Hamid Abbulnabi R-7 NTH 2 Katcha 76 Meerjapuram 68+920 Nuzvid Sk Mastan Parisaheb L-6 NTH 2 Katcha 77 Gollapalli 72+100 Nuzvid Attili Brahmam Person Not Available R-6 NTH 78 Gollapalli 72+400 Nuzvid Shaik Dilshadbagem Munnabasha R-5.4 NTH 3 Katcha 79 Gollapalli 72+770 Nuzvid Makaraju Rangaraju Subbaraju L-5.2 TH 2 Semipucca 80 Morsapudi 75+100 Nuzvid MD Yusuf Ibraheem L-5 NTH 4 Katcha 81 Morsapudi 75+110 Nuzvid Bejawada Bujji Rangarao R-5.5 NTH 4 Katcha 82 Tukkuluru 78+420 Nuzvid Mohamad Kareemulla Ibraheem L-6.8 NTH 4 Semipucca 83 Tukkuluru 78+420 Nuzvid Gonduboiena Sekhar Venkatesh R-6 NTH 2 Katcha 84 Nuzvid 84+200 Nuzvid Puram Samrajyam Venkateswararo L-5 NTH 85 Nuzvid 84+480 Nuzvid Vanapalli Laxmanarao Narayana R-6.4 NTH 5 Katcha 86 Annavaram 86+390 Nuzvid Chukkala Nageswarrao Kurmayya R-4.6 NTH 4 Katcha 87 Annavaram 86+500 Nuzvid Yadala Rajarao Ramulu L-5.8 TH 5 Semipucca 88 Annavaram 86+750 Nuzvid Shaik Kaleeshavali Kasimsaheb R-6.7 TH 6 Semipucca 89 Annavaram 86+750 Nuzvid Shaik Chanbasha Ameersaheb R-6.7 NTH 4 Semipucca 90 Annavaram 86+760 Nuzvid Nerusu Upendhra Koteswararao L-7 NTH 0 Katcha 91 Annavaram 87+020 Nuzvid Dasireddy Satyanarayana Venkatakrishana L-5.8 NTH 3 Semipucca 92 87+190 Nuzvid Kota Suryanarayana Venkataswamy R-7 NTH 2 Katcha 93 Annavaram Hunumuntulagud em 89+710 Nuzvid Ippagunta krishana Narasimharao R-6 NTH 0 Semipucca 94 Leelanager 92+300 Nuzvid J.Subramanneswararao L-5.6 NTH 4 Katcha Katcha Semipucca Nadupuru 10+800 Nadupuru 10+800 Nadupuru 11+020 4 Vemavaram 16+900 Machilipatna m Machilipatna m Machilipatna m Gudivada 5 Vemavaram 17+750 Gudivada 1 2 3 Name of the Head(HHH) HouseHold Father\husband name Title holder(TH)/NonTitle Holder(NTH) No of Family Members Division Chanage Sl.No Name of the Village Location (Left\ Right) PDF LIST - Pedana - Nuzvid - Visannapeta ROAD - Residential & Commercial Category Type of Structure Pamarthi Bramajirao Narasimharao R-6.3 NTH 4 Rajulapati Gowri rajulu Gurunadham L-6 NTH 5 Gandikota Dhanaraju Kotayya L-7 NTH 7 Yaragani Mohanarao Mamillu L-5.2 NTH 4 Katcha Tammesetti Satyanarayana Suryanarayana L-4.5 NTH 4 SemiPucca Katcha Katcha Katcha 6 kowthvaram 22+090 Gudivada Jakka Nagamani S/o Sanganna R-5.3 NTH 2 Katcha 7 kowthvaram 22+100 Gudivada Allu Narasamma Apparao R-6.8 NTH 1 Katcha 8 Gudlavalleru 23+800 Gudivada Sonti Amareswari Venkanna R-5.2 NTH 4 Pucca 9 Gudlavalleru 23+810 Gudivada MD.Muzeeurrab Abdhullah R-6.2 TH 5 Pucca 10 Gudlavalleru 24+000 Gudivada K.Kameswaramma KVKrishanarao R-5.7 TH 4 SemiPucca 11 Gudlavalleru 23+834 Gudivada S.Venkanna Person Not Available R-6.3 NTH 1 Pucca 12 Janardhanapuram 41+150 Gudivada Manepalli Subramanyam Adinarayana L-6 NTH 6 semiPucca 13 Puttagunta 45+800 Gudivada Valiveti Satyanarayana Jayaharinadh L-6.2 TH 2 Katcha 14 Puttagunta 45+810 Gudivada Jayaharinadh L-6.9 TH 5 Katcha 15 Kanumolu 55+820 Nuzvid Valiveti Seshagirirao Chamarthi venkatanarasimharao Viswanadham R-6.2 NTH 2 Pucca 16 Kanumolu 55+860 Nuzvid Allamuri Murali Krishana Prasadarao L-6.2 NTH 4 Pucca Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 66 Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project 17 Kanumolu 55+870 Nuzvid Chamarthi Venketeswararao Rammohanarao R-5 NTH Pucca 18 Kanumolu 55+900 Nuzvid Vanamala Eswararao Nageswararao R-6.5 NTH 4 Semipucca 19 Kanumolu 55+930 Nuzvid Morla Venkateswramma Vasantharao R-5.5 NTH 1 Semipucca 20 Kanumolu 55+930 Nuzvid polasi Pothuraju Abimanyarao R-5.5 NTH 4 Pucca 21 Kanumolu 55+940 Nuzvid Maredu Rambabu Sobhanachalam R-5.7 NTH 4 Semipucca 22 Kanumolu 55+960 Nuzvid mangayya R-5 NTH 3 Pucca 23 Kanumolu 55+960 Nuzvid Bhemavarapu Rangarao Chintala Ravivenkatasatyanarayana Satyavenkataramarao R-5.7 NTH 4 Pucca 24 Kanumolu 56+000 Nuzvid Volusuri Venugopal L-4.2 TH 5 Pucca 25 Kanumolu 56+200 Nuzvid Bandili Satyanarayana singh Subbisingh L-6 NTH 26 Kanumolu 56+350 Nuzvid Venkataratnam R-7 TH 2 Semipucca 27 Kanumolu 56+350 Nuzvid Naraharasetty Venkateswraro Naraharasetty Venkatasatya Gangadhar Venkataratnam R-7 TH 4 Semipucca 28 Perikeedu 57+300 Nuzvid Singireddy Narakumari Chennakesavarao L-7 NTH 4 Semipucca 29 Perikeedu 57+320 Nuzvid Gottapu Koteswararao Paparao L-7 NTH 3 Semipucca 30 Perikeedu 57+360 Nuzvid Allu Trimurtulu Narayanarao L-6.5 NTH 4 Semipucca 31 Meerjapuram 67+620 Nuzvid Badipati Isak Person Not Available L-6.2 NTH 5 Katcha 32 Meerjapuram 68+850 Nuzvid Pamidikondala Radhakrishana Ramachandrarao L-5 NTH 2 Katcha 33 Gollapalli 72+070 Nuzvid Pamarthi Kriskanakumari Radhakrishana L-7 NTH 1 Katcha 34 Gollapalli 72+405 Nuzvid Shaik Babu Abdhul L-5.7 NTH 6 Semipucca 35 Annavaram 86+505 Nuzvid Ede Savitri Sambasivarao R-5.4 TH 4 Katcha 36 Annavaram 86+720 Nuzvid Katuri Subbarao Venkayya L-6.7 NTH 0 Katcha 37 Annavaram 86+820 Nuzvid Mareedu Chennakesavarao Narayana L-5.9 NTH 5 Semipucca Semipucca Sl.No Pedna 7+020 Pedna 7+120 Pedna 7+220 Pedna 7+280 Pedna 7+325 Pedna 7+360 Pedna 7+430 Pedna 7+450 Nadupuru 10+930 10 Reddipalaem 13+420 11 Reddipalaem 13+425 12 Reddipalaem 13 Reddipalaem 14 Reddipalaem 1 2 3 4 5 6 7 8 9 Machilipatna m Machilipatna m Machilipatna m Machilipatna m Machilipatna m Machilipatna m Machilipatna