GOVERNMENT OF ANDHRA PRADESH ROADS & BUILDINGS

advertisement
Pedana-Nuzvid-Visannapeta
Andhra Pradesh Road Sector Project
RP785 v12
GOVERNMENT OF ANDHRA PRADESH
ROADS & BUILDINGS DEPARTMENT
ANDHRA PRADESH ROAD SECTOR PROJECT
Feasibility Study, Design and Detailed Engineering
DETAILED PROJECT REPORT
UPGRADING OF PEDANA – NUZVID – VISSANNAPETA ROAD
VOLUME – VIII – ANNEXURES FOR RESETTLEMENT ACTION PLAN
ANDHRA PRADESH ROAD DEVELOPMENT CORPORATION
JUNE – 2012
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
Page 1
Pedana-Nuzvid-Visannapeta
Andhra Pradesh Road Sector Project
CONTENTS
S.No
Description
Page.No
1
ANNX-1.1, AP R&R POLICY 2005
3
2
ANNX-1.2: MODIFIED R&R POLICY PROVISIONS
26
3
ANNX-1.3 : R&R ENTITLEMENT FRAMEWORK
30
4
ANNX-2.1: LIST OF PROJECT AFFECTED FAMILIES
AND PROJECT DISPLACED FAMILIES
33
5
ANNX-2.2 PROJECT DISPLACED FAMILIES
57
6
ANNX- 2.3: COMMUNITY PROPERTY RESOURCES
OF PEDNA- NUZVID- VISANNAPETA ROAD
72
7
ANNX-2.4: CONSULTATION FINDINGS
79
8
ANNX-3.1: CHAINAGE WISE ENCUMBRANCE
DETAILS
80
9
ANNX-5.1 : G.O Rt No. 1615 : PLMC CONSTITUTION
82
10
ANNX-5.2: G O Rt. No. 167 – APPOINTMENT OF
PROJECT ADMINISTRATOR
84
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
Page 2
Pedana-Nuzvid-Visannapeta
Andhra Pradesh Road Sector Project
ANNEXURE 1.1 – AP R&R POLICY -2005
G.O.Ms.No.68
Rehabilitation and Resettlement (R&R) Policy for Government of Andhra
Pradesh - Issued.
Irrigation & CAD (Project Wing-LA-IV-R&R) Department
G.O.Ms.No.68 Dated the 8th April, 2005 ORDER:
1.Compulsory acquisition of land for implementation of development and infrastructure projects
displaces people from their homes, land and/or their means of livelihood. Apart from depriving
them of their land, livelihood and resources base, displacement has other psychological, social and
cultural consequences also. The Government recognize the need to minimize large scale
displacement to the extent possible and where displacement is inevitable, the need to address the
Issue of displacement with utmost care human touch and forethought. Such an approach is
especially necessary in respect of Tribal, Small and Marginal farmers.
2. Various policies
persons have been in
district. The need has
uniformity of benefits
manner.
relating to the Resettlement and the Rehabilitation (R&R) of displaced
place from time to time, varying 'Tom project to project and district to
been felt for the evolution of a comprehensive policy on R& R to ensure
across the State and also to ensure the delivery of benefits in a transparent
3. A Committee was constituted by the Government vide G.O. Ms. No.70, irrigation & CAD
(Projects Wing) Department, dated 15-07-2004 for preparation of draft R&R Policy for
Government of Andhra Pradesh, The recommendations of the Committee were discussed in a State
Level meeting comprising of major stake holders in the policy like the Department of Energy,
Industries, Roads & Buildings, Environment, Forest, Science & Technology, Finance, Tribal
Welfare, Law and Revenue. The State Level Meeting endorsed the recommendations of the
Committee.
4. Government after careful examination of the Committee recommendations as endorsed by
State Level meeting hereby approve the Rehabilitation & Resettlement Policy for Government of
Andhra Pradesh enclosed to this order for implementation by all the Departments for Government
of Andhra Pradesh.
5. It is further ordered that as per Section 8.5 of this Policy the provisions of G.O. Ms. No. 98,
Irrigation & CAD (Projects Wing) Department, dated 15-04-1986 and G.O. Ms. No. 64, Social
Welfare (T) Department, dated 18-04-1990 and any other Government order/Memo Instructions
issued by any other Department of" Government of Andhra Pradesh shall cease to operate as far as
those Projects are concerned that are notified under this Policy.
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
Page 3
Pedana-Nuzvid-Visannapeta
Andhra Pradesh Road Sector Project
(BY ORDER AND IN THE NAME OF GOVERNOR OF ANDHRA PRADESH)
MOHAN KANDA
CHIEF SECRETARY TO GOVERNMENT
To :
All the Departments of Secretariat
All the District Collectors in the State.
All the Special Collectors of Irrigation Projects.
The Engineer-in-Chief (AW)/(Irrigation), Errum Manzil, Hyderabad
All the Chief Engineers of the Projects.
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
Page 4
Pedana-Nuzvid-Visannapeta
Andhra Pradesh Road Sector Project
CHAPTER –I
1.0 POLICY PREAMBLE
1.1 Compulsory acquisition of land for public purpose including infrastructure projects displaces
people, forcing them to give up their home, assets and means of livelihood, a part from depriving
them of their lands, livelihoods and resource-base, displacement has other traumatic psychological
and socio-cultural consequences. The Government of Andhra Pradesh recognizes the need to
minimize large-scale displacement to the extent possible and, where displacement is inevitable, the
need to handle with utmost care, human touch and forethought, issues relating to Resettlement &
Rehabilitation of Project Affected Families. Such an approach is especially necessary in respect of
tribal, small & marginal farmers and women.
1.2 The system of extending cash compensation does not, by itself, in most cases, enable the
affected families to obtain cultivable agricultural land, homestead and other resources, which they
have to surrender to the State. The difficulties are more acute for persons who are critically
dependent on the acquired assets for their subsistence/ livelihoods, such as landless agricultural
workers, forest dwellers, tenants and artisans, as their distress and destitution is more severe, and,
yet they are not eligible for compensation.
1.3 The Policy essentially addresses the need to provide succour to the asset less rural poor,
support the rehabilitation efforts of the resource poor section, namely, small and marginal farmers,
SCs/STs and women who have been displaced, besides, it seeks to provide a broad canvas for an
effective dialogue between the Project Affected
Families
and
Project
Displaced.
Families and the Administration for Resettlement
& Rehabilitation. Such a dialogue is expected to
enable timely completion of projects with a sense
of definiteness as regards costs and adequate
attention to the needs of the displaced persons
especially the resource poor sections. The
intention is to impart greater flexibility for
interaction and negotiation so that the resultant
Package gains all-round acceptability in the shape
of a workable instrument providing satisfaction to
all stakeholder/ Requiring bodies.
1.4 The GOAP Policy on the Resettlement & Rehabilitation of Project Affected Families and
Project Displaced Families will be applicable to the projects as defined in this policy and upon
notification under this policy.
1.5 Administrator for Resettlement & Rehabilitation shall implement this Policy in letter and spirit
in order to ensure that the benefits envisaged under the Policy reaches the Project Affected and
Displaced Families, especially resource poor sections including SCs/STs.
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
Page 5
Pedana-Nuzvid-Visannapeta
Andhra Pradesh Road Sector Project
CHAPTER –II:
2.0 OBJECTIVES OF THE POLICY
The objectives of the Policy are as follows:
2.1 To minimize displacement and to identify non- displacing or least- displacing alternatives:
2.2 To Plan the resettlement and rehabilitation of Project Affected and Displaced Families,
(PAFs/ PDFs) including special needs Tribals and vulnerable section;
2.3 To provide better Standard of living to PAFs; and
2.4 To facilitate harmonious relationship between the Requiring Body and PAFs through
mutual cooperation.
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
Page 6
Pedana-Nuzvid-Visannapeta
Andhra Pradesh Road Sector Project
CHAPTER –III
3.0 DEFINITIONS:
The definition of various terms used in this Policy Document are as follows:
3.1 “Administrator for Resettlement and Rehabilitation” means an officer not below the rank of
Joint Collector of the State Government appointed by it for the purpose of resettlement and
rehabilitation of the Project Affected Families of the Project concerned provided that if the
appropriate Government in respect of the Project is the Central Government, Such appointment
shall be made in consultation with the Central Govt.
3.2“Affected Zone”, in relation to a project, means declaration under Para 5.1 of this policy by
the appropriate Government area of Villages or locality under a project for which the Land is being
acquired under Land Acquisition Act, 1894 or any other Act in force for the following areas:
a. Area falling under FRL contour
b. Dwelling House (S) falling within 100 meters of surface distance from FRL water line
3.3 “Agricultural family” means a family whose primary mode of livelihood is agriculture and
includes family of owners as well as tenants / sub-tenants of agricultural land, agricultural
labourers, occupiers of forest lands and of Collectors of minor forest produce;
3.4 “Agricultural labourers” means a person normally resident in the affected zone for a period of
not less than three years immediately before the declaration of the affected zone who does not hold
any land in the affected zone but who earns his livelihood principally by manual labour on
agricultural land therein immediately before such declaration and who has been deprived of his
livelihood as ascertained through enquiry in the gram sabha;
3.5 “Agricultural Land” includes lands uses or capable of being used for the purpose ofa. agriculture or horticulture;
b. diary farming, poultry farming, pisciculture, breeding or livestock and nursery growing
medical herbs;
c. raising of crops, grass or garden produce; and
d. Land used by an agriculturist for the grazing of cattle, but does not include land used for
the cutting of wood only;
3.6 “Appropriate Government” means:
a. in relation to acquisition of land for the purposes of the Union, the Central Government;
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
Page 7
Pedana-Nuzvid-Visannapeta
Andhra Pradesh Road Sector Project
b. in relation to a project which is executed by Central Government agency/ Central
Government undertaking or by any other agency of the orders/ directions of Central
Government, the Central Government, otherwise the State Government and
c. in relation to acquisition of land for other purposes, the State Government.
3.7 “BPL Family”: The Below Poverty Line Families shall be those as defined by the planning
Commission of India from time to time.
3.8 “Project” means the project(S) notified under this Policy and displacing:
a. 100 or more families en- mass under this policy and displacing:
b. 25 or more families en- mass in Tribal areas or in areas mentioned in Schedule V of the
constitution India from their Lands or houses.
3.9 “Commissioner for Resettlement & Rehabilitation”, means the Commissioner for
Resettlement & Rehabilitation appointed by the State Government not below the rank of
Commissioner/ Secretary of that Government.
3.10 “a)Family” means Family consisting of such persons as his or her spouse, minor sons,
unmarried daughters, minor brothers or unmarried sisters, fathers, mother and other members
residing with him and dependent on him for their livelihood 1 “and each major son residing with
such person will be treated as a separate family ”1
b)1a“Vulnerable persons” means the disabled, destitute, orphans, widows, major unmarried
daughter,abandoned/ divorced women or persons above fifty years of age, who are not provided or
can not immediately be provided with alternative livelihood, and who are not otherwise covered as
part of a family 1a
3.11 “Holding”: means the total land held by a person as an occupant or tenant or as both;
3.12 “Marginal farmer”: means a cultivator with an un-irrigated land holding up to one hectare or
irrigated land holding up to half hectare or combination of both on same principle;
3.13 “Non-agricultural Labourer”: means a person who is not an agricultural labourer but is
normally residing in the affected zone for a period of not less than three years immediately before
the declaration of the affected zone and who does not hold any land under the affected zone but
who earns his livelihood principally by manual labour or as a rural artisan immediately before such
declaration and who has been deprived of earning his livelihood principally by manual labour or as
such artisan in the affected zone;
3.14 “Notification”: means a notification published in the Official Gazette;
3.15 “Occupiers”: Means members of Scheduled Tribe community in possession of forest land
prior to 25th October, 1980.
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
Page 8
Pedana-Nuzvid-Visannapeta
Andhra Pradesh Road Sector Project
3.16 “Project Affected Family” Means and displacing:
a. a family whose source of livelihood are substantially affected by the process of acquisition
of land for the project and who has been residing continuously for a period of not les than
three years preceding the date of declaration of the affected zone or practicing any trade,
occupation or vocation continuously for a period of not less than three years in the affected
zone regardless of the fact whether they owned land or not
b. family whose more than 50% of land is acquired and left over land after acquisition is
below Ac.5.0 dry Ac. 2.5 wet or combination of both on above principle
c. a Project Displaced Family
3.17 “Project Displaced family”: means any family, who on account of acquisition of his
dwelling house in the village in the affected zone for the purpose of the project, has been displaced
from such dwelling house.
3.18 “Resettlement Zone”, in relation to a project, means the declaration of any area under Para
5.12 of this Policy by the appropriate Government acquired or proposed to be acquired for
resettlement of Project Displaced Families as a resettlement zone:
3.19 “Requiring Body” ” shall mean any company, a body corporate, an institution, or any other
Organization for whom land is to be acquired by the appropriate Government, and includes the
appropriate Government if the acquisition of land is for such Government either for its own use or
for subsequent allotment of such land in public interest to a body corporate, institution, or any
other organization or to any company under lease, license or through any other system of transfer
of land to such company, as the case may be;
3.20 “Small farmer”: means a cultivator with an un-irrigated land holding of more than one
hectare and up to two hectares or with an irrigated land holding of more than half hectare and up to
one hectare or combination of both on same principle
3.21 “Substantially affected”: ” means where average annual income of PAF is likely to be more
than 50% and is likely to become BPL family due to acquisition of his land or other’s land for the
project, as compared to his average annual income in last three years preceding the date of
notification, from land and or other sources of incomes
3.22 “Tribal Areas”: means areas declared so by the Tribal Welfare Government of Andhra
Pradesh from time to time.