m Machilipatna m Machilipatna m Name of the Head(HHH) HouseHold Father\husband name Title holder(TH)/NonTitle Holder(NTH) No of Family Members Division Chanage Name of the Village Location (Left\ Right) PDF LIST - Pedana - Nuzvid - Visannapeta ROAD - Cattleshed Category Varudhu Ramachandrarao Subbarao R-3 TH 3 jonabattula koteswaramma Nancharayya R-2 NTH 5 Varudhu Nancharayya Subbarao R-4.5 TH 6 Varudhu Ragavayya Subbayya R-6 NTH 3 Maruboiena Srinivasarao Nageswarao R-6 TH 6 Varudhu Venkateswararo Koteswararo L-5 NTH 5 Varudhu Suryachanrraro Venkatasubbayya R-9 NTH 13 Varudhu Subbarao Madavarao R-6 NTH 7 Polagiri nageswararao Srimahathi R-6.5 NTH 4 Type of Structure Katcha Katcha Katcha Katcha Katcha Katcha Katcha Katcha Gudivada Katta Laxminarayana Subbayya R-8.2 TH 5 Katcha Katcha Gudivada Bellamkonda Venkateswarao Mallikarjunarao L-7.5 NTH 4 Katcha 13+425 13+510 Gudivada Bellamkonda Sahademudu Pamarthi VeeraVenkateswarao Mallikarjunarao L-7.5 Rangarao R-8 NTH NTH 3 Gudivada 5 Katcha Katcha 13+525 Gudivada Pamarthi Venkataswamy Ramayya R-7 NTH 4 Katcha Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 67 Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project 15 Reddipalaem 13+890 Gudivada Pamarthi Ramesh Dasaradharamayya R-7 NTH 4 Katcha 16 Reddipalaem 13+900 Gudivada Pamarthi Ankalarao Ragavulu R-7.5 NTH 2 Katcha 17 Reddipalaem Parasa Reddemma Kolusu Reddayya L-9 Veraraju L-6.5 NTH TH 3 18 Gudivada Gudivada Durgayya Vaddlamannadu 14+400 15+400 5 Katcha Katcha 19 Vaddlamannadu 15+420 Gudivada Madamala Sivaleela Venkateswararao R-5 NTH 2 Katcha 20 Vaddlamannadu 15+560 Gudivada Yadaala Ramarao Rajarao L-6.2 NTH 2 Katcha 21 Vemavaram 16+820 Gudivada Yarlagadda hunumantharao Rammurthy L-4.5 NTH 4 Katcha 22 Vemavaram L-4.5 NTH 2 Vemavaram Gudivada Pamarthi Samrajam Yarlagadda Nagapanindhra Rangarao 23 16+880 16+900 Gudivada M/o Vijayamma L-5.5 NTH 3 Katcha Katcha 24 Vemavaram 17+050 Gudivada Sonti Venkateswarao Veraswamy L-5.2 TH 5 Katcha 25 Vemavaram L-4.5 NTH 2 Gudivada Vemula Durgarao Vemula Veraanjeneyulu Danayya 26 17+100 17+140 Gudivada Vemavaram Venkateswaralu L-4.5 NTH 2 Katcha Katcha 27 Vemavaram 17+140 Gudivada Mannem Gopalarao Daharmayya L-4.5 NTH 3 Katcha 28 Vemavaram 17+150 Gudivada Mannem ChinaRagavulu Daharmayya L-4.5 NTH 2 Katcha 29 Vemavaram 17+160 Gudivada Mannem Nageswararao Venkateswaralu L-4.5 NTH 4 Katcha 30 Vemavaram 17+180 Gudivada Mannem Pedaragavayya Venkateswaralu L-4.5 NTH 5 Katcha 31 Bommuluru 31+100 Gudivada Gutta jagadesh chandrachowdary Venkata swamy R-7 NTH 4 Katcha 32 Bommuluru 31+620 Gudivada Uyyapatti koteswararo Duravasulu R-9 NTH 6 Katcha 33 Janardhanapuram 40+820 Gudivada Kondapalli Ravi Akiripalli R-7 NTH 4 Katcha 34 Janardhanapuram 41+400 Gudivada Pilli Srinivasaarao L-7 NTH 4 Katcha 35 Janardhanapuram 41+650 Gudivada Narapareddy R-8 NTH 3 Katcha 36 41+650 Gudivada Rajarao R-8 NTH 4 Katcha 37 Janardhanapuram Arugolanu Subbarao Person Not Available Person Not Available 53+650 Nuzvid Varri Chakravarthi Rajarao R-8 NTH 5 Katcha 38 Kanumolu 55+430 Nuzvid Dodda Koteswrarao Ratnam L-6 NTH 6 Katcha 39 Kanumolu 56+450 Nuzvid Badicherla Narasimharao Koteswararo R-7.5 NTH 6 Katcha 40 Perikeedu 57+560 Nuzvid Tavva Suryaprakasarao Purnayya L-7.2 NTH 6 Katcha 41 Perikeedu 58+880 Nuzvid Padmala Venkateswararo Venkatanarasayya L7 NTH 6 Katcha 42 Marribandam 65+100 Nuzvid Podhuri Srinu Rattayya R-7 NTH 3 Katcha 43 Meerjapuram 67+801 Nuzvid Tegala Tirupathirao Ramulu L-7 NTH 7 Katcha 44 Annavaram 86+760 Nuzvid Gholla Laxmayya Chintayya L-7.2 NTH 0 Katcha 45 Annavaram 86+820 Nuzvid Ganduboiena Nagaraju Ramarao R-8 NTH 3 Katcha Pedna 9+650 Nadupuru 12+050 3 Vaddlamannadu 15+440 Machilipatna m Machilipatna m Gudivada 4 Vaddlamannadu 15+450 Gudivada 5 Vaddlamannadu 15+480 6 Vaddlamannadu 15+520 1 2 Name of the Head(HHH) HouseHold Father\husband name Title holder(TH)/NonTitl eHolder(NTH) No of Family Members Division Location (Left\ Right) Sl.No Name of the Village Chanage PDF LIST - Pedana - Nuzvid - Visannapeta ROAD - Kiosks Category Type of Structure MD.Sardhar Awa L-5 NTH 3 Parasa Gopalkrishana Nancharayya R-4.5 NTH 5 Sk.Raheman Not Available L-5 NTH 0 Kiosk N.Sambasivarao Not Available L-5.5 0 Kiosk Gudivada Udayagiri Venkateswararao Person Not Available R-6.5 NTH NTH 0 Kiosk Gudivada Thota Umashankar Person Not Available L-7 NTH 3 Kiosk Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 68 Kisok Kiosk Pedana-Nuzvid-Visannapeta Vaddlamannadu 15+550 Gudivada 8 Vaddlamannadu 15+560 Gudivada 9 Vaddlamannadu 10 Vaddlamannadu 15+560 15+560 Gudivada Gudivada 11 Vaddlamannadu 15+580 12 Vemavaram 13 Vemavaram 14 Vemavaram 7 Andhra Pradesh Road Sector Project Thota venkatanagaanjeneyulu G.Nageswararao NTH 2 Kiosk Hunumantharao L-6.8 Person Not Available L-6.5 NTH 0 Kiosk Gandam Rangarao Garikipati laxmayya Venkatakrishanarao R-6.5 R-6.8 NTH NTH 0 Ragavayya 4 Kiosk Kiosk Gudivada NKV Subbarao Venu R-6.8 NTH 4 Kiosk 17+630 Gudivada M.Ismail Kondayya L-4.2 NTH 6 Kisosk 17+690 Gudivada Mannem Nageswararao Venkateswaralu L-4.5 NTH 1 Kisosk 17+700 Gudivada Mannem Nageswararao Person Not Available L-4.5 NTH 2 Kisosk 15 Vemavaram 17+710 Gudivada Tammisetty nookalu nookalu L-4.5 NTH 3 Kisosk 16 Vemavaram 17+730 Gudivada Akurathi hema Srinivasarao L-4.5 NTH 4 Kisosk 17 Vemavaram 17+730 Gudivada Munagala Pramela Danumjay L-4.5 NTH 4 Kisosk 18 Vemavaram 17+730 Gudivada Satyanarayana Person Not Available L-4.5 NTH 3 Kisosk 19 Vemavaram 17+780 Gudivada Srisylam Person Not Available L-4.5 NTH 3 Kisosk 20 Vemavaram 17+810 Gudivada Sarveswararao Person Not Available L-4.5 NTH 0 Kisosk 21 Vemavaram 17+810 Gudivada Basaveswararao Person Not Available L-4.6 NTH 0 Kisosk 22 Vemavaram 17+820 Gudivada Tammisetty Suryanarayana Person Not Available R-6 NTH 0 Kisosk 23 Vemavaram 17+820 Gudivada kagita Veranjeneyulu Person Not Available R-6 NTH 0 Kisosk 24 Vemavaram 17+830 Gudivada Bapanayya Person Not Available R-6 NTH 0 Kisosk 25 Vemavaram 17+830 Gudivada Chetturu jaganadharao nageswarrao R-6 NTH 4 Kisosk 26 Vemavaram 17+840 Gudivada Narapalem krishana Rangarao L-6 NTH 5 Kiosk 27 Vemavaram 17+840 Gudivada Bodda Romahanaramesh pullarao L-6 NTH 3 Kiosk 28 kowthvaram 22+065 Gudivada koreni Appayamma Chittibabu L-4.4 NTH 3 Katcha 29 kowthvaram 22+070 Gudivada Allu suryanarayana W/o Atchinaidu L-6 NTH 3 SemiPucca 30 kowthvaram 22+120 Gudivada Sonayala Suryanarayan a Satyam R-6.8 NTH 1 Kiosk 31 Gudlavalleru 22+780 Gudivada Alajangi Lingamurthy Sambayya R-9 NTH 0 Kiosk 32 Gudlavalleru 23+000 Gudivada Ch.Krishana Musalayya R-8 NTH 4 Kiosk 33 Gudlavalleru 23+000 Gudivada Miriyala veranjeneyulu Veravenkayya R-8 NTH 6 Kiosk 34 Gudlavalleru 23+030 Gudivada Mukkudi Rajasekhar Setti narayana R-6 NTH 2 Kiosk 35 Gudlavalleru 23+220 Gudivada kaja pandu Gangayya R-7 NTH 5 Kiosk 36 Gudlavalleru 23+220 Gudivada katuri Arjunrao Person Not Available R-7 NTH 4 Kiosk 37 Gudlavalleru 23+990 Gudivada Mutthireddy Sekhar Nagamalleswararao L-6 NTH 4 Kiosk 38 Gudlavalleru 23+860 Gudivada v.laxmiPrasadarao Person Not Available L-7.2 NTH 0 Kiosk 39 Angalur 27+820 Gudivada Vadladi Jagadish Subbarao R-7.3 NTH 4 Kiosk 40 Angalur 27+820 Gudivada Dhulupudi Nagamalleswar Venkataramana R-7.3 NTH 2 kiosk 41 Angalur 27+830 Gudivada Kodali Madhu Venkataratnam L-6.7 NTH 5 Kiosk 42 Angalur 27+850 Gudivada Merugumalla Srinivasarao Bheemarao R-8.8 NTH 4 Katcha 43 Bommuluru 31+200 Gudivada Cheboiena Umadevi Venkateswararao R-8 NTH 2 kiosk 44 Bommuluru 31+430 Gudivada Rangula Raju Tadayya R-8.5 NTH 4 kiosk 45 Bommuluru 31+600 Gudivada Late)Harinadh R-8.8 NTH 3 Kiosk 46 Bommuluru 31+610 Gudivada Sonti Dhanalaxmi Chilakabatthina Chinakoteswararao padalalu L-7.3 NTH 3 Kiosk 47 Bommuluru 31+620 Gudivada Chilakabatthula nagaraju Sreeramulu L-6.1 NTH 4 Kiosk 48 Gudiwada 37+220 Gudivada Ramanapudi Suresh Venkateshswararao l-8 NTH 5 Kiosk 49 Janardhanapuram 39+400 Gudivada Godavalli Sambasivarao Parasuramayya L-5 NTH 2 Kiosk 50 Janardhanapuram 40+880 Gudivada Marikayalareddy L-9.5 NTH 0 Kiosk 51 Janardhanapuram 40+890 Gudivada Tammi Narapureddy Bommanapalli Venkataswamy Chinna L-8.2 NTH 0 Kiosk Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 69 Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project 52 Janardhanapuram 41+000 Gudivada kokkerapati Subbaramayya krishana L-9.5 NTH 0 Kiosk 53 Janardhanapuram 41+080 Gudivada Annem koteswararao iyyanna R-6 NTH 5 Kiosk 54 Janardhanapuram 41+100 Gudivada Pavisa Rammohanarao Venkatanarayana L-6.9 NTH 2 Kiosk 55 Janardhanapuram 41+100 Gudivada Manepalli subbarao Adinarayana R-6 NTH 2 Kiosk 56 Janardhanapuram 41+110 Gudivada Muddula Gopalakrishana Ramanjaneyulu R-6.5 NTH 4 Kiosk 57 Janardhanapuram 41+150 Gudivada Vempala Venkatalaxmi Person Not Available L-5 NTH 0 Kiosk 58 Janardhanapuram 41+150 Gudivada C.Vijaya Person Not Available R-7 NTH 0 Kiosk 59 Janardhanapuram 41+155 Gudivada S.Venkatasitaramayya Amba lakshmaiah L-6.8 NTH 0 Kiosk 60 Janardhanapuram 41+200 Gudivada Awalomdhar Ajibabau Hoozoor L-7 NTH 2 Kiosk 61 Janardhanapuram 41+210 Gudivada Mekala laxmi kanakapothuraju L-8 NTH 3 Kiosk 62 Janardhanapuram 41+500 Gudivada pattumuri Satyanarayana Krishana L-7.2 NTH 4 Kiosk 63 Puttagunta Arugolanu 45+800 Gudivada maddala Venkateswararo Person Not Available L-8 NTH 0 Kiosk 64 50+600 Nuzvid Reddysobhana chalapathirao Atchiyya L-7.8 NTH 2 Kiosk 65 Arugolanu 50+740 Nuzvid Varalaxmi R-6.2 NTH 3 Kiosk 51+150 Nuzvid V.Kesavarao Vadavalli Sivabully challyya Manikyarao L-6.5 NTH 67 Kanumolu 55+645 Nuzvid Chintapalli Prasannakumari Prabhakar(late) R-8 NTH 3 Kiosk 68 Kanumolu 55+670 Nuzvid Chinnam Siyyaon Somayya R-7 NTH 1 Kiosk 69 Kanumolu 55+740 Nuzvid kattumala Adrutstarao Imannual R-5.5 NTH 1 Kiosk 70 Kanumolu 56+980 Nuzvid Panchakarla Satyanarayana Venkataramana R-8 NTH 4 Kiosk 71 Kanumolu 56+980 Nuzvid Vijayakumar Bhyragi R-4.2 NTH Kiosk 72 Kanumolu 56+070 Vanukuri Edukondalu Satyanarayana(late) L-10 NTH Kiosk 73 Perikeedu 57+350 Nuzvid Vankuri Hunumantharao Verayya L-7 NTH Kiosk 74 Perikeedu 57+650 Nuzvid Singarapu Durgarao Simhachalam R-7.5 NTH 75 Marribandam 64+700 Nuzvid Rayavarapu Swami Rangarao L-6.4 NTH 4 Kiosk 76 Marribandam 64+720 Nuzvid Aladangi Ugadi Chinnarao L-6 NTH 4 Kiosk 77 Marribandam 64+745 Nuzvid Vaddadi Trinadh Appalaswamy L-7 NTH 0 Kiosk 78 Marribandam 