1. Added by vide G.O.Ms.No.76, I & CAD(PW-LA-IV, R&R.I) Dept., dt:13-4-2006.
1a. Added to para 3.10 as 3.10( b)vide G.O.Ms.No.46 I & CAD(PW:LA- IV-R&R)Dept., dt:28-2-2009,G.O.MS.No
77 I & CAD(PW-LA-IV, R&R.I) Dept., dt:10-7-2009.& Para 3.10 shall be treated as Para 3.10(a).
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
Page 9
Pedana-Nuzvid-Visannapeta
Andhra Pradesh Road Sector Project
CHAPTER-IV
4.0 Appointment of Administrator And Commissioner For Resettlement And Rehabilitation
And Their Powers & Functions
4.1 Where the appropriate Government is satisfied that acquisition of land for any project
involves displacement of families from their lands and or houses as a result of acquisition of land,
it shall, by notification, appoint in respect of that project an officer not below the rank of Joint
Collector of the state Government to be the Administrator for R&R in respect of that project.
Provided that if the appropriate Government in respect of the project is the Central Government,
such appointment shall be made in consultation with the Central Government.
4.2 The Administrator for Resettlement & Rehabilitation shall be assisted by such officers and
employees as the appropriate Government may provide
4.3 Subject to the superintendence, directions and control of the appropriate Government and
Commissioner for R&R, the Administrator for Resettlement & Rehabilitation shall take all
measures for the Rehabilitation and Resettlement of all Project Affected Families (PAF) in respect
of that project.
4.4 The overall control and superintendence of the formulation of resettlement & rehabilitation
plan and execution of the same shall vest in the Administrator, Resettlement & Rehabilitation.
4.5 Subject to any general or special order of the appropriate
a. Minimize displacement of persons and identify non- displacing or least displacing
alternatives in consultation with the requiring body.
b. Hold consultation with the Project Affected Families while preparing a resettlement and
rehabilitation Scheme /plan;
c. Ensure that interest of the adversely Project Affected Families of Scheduled Tribes and
weaker sections are protected.
d. Prepare a draft Plan/Scheme of resettlement and rehabilitations as required under Chapter
V and VI of this Policy. Wherever tribal PAPs are involved, the draft plan/ scheme shall be
prepared in consultation with respective area Project officer ITDA/DTWO. .
e. Prepare a budget including estimated expenditure of various components of acquisition of
Land, Resettlement and Rehabilitation activities or programmes in consultation with
representatives of the Project Affected Families and requiring body for whom the land is
acquired;
f. Acquired adequate land for the Project and also for Resettlement and Rehabilitation of the
Project Affected Families;
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
Page 10
Pedana-Nuzvid-Visannapeta
Andhra Pradesh Road Sector Project
g. Allot Land and sanction benefits to Project Affected Families;
h. Perform such other function as the appropriate Government may, form time to time, by
order in writing, assign.
4.6 Administrator for Resettlement & rehabilitation may, by order in writing, delegates such of
the administrative powers conferred and duties imposed on him by or under this policy to any
officer not below the rank of RDO/ Sub Collector or equivalent who will be called as R&R officer
for the said project
4.7 All officers and staff appointed by the appropriate Government under this policy shall be
subordinate to the Administrator for Resettlement & Rehabilitation.
4.8 The State Government shall appoint an officer of the rank of Commissioner/ Secretary of that
Government for Resettlement and Rehabilitation in respect of such projects to which this Policy
applies to be called the Commissioner for Resettlement & Rehabilitation
4.9 For the purposes of this Policy, the Administrator the Resettlement & Rehabilitation and other
officers and employees appointed for the purposes of Resettlement and Rehabilitation of PAF shall
be subordinate to the Commissioner for Resettlement and Rehabilitation
4.10 The Commissioner shall be responsible for supervising the formulation of resettlement and
rehabilitation plans/ schemes, proper implementation of such plans/ schemes and redressal of
grievances as mentioned in Chapter VII of this Policy. Wherever tribal PAPs are involved,
commissioner, TW shall also be involved in above responsibilities and functions.
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
Page 11
Pedana-Nuzvid-Visannapeta
Andhra Pradesh Road Sector Project
CHAPTER-V
5.0 Schemes/PlansFor Resettlement And Rehabilitation;
The procedure mentioned in this Chapter shall be followed for declaration of Affected Zone,
carrying out survey & census of Project Affected Families, Assessment of Government Land
available and land to be acquired for the purpose of Resettlement and Rehabilitation, preparation
of draft scheme/plan for R&R and its final publication.
5.1 The appropriate Government may, if it is of the opinion that acquisition of land for a project
is likely to displace families from their lands and or houses, declare, by notification in the Official
Gazette, area of villages or localities as an affected zone of the project and thereupon the contents
of this Policy shall apply to the project involved.
5.2 Every declaration made under Para 5.1 of the Policy shall be published in at least two daily
newspapers one of them should be in the local vernacular having circulation in villages or areas
which are likely to be affected and also by affixing a copy of the notification on the Notice Board
of the concerned Gram Panchayats and other prominent place or places in the affected zone.
5.3 Once the declaration is made under para 5.1 of the Policy, the Administrator for Resettlement
and Rehabilitation shall undertake a socio- Economic survey for identification of the persons and
their families likely to be affected by the project
5.4 Every survey shall contain the following village-wise information of the project Affected
Families:a. Members of families who are permanently residing, practicing any trade, occupation or
vocation in the Project Affected Area;
b. Project Affected Families ho are likely to lose their house, agricultural land, employment a
or are alienated wholly or substantially from the main source of their trade/ occupation or
vocation
c. Agricultural labourers and non- agriculture laborers
d. Project Affected Families who are having possession of forestlands prior to 25th October,
1980, that are prior to the commencement of the Forest (Conservation) Act, 1980.
5.5 Every survey undertaken under Para 5.4 shall be completed within a maximum period of
ninety days from the date of declaration made under para 5.1.
5.6 On the expiry of the period of ninety days as aforesaid or as earlier as possible, the Gram
Panchayat concerned the details of the findings of the survey conducted by him for inviting
objections and suggestions form all persons likely to be affected thereby.
5.7 2 “On the expiry of thirty days from the date of publication of the draft of the details of survey
and after considering the objections and suggestions received by him on this behalf, the
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
Page 12
Pedana-Nuzvid-Visannapeta
Andhra Pradesh Road Sector Project
Administrator for Resettlement & Rehabilitation shall submit the final details of survey with his
recommendations to the District Collector for approval. After approval by the District Collector
necessary funds may be obtained from the relevant Head of Accounts for allotment from the Chief
Engineer of concerned Irrigatio n Project.” 2
5.8 3 “Within forty-five days from the date of receipt of recommendations of the Administrator for
Resettlement & Rehabilitation, the District Administration shall publish the final details of survey
in the District Gazette. A copy of such publication shall also be published in the Gram Panchayat
concerned.” 3
5.9 The Administrator for Resettlement & Rehabilitation shall ensure that the Project Displaced
Families may be settled preferably in group or groups and such sites should form a part of existing
Gram Panchayat as far as possible. However it has to ensured that the PDFs may be Resettlement
with the host community on the basis of equality and mutual understanding, Consistent with the
desire of each group to preserve its own identify and culture.
5.10 For the purposes of para 5.9 above, the Administrator for Resettlement & Rehabilitation shall
draw up a list of lands, which may be available in any existing Gram Panchayat or neighbouring
Gram Panchayat for Resettlement of Project displaced families.
5.11 The Lands drawn up under para 5.10 shall consist of:a. Government wastelands or any other land vesting in the Government available for
Resettlement or project displaced families.
b. If sufficient Government land is not available there, then land to be acquired for the
purposes of Resettlement (R&R centre) Scheme/Plan. However, the Administrator for
R&R should ensue that such acquisition of land should not lead to another list of affected
families.
5.12 The appropriate Government shall, by notification, declare any area acquired or proposed to
be acquired for Resettlement of Project-displaced families, as a resettlement zone.
5.13 The Administrator for R&R or any other officer empowered by Government, on behalf of
the appropriate Government, may compulsorily acquire lands required for re-settlement and
rehabilitation of PAFs under the Provisions of Land Acquisition Act, 1894.
5.14 After completion of base line survey and census of Project Affected Families and project
Displaced Families and assessment of requirement of land for resettlement of land for resettlement
and rehabilitation, the Administrator for R&R shall prepare a draft scheme/ plan for the
Resettlement & Rehabilitation of the Project Affected Families and project Displaced Families in
consultation with representatives of Project Affected Families and Project Displaced Families
including women, Chairpersons of elected Panchayati Raj Institutions within which the project
area is situated.
5.15 While preparing a draft scheme/ Plan, the Administrator for R&R shall ensure that the cost
of R&R scheme/ plan should be an integral part of the cost of the Project for which the land is
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
Page 13
Pedana-Nuzvid-Visannapeta
Andhra Pradesh Road Sector Project
being acquired and the entire expenditure for resettlement and rehabilitation of PAFs are to be
borne by the requiring body for which the area is being acquired
5.16 It shall be the responsibility of the requiring body to provide sufficient funds to the
administrator for R&R for proper implementation of resettlement & Rehabilitation scheme/ plan of
Project Affected Families.
5.17 The Administrator for R&R shall keep proper books of accounts and records of the funds
placed at his disposal and submit periodical returns to the Appropriate Government in this behalf.
5.18 Every drafts Scheme/ Plan of resettlement and rehabilitation prepared shall contain the
following particulars, namely: a. the extent of area to be acquired for the project and the name(S) of the corresponding
village (S)
b. a Village - Wise list of Project Affected Families and likely number of displaced persons,
family- wise and the extent and nature of land and immovable property in their possession
indicating the survey numbers thereof held by such person in the affected Zone prior to
acquisition of lands for the project and after acquisition of lands for the project;
c. a list of persons who have lost or are likely to lose their employment or livelihood or who
have been alienated wholly and substantially from their main sources o occupation or
vocation consequent to the acquisition of land for the project;
d. a list of occupiers, if any,
e. a list of public utilities and Government buildings which are likely to be affected;
f. a comprehensive list of benefits and packages which are to be provided to project affected
families;
g. details of the extent of land available which may be acquired in settlement area for
resettling of the project displaced families;
h. Details of the extent of Government land available which may be allotted to PAFs in lieu of
land acquired for the project.
i. Details of the extent of patta land available in project benefited area that can be acquired
for allotment of PAFs in lieu of land acquired for the project.
j. detailed of the basic amenities and infrastructure facilities which are to be provided for
resettlement;
k. the time schedule for shifting and resettling the displaced families in resettlement zones;
l. Such other particular as the Administrator for Resettlement & Rehabilitation ma think fit to
include.
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
Page 14
Pedana-Nuzvid-Visannapeta
Andhra Pradesh Road Sector Project
5.19 4 “The Administrator for Resettlement & Rehabilitation shall submit the draft scheme/ plan
for R&R to the District Administration for its approval. The draft scheme/ plan shall be published
in the village/locality concerned. The draft scheme/plan may also be published in the District
Gazette to give wide publicity to the same in the affected zone.” 4
5.20 Upon notification of such scheme/ plan, the same shall come into force
3. Substituted for para 5.8 vide G.O.Ms.No.120, I & CAD (PW- LA.IV, R&R-II) Dept., DT:
26.6.2006.
4. Substituted for Para 5.19 vide G.O.Ms.No.120 I & CAD (PW- LA.IV, R&R-II) Dept., DT:
26.6.2006.
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
Page 15
Pedana-Nuzvid-Visannapeta
Andhra Pradesh Road Sector Project
CHAPTER –VI
6.0 R&R benefits for Project Affected Families
6.1 The Resettlement and Rehabilitation (R&R) benefits shall be extended to all the Project
Affected Families and Project Displaced Families (PDF) whether belonging to below poverty line
(BPL) or non- BPL except to the extent where specifically restrictions mentioned in the policy.
6.2 5"Allotment of house site/ payment of exgratia
a. Any Project Displaced Family (PDF) holding upto an area of 5 Cents of village site and
whose site has been acquired shall be allotted house site of an extent of 202 square meters
(5 Cents) of land in rural areas or 75 square meters of land in Urban areas in the
Resettlement zone besides payment of compensation for the structures if any therein;
b. In case if any Project Displaced Family (PDF) holds village site of more than 5 Cents,
such holder shall be allotted village house site of an extent of 202 Square Meters (5 cents)
of land in rural areas or 75 Square Meters of land in Urban areas in the Resettlement zone
and also be paid exgratia for the site in excess of 5 Cents ( for example if a family holds
village site of 20 Cents in Project Affected Zone and have two major sons, residing with
such person in case, they take 3 house sites of 5 Cents each in Resettlement zone, they will
get exgratia for the balance of 5 Cents (20 Cents – 3x5 cents = 15 cents); and
c. The exgratia payable as above shall be on par with the package deal payable in case of
acquisition of private / patta lands” 5
6.3 Grant for House construction:
“One time financial assistance of Rs.40,000/-(Rupees Forty thousand only) shall be increased to
Rs.50,000/- (Rupees Fifty thousand only). This increase will have prospective effect. A sum of
Rs.5,000/- (Rupees Five thousand only) is granted to those who have already shifted houses from
8-4-2005 to 10-12-2007. Apart from the above, a sum of Rs.3,000/- (Rupees Three thousand only)
would be allowed in addition to the housing grant as per G.O.Ms.No.68, dt:8-4-2005. The above
increase shall come into force with retrospective effect i.e., the date of issue of G.O.Ms.No.68,
dt:8-4-2005.” 6
6
6.4 Allotment of Government land to PAFs, who become Small, or Marginal farmers or Landless
after acquisition in lieu of Acquired land: in case of allotment of waste/ degraded or agricultural
Government land, if available with in the District, in lieu of acquired land and if agreed by PAF for
allotment of such land, each such PAF shall also get financial assistance of Rs.10,000 per hectare
or as fixed by Government from time to time for land development and in case of allotment of
agricultural land, Rs.5,000 per PAF or as fixed by Government from time to time for agricultural
production shall be given.