64+810 Nuzvid Machavarapu Tirupatayya Ramdhar L-6 NTH 2 Kiosk 79 Marribandam 65+850 Nuzvid Vadduluri Venkateswararo Raghavalu L-8.1 NTH 6 Kiosk 80 Marribandam 65+850 Nuzvid Jakkula Laxmi Venkataramana L-8.1 NTH 2 Kiosk(2shops 81 Marribandam 65+850 Nuzvid Chabathina Ratnasamual Samual R-8 NTH Kiosk 82 Meerjapuram 68+910 Nuzvid Sedirala Koteswararao Venkatasubbarao L-8 NTH kiosk 83 Meerjapuram 68+940 Nuzvid Sutrala Rangarao Subbarao R-7.3 NTH kiosk 84 Meerjapuram 68+940 Nuzvid Maragani Nehrukanth Ayanna R-9 NTH 85 Meerjapuram 68+960 Nuzvid Maddirala NagaSriragavarao Venu L-9 NTH 86 Meerjapuram 69+030 Nuzvid Yarramsetty Loknadh Tirupatiayya L-8.5 NTH 87 Gollapalli 72+100 Nuzvid Penumada Kalebu Venkataratnam L-9 NTH 3 kiosk 88 Gollapalli 72+180 Nuzvid Koduru Nageswararao Subbarao L-7 NTH 2 kiosk 89 Gollapalli 72+200 Nuzvid Owner not Available Person Not Available 90 Gollapalli 72+265 Nuzvid Shaik Meerjavali Kaream R-6 NTH 4 Kiosk 91 Gollapalli 72+410 Nuzvid Mylavarapu Tirapatirao Raghunadam L-6.8 NTH 0 kiosk 92 Gollapalli 72+710 Nuzvid Venkayya L-5.7 NTH 4 Kiosk 93 Gollapalli 72+720 Nuzvid Ulaga Krishana Mylavarapu Venkateswararao Subbarao R-5.3 NTH 4 Kiosk 94 Morsapudi 75+200 Nuzvid G.Apparao Person Not Available R-6.4 NTH 4 Kiosk 95 Tukkuluru 78+430 Nuzvid Badugu Venkateswararao Kondayya L-8 NTH 5 Kiosk 96 Tukkuluru 78+430 Nuzvid Kosuri Srinivasarao Venkateswararao R-6.8 NTH 4 Kiosk 97 Tukkuluru 78+430 Nuzvid Kosaraju Rajarao Person Not Available R-7.2 NTH 6 Kiosk 66 Arugolanu Detailed Project Report VIII: Resettlement Action Plan (Annexures) Kiosk Kiosk 5 kiosk kiosk kiosk NTH kiosk Page 70 Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project 98 Annavaram 86+770 Nuzvid Satyanarayana Jaganadham L-7.8 NTH 0 Kiosk 99 86+820 Nuzvid Koppakala Sitaramayya Venkateswrarao L-7.5 NTH 0 Kiosk 100 Annavaram Hunumuntulagude m 89+880 Nuzvid Polapaka Sudhakar Prasadarao L-8 NTH 5 kiosk 101 Mittagudem 90+680 Nuzvid Velivela Gopalaswamy Venkataratnam R-8.8 NTH 2 Kiosk 102 Mittagudem 90+705 Nuzvid Chalamala Sambasivarao Bulliramayya R-7.8 NTH 6 Kiosk 103 Mittagudem 90+900 Nuzvid Janga Somasundhar Yakobu L-7.5 NTH 0 Kiosk 104 Leelanager 92+180 Nuzvid Kethe Jaganadharao Seetayya L-8 NTH 4 Kiosk 105 Leelanager 92+180 Nuzvid Kethe Sheshamma Tirupatayya L-6.9 NTH 5 Kiosk ANNEXURE 2.3: COMMUNITY PROPERTY RESOURCES OF PEDNA- NUZVID- VISANNAPETA ROAD. S.no Name of the Common Property Resources Chainage Location (Left/Right) Distance from the Centre line in Mts) Remarks 1 Eadgah 9+300 Right 3 Situated in Proposed By pass 2 Hanuman Temple 12+020 Left 5 Direct Affect. 3 Human Temple 13+750 Left 6 Direct Affect. 4 Kondalamma Temple 17+700 Left 5 Direct Affect. 5 sai temple 22+100 Left 1.5 Indirect Affect. 6 Human Temple 23+650 Left 5 Direct Affect. 7 Ram temple 23+750 Left 5 Direct Affect. 8 Krishna Temple 24+000 Left 6.5 Direct Affect. 9 Hanuman Temple 27+850 Left 7.4 Direct Affect. 10 Krishana Temple 27+865 Right 7.3 Direct Affect. 11 Ram temple 31+160 Left 15 Indirect Affect. 12 Church 31+600 Left 6.5 Direct Affect. 13 Hunuman Temple 39+420 Right 8 Direct Affect. 14 Ayyappa Swami Temple 39+420 Right 9 Direct Affect. 15 Temple 39+450 Right 18 Indirect Affect. 16 Sivalayam Temple 41+000 Left 7 Direct Affect. 17 Ganapathi Temple 45+640 Left 5 Direct Affect. 18 Church 46+220 Right 8 Direct Affect. 19 Temple 47+800 Right 10 Direct Affect. 20 Temple 49+000 Left 10 Direct Affect. 21 Catalic Church 50+350 Left 8 Indirect Affect. 22 Temple 50+700 Left 8 Direct Affect. 23 Sai temple 50+975 Left 7 Direct Affect. 24 Sai temple 51+100 Right 8 Direct Affect. 25 Krishana temple 51+210 Left 8 Direct Affect. 26 Temple 51+400 Left 9 Direct Affect. 27 Temple 51+500 Left 12 Indirect Affect. 28 KrishanaTemple 53+700 Left 9 Direct Affect. Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 71 Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project 29 Church 55+625 Left 9 Indirect Affect. 30 Church prayer hall 55+700 Right 9 Indirect Affect. 31 Statue(Jesus & CPI) 55+800 Left 7 Direct Affect. 32 Ramalayam Temple 55+810 Left 6 Direct Affect. 33 Ramalayam Temple 55+950 Left 7 Direct Affect. 34 Hanuman Temple & pond 56+050 Left 5.5 Direct Affect. 35 sai temple 56+200 Left 9 Direct Affect. 36 Temple 57+300 Left 4.5 Direct Affect. 37 Ayyappa Swami Statue 57+450 Left 5 Direct Affect. 38 Temple Ayyappa Swamy 57+450 Left 12 Indirect Affect. 39 Statues of Gandhi garu and Subashchandrabosu garu 57+550 Right 8.5 Direct Affect. 40 VinayakaTemple 64+300 Left 4.5 Direct Affect. 41 HunumanTemple 64+500 Right 6.5 Direct Affect. 42 Temple & Tap 65+810 Left 5.5 Direct Affect. 43 Temple 67+600 Left 5.5 Direct Affect. 44 Hunuman Temple 68+000 Right 7 Direct Affect. 45 Veerabramamgari Tempel 69+100 Right 8 Direct Affect. 46 Hanuman Temple 72+450 Left 7 Direct Affect. 47 Hanuman Statue 75+100 Left 7 Direct Affect. 48 Jesus statue 75+200 Left 7 Direct Affect. 49 Ganesh temple 75+400 Right 8 Direct Affect. 50 Hanuman temple 77+200 Left 6.2 Direct Affect. 51 mosque 78+250 Right 12.5 Indirect Affect. 52 Temple 84+200 Right 12 Indirect Affect. 53 Hanuman Temple 85+400 Right 12 Indirect Affect. 