However such allotment of Government land will be restricted to an extent of land acquired from
PAF or 2.5 Ha of dry or 1.25Ha wet land which ever is lesser.
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
Page 16
Pedana-Nuzvid-Visannapeta
Andhra Pradesh Road Sector Project
Provided further that in such cases,
a. no compensation will be payable for the lands acquired from the PAF for the Project, to the
extent of Government land is allotted.
b. No exgratia will be payable for the lands resumed from PAF for the project, to the extent of
Government land is allotted
Land Acquisition officer shall pass the award for the lands acquire or resumed from PAF
accordingly
if
such
PAFs
so
desire,
6.5 Allotment of land acquired by Government from the
project benefited area to Schedule Tribe PAFs, who
become Small, or Marginal farmers or landlsess after
acquisition, in lieu of Acquired land from them:
7
“Government shall acquire land with in the project
benefited area, as per guidelines issued by the
Government from time to time such that no person
should become small or marginal farmer or land less
due such acquisition, for allotment of such land to ST
PAFs(who become small or marginal farmers or
landless due to acquisition of their land for the project),
in
lieu
of
lands
acquired
from
them.
However such allotment will be restricted to the extent of land acquired from such PAFs or 2.5 Ha
dry land or 1.25Ha wet land which ever is lower. Further provided that in such cases,
a. no compensation will be payable for the lands acquired from the PAF for the project, to the
extent of such land is allotted
b. No exgratia will be payable for the lands resumed from PAF for the project, to the extent of
such land is allotted
Land Acquisition officer shall pass the award for the lands acquired or resumed from PAF
accordingly.”7
6.6 The land allotted under Para 6.2, 6.4 and 6.5 shall be free from all encumbrances. The land
allotted may be in the joint names of wife and husband of PAP.
6.7 Grant for cattle shed: Each PAF having cattle, at the time of acquiring his house, shall get
financial assistance of Rs.15000/- or as fixed by Government from time to time for construction of
cattle shed in new settlement.
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
Page 17
Pedana-Nuzvid-Visannapeta
Andhra Pradesh Road Sector Project
6.8 Grant for Transporting materials: Each PAF shall get lump sum one time financial assistance
of Rs.5000/- or as fixed by Government from time to time for transportation / shifting of his
building materials, belongings and cattle etc. from the affected zone to the resettlement zone.
6.9
6.9 Income Generating Scheme Grant: Each PAF comprising of rural artisan/ small trader and
self employed person shall get one – time lump sum financial assistance of Rs.25,000 or as fixed
by Government from time to time for construction of working shed / shop.
6.10 Wages if after acquisition land owner becomes land less: Each PAF owning agricultural
land in the affected zone and whose entire land has been acquired shall get one – time financial
assistance equivalent to 750 days minimum agricultural wages for “loss of livelihood” if no land is
allotted in lieu of acquired land.
6.11 Wages if after acquisition land owner becomes marginal farmer 8“or continues to be a
marginal farmer even after acquisition”8 : Each PAF owning agriculture land in the affected zone
and who consequently becomes a marginal farmer 8a“or continues to be a marginal farmer even
after acquisition”8a shall get one time financial assistance equivalent to 500 days minimum
agriculture wages if no land is allotted in lieu of acquired land.
6.12 Wages if after acquisition land owner becomes small farmer 8b“or continues to be a small
farmer even after acquisition”8b: Each PAF owning agriculture land in this affected zone and who
consequently becomes a small farmer 8c“or continuous to be a small farmer even after
acquisition”8c shall get one time financial assistance equivalent to 375 days minimum agricultural
wages if no land is allotted in lieu of acquired land.
6.13 Wages to Labourers: Each PAF belonging to the category of “agricultural labourer’ or “nonagricultural labourer" shall be provided a one time financial assistance equivalent to 625 days of
the minimum agricultural wages.
6.14 (a) Subsistence allowance to displaced family Each PAF who is also a project displaced
family shall at a one time subsistence allowance equivalent to 240 days of minimum agricultural
wages. It will be in addition to any other benefit available to him as PAF.
6.14 (b) 9 “Each vulnerable person as defined at Para -3.10(b) will be paid a pension of Rs.500/(Rupees Five hundred only) a moth for life by arranging the necessary annuity policies by the
Project Administrator at its cost.”9
6.15 In the case of acquisition of land in emergent situation such as under Section 17 of the Land
Acquisition Act 1894 or similar provision of other Act in force, each PAF shall be provided with
transit accommodation, pending resettlement and rehabilitation scheme. Such families shall also
get R&R benefits as mentioned in above Paras under the Policy.
6.16 The Project Affected Families who were in possession of forest lands prior to 25th October,
1980 shall get all the benefits of R&R as given in above paras under the Policy.
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
Page 18
Pedana-Nuzvid-Visannapeta
Andhra Pradesh Road Sector Project
6.17 The PAFs enjoying reservation benefits in the affected zone shall be entitled to get the same
reservation benfits at the resettlement zone.
6.18 Basic Amenities To Be Provided At Resettlement Centre For Projects:
While shifting the population of the Affected zone to the Resettlement zone, the Administrator for
R&R may far as possible, ensure that:
a. In case the entire population of the Village / area to be shifted belongs to a particular
community, such population/ families may be resettled enmasse in a compact area so that
socio- cultural relations (social harmony) a amongst shifted families are not disturbed
b. The Re- settlement Center shall be provided with the basic amenities and infrastructure
facilities of drinking water, Internal roads, Drainage Electricity, primary School building,
playground, Community Center and access road to the resettlement site. In addition to these
facilities, the other community center and access road to the resettlement site. In addition t
these facilities, the other community facilities which were available in the village, at the
time of acquisition, shall also be provided.
6.19 R&R Benefits Project Affected Families Of Scheduled Tribes :
a. Each project Affected Family of ST category shall be given preference in allotment of land.
b. Each Tribal PAF shall get additional Financial assistance equivalent to 500 days minimum
agriculture
wages
b 10“(i)Each non tribal PAF who is a member of a registered Fishermen Cooperative
Society/Fishing license holders in the affected zone and who lost fishing rights and
livelihood shall get additional financial assistance equivalent to 500 days minimum
agricultural wages for loss of fishing rights.”10
c. Tribal PAF s will be re- settled close to their natural habitat of their choice, to the extent
possible, in a compact block so that they can retain their ethnic, linguistic and cultural
identify
d. Tribal PAFs resettled out of the district or out side tribal area will get 25% higher R&R
benefits in monetary terms.
e. The Tribal families residing in the Project Affected Area having fishing rights in the river/
Pond/ dam shall be given fishing rights in the reservoir area.
f. The Tribal land Alienated in violation of the laws and regulation in force on the subject
would be treated as null and void and the R&R benefits would be available only to the
original
tribal
landowner.
f 11“i)The Non tribal families residing in the project affected areas having fishing rights in
the river /pond/dam who is a member of a registered Fishermen Cooperative
Society/Fishing license holders shall be given fishing rights in the reservoir area.
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
Page 19
Pedana-Nuzvid-Visannapeta
Andhra Pradesh Road Sector Project
g. All the Fishermen PAFs will be accorded priority in extending benefits under various
schemes/programmes being implemented by the state fisheries Department in consultation
with R&R authorities.
h. Newly impounded/completed Reservoirs under jalayagnam shall be stocked with Fish Seed
on priority basis by the state Fisheries Department by utilizing funds available under
different schemes with the Fisheries Department/DRDA/ITDA/SC Corporation/MADA/BC
Corporation or by seeking provision of funds under R7R package as per requirement”11
6.20
Constitutional benefits to ST/SC/BC PAPs at the Re-settlement centre:
The PAPs shall enjoy all the constitutional benefits at new settlement also to which they
were entitled to at the village that was acquired for the project.
5. Substitued for Para 6.2 vide G.O.Ms.No.76, I & CAD (PW.LA.IV- R&R.I)Dept., dt:13-42006.
6. Substituted for Para 6.3 vide G.O.MS.No.271, I & CAD (PW.LA.IV- R&R)Dept., dt:11-122007.
7. The word “shall” incorporated substituting the word “may” vide G.O.MS.No. 119, I & CAD
(PW-LA-IV, R&R.II) Dept., DT: 26-6-2006.
8. Substitued for Para 6.11 vide G.O.Ms.No.46, I & CAD (PW:LA- IV-R&R)Dept., dt:28-2-2009.
8a Substitued for Para 6.11 vide G.O.Ms.No.46, I & CAD (PW:LA- IV-R&R)Dept., dt:28-22009
8b. Substitued for Para 6.12 vide G.O.Ms.No.46, I & CAD (PW:LA- IV-R&R)Dept., dt:28-22009.
8c. Substitued for Para 6.12 vide G.O.Ms.No.46, I & CAD (PW:LA- IV-R&R)Dept., dt:28-22009.
9. Substitued for Para 6.14 as Para 6.14(b) vide G.O.Ms.No.46, I & CAD (PW:LA- IV-R&R)
Dept., dt:28-2-2009 & Para 6.14 shall be treated as Para6.14(a) vide G.O.Ms.No.46,I&CAD
(PW:LA-IV-R&R)Dept., dt:28-2-2009.
10 &11. Added vide G.O.Ms.No.114
DEPARTMENT dt:08-09-2009.
IRRIGATION
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
&
C.A.D.(PW:
LA.IV-R&R)
Page 20
Pedana-Nuzvid-Visannapeta
Andhra Pradesh Road Sector Project
CHAPTER – VII
7.0 Dispute Redressal Mechanism
7.1 R&R Committee at Project level:
a. in respect of every project to which this Policy applies, the State Government shall
constitute a Committee under the Chairmanship of the Administrator of that Project to be
called the Resettlement and Rehabilitation Committee to monitor and review the progress
of implementation of scheme/ plan of resettlement and rehabilitation of the Project
Affected Families.
b. The Resettlement & Rehabilitation Committee constituted as above shall inter-alia include
as one of its members:
1. a representative of women PAP residing in the affected zone;
2. a representative each of the Scheduled Castes and Scheduled Tribes, PAPs residing
in the affected zone;
3. a representative of a voluntary organization;
4. a representative of the lead bank;
5. Chairperson of the PRIs located in the affected zone
6. MPs/MLAs of the area included in the affected zone
c. Procedure regulating the business of the Resettlement & Rehabilitation Committee shall be
framed by the Appropriate Government
7.2 Grievance Redressal Cell:
a. In respect of every project to which this Policy applies, the State Government shall
constitute a Grievance Redressal Mechanism under the Chairmanship of the Commissioner
for Resettlement & Rehabilitation for redressal of grievances of the PAFs.
b. The composition, powers, functions and other matters relating to the functioning of the
Grievance Redressal Mechanism shall be such as may be prescribed by the Appropriate
Government.
c. Any Project Affected Family, if aggrieved, for not being offered the admissible R&R
benefits as provided under this Policy, may move an appropriate petition for redressal of
his grievances to the Grievance Redressal Mechanism.
d. The form and manner in which and the time within which complaints may be made to the
Grievance Redressal Mechanism and disposed of shall be such as may be prescribed by the
appropriate Government.
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
Page 21
Pedana-Nuzvid-Visannapeta
Andhra Pradesh Road Sector Project
7.3 The Grievance Redressal Mechanism shall have the power to consider and dispose of all
complaints relating to resettlement and rehabilitation against the decision of the
Administrator / R&R Committee at Project Level and issue such directions to the
Administrator for Resettlement & Rehabilitation as it may deem proper for the Redressal of
such grievances.
7.4 Commissioner for Resettlement and Rehabilitation may, by order in writing, delegate such
of the administrative powers conferred and duties imposed on him by or under this policy to
any officer not below the rank of Joint Collector.
7.5 INTER-STATE PROJECTS:
a. In case a project covers an area in more than one state or Union territory where the Project
Affected Families and Project Displaced Families are or had been residing, or proposed to
be resettled, the states and or GOI in consultation with each other, may appoint the
Administrator for Resettlement & Rehabilitation and the Commissioner for Resettlement
and Rehabilitation for the purposes of this Policy.
b. The method of implementation of plans schemes for resettlement and rehabilitation shall be
mutually discussed by the State Governments and the Union territory administration and
the common plan/ Schemes shall be notified by the Administrator for Resettlement &
Rehabilitation in the State or Union territory administration, as agreed to, in Accordance
with the procedure laid down in this policy.
c. If any difficulty arises in the implementation of the scheme/ plans, the matter shall be
referred to the Central Government in the ministry of Rural Development (Department of
Land Resources) for its decision and the decision of the Central Government shall be
binding on the concerned States and Union territory.
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
Page 22
Pedana-Nuzvid-Visannapeta
Andhra Pradesh Road Sector Project
CHAPTER-VIII
8.0 MONITORING MECHANISM AND APPLICABILITY
8.1
STATE LEVEL MONITORING COMMITTEE:
“The GOAP, Department of Revenue, Shall constitute a State Level Monitoring Committee, to
be chaired by the Principle Secretary/ Secretary, Department of Revenue for reviewing and
monitoring the progress of implementation of resettlement and rehabilitation scheme/ plan relating
to all projects to which this policy applies. The committee shall meet at lest once in three months
to review and monitor the implementation of R&R plan in all projects. The committee will have
the following or his nominee not below the rank of Joint Secretary as its Members:
12
1. Special C.S. & CCLA, Chairman
2. Commissioner for R&R & E.O.Secretary to Govt.
3. Prl. Secretary, Revenue
4. Secretary, Planning
5. Secretary, Social Welfare
6. Secretary, Tribal Welfare
7. Secretary, MA & UD
8. Secretary, PR & RD
9. Secretary, Housing
10. Secretary, Education
11. Secretary, Agriculture
12. Secretary, Women and Child Welfare
13. Secretary, Energy
14. Secretary, Law
15. Secretary, Finance
16. State Level N.G.O
17. Chief Engineer/ Project Administrator Special invitee
18. Secretary, Requisition Department”12
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
Page 23
Pedana-Nuzvid-Visannapeta
Andhra Pradesh Road Sector Project
8.2 THIRD PARTY CONCURRENT AUDIT OF IMPLEMNTATION:
Chairman State level committee shall put in place mechanism for each project for third
party concurrent audit of implementation of R&R plan. The audit report of such concurrent
audit shall be placed before state level committee form time to time.
8.3 PROJECT LEVEL MONITORING COMMITTEE:
The Administrative Department of the project for which land is being acquired, shall
constitute a Project Level Monitoring Committee, to be chaired by the District Collector of
the district in whose jurisdiction the main component of the project lies, in case main
component projects spreads over more than one district, senior most of the District
Collectors shall chair the committee for reviewing and monitoring the progress of
implementation of resettlement and rehabilitation scheme/ plan relating to the project to
which this Policy applies. The committee shall meet at least once in two months to review
and monitor the implementation of R&R plan
The Committee will have following as its members”
13
“Joint Collector/ P.O ITDA- Convener
R&R officer- RDO/ Sub Collector of the division
SDC/ RDO/ Sub Collector, Land Acquisition
Project Director, DRDA
Chief Executive Officer, Zilla Parishad
District Panchayat Officer
District Education Officer
District Medical and Health Officer
District Level representative of DISCOM
Superintendent Engineer, RWS PanchayatRaj Department
Three members from PAPs, one at least women
One member from local NGO
Superintendent Engineer, Project site
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
Page 24
Pedana-Nuzvid-Visannapeta
Andhra Pradesh Road Sector Project
Superintendent Engineer, Panchayat Raj
Superintendent Engineer, R&B
Executive Engineer, Social Welfare Department.”13 APPLICABILITY OF POLICY:
8.4 THE POLICY ON THE RESETTLEMENT AND REHABILITATION OF
PROJECT AFFECTED FAMILIES AND PROJECT DISPLACED FAMILIES
(PRR-2005) SHALL COME INTO EFFECT FROM THE DATE OF ISSUE OF
GOVERNEMNT ORDER.
8.5 The Project to which this policy is made applicable, the provisions of G.O. Ms 98
Irrigation (Project Wing) Department Dated:15.4.1986 and G.O.Ms.No.64 Social
Welfare (T) Department, Dated: 18-4-1990 or any other order issued by any other
department on this subject shall cease to operate form the date of commencement of
this policy.
12. . Substituted for para 8.1 vide G.O.Ms.No.184, I & CAD (PW:LA-IV- R&R) Dept, DT: 0909-2008.
13. Added vide G.O.Ms.No.101, I & CAD (PW: LA-IV- R&R) Dept, DT: 24-08-2009.
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
Page 25
Pedana-Nuzvid-Visannapeta
Andhra Pradesh Road Sector Project
ANNEXURE 1.2: MODIFIED R&R POLICY PROVISIONS – VIDE G.O R T No. 1059
GOVERNMENT OF ANDHRA PRADESH
ABSTRACT
R & B Department – R & R Policy on Resettlement and Rehabilitation for Project Affected Families.
2005 – Certain modifications – Accepted – Orders – Issued.
TRANSPORT, ROADS & BUILDINGS (R.IV) DEPARTMENT
G.O.Rt.No. 1059
Dated:20-11-2010.
Read the following:
1. Govt. Memo No.13236/Roads.IV.2/07, Dated 25.01.2008.
2. From
the
Chief
Engineer(R&B)CRN
&
M.D.,
No.1/APRDC/APRSP/R&R/NGO/2007, Dated 10.11.2010.
APRDC
Letter
-: xxxx :O R D E R:In supersession of the orders issued in the memo 1st read above, Government after careful
examination of the matter approve the modifications proposed by the Chief Engineer (R&B) CRN &
Managing Director. Andhra Pradesh Road Development Corporation appended to this order.
2. The Chief Engineer (R&B) CRN & Managing Director. Andhra Pradesh Road Development
Corporation shall take necessary action accordingly.
(BY ORDER AND IN THE NAME OF THE GOVERNOR OF ANDHRA PRADESH)
S.P. SINGH
PRINCIPAL SECRETARY TO GOVERNMENT
To
The Chief Engineer (R&B) CRN & Managing Director
Andhra Pradesh Road Development Corporation, Hyderabad(w.e).
Copy to:The Engineer-in-Chief (Admn. & NH ), A.P., Hyderabad./
The Engineer-in-Chief ( State Roads), A.P., Hyderabad.
The Chief Engineer, NABARD, Hyderabad.
The Chief Engineer, Buildings, Hyderabad.
The Chief Engineer, HUDCO, Hyderabad.
//FORWARDED BY ORDER//
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
Page 26
Pedana-Nuzvid-Visannapeta
Andhra Pradesh Road Sector Project
ANNEXURE TO G.O Rt. NO. 1059/Roads.IV/2/2007, T (R&B) DEPT.,
Dt: 20.11.2010
MODIFICATIONS IN THE AP R&R POLICY FOR ROAD SECTOR PROJECTS
S.
No
1
2
3
4
Provisions
under
the Modifications
proposed
by Modifications
present
AP R&R Policy Managing Director, APRDC, APRDC
accepted by Govt.
2005
Para
1.3: ‘….
Provide Add “ and /or affected “ after displaced
Accepted
succor to the assets less
rural poor. Who have been
displaced
Para 3.2 : The definition of
Add one more parameter “( c ) for
Accepted
affected zone refers
to linear projects area falling within the
water sector projects
project corridor of impact”
Para 3.8: Project means the Replace the definition of the project as: Accepted project(s)
notified under this “Project means the project(s) notified
policy and displacing.
under this policy and resulting in partial
a) 100
or
more losses and/or displacing”.
families en-mass in
Add one more parameter as (c) for
plain areas
linear project displacement is not en
b) 25 or more families
mass but scattered
en
mass in tribal
areas or in areas
mentioned
in
Schedule V of the
constitution of India
from
their lands
and or houses
Para
3.0:
There is no
Add the following efinition:
Accepted
mention under the policy
of
Families with no legal titles are the
families with no legal title persons
and
non
– agricultural (i)Occupying
families.
government/other
land for
cultivation
to earn their
living
(ii)Residing
or carrying out
economic
activity
in
structures
built within the
affected
zone/corridor of
impact
Non agricultural families: means
whose primary source of livelihood is
from non agricultural source (like
trading, business and
manufacturing
etc.) within the affected zone/corridor
of impact
Para
3.16:
A Project Under Para 3.16 (b) replace 50% by
Accepted
Displaced Family is defined
25% and add (d) families losing more
as one whose more than
than25%
of
their
50% of land is required
residential/commercial structures.
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
Page 27
Pedana-Nuzvid-Visannapeta
Andhra Pradesh Road Sector Project
5
Para 3.17 project displaced
Family
is
defined
as
“means
any
family.
Dwelling
house
in the
village
in the
affected.
…Dwelling house”
Revise the definition as follows:
Accepted
“Project Displaced family“ means any
family, who on account of acquisition
of dwelling house and structures used
for commercial purposes
including
business/trade in the affected zone for
the purpose of the project, has been
displaced from such dwellings and/or
commercial structures.
6
The
notification
under
section 4(i) of LA Act
pertains to those
whose
lands/other
immovable
properties are acquired
Add: under Chapter III, the following
Cut off date: For the legal owners of
the land and structures the date of land
acquisition notification will be the cut
off date. For squatters/encroachers the
date of social survey will be the cut off
date for R&R entitlements.
7
Para 5.4: Procedure to be
followed for survey and
census of PAFs and PDFs
etc.
Revise Para 5.4 (b) as follows:
Accepted
“Project affected families… agriculture
land
business/work
place,
employment…. Or vocation. Also add
the following:
(e). The project affected persons who
have unauthorized occupied the land
/structures in the affected area.
8
Para
5.14:
After
completion….
In
consultation with. …Project
area is situated.
9
10
Accepted
Revise Para 5.14 as under:
Accepted
After completion. In consultation with
Project Affected families and Project
Displaced
families
and
their
representatives,
women,
Chairpersons…Area is situated.
Para
5.18: Contents of Add the following:
Accepted
Draft Scheme/Plan of R&R
n) The time schedule to extend R&R
entitlements to project affected /
displaced families
Para 6.2: Free house sites:
This is presently
available
to
losing their
private
properties
Add:
Any project displaced family (including
squatters losing
dwelling/shops/work
place) has been acquired should be
allotted site for
(i)
Dwelling house site free of
cost
(ii)
Site for shop 30 sq.m in
rural areas 25 sq.m in
urban areas, free of cost.
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
Accepted
suggested: “Any
according
to
eligibility
will
suitably
compensated”.
as
PDF
their
be
Page 28
Pedana-Nuzvid-Visannapeta
11
Para
6.3: The
provides
construction grant
Policy
house
Andhra Pradesh Road Sector Project
Include the following:
As above
Project displaced families
including
squatters who are of BPL category
would get house construction grant.
Any displaced
person
(including
squatters) losing shop/work
place
should be allotted a site for shop free
of cost 30 Sq.m. in rural areas, 25
Sq.m in urban areas. Each of the
displaced families would also been
given a grant of Rs. 10,000/- towards
construction
of alternate
shop/work
place.
S.P. SINGH
PRINCIPAL SECRETARY TO GOVERNMENT
//FORWARDED:: BY ORDER//
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
Page 29
Pedana-Nuzvid-Visannapeta
Andhra Pradesh Road Sector Project
ANNEXURE 1.3: R&R ENTITLEMENT FRAMEWORK
Type of Loss
Agricultural
land
Unit of
Entitlement
Titleholder
Family
R&R Entitlement Framework
(i) Compensation as per the LA Act through consent award.
(ii) If consent award fails to reach agreement the difference between
replacement value and market value (approved by the Government) will be
paid in the form of rehabilitation assistance.
(iii) If alternate land is provided under section 6.4 of APRRP, the cost of
land will be deducted from the compensation amount and the rehabilitation
grant will be proportionately reduced, however other R&R entitlements
will be extended as per APRRP 2005
(iv) At least 3 months notice will be given in advance of crop harvest,
failing which compensation for crop lost will be paid.
(v) A one time lump sum amount equal to 750 days, 500 days and 375
days of minimum agricultural wages will be paid to those (owner) PAFs
who after LA become landless, marginal, small farmers respectively.
Training will be arranged for income generation activities (IGA) to one
member of such PAFs in suitable IG activities.
Special benefit to ST families


Share Cropper
Homestead
(or non-agril.
land)
Titleholder
Preference in allotment of land
A lump sum amount equal to 500 days minimum wages for lost
customary rights or use of forest produce (if any)
An affected share cropper will get a sum equal to the un-expired lease
period
(i) Compensation as per LA Act for the loss of homestead land
(ii) If more than 25% of the structure is lost, such affected people will be
categorized as ‘displaced’
(iii) Those affected but not displaced will get compensation for the
portion of homestead land and structure affected by the project and
permission to salvage construction material.
(iv) Those displaced will get






Compensation for the structure affected (part or full) computed at BSR
without deducting depreciation
Permission to salvage construction material
Alternate house site (to a maximum extent of 150 sqm in rural areas
and 75 sqm. in urban areas) or cash in lieu of site to those getting
physically displaced.
A sum total of Rs 50,000 as one time financial assistance to BPL for
house construction and 3000 for lavatory construction.
Subsistence allowances equal to 240 days of minimum agriculture
wages.
Grant for a cattle shed equivalent to a sum total of
Rs 15000.