54 Temple 86+400 Left 6 55 Ram temple 86+700 Left 7 56 Temple, School 88+400 Left 20 Indirect Affect. 57 Hanuman Statue 89+500 Right 6.5 Direct Affect. 58 Hanuman temple 89+600 Right 8 Direct Affect. 59 church 90+700 Right 7 Direct Affect. 60 Hunman temple 91+750 Left 10 Direct Affect. 61 Temple, water tap 92+290 Left 8 Direct Affect. 62 Temple troc 93+300 Right 5.5 Direct Affect. 63 Hanuman temple 94+700 Left 10 Indirect Affect. 64 Trees 62+500 to 94+ 770 Both Sides 5 to 6 mts distance Direct Affect. 65 Tree ( temple) 7+000 Right 1 Situated in Proposed By pass 66 Tree 23+850 L/R 7 Direct Affect. Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 72 Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project 67 Tree & Rachabanda 31+100 Left 8 Direct Affect. 68 Pond & Tree 45+650 Left 8 Direct Affect. 69 Tree ( temple) 56+100 Left 6 Direct Affect. 70 Tree & Rachabanda 64+720 Left 4 Direct Affect. 71 Tree & Rachabanda 72+220 Left 8 Direct Affect. 72 Tree & Rachabanda 90+700 Right 5 Direct Affect. 73 Big pond 23+820 Left 9 Indirect Affect. 74 Pond 31+100 Left 8 Direct Affect. 75 Pond 40+900 Right 5 Direct Affect. 76 Big pond 43+200 & 500 Right 4 Direct Affect. 77 Pond 44+450 Right 8 Direct Affect. 78 Pond 46+750 Right 10 Indirect Affect. 79 Pond 55+400 Left 9 Indirect Affect. Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 73 Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project OTHER STRUCTURES OF PEDNA- NUZVID- VISANNAPETA ROAD. S.no Name of the Other Property Resources Chainage Location (Left/Right) Distance from the Centre line in Mts) Remarks 1 School 31+350 Left 10 Indirect Affect. 2 School 51+400 Left 9 Direct Affect. 3 School 55+600 Left 5 Direct Affect. 4 School 56+300 Left 10 5 High School 56+350 Left 6 Direct Affect. 6 School 77+800 Right 12 Indirect Affect. 7 Well 7+550 Right 1 Situated in Proposed By pass 8 Tap 10+900 Right 5 Direct Affect. 9 Public Well 11+000 Left 6.5 Direct Affect. 10 Public Well 12+000 Left 6.5 Direct Affect. 11 Public Tap 12+020 Left 6.5 Direct Affect. 12 Well and Hand pump 17+000 Left 8 Direct Affect. 13 Public well 22+100 Left 10 Direct Affect. 14 tap 22+100 Left 6 Direct Affect. 15 Public well 22+200 Right 8 Direct Affect. 16 Water Tap 31+020 Right 6 Direct Affect. 17 Water Tap 37+350 Left 8.5 Direct Affect. 18 Direct Affect. 19 Tap 39+525 Right 7 Direct Affect. 20 Tap 41+600 Left 6 Direct Affect. 21 Tank, Tap, School 45+600 Right 15 Indirect Affect. 22 Tap 45+800 Right 7 Direct Affect. 23 Tap 45+850 Right 6 Direct Affect. 24 Tap 46+200 Right 6 Direct Affect. 25 Taps(Panchayathi) 50+500 to 50+750 Left -2taps Right5taps 6 to 7 mts Direct Affect. 26 Temple & Tap 65+810 Left 5.5 Direct Affect. 27 Tap 67+640 Left 6 Direct Affect. 28 Tap 72+550 Left 8 Direct Affect. 29 Tap 75+180 Left 8 Direct Affect. Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 74 Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project 30 Hand pump 84+650 Right 5 Direct Affect. 31 Hand pump 87+950 Left 5 Direct Affect. 32 Tap 88+400 Left 6 Direct Affect. 33 Hand pump 88+600 Left 6 Direct Affect. 34 Hand pump 89+580 Left 5 Direct Affect. 35 Hand pump 89+950 Left 6 Direct Affect. 36 Tap 90+580 Left 4 Direct Affect. 37 Temple, water tap 92+290 Left 8 Direct Affect. 38 Tap 92+500 Left 5 Direct Affect. 39 Tap 92+500 Right 5 Direct Affect. 40 Hand pump 93+300 Left 6 Direct Affect. 41 Govt.Ayurvedik Hospital 56+250 left 13 Indirect Affect. 42 BSNL tele Box 10+900 Left 7.8 Direct Affect. 43 Ele Bill Collection Center 23+650 Left 5 Direct Affect. 44 Milk Society 40+900 Right 5 Direct Affect. 45 Panchyat Office 41+100 Right 7 Direct Affect. 46 Panchyat Office 45+650 Right 7.6 Direct Affect. 47 Milk Society & Collection centre 51+240 8.5 Direct Affect. 48 library 51+250 Left 10 Direct Affect. 49 Panchyat Office 51+300 Left 9 Direct Affect. 50 Agriculturel Cooprative Socity Building &Gowdown 51+350 Right 9 Direct Affect. 51 Panchyat Office 56+010 Left 7 Indirect Affect. 52 library 56+260 Left 11 Indirect Affect. 53 Agriculturel Cooprative Socity Building 56+270 Left 9 Direct Affect. 54 Sub Register Office 56+350 Right 9 Indirect Affect. 55 BSNL office 58+950 Right 7.8 Indirect Affect. 56 Check Post 92+300 Left 5 Direct Affect. 57 Bus Shelter 10+650 Left 6 Direct Affect. 58 Bus Shelter 10+900 Left 7.8 Direct Affect. 59 Bus Shelter 13+750 Right 6.5 Direct Affect. 60 Bus Shelter 17+100 Right 8 Direct Affect. 61 Bus Shelter 17+820 Left 6 Direct Affect. 62 Bus Shelter 22+800 Left 7 Direct Affect. 63 Bus Shelter 23+650 Left 5 Direct Affect. 64 Committee Hall 23+800 Left 6 Direct Affect. 65 Subhasu Chandra Bose Statue 23+800 Left 6 Direct Affect. 66 Bus Shelter 23+900 Left 8 Direct Affect. 67 Krishna Temple Land 24+000 Left 6.5 Direct Affect. 68 Statue of NTR 24+050 Left 5 Direct Affect. 69 Bus Shelter 26+700 Left 5 Direct Affect. 70 Bus Shelter 27+820 Right 7.5 Direct Affect. Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 75 Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project 71 Bus Shelter 27+875 Left 8.35 Direct Affect. 72 NTR Statue 31+150 Left 8.5 Direct Affect. 73 Bus Shelter 31+200 Right 8 Direct Affect. 