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
Page 30
Pedana-Nuzvid-Visannapeta
Type of Loss
Andhra Pradesh Road Sector Project
Unit of
Entitlement
R&R Entitlement Framework

Tenant/ Lease
holder
Land under
commercial
use
IGA grant to affected artisans, small traders, and self employed
persons at Rs 25,000 per PDF
 Grant for transporting materials at Rs 5,000 per PDF
Only displaced tenant will get:

Titleholder
A sum equal to two months rental in consideration of the disruption
caused.
 Transportation allowance of Rs. 5,000 towards shifting household
materials.
(i) Compensation for the loss of land (commercial).
(Owner and
occupier)
(ii) For the structure affected (part or full), compensation will be computed
at BSR without deducting depreciation
(iii) Permission to salvage construction material
(iv) If more than 25% of the structure is lost, the affected business/work
place will be categorized as ‘displaced’.
(v) PAFs affected but not displaced will get compensation for the portion
of land lost and the structure (at BSR without depreciation) affected by the
project.
(vi) Those displaced will get

An alternate site (40 sq.mtr in rural areas or 25 sq.mtr. in urban areas)
free of cost or cash equivalent in lieu there of.
 A construction assistance of Rs 10,000 for each PDF
(v) If alternate shop/work place is allotted by the project, those displaced
will not be eligible for alternate site and construction assistance.
(v) Other assistance:

Titleholder
(Absentee
Land Lord)
Tenant/Lease
holder
Subsistence allowances equal to 240 days of minimum agriculture
wages.
 A transportation allowance of Rs 7,000 to Residence cum commercial.
 A transportation allowance of Rs 2,000 to commercial units.
(i) Only compensation for both land and structure (owned)
(ii) Permission to salvage materials from demolished structure.
Only displaced tenant will get:


Other assets
Owner
affected
family
A sum equal to two months rental in consideration of the disruption
caused.
Transportation allowance of Rs. 1,000 towards shifting.
Loss of other assets (including wells, trees) will be compensated
equivalent to their replacement value.
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
Page 31
Pedana-Nuzvid-Visannapeta
Type of Loss
Andhra Pradesh Road Sector Project
Unit of
Entitlement
R&R Entitlement Framework
Encroachers
(Agril. land)
Family
If a PAF is dependent on the public land required for the project for the
livelihood and belongs to ‘vulnerable’ groups he/she will get assistance to
take up self-employment activities by dovetailing government programs or
providing an assistance of Rs 25,000 to take up IG Activity.
Encroachers
(Non-agril.
land)
Family
If encroached land is used for housing and/or commercial purpose and if
the affected person loses more than 25% of the built up structure
(including one’s own portion) and if physically displace will be given the
same R&R assistance as available to a displaced family. However, such
PAFs will not get the compensation for the encroached land.
Squatters (for
homestead
purpose)
Vulnerable
Family
If the public land is occupied for homestead purpose and if the affected
person has no alternate housing he/she will get:
Squatters (for
commercial)
Vulnerable
Family


Notice to remove the structure
An alternate site of 150 sq.mtr in rural areas or 75 sq.mtr. in urban
areas or cash equivalent and compensation for lost structure without
depreciation. If the family is allotted alternate weaker section housing,
he/she will not be eligible for compensation and assistance or alternate
housing equivalent to IAY.
 House construction grant Rs 10,000
A transportation assistance of Rs 2,000
If the PDF has no alternate place, he/she will get:

Notice to remove the structure

An alternate site of 40 sq.mtr in rural areas or 25 sq.mtr. in urban areas
or cash equivalent and compensation for lost structure without
depreciation. If the project allots an alternate commercial place
developed by it, the PDF will not be eligible for neither compensation
nor house construction assistance or Rs 10,000 for shop construction
as per amended policy for APRSP.



Kiosks
Vendor
A transportation assistance of Rs 1,000
A maintenance allowance of Rs 2,000 (one time)
PAFs from vulnerable sections will be provided training to take up self
employment activity by dovetailing ongoing Government schemes
Ambulatory vendors licensed for fixed locations will be considered as
kiosks and each affected vendor will get
 Alternate site for kiosks or a sum of Rs.5000 for self relocation
NOTE: Vendors in groups (of more than 50) will be considered for
relocating in a commercial complex, if developed by the project. Those
allotted space there will not get any assistance.
Common
infrastructure
and common
Property
Resources
Community


Common properties will be replaced in consultation with the
community
Civic infrastructure will be replaced in consultation with the affected
community and the local administration
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
Page 32
Pedana-Nuzvid-Visannapeta
Type of Loss
Any
Unforeseen
Impacts
Unit of
Entitlement
Affected
community
and/persons
Andhra Pradesh Road Sector Project
R&R Entitlement Framework
Any unforeseen impact would be mitigated/enhance as per the APRRP
2005 or through any additional measures as may be required
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
Page 33
Pedana-Nuzvid-Visannapeta
Andhra Pradesh Road Sector Project
ANNEXURE 2.1: LIST OF PROJECT AFFECTED FAMILIES AND
PROJECT DISPLACED FAMILIES
Father\husba
nd name
Chanage
Sl.N
o
L-1
TH
4
R-1
TH
5
Kalkimurthy
R-1
TH
4
Madisetty Maruthi
Late
Satyanarayana
R-1
TH
5
Semipucc
a
Com
Machilipatnam
Varudhu malleswararao
Subbarao
R-3
TH
3
Katcha
Res
7+020
Machilipatnam
Varudhu Ramachandrarao
Subbarao
R-3
TH
3
7+120
Machilipatnam
jonabattula koteswaramma
Nancharayya
R-2
NTH
5
Katcha
Cattle
Shed
Cattle
Shed
9
7+120
Machilipatnam
jonabattula koteswaramma
Nancharayya
R-3
NTH
6
Katcha
Res
10
7+140
Machilipatnam
Garikimukkala Sriramulu
Mahamkali
R-4.5
NTH
3
Katcha
Res
7+140
Machilipatnam
Chinnam Suramraju
Person not
Available
L-4
TH
0
4
Moganti Prasad
7+000
Machilipatnam
Moganti Prasad
7+000
Machilipatnam
Varudhu Balaji Kumar
7+000
Machilipatnam
Dinduluri Srinivasarao
7+000
Machilipatnam
7+020
Narayanna
Rao
Narayanna
Rao
Narayanna
Rao
4
3
Machilipatnam
Nature of
House
TH
2
7+000
Type of
House
Semipucc
a
L-1
1
Pedna
No of Family Members
Name of the
HouseHold Head(HHH)
Location
Division
Title
holder(TH)/NonTitleHold
er(NTH)
Name of the
Village
(Left\Right)
Machilipatnam Division Project Affected Famalies(PAF'S) of PEDNA - NUZVID -VISANNAPETA Road.
5
6
7
8
11
12
14
15
16
17
18
19
20
21
22
23
24
Machilipatnam
Varudhu Venkateswararo
Govind
L-2
NTH
4
7+200
Machilipatnam
Varudhu
Nagamalleswaramma
Venkateswarul
u
R-6
TH
4
7+220
Machilipatnam
Varudhu Nancharayya
Subbarao
R-4.5
TH
6
7+220
Machilipatnam
Varudhu Nancharayya
Subbarao
R-4.5
TH
6
7+240
Machilipatnam
Bulusuru Symalarao
Subramanyam
L-7
TH
4
7+260
Machilipatnam
maddemsetty Rambabu
Nancharayya
R-6
TH
5
7+280
Machilipatnam
Varudhu Venkaranarayana
Marillu
L-3
TH
2
7+280
Machilipatnam
Varudhu Venkateswararo
Subbayya
R-5
NTH
3
7+280
Machilipatnam
Varudhu Ragavayya
Subbayya
R-6
NTH
3
7+300
Machilipatnam
Varudhu kondayya
Krishana
R-6
TH
6
7+310
Machilipatnam
Varudhu Venkataswamy
Krishana
R-6
TH
3
7+320
Machilipatnam
Varudhu Venkanna
Nageswarao
R-2
TH
4
7+320
Machilipatnam
Varudhu Balaji Kumar
Nageswarao
R-2
TH
5
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
Katcha
Res
Com
Com
Res
Pucca
7+200
13
Katcha
Semipucc
a
Semipucc
a
Com
Pucca
Res
Res
Katcha
Semipucc
a
Katcha
Res
Cattle
Shed
Katcha
Semipucc
a
Semipucc
a
Res
Katcha
Res
Katcha
Cattle
Shed
Res
Res
Katcha
Semipucc
a
Res
Pucca
Semipucc
a
Res
Page 34
Res
Res
Pedana-Nuzvid-Visannapeta
7+325
Machilipatnam
25
Andhra Pradesh Road Sector Project
Maruboiena Naga
malleswararao
Nageswarao
R-5
TH
4
Res
Katcha
7+325
Machilipatnam
Maruboiena SriniVasarao
Nageswarao
R-5
TH
5
7+325
Machilipatnam
Maruboiena Srinivasarao
Nageswarao
R-6
TH
6
7+325
Machilipatnam
Koutarapu Naga Durga
Bhavani
Ganapathi
L-3
TH
4
Semipucc
a
Res
29
7+350
Machilipatnam
Varudhu Baburao
Seetayya
L-3
TH
2
Pucca
Res
30
7+360
Machilipatnam
Varudhu Venkateswararo
Koteswararo
L-4
NTH
4
Katcha
Res
7+360
Machilipatnam
Varudhu Venkateswararo
Koteswararo
L-5
NTH
5
Katcha
Cattle
Shed
7+420
Machilipatnam
Maddisetty Anasuya
Koteswararo
R-5
TH
7
7+430
Machilipatnam
Varudhu Suryachanrraro
R-7
NTH
11
7+430
Machilipatnam
Varudhu Suryachanrraro
R-8
NTH
12
7+430
Machilipatnam
Varudhu Suryachanrraro
R-9
NTH
13
36
7+450
Machilipatnam
Varudhu Durgarao
Madavarao
R-6
NTH
37
7+450
Machilipatnam
Varudhu Subbarao
Madavarao
R-6
7+450
Machilipatnam
Varudhu Subbarao
Madavarao
7+450
Machilipatnam
Varudhu Venkata
Ramanjeyaneyulu
40
7+500
Machilipatnam
41
9+650
Machilipatnam
42
9+850
26
27
28
31
32
33
34
35
38
Res
6
Katcha
Res
R-6
NTH
7
Katcha
Cattle
Shed
Nageswarao
L-2
TH
4
Semipucc
a
Res
Varudhu Pitchemma
Narasimharao
R-2
TH
8
Katcha
Res
MD.Sardhar
Awa
L-5
NTH
3
Kisok
Kiosk
Machilipatnam
Vanka Rani
Subbayya
L-7.5
NTH
3
Katcha
Res
Machilipatnam
Parusa Pandurangarao
Durgarao
L-6.2
NTH
2
Machilipatnam
Pamarthi Bramajirao
Narasimharao
R-6.3
NTH
4
Machilipatnam
Rajulapati Gowri rajulu
Gurunadham
L-6
NTH
5
Machilipatnam
Polagiri Jaganadham
Srimanrao
L-7.8
NTH
4
Machilipatnam
Polagiri nageswararao
Srimahathi
R-6.5
NTH
4
Machilipatnam
Yarlagedda Sethratnam
Venkataratnam
R-6.5
NTH
1
Machilipatnam
Gandikota Dhanaraju
Kotayya
L-7
NTH
7
Vallaba Pamulu
L-7.2
NTH
3
Machilipatnam
51
11+66
0
11+67
0
Machilipatnam
48
Res
NTH
Machilipatnam
47
Katcha
Res
Res
11+65
0
46
Katcha
Semipucc
a
Pucca
50
45
Cattle
Shed
3
49
44
Katcha
Cattle
Shed
10+70
0
10+80
0
10+80
0
10+90
0
10+93
0
10+94
0
11+02
0
Nadupuru
Res
Katcha
39
43
Venkatasubba
yya
Venkatasubba
yya
Venkatasubba
yya
Katcha
Katcha
Katcha
Katcha
Katcha
Katcha
Katcha
Katcha
Benarji
Res&Co
m
Res&Co
m
Res
Cattle
Shed
Res
Res
&Com
Katcha
Laxmayya
kanakavalli Subadra
Res
Res
R-6.5
NTH
2
Res
Katcha
Nimmagedda Rajarao
52
53
11+75
0
Machilipatnam
54
11+76
0
11+80
0
Machilipatnam
55
Machilipatnam
NTH
Person not
Available
L-7
Venkateswrulu
L-7.2
Kandara Anjeneyulu
L-8.5
Sitaramayya
R-8.2
4
Katcha
4
Semipucc
a
Res
Katcha
Res
Res
NTH
Subbarao
Katcha
Res
NTH
Davu Ramakrishana
2
2
Ede.Sobanadri
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
NTH
Page 35
Pedana-Nuzvid-Visannapeta
Andhra Pradesh Road Sector Project
11+82
0
Machilipatnam
56
Machilipatnam
57
12+05
0
58
12+05
0
Machilipatnam
Sammeta Nagasehagirirao
Veerabadrayya
R-8.3
59
12+00
0
12+05
0
Machilipatnam
Tontipakala.Lalitamba
Person not
Available
12+10
0
Machilipatnam
Bellamkonda Tatayya
H/o
mastanamma
60
61
4
Borra Haribabu
Veraraghavulu
R-9
NTH
Parasa Gopalkrishana
Nancharayya
R-4.5
NTH
Katcha
Res
5
Kiosk
3
Semipucc
a
Com
NTH
5
Semipucc
a
Res&Co
m
R-7.8
NTH
1
Katcha
Res
&Com
L-8.5
NTH
3
Katcha
Kiosk
Machilipatnam
Parasa Ramachandrarajulu
Nancharayya
R-4.5
NTH
Res
Name of the
HouseHold Head(HHH)
Father\husband
name
Location(Lef
t\Right)
Chanage
Sl.
No
1
Division
Reddipalae
m
Title
holder(TH)/NonTitleHolde
r(NTH)
Name of the
Village
No of Family Members
Gudivada Division Project Affected Famalies(PAF'S) PEDNA - NUZVID -VISANNAPETA Road.
Type of
Structur
e
Nature of
Stucture
13+400
Gudivada
Bojana Nagayya
Veeraswamy
L-7.8
NTH
3
Katcha
Res
2
13+400
Gudivada
Madamala Ramarao
Nancharayya
L-8
NTH
2
Katcha
Res
3
13+410
Gudivada
B.Nancharayya
H|0 Venkamma
L-6.2
NTH
3
Katcha
Res
4
13+410
Gudivada
Bojana Lazar
Nagayya
R-7.5
NTH
5
Katcha
Res
5
13+420
Gudivada
Modugummdi Veramma
pandurangarao
R-8
NTH
2
Katcha
Subbayya
R-8.2
Res
Cattle
Shed
6
13+420
Gudivada
Katta Laxminarayana
TH
5
Katcha
7
13+420
Gudivada
ponki nagaraju
verayya
R-8.2
NTH
3
Katcha
Res
8
13+420
Gudivada
Chittibomma Nagababu
Srinivasarao
L-7.5
NTH
4
Katcha
Res
9
13+420
Gudivada
Chittibomma Srinivasarao
Subramanyam
R-6.4
NTH
5
Katcha
Mallikarjunarao
L-7.5
NTH
4
Katcha
Mallikarjunarao
L-7.5
NTH
3
Katcha
Res
Cattle
Shed
Cattle
Shed
L-8.2
NTH
3
Katcha
10
13+425
Gudivada
11
13+425
Gudivada
Bellamkonda
Venkateswarao
Bellamkonda
Sahademudu
12
13+500
Gudivada
Panku Chinaveerayya
Gudivada
Pamarthi
VeeraVenkateswarao
Rangarao
R-8
13
13+510
Subbarao
NTH
5
Katcha
Res
Cattle
Shed
14
13+510
Gudivada
Kandula Sesayya
Nancharayya
R-6.4
NTH
6
Katcha
Res
15
13+520
Gudivada
Botla Koteswaerarao
Anjayya
R-8.2
NTH
1
Katcha
16
13+525
Gudivada
Pamarthi Venkataswamy
Ramayya
R-7
NTH
4
Katcha
Res
Cattle
Shed
17
13+530
Gudivada
Bethapudi Srinivasarao
R-6.2
NTH
4
Katcha
Res
18
13+550
Gudivada
Katta Srinivasarao
L-7.2
NTH
3
Katcha
Res
19
13+420
Gudivada
Katta Laxminarayana
Subbayya
L-7.5
TH
5
Katcha
Res
20
13+550
Gudivada
Kagitha Pabma
Nancharayya
Anjeneya
Swamy
L-6.5
TH
2
4
S
Katcha
Res
SemiPucc
a
Com
21
13+700
Gudivada
Shop related to Temple
pandu
Nancharayya
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
L-7.5
NTH
Page 36
Pedana-Nuzvid-Visannapeta
13+750
22
13+790
23
13+790
24
13+750
25
Gudivada
Gudivada
Gudivada
Gudivada
Andhra Pradesh Road Sector Project
Sodagani laxmarao
Modugumudi
Mallikarjunarao
Modugumudi
Harikrishana
Modugumudi Haribabu
Veeraswamy
Laxmipathi
Buchiyya
R-7.7
L-7.6
R-8
NTH
NTH
NTH
1
2
3
Katcha
Katcha
Katcha
Ramachandrarao
L-5.7
L-7.2
NTH
3
SemiPucc
a
SemiPucc
a
R-7
NTH
4
Katcha
NTH
4
Res
Com
Res
Res
26
13+800
Gudivada
Bellamkonda
Srininvasarao
27
13+890
Gudivada
Pamarthi Ramesh
Mallikarjunarao
Dasaradharamay
ya
28
13+900
Gudivada
Pamarthi Ankalarao
Ragavulu
R-7.5
NTH
2
Katcha
29
14+400
Gudivada
Parasa Reddemma
Durgayya
L-8
NTH
2
Katcha
14+400
Gudivada
Parasa Reddemma
Durgayya
L-9
NTH
3
Katcha
15+190
Gudivada
Abdhul Azeez
Basha
R-6.8
32
15+160
Gudivada
AvarlanDammidayya
Veerayya
R-6.5
NTH
33
15+400
Gudivada
Kolusu Reddayya
L-6.5
TH
15+400
Gudivada
Kolusu Reddayya
35
15+400
Gudivada
Kolusu Veraraju
36
15+400
Gudivada
Kolusu Koteswarararo
37
15+420
Gudivada
Pari devamani
15+420
Gudivada
Madamala Sivaleela
Venkateswararao
R-5
39
15+430
Gudivada
Iku Adilaxmi
Late)Gopayya
L-5.2
TH
1
Katcha
Res
40
15+430
Gudivada
S.Bayrasi
Not Available
R-5.6
NTH
0
Katcha
Res
4
SemiPucc
a
Com
0
Kiosk
Kiosk
0
Kiosk
Kiosk
30
31
34
38
Vaddlamann
adu
Veraraju
Veraraju
Ragavulu
Veraraju
Late)Yakobu
L-6.5
L-5.5
L-6.5
NTH
L-6.5
TH
Gudivada
Jakkula Sureshbabu
42
15+440
Gudivada
Sk.Raheman
43
15+450
Gudivada
N.Sambasivarao
Not Available
L-5.5
15+450
Gudivada
Gudivada Venkateswarao
Person Not
Available
R-6.2
Venkateswarulu
R-6.5
Person Not
Available
R-6.5
44
15+480
Gudivada
45
15+480
Gudivada
46
47
Vallabapurapu
nancharayya
Udayagiri
Venkateswararao
15+520
Gudivada
Thota Laxmayya
15+520
Gudivada
Thota Umashankar
48
49
50
15+550
Gudivada
15+560
Gudivada
15+560
Gudivada
Thota
venkatanagaanjeneyulu
Penneru
jayapattabiramayya
G.Nageswararao
51
52
15+560
Gudivada
Gandam Rangarao
Balayya
Not Available
TH
TH
15+440
41
NTH
L-5
L-5
NTH
NTH
NTH
NTH
Res
4
Katcha
Res
Cattle
Shed
5
2
Katcha
Res
4
Katcha
Res
6
Katcha
Res
Cattle
Shed
2
Person Not
Available
L-7
Hunumantharao
L-6.8
Venugopalarao
Person Not
Available
Venkatakrishana
rao
Com
Katcha
3
Com
Kiosk
0
4
Kiosk
SemiPucc
a
Com
Kiosk
L-6.8
NTH
NTH
NTH
3
2
2
Kiosk
Kiosk
SemiPucc
a
Kiosk
Com
Kiosk
L-6.5
NTH
0
R-6.5
NTH
0
Gudivada
Garikipathi Tulasiram
Ragavulu
R-6.8
54
15+560
Gudivada
Garikipati laxmayya
Ragavayya
R-6.8
NTH
55
15+560
Gudivada
Meda Venkateswarao
Adinarayana
R-7.2
NTH
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
Katcha
Katcha
NTH
R-6.8
Katcha
0
NTH
Res
Katcha
NTH
krishanamurthy
Katcha
Res
Cattle
Shed
2
NTH
15+560
53
3
Res
Cattle
Shed
Cattle
Shed
NTH
Kiosk
Kiosk
4
Kiosk
SemiPucc
a
4
Kiosk
Kiosk
4
Katcha
Com
Page 37
Com
Pedana-Nuzvid-Visannapeta
Andhra Pradesh Road Sector Project
15+560
Gudivada
Yadaala Ramarao
57
15+560
Gudivada
58
15+580
59
56
Katcha
Cattle
Shed
3
Katcha
Com
NTH
4
Kiosk
Kiosk
R-6.6
NTH
2
Katcha
Com
R-5.9
NTH
3
Katcha
Res
R-6.5
NTH
4
Katcha
Res
R-6.2
NTH
4
Katcha
Res
Durgapraasad
R-6.5
NTH
3
Katcha
Res
Person Not
Available
R-4.4
Nancharayya
L-5.1
TH
L-5.3
NTH
NTH
Rajarao
L-6.2
manda prasad
Ramarao
L-7
NTH
Gudivada
NKV Subbarao
Venu
R-6.8
15+590
Gudivada
kundeti Verayya
Ramayya
60
15+600
Gudivada
Atchuta jaganmohanarao
61
15+650
Gudivada
Degala Srinu
62
15+650
Gudivada
Degala Venkataswamy
63
15+660
Gudivada
Maddela Veramma
15+670
Gudivada
Atchuta kasturi
64
Subbarao
Venkataswamy
Rammurthy
NTH
15+670
Gudivada
Atchuta Srinivasarao
66
15+750
Gudivada
Atchuta Sivashankararo
67
15+750
Gudivada
Penta Ramu
Laxmayya
R-5.5
NTH
15+360
Gudivada
DegalanSubbarao
Chinnappayya
R-6.2
16+740
Gudivada
Parasa Venkatasubbamma
Krishanamurthy
L-4.7
68
Vemavaram
69
70
16+780
Gudivada
Padamata Pandu
71
16+785
Gudivada
Venka Nageswarao
72
16+785
Gudivada
Veranji Kanakam
73
16+785
74
16+820
75
16+880
Gudivada
Gudivada
Gudivada
Chillimuntha
Badrachalam
Yarlagadda
hunumantharao
Katcha
1
65
Subbarao
2
Res
3
Katcha
Res
4
Katcha
Res
3
Katcha
Res
NTH
2
Katcha
Res
NTH
4
Katcha
Basavayya
Rammurthy
L-6.9
L-6.3
TH
TH
Res
4
Katcha
Res
3
Katcha
Res
Res
Krishanamurthy
R-4.5
NTH
2
Katcha
Gangadaram
L-5.8
NTH
0
Katcha
Rammurthy
L-4.5
NTH
4
Katcha
Pamarthi Samrajam
Rangarao
L-4.5
NTH
2
Katcha
Res
Cattle
Shed
Cattle
Shed
76
16+880
Gudivada
Padamati Veraswamy
Venkanna
L-4.3
NTH
3
Katcha
Res
77
16+890
Gudivada
Madugu Pedaverayya
Subbarao
R-4.5
NTH
0
Katcha
Res
78
16+900
Gudivada
Vemula Srinivasarao
Veraragavulu
R-4.3
NTH
5
Katcha
Com
79
16+900
Gudivada
Mannem Venkateswarama
Venkateswaralu
L-5.2
NTH
2
Katcha
80
16+900
Yaragani Mohanarao
Mamillu
L-5.2
NTH
4
Katcha
Res
Res&Co
m
Mannem Basavayya
Yarlagadda
Nagapanindhra
Yarlagadda
Nagapanindhra
Laxmayya
L-6.2
NTH
2
Katcha
Res
M/o Vijayamma
L-5.5
NTH
3
Veraswamy
L-5.2
TH
4
Veraswamy
L-5.2
TH
5
81
82
83
84
85
86
87
88
89
90
91
92
Gudivada
16+900
Gudivada
16+900
Gudivada
16+900
Gudivada
17+050
Gudivada
Sonti Venkateswarao
17+050
Gudivada
Sonti Venkateswarao
17+050
Gudivada
Mulala edukondalu
Pakeer
R-5.1
NTH
8
Katcha
Res
17+060
Gudivada
Borra Durgamma
Ragavulu
L-6.2
NTH
1
Katcha
Res
17+070
Gudivada
pandiri Kurmarao
narasimharao
L-5.3
NTH
3
Katcha
Vemula Durgarao
Danayya
H\o
Haseenabegum
L-4.5
NTH
2
Katcha
Res
Cattle
Shed
L-4.3
NTH
5
Venkateswaralu
L-4.5
NTH
2
Daharmayya
L-4.5
NTH
3
17+100
Gudivada
17+120
Gudivada
Shaik Adem
17+140
Gudivada
Vemula Veraanjeneyulu
17+140
Gudivada
Mannem Gopalarao
M/o Vijayamma
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
L-5.5
NTH
2
Katcha
Katcha
Katcha
Katcha
Katcha
Katcha
Katcha
Page 38
Res
Cattle
Shed
Res
Cattle
Shed
Res
Cattle
Shed
Cattle
Shed
Pedana-Nuzvid-Visannapeta
Andhra Pradesh Road Sector Project
17+150
Gudivada
Mannem ChinaRagavulu
17+160
Gudivada
Mannem Nageswararao
17+180
Gudivada
Mannem Pedaragavayya
17+200
Gudivada
97
17+200
Gudivada
98
17+630
Gudivada
M.Ismail
Kondayya
L-4.2
17+690
Gudivada
Mannem Srinu
Venkateswaralu
100
17+690
Gudivada
Mannem Somulu
101
17+690
Gudivada
Mannem Ragavulu
102
17+690
Gudivada
17+690
Gudivada
17+690
Gudivada
17+690
Gudivada
17+690
Gudivada
17+700
Gudivada
93
94
95
96
99
103
104
105
106
107
Gudivada
Katcha
Cattle
Shed