74 Br.Ambedkar Statue 37+200 Right 10 Indirect Affect. 75 Bus Shelter 37+450 Left 6.5 Direct Affect. 76 Municipal Waste 38+900 Right 10 Indirect Affect. 77 Bus Shelter 39+300 Right 7 Direct Affect. 78 TDP Flag 40+800 Right 6 Direct Affect. 79 CPM Flag 40+800 Right 6 Direct Affect. 80 YSR Flag 40+810 Right 6 Direct Affect. 81 Community Hall 40+810 Right 6 Direct Affect. 82 Over Head Tank 41+000 Left 12 Indirect Affect. 83 YSR Statue 41+100 Left 8.5 Direct Affect. 84 Bus Shelter 41+100 Right 7 Direct Affect. 85 YSR Flag 45+790 Left 6 Direct Affect. 86 Community Hall 45+800 Left 8 Direct Affect. 87 Community Hall 46+400 Right 8 Direct Affect. 88 Ambedkar Statue 46+500 Right 13 Indirect Affect. 89 Bus Shelter 49+200 Left 6.4 Direct Affect. 90 Church Ground 50+350 Left 12 Indirect Affect. 91 Bus Shelter 50+800 Left 7 Direct Affect. 92 Abbedkar Statue 50+800 Left 8 Direct Affect. 93 Youth Community Hall 51+210 Left 9 Direct Affect. 94 Dr.Water Plant 51+230 Left 9 Direct Affect. 95 Nethaje Statue 50+300 Left 9 Direct Affect. 96 Over Head Tank 51+350 Left 8 Direct Affect. 97 Cemetery 55+300 Left 7 Direct Affect. 98 Over Head Tank 55+500 Right 15 Indirect Affect. 99 Ambedkar Statue 55+750 Right 12 Indirect Affect. 100 Statue(Jesus & CPI) 55+800 Left 7 Direct Affect. 101 Statue & Committee Hall 56+150 Left 9 Indirect Affect. 102 Bus Shelter 56+340 Left 8 Direct Affect. 103 Bus Shelter 57+550 Right 8.5 Direct Affect. 104 Statues of Gandhi garu and Subashchandrabosu garu 57+550 Right 8.5 Direct Affect. 105 JMJ junior College 58+925 Right 8.2 Indirect Affect. 106 JMJ junior College 58+950 Right 8.2 Indirect Affect. 107 NTR Statue 64+850 Left 6 Direct Affect. 108 Bus Shelter 68+500 Right 10 Direct Affect. 109 Over Head Tank 69+100 Right 15 Indirect Affect. 110 Bus Shelter 72+200 Right 9 Direct Affect. 111 Bus Shelter 72+400 Left 6 Direct Affect. Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 76 Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project 112 Bus Shelter 75+050 Left 6.5 Direct Affect. 113 TDP Flag 75+100 Left 6.5 Direct Affect. 114 Congrase Flage 75+110 Left 6 Direct Affect. 115 Bus Shelter 76+180 Left 7 Direct Affect. 116 Bus Shelter 78+500 Right 6.2 Direct Affect. 117 IFTU Flag 87+720 Left 5.5 Direct Affect. 118 CPI Statue 87+940 Left 5 Direct Affect. 119 TDP Flag 87+950 Left 6.5 Direct Affect. 120 Bus Shelter 87+950 Right 6 Direct Affect. 121 Bus Shelter 90+050 Left 7 Direct Affect. 122 NREGS Board 90+18 Right 5.5 Direct Affect. 123 NRGS Board 91+830 Left 5 Direct Affect. 124 Scheme NGRY - Display Board 94+400 Left 4.5 Direct Affect. 125 Trees 62+500 to 94+ 770 Both Sides 5 to 6 mts distance Direct Affect. Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 77 Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project ANNEXURE 2.4 : CONSULTATION FINDINGS Participant Issue Discussed Suggestion Important Finding Venue-Janardhanpuram, Machilipatnam Project Preparation Team: Social, environmental and technical expert of the consultant, environmental officer APRDC, Stakeholders: Local engineers(R&B),MRO, Dy S.P., MLA representatives, Revenue officials, Elected representatives of local self- Government Relocation of temple in general from road side Importance and utility of ponds Cost of agricultural Land Submerged stretches Migration and HIV/AIDS issues Relocation is possible if replacement is done Pond is source of potable water , fish farming is done thus source of livelihood so minimize impact on pond Cost of land is very high because it is a productive land of lower deltaic flood plain Land acquisition should be minimized Direct purchasing of land should be done to avoid litigation HIV/AIDS is not considered important because of low level of awareness and people find restricted themselves in discussing HIV/AIDS issue Land acquisition strategy should be devised HIV/AIDS awareness campaign should be part of social management plan to generate awareness and BCC among general people Future course of Action Venue: Nadupuru,Pedna,Krishna Project Preparation Team: Social, environmental and technical expert of the consultant, environmental officer APRDC, Participant Stakeholders: Local engineers(R&B),MRO, MLA representatives, Revenue officials, Elected representatives of local self- Government All ready encroachment have been compensated by 2 Cents and Rs 33000 per family for construction Issue Cost of relocation of pucca structure in the village and cost of land Discussed Tree cutting Utility shifting Migration and HIV/AIDS issues Multiple displacement of commercial families should be avoided Acquisition of pucca structure should be avoided Suggestion Cost of land is very high because it is a productive land of lower deltaic flood plain Tree cutting is part of Government so Government should take care of such issues Important People are very cooperative. Involvement of local R&B engineers in project planning will be key to successful Finding implementation of land acquisition. Future Land acquisition strategy has been devised HIV/AIDS awareness campaign has become of social management plan(SMP). course of Action Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 