Cattle
Shed
Cattle
Shed
Daharmayya
L-4.5
NTH
2
Venkateswaralu
L-4.5
NTH
4
Venkateswaralu
L-4.5
NTH
5
Abdhul Baseer
Sattar
L-4.1
NTH
1
Katcha
Res
Naragani Venugopal
Ankinaidu
L-4.5
NTH
5
Katcha
Res
NTH
6
Kisosk
Kiosk
l-4.5
NTH
4
Katcha
Com
Venkateswaralu
l-4.6
NTH
5
Katcha
Com
Anjayya
L-4.5
NTH
5
Katcha
Com
Bolla Ankalu
nageswarrao
L-4.6
NTH
5
Katcha
Com
Mannem Ramachandrudu
Subbayya
L-4.6
NTH
5
Katcha
Com
Matta Ragavayya
Saianna
L-4.6
NTH
4
Katcha
Com
Chettibomma Tulasamma
Malleswararao
L-4.5
NTH
4
Katcha
Com
Mannem Nageswararao
Venkateswaralu
L-4.5
NTH
1
Kisosk
Kiosk
Pappula Peramma
L-4.5
NTH
1
Katcha
Com
Mannem Nageswararao
Nancharayya
Person Not
Available
L-4.5
NTH
2
Kisosk
Kiosk
Katcha
Katcha
108
17+700
109
17+710
Gudivada
Tammisetty nookalu
nookalu
L-4.5
NTH
3
Kisosk
Kiosk
17+710
Gudivada
Tammisetty nookalu
nookalu
L-4.5
NTH
3
Katcha
Com
17+720
Gudivada
Tammisetty Durgarao
Suryanarayana
L-4.5
NTH
4
Katcha
Com
17+730
Gudivada
Matta Ragavayya
Saianna
L-4.5
NTH
4
Katcha
Com
17+730
Gudivada
Akurathi hema
Srinivasarao
L-4.5
NTH
4
Kisosk
Kiosk
17+730
Gudivada
mannem Pitchemma
pothuraju
L-4.5
NTH
4
Katcha
Com
115
17+730
Gudivada
Munagala Pramela
Danumjay
L-4.5
NTH
4
Kisosk
Kiosk
116
17+730
Person Not
Available
L-4.5
NTH
3
117
17+750
Suryanarayana
L-4.5
NTH
4
Kisosk
SemiPucc
a
Kiosk
Res
&Com
Narepalli Srinivasarao
Rangarao
L-4.5
NTH
4
Katcha
Com
Srisylam
Person Not
Available
L-4.5
NTH
3
Kiosk
Manda Nagamani
Ramanjeneyulu
R-4.5
NTH
5
Kisosk
SemiPucc
a
Sarveswararao
Person Not
Available
L-4.5
NTH
0
Kisosk
Kiosk
Basaveswararao
Person Not
Available
L-4.6
NTH
0
Kisosk
Kiosk
Tammisetty
Suryanarayana
Person Not
Available
R-6
NTH
0
Kisosk
Kiosk
kagita Veranjeneyulu
Person Not
Available
R-6
NTH
0
Kisosk
Kiosk
Bapanayya
Person Not
Available
R-6
NTH
0
Kisosk
Kiosk
Chetturu jaganadharao
nageswarrao
R-6
NTH
4
Kisosk
Kiosk
110
111
112
113
114
Gudivada
118
17+750
119
17+780
120
17+780
121
17+810
122
17+810
123
17+820
124
17+820
125
17+830
Gudivada
Gudivada
Satyanarayana
Tammesetti
Satyanarayana
Gudivada
Gudivada
Gudivada
Gudivada
Gudivada
Gudivada
Gudivada
126
17+830
Gudivada
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
Page 39
Com
Pedana-Nuzvid-Visannapeta
127
128
129
kowthvaram
-Gv-1
17+840
Gudivada
Narapalem krishana
Rangarao
L-6
NTH
5
Kiosk
Kiosk
17+840
Gudivada
Bodda Romahanaramesh
pullarao
L-6
NTH
3
Kiosk
Kiosk
koreni Appayamma
Chittibabu
L-4.4
NTH
3
Kiosk
Allu suryanarayana
W/o Atchinaidu
L-6
NTH
3
Katcha
SemiPucc
a
Allu Apparao
Adinarayana
L-7.5
NTH
4
Katcha
Jakka Nagamani
S/o Sanganna
R-5.3
NTH
2
Katcha
Allu Narasamma
Apparao
R-6.8
NTH
1
Katcha
Geduturi Rajarao
Yarayya
R-6.6
NTH
2
Res
Tummala Rajarao
Suryanarayana
L-7.3
TH
2
22+065
130
22+070
131
22+090
132
Andhra Pradesh Road Sector Project
22+090
133
22+100
134
22+100
135
22+100
136
22+120
Gudivada
Gudivada
Gudivada
Gudivada
Gudivada
Gudivada
Gudivada
Gudivada
Juvvadi Edukondalu
Venkateswarao
L-6.9
NTH
3
Katcha
SemiPucc
a
SemiPucc
a
Kiosk
Res&Co
m
Res&Co
m
Res&Co
m
res
Com
137
22+120
Gudivada
Sonayala Suryanarayan a
Satyam
R-6.8
NTH
1
Kiosk
Kiosk
138
22+120
Gudivada
Nasethi Ramesh
Subbarao
R-6.8
TH
3
Katcha
Res
139
22+120
Gudivada
koripalli Sanyasirao
Appannna
R-6.7
NTH
12
Katcha
Res
140
22+140
Gudivada
Javvari Nageswarao
Venkateswarao
R-6.8
NTH
5
Katcha
Res
141
22+140
Gudivada
Kasani Sowbagyarao
Edukondalu
L-8
NTH
3
Com
142
22+140
143
144
Paramati Sitaramamma
Venkataramana
L-8
NTH
3
Katcha
SemiPucc
a
22+200
Gudivada
Muttireddy Pichheswarao
hunumantarao
R-7.3
NTH
5
Katcha
Res
22+200
Gudivada
Allu Bullemma
Appalaswamy
R-6.3
NTH
2
Katcha
Res
Com
145
22+200
146
22+200
147
22+200
148
22+125
Gudivada
Gudivada
Gudivada
Atmakuri Nagaprasad
hunumantarao
L-7.5
NTH
4
SemiPucc
a
malireddy Srinivasarao
Suribabu
R-7.3
NTH
4
Katcha
Com
Person Not
Available
R-6.3
NTH
5
Katcha
Res
Satyanarayana
R-5.3
NTH
4
Katcha
Res
Gudivada
Gudivada
Com
muttireddy Srinivasarao
Ramabalapala
Durgaprasad
149
22+200
Gudivada
Arji Applanarasamma
Laxmayya(late0
R-7.3
NTH
2
Katcha
Res
150
22+200
Gudivada
Kagitha Gangadhararao
narasimharao
R-8.1
NTH
4
Katcha
Res
151
22+200
Gudivada
matireddy Suribabu
hunumantarao
L-7.5
NTH
5
Katcha
Res
22+200
Gudivada
Nekipeti Chinayya
Janayya
R-8
NTH
2
Katcha
Res
22+200
Gudivada
Dokku Durgarao
Subbarao
R-8
NTH
4
Katcha
Res
154
22+200
Gudivada
Doddi Ramu
Paidayya
R-7.8
NTH
0
Katcha
Res
Gudivada
155
22+200
Vinshuntumurthula.
Simhachalam
Srinivasarao
R-7.8
NTH
0
Katcha
Res
Erupuganti
Umamaheswarrao
Sitarama
Brahmam
L-8
TH
0
Semi
Com
152
153
156
Gudlavaller
u-2
Gudivada
22+760
157
22+780
Gudivada
Alajangi Lingamurthy
Sambayya
R-9
NTH
0
Kiosk
kiosk
158
23+000
Gudivada
Ch.Krishana
Musalayya
R-8
NTH
4
Kiosk
kiosk
159
23+000
Gudivada
Miriyala veranjeneyulu
Veravenkayya
R-8
NTH
6
Kiosk
kiosk
23+030
Gudivada
Mukkudi Rajasekhar
Setti narayana
R-6
NTH
2
Kiosk
kiosk
23+220
Gudivada
kaja pandu
Gangayya
R-7
NTH
5
Kiosk
kiosk
160
161
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
Page 40
Pedana-Nuzvid-Visannapeta
Andhra Pradesh Road Sector Project
Gudivada
162
23+220
163
23+790
164
23+990
165
23+995
Gudivada
katuri Arjunrao
Person Not
Available
R-7
NTH
4
Kiosk
kiosk
Jupudi Krishana
mohanarao
Person Not
Available
R-6
TH
2
Pucca
Res
Mutthireddy Sekhar
Nagamalleswarar
ao
L-6
NTH
4
Kiosk
kiosk
Nara janardhanarao
Sobanadri
L-6
TH
0
SemiPucc
a
Com
Gudivada
Gudivada
166
23+800
167
23+800
168
23+800
169
23+810
170
23+950
171
23+980
172
24+000
173
24+000
174
24+000
175
24+000
Gudivada
Gudivada
Gudivada
Gudivada
Paruchuri Tripurantharao
R-5.6
TH
4
Pucca
Res
vallabhapurapu Eswararao
Ramachandarara
o
R-4.6
TH
5
Pucca
Sonti Amareswari
Venkanna
R-5.2
NTH
4
Pucca
MD.Muzeeurrab
Abdhullah
R-6.2
TH
5
Pucca
Res
Res&Co
m
Res&Co
m
A.A.Seshacharyulu
Person Not
Available
L-7.3
NTH
0
Pucca
Res
Kunchapati
Venkateswwarao
Pandurangarao
R-4.6
TH
3
K.Kameswaramma
KVKrishanarao
R-5.7
TH
4
Pucca
SemiPucc
a
Res
Res&Co
m
V.Narasimharao
Person Not
Available
R-4.8
TH
1
Pucca
Res
Polavarapu Rajeswarao
Person Not
Available
R-5.5
TH
1
Pucca
Res
Gudlavalleti
Venkateswarao
Gangajalam
R-4.5
TH
4
SemiPucc
a
Res
Res
Gudivada
Gudivada
Gudivada
Gudivada
Gudivada
Gudivada
Bulla Ravibabu
Koteswararao
L-6.8
TH
5
SemiPucc
a
S.Venkanna
Person Not
Available
R-6.3
NTH
1
Pucca
Res
&Com
v.laxmiPrasadarao
Person Not
Available
L-7.2
NTH
0
Kiosk
Kiosk
Vadladi Jagadish
Dhulupudi
Nagamalleswar
Subbarao
R-7.3
NTH
4
Kiosk
Kiosk
Venkataramana
R-7.3
NTH
2
kiosk
Kiosk
Gudivada
Kodali Madhu
Venkataratnam
L-6.7
NTH
5
Kiosk
kiosk
Gudivada
Veeramasineni
Jaganmohanrao
Person Not
Available
L-9.5
TH
3
SemiPucc
a
com
27+850
Gudivada
Merugumalla Srinivasarao
Bheemarao
R-8.8
NTH
4
Katcha
Kiosk
27+860
Gudivada
Rajulapati Srinivasarao
Merugumalla
Durgamaheswararao
Subbarao
L-6.75
NTH
5
Katcha
com
Venkataratnam
L-6.75
NTH
4
com
Lingam Venkataratnam
Merugamalla Visweswara
Rao
Nagabhushanam
L-8.85
NTH
3
Katcha
SemiPucc
a
L-7.5
TH
2
L-8.5
TH
4
Katcha
SemiPucc
a
Res
Kaja Jhansi Laxmi
Nageswarao
Mallikarjuna
(Late)
Jonnalagadda Tirupathirao
Venkataramaiah
L-8.5
TH
6
Katcha
Res
176
24+050
177
23+834
178
23+860
Gudivada
Gudivada
Gudivada
179
Angalur
27+820
180
27+820
181
27+830
182
27+840
183
184
185
27+875
186
27+880
187
27+900
188
27+900
189
28+010
Gudivada
Gudivada
Gudivada
Gudivada
Gudivada
Gudivada
Gudivada
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
Page 41
Res
Res
Pedana-Nuzvid-Visannapeta
28+010
Gudivada
31+100
Gudivada
192
31+100
193
190
Andhra Pradesh Road Sector Project
Venketeswararao
R-9.5
TH
1
Katcha
Venkata swamy
R-7
NTH
4
Gudivada
Jonnalagadda Chittamma
Gutta jagadesh
chandrachowdary
Gutta Venuprasad
Chowdary
Venkata swamy
R-7
NTH
4
Katcha
Semipucc
a
31+150
Gudivada
Gutta krishana
narayana
R-5.5
TH
2
Pucca
Res
194
31+200
Gudivada
Cheboiena Umadevi
Venkateswararao
R-8
NTH
2
kiosk
kiosk
195
31+430
Gudivada
Rangula Raju
Tadayya
R-8.5
NTH
4
kiosk
kiosk
196
31+550
Gudivada
Penumarthi Srinu
nagendrudu
L-5.6
NTH
4
Katcha
Res
197
31+600
Gudivada
Pallakattu veeraragavulu
venkatasubbayya