78 Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project Annexure: 3.1: CHAINAGE WISE ENCUMBRANCE DETAILS Chainage S.No Type Of Encumberances Village Remarks From To LA LA and R&R R&R and CPR Encumbrance Free Stretch PNV - 8 1 Pedna 2 Nadupuru 3 Reddipalem 4 5 6 7 8 9 10 Vadlamadugu Vemavaram Kowtaram Gudlavalleru Anguluru Bommuluru Gudivada 11 Janardhanapuram 12 Puttagunta 13 14 Shivayypakalu Arugolalu 7+000 7+500 7+500 9+650 9+650 9+850 9+850 10+700 10+700 12+100 12+100 13+400 13+400 14+400 14+400 15+190 15+190 15+360 15+360 16+740 16+740 17+840 17+840 18+900 18+900 21+000 21+00 22+065 22+065 22+200 22+200 22+760 22+760 23+860 23+860 25+500 25+500 25+750 25+750 27+820 27+820 28+010 28+010 31+000 31+000 31+330 31+330 31+430 31+430 37+220 37+220 37+400 37+400 39+400 39+400 41+770 41+770 45+200 45+200 46+400 46+400 48+700 48+700 48+710 48+710 50+500 50+500 51+400 51+400 54+000 500 2150 Bye Pass 200 850 1400 1300 1000 790 170 1380 1100 1060 2100 Bye Pass 1065 135 560 1100 1640 250 2070 190 2890 330 Detailed Project Report VIII: Resettlement Action Plan (Annexures) 100 5790 180 2000 970 3430 1200 2300 10 1790 900 2600 Page 79 Pedana-Nuzvid-Visannapeta 15 16 Kanumolu Perikeed Andhra Pradesh Road Sector Project 54+000 54+400 54+400 54+760 54+760 55+200 55+200 55+410 55+410 56+460 56+460 56+600 56+600 57+200 57+200 57+300 57+300 58+880 58+880 59+000 Sub Total 59+000 62+000 400 360 440 210 1050 140 600 100 1580 200 5340 1430 11185 32625 It is not in the scope of the Project PNV- 9 17 18 19 Marribandam Meerjapuram Gollapalle 62+000 64+300 64+300 65+900 65+900 67+450 67+450 70+200 70+200 71+250 71+250 72+000 72+000 72+780 72+780 75+040 75+040 75+230 20 Morsapudi 75+230 78+380 21 Tukkuluru 78+380 78+600 22 Nuzvid 78+600 83+400 83+400 84+200 84+200 84+615 84+615 86+100 86+100 86+175 86+175 86+310 86+310 87+210 87+210 88+350 88+350 88+350 88+350 89+700 23 24 Annavaram Venkatdripuram 25 Hunumanthulagudem 89+700 90+400 26 Mittagudem 90+400 90+960 90+960 92+180 92+180 92+300 92+300 96+000 27 Leelanageer 2300 Hanuman Junction ( NH5) 1600 1550 2750 1050 750 780 2260 190 3150 480 Bye Pass 4800 800 415 1485 75 135 900 1140 0 1350 700 560 1220 120 3700 Sub Total 5625 3930 4565 20140 TOTAL 10965 5360 15750 55685 Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 80 Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project ANNEXURE : 5.1 : G.O Rt No. 1615 : PLMC CONSTITUTION GOVERNMENT OF ANDHRA PRADESH ABSTRACT R&B Dept. – Andhra Pradesh Road Sector Project – Appointment of Commissioner at State level & Constitution of Project Level Monitoring Committee to monitor R&R Policy in the State - Orders-Issued. TRANSPORT, ROADS & BUILDINGS (R.IV) DEPARTMENT G.O.Rt.No.1615 Dt:03.11.2008. Read the following: From the CE(R&B) Core Road Network & MD,APRDC Lr.No.1/APRDC/APRSP/R&R/2007, dt:16.9.2008. ** ** ** ORDER: The Government of Andhra Pradesh through Government of India has applied for financial assistance in the form of a Loan from the World Bank for the Andhra Pradesh Road Sector Project (APRSP) to a tune of US$ 320 million. Already 50% of the work has been commenced and tender processes also completed. As such it is felt that there is now necessity to appoint a Commissioner and Administrator to monitor the Rehabilitation and Resettlement activity of the APRSP. 2. Government, after careful examination of the matter, keeping Chapter IV & VIII of R&R Policy and in view of the recommendations of the Chief Engineer (R&B) Core Road Network & Managing Director,Andhra Pradesh Road Development Corporation in the reference read above, hereby issue orders for constitution of “Project Level Monitoring Committee” in each district of the State except Hyderabad. 3. The Project Level Monitoring Committee will be headed by Joint Collector of the concerned district in whose jurisdiction the main component of the project lies. In case the main component of the project spreads over more than one district, the senior among the Joint collectors involved shall chair the committee for reviewing and monitoring the progress of implementation of resettlement and rehabilitation relating to the project. The committee shall meet at least once in two months. The members of the committee will be as per the list under clause 8.3 of chapter VIII of R&R Policy with the Superintendent Engineer (R&B) of the concerned district as Convenor. 4. The Principal Secretary to Govt., T,R&B Department shall act as R&R Commissioner and Convenor at the State level. 2 The Chief Engineer [R&B] Core Road Network & Managing Director,Andhra Pradesh Road Development Corporation, Hyderabad shall take further action for constitution of Project Monitoring Committees with members as mentioned in the list under clause 8.3 of chapter 8 of R&R Policy. Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 81 Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project (BY ORDER AND IN THE NAME OF THE GOVERNOR OF ANDHRA PRADESH) DR T CHATTERJEE PRINCIPAL SECRETARY TO GOVERNMENT To The Chief Engineer (R&B) Core Road Network & Managing Director, Andhra Pradesh Road Development Corporation, Hyderabad. Copy to: The PS to Minister R&B. The PS to Prl.Secretary (TC). // FORWARDED :: BY ORDER // SECTION OFFICER Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 82 Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project ANNEXURE 5.2: G O Rt. No. 167 – APPOINTMENT OF PROJECT ADMINISTRATOR GOVERNMENT OF ANDHRA PRADESH ABSTRACT Roads & Buildings Department - Andhra Pradesh Road Sector Project - Appointment of Administrator for implementation of Resettlement and Rehabilitation activities – Orders –Issued. 5. - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - -----TRANSPORT, ROADS & BUILDINGS (R.IV) DEPARTMENT G.O.Rt.No. 167 Dated 19-02-2011. Read: From the CE(R&B) CRN & Managing Director, APRDC. Lr.No. 1/APRDC/APRSP/R&R/2007, Dt: 25.01.2011 and even No. Dt.03.02.2011. *** O R D E R: The Government of Andhra Pradesh through Government of India has taken financial assistance in the form of a Loan from the World Bank for the Andhra Pradesh Road Sector Project (APRSP) to a tune of US$ 320 million. Some packages have already been grounded, and the tender process for other packages is at various stages. As such, it is felt that there is now necessity to appoint Project Administrators to perform functions and duties envisaged under the policy on R&R for PAFs 2005, chapters IV, V and VI relating to the Resettlement and Rehabilitation activities of the Andhra Pradesh Road Sector Project. Implementation activities pertaining to Resettlement and Rehabilitation, some of which have already been carried out and also those which are yet to be carried out have to be taken up and completed by the Project Administrator i.e., the Joint Collector concerned. 1.The Chief Engineer (R&B) CRN & Managing Director, Andhra Pradesh Road Development Corporation has requested the Government to issue orders appointing Joint Collectors as Project Administrators of the districts, in which Widening and Strengthening of roads and PPP projects have been taken up. 2 Government after careful examination of the entire matter hereby appoint the following Joint Collectors as Project Administrators of the districts concerned against each road, in which Widening and Strengthening of roads and PPP projects have been taken up. Sl. No. I. 1. Road Name Chittoor Puttur Distance in kms Districts covered Project Administrator Widening and Strengthening Roads: 65 Chittoor Joint Collector, Chittoor District. Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 83 Pedana-Nuzvid-Visannapeta 2. 3. 4. Andhra Pradesh Road Sector Project Mydukur Jammalamadug u Kurnool Devanakonda 45 Kadapa Joint Collector, Kadapa District 54 Kurnool Joint Collector, Kurnool District. Kandi Shadnagar 65 Mahaboobnagar Joint Collector, Mahaboobnagar District. Joint Collector, Rangareddy District. Joint Collector, Medak District. Joint Collector, Karimnagar District. Rangareddy Medak 5. 6. 7. II. 1. Jagityal Peddapalli 58 Karimnagar Kakinada Rajahmundry 62 East Godavari Joint Collector, Godavari District. 95 Krishna Joint Collector, Krishna District. 207 Rangareddy Joint Collector, Rangareddy District. Medak Joint Collector, Medak District. Joint Collector, Karimnagar District. Pedana – Nuzvid – Vissanapeta PPP Roads: Hyderabad Karimnagar Ramagundam Karimnagar, Warangal Adilabad. 2. Narketpally Addanki Medarametla 213 Joint Collector, Warangal District. Joint Collector, Adilabad District. Nalgonda, Joint Collector, Nalgonda District. Guntur Joint Collector, Guntur District Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 84 East Pedana-Nuzvid-Visannapeta Andhra Pradesh Road Sector Project Prakasam 3. Renigunta Naidupeta 58 Chittoor Nellore 4. Renigunta Kadapa 138 Kadapa Chittoor 5. Khammam Tallada Deverapalli 177 Khammam West Godavari Joint Collector, Prakasam District. Joint Collector, Chittoor District. Joint Collector, Nellore District. Joint Collector, Kadapa District. Joint Collector, Chittoor District. Joint Collector, Khammam District. Joint Collector, West Godavari District. 4. The Joint Collectors are informed that the functions relating to the implementation of R & R activities such as approval of final Detailed Project Reports, minimizing displacements, identification of Project Affected Families (PAFs), holding consultations with PAFs, ensuring protection to the SC/STs and preparation of budgetary estimates etc. have been carried out and they are requested to carry out the remaining activities and take expeditious actions for immediate and complete implementation of Resettlement and Rehabilitation Plans. (BY ORDER AND IN THE NAME OF THE GOVERNOR OF ANDHRA PRADESH) S.P.SINGH PRINCIPAL SECRETARY TO GOVERNMENT The District Collectors concerned. The Joint Collectors concerned. Copy to: The Chief Engineer (R&B) Core Road Network & Managing Director, Andhra Pradesh Road Development Corporation, Hyderabad. The Chief Commissioner Land Administration AP, Hyderabad. The Commissioner, Govt.Printing press, Chancalaguda, Hyderabad for publication in the AP Gazette. The Special Officer AP Portal, IT and C Department, Secretariat. Detailed Project Report VIII: Resettlement Action Plan (Annexures) Page 85