L-5.6
NTH
4
Katcha
Com
198
31+600
Gudivada
Late)Harinadh
R-8.8
NTH
3
Kiosk
Kiosk
199
31+610
Gudivada
Sonti Dhanalaxmi
Chilakabatthina
Chinakoteswararao
padalalu
L-7.3
NTH
3
Kiosk
Kiosk
200
31+620
Gudivada
Chilakabatthula nagaraju
Sreeramulu
L-6.1
NTH
4
Kiosk
Kiosk
201
31+620
Gudivada
Talaie Satyanarayana
Venkateswararo
R-7.2
NTH
4
Katcha
202
31+620
Gudivada
Uyyapatti koteswararo
Duravasulu
R-9
NTH
6
Katcha
Res
Cattleshe
d
203
31+700
Gudivada
Madda Sorojini
Subhakararao
L-8.5
NTH
4
Katcha
Res
204
31+710
Gudivada
Lankapalli Raju
Musalayya
L-7.8
NTH
5
Katcha
Res
205
31+710
Gudivada
Madda Mosayya
Bhushanam
L-8.1
NTH
2
Katcha
Res
206
31+790
Gudivada
Saradala Nagaraju
Brahmayya
L-6.5
NTH
0
Katcha
Res
207
31+790
Gudivada
Mocherla mamatha
Srinu
R-4.5
NTH
4
Katcha
Res
208
31+790
Gudivada
Vara samual
Mosa
R-5.2
NTH
0
Katcha
Res
209
31+790
Gudivada
Ganta Israyulu
peddiraju
L-5.9
TH
2
Katcha
Res
210
31+800
Gudivada
Akunoori Yesobu
Eliya
R-5.1
NTH
3
Katcha
Res
211
31+800
Gudivada
Chebrolu Ramarao
Ramayya
L-5.7
NTH
2
Katcha
Res
212
31+800
Gudivada
Sura Apparao
Tatabbie
L-5.8
NTH
3
Katcha
Res
213
31+815
Gudivada
Kandavalli Edukondalu
Adishesu
L-6.6
NTH
5
Katcha
Res
214
31+820
Gudivada
Usalla Devakanya
Krishana
L-6.8
NTH
3
Katcha
Res
215
31+840
Gudivada
Varigani Devamatha
Adama
L-4.6
NTH
2
Katcha
Res
216
31+600
Gudivada
Bura Srininvasarao
L-5.1
NTH
5
Katcha
Res
37+220
Gudivada
Ramanapudi Suresh
l-8
NTH
5
Kiosk
Kiosk
37+400
Gudivada
Painapurla Pothuraju
Dasu(samual)
Venkateshswarar
ao
Anantharamurth
y
l-8.5
NTH
4
Katcha
Com
39+400
Gudivada
Godavalli Sambasivarao
Parasuramayya
L-5
NTH
2
Kiosk
Kiosk
220
40+800
Gudivada
Kandepalli Saritha
Kiranreddy
L-7.3
NTH
0
Pucca
221
40+800
Gudivada
NTH
0
Katcha
40+800
Gudivada
Sattemma
Ramakridhanare
ddy
L-7.2
222
Devireddy Radharani
Vangapati
Nageswaramma
Res
Res&Co
m
R-8.2
NTH
0
Katcha
Res
223
40+800
Gudivada
Manda Srinu
Kasimreddy
L-6.6
NTH
4
Semi
Com
224
40+810
Gudivada
Savireddy
R-8.2
NTH
0
Katcha
Res
225
40+810
Gudivada
Alla Sundaramma
Kandavalli
Ramakrishanareddy
Venkareddy
L-8
TH
6
Pucca
226
40+820
Gudivada
Kondapalli Ravi
Akiripalli
R-7
NTH
4
Katcha
Res
Cattleshe
d
227
40+820
Gudivada
Pullareddy Rangareddy
Person Not
Available
L-6
TH
0
Pucca
res
191
217
Bommuluru
Gudiwada-1
218
219
Janardhana
puram
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
Page 42
Res
Cattleshe
d
Res
Pedana-Nuzvid-Visannapeta
Andhra Pradesh Road Sector Project
228
40+840
Gudivada
NVS Nagireddy
Rammohnareddy
L-6.5
TH
0
Pucca
res
229
40+840
Gudivada
Konapalli narayanareddy
Narayanaereddy
L-6.5
TH
2
Pucca
res
230
40+880
Gudivada
Marikayalareddy
L-9.5
NTH
0
Kiosk
Kiosk
231
40+890
Gudivada
Chinna
L-8.2
NTH
0
Kiosk
Kiosk
232
41+000
Gudivada
Tammi Narapureddy
Bommanapalli
Venkataswamy
kokkerapati
Subbaramayya
krishana
L-9.5
NTH
0
Kiosk
Kiosk
233
41+080
Gudivada
Annem koteswararao
iyyanna
R-6
NTH
5
Kiosk
Kiosk
234
41+080
Gudivada
Venkdaru mallikarjunarao
Ramarao
R-9
TH
5
Semi
Com
235
41+080
Gudivada
Swarna Vani
Ramakrishana
L-9
TH
3
Semi
Com
236
41+080
Gudivada
Gantala krishanarao
Person Not
Available
L-9
TH
5
Semi
Com
237
41+080
Gudivada
Karamsetty Koteswararao
Subbarao
L-9
TH
4
Semi
Com
238
41+080
Gudivada
Karamsetty jagadeesh
Subbarao
L-9
TH
2
Semi
Com
239
41+080
Gudivada
Ponnati Babji
Person Not
Available
L-9
TH
6
Semi
Com
240
41+100
Gudivada
Galla Dhanalaxmi
Narasimharao
L-9
NTH
2
Semi
Com
241
41+100
Gudivada
Puttalamm Ammavari
Shoping complex
Person Not
Available
R-6.3
NTH
0
Pucca
Com
242
41+100
Gudivada
Pavisa Rammohanarao
Venkatanarayana
L-6.9
NTH
2
Kiosk
Kiosk
243
41+100
Gudivada
Manepalli subbarao
Adinarayana
R-6
NTH
2
Kiosk
Kiosk
244
41+110
Gudivada
Muddula Gopalakrishana
Ramanjaneyulu
R-6.5
NTH
4
Kiosk
Kiosk
245
41+125
Gudivada
Veruvada
NarayanaNagabhusanam
Venkateshawarar
ao
L-6
NTH
4
246
41+150
Gudivada
Manepalli Subramanyam
Adinarayana
L-6
NTH
6
Katcha
semiPucc
a
res
Res&Co
m
247
41+150
Gudivada
Vempala Venkatalaxmi
Person Not
Available
L-5
NTH
0
Kiosk
Kiosk
248
41+150
Gudivada
C.Vijaya
Person Not
Available
R-7
NTH
0
Kiosk
Kiosk
249
41+150
Gudivada
Vanapalli Adilaxmi
Laxmanarao
L-6.5
NTH
2
Res
250
41+150
Gudivada
Saripalli Rameshreddy
L-5.9
TH
3
251
41+155
Gudivada
S.Venkatasitaramayya
Rangareddy
Amba
lakshmaiah
Katcha
semiPucc
a
L-6.8
NTH
0
Kiosk
Kiosk
252
41+160
Gudivada
Malleboiena pitchayy
Narasimha
R-8.9
NTH
4
Katcha
Res
253
41+170
Gudivada
Malliboiena Anjeneyulu
Chinaramulu
R-7.8
NTH
5
Res
254
41+170
Gudivada
Girijala Rammurthy
Apparao
R-7.2
NTH
0
Katcha
SemiPucc
a
255
41+200
Gudivada
Malliboiena Devakamma
Pandu
L-7.5
NTH
2
Katcha
Res
256
41+200
Gudivada
Awalomdhar Ajibabau
Hoozoor
L-7
NTH
2
Kiosk
Kiosk
257
41+210
Gudivada
Mekala laxmi
kanakapothuraju
L-8
NTH
3
Kiosk
Kiosk
258
41+220
Gudivada
Badam Venkatanarayana
Ragavayya
L-7
NTH
3
Com
259
41+230
Gudivada
Alugolu Rangachari
Ramamurthy
L-8
NTH
5
Katcha
semiPucc
a
260
41+240
Gudivada
Tallaparthi Ramarao
Appalasuri
R-7.1
NTH
3
Katcha
Res
261
41+240
Gudivada
malliboiena Lingayya
Chinaramulu
R-7.2
NTH
4
Katcha
Res
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
Page 43
Res
Com
Com
Pedana-Nuzvid-Visannapeta
Andhra Pradesh Road Sector Project
262
41+240
Gudivada
Nakka Narasimharao
Mahalaxmayya
L-6.8
NTH
0
Katcha
Res
263
41+245
Gudivada
laveti Durgarao
Venkateswararao
R-6.5
NTH
2
Res
264
41+310
Gudivada
Suroju Nageswararao
Laxmayya
L-9
NTH
6
Katcha
semiPucc
a
265
41+400
Gudivada
Chegandi Kanakamma
Krishanamurthy
L-7.2
NTH
2
Katcha
266
41+400
Gudivada
Subbarao
L-7
NTH
4
Katcha
267
41+400
Gudivada
Pilli Srinivasaarao
Devarapalli
Satyanarayana
Res
Cattleshe
d
Nomulu
L-6.1
NTH
3
Katcha
Res
268
41+450
Gudivada
Vanam Venkateseararao
Durgamma
R-6.8
NTH
3
Katcha
Res
269
41+460
Gudivada
Katari Kotayya
Anjeneyulu
R-6.1
NTH
4
Katcha
Res
270
41+500
Gudivada
pattumuri Satyanarayana
Krishana
L-7.2
NTH
4
Kiosk
Kiosk
271
41+500
Gudivada
Gurram Nagaraju
Sriramulu
R-7.8
NTH
2
Katcha
Res
272
41+515
Gudivada
Nanganama bujjibabu
Chitayya
R-8.3
TH
4
Katcha
Res
273
41+515
Gudivada
Ekba Peddirajulu
Ramayya
L-6.4
NTH
0
Katcha
Res
274
41+550
Gudivada
Nagaram Laxmana
Krishanamurthy
R-7.5
NTH
0
Katcha
Res
275
41+550
Gudivada
Kadekollu Nagaraju
Nallayya
L-5.6
TH
4
Katcha
Res
276
41+550
Gudivada
Jalasuthram Rangamma
Baskararao
L-6.2
NTH
2
Katcha
Res
277
41+550
Gudivada
Ambaru
R-7.5
NTH
3
Katcha
Res
278
41+550
Gudivada
Gurram Srinu
Kadavakollu
tungabadrayya
Nallayya
R-7.3
NTH
7
Katcha
Res
279
41+565
Gudivada
Nakka Puttalamma
Late) Bodayya
L-6.4
TH
4
Katcha
Res
280
41+600
Gudivada
Kotaru Nagaraju
Sitayya
L-6.8
NTH
0
Katcha
Res
281
41+600
Gudivada
Nakka Venkateswararao
Gopalam
R-7.5
NTH
2
Katcha
Res
282
41+600
Gudivada
Ebba Srinivasu
Ramayya
R-7.2
NTH
4
Katcha
Res
283
41+600
Gudivada
Kataru Adinarayana
Anjeneyulu
R-7.4
NTH
10
Katcha
Res
284
41+620
Gudivada
Katari Suramma
Srinu
R-7.8
NTH
4
Katcha
Res
285
41+620
Gudivada
Kataru Demuduvenkanna
Badraju
R-7.5
NTH
6
Katcha
Res
286
41+555
Gudivada
Incha Narashima Rao
Ramaiah
R-7.5
TH
0
Katcha
Res
287
41+650
Gudivada
Narapareddy
Person Not
Available
R-8
NTH
3
Katcha
Cattleshe
d
288
41+650
Gudivada
Person Not
Available
R-8
NTH
4
Katcha
Cattleshe
d
289
41+770
Gudivada
Rajarao
Nagalam
Venkateswararao
Krishanamurthy
R-6.2
NTH
5
Katcha
Res
290
41+770
Gudivada
Srinu
R-6.8
NTH
4
Katcha
Res
291
41+770
Gudivada
Kagga Padma
Nangalam
Venkatarammayya
Krishanamurthy
R-6.8
NTH
3
Katcha
Res
292
Puttagunta
res
45+200
Gudivada
Ranchari Laxmi
Nageswararao
L-6.6
NTH
0
Katcha
Res
293
45+600
Gudivada
Vinjavarapu Appalachari
Bhrahmam
R-5.5
TH
2
Pucca
res
294
45+630
Gudivada
Pamulapati Ramireddy
Person Not
Available
R-5.8
TH
2
Res
295
45+650
Gudivada
Valiveti Purna
Subbarao
R-6.5
NTH
0
Pucca
Semipucc
a
296
45+650
Gudivada
Vankayalapati Murali
Person Not
Available
R-7
TH
0
Pucca
res
297
45+650
Gudivada
Ravulapati Mangireddy
Tatireddy
L-7.2
NTH
0
Katcha
Res
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
Page 44
Res
Pedana-Nuzvid-Visannapeta
Andhra Pradesh Road Sector Project
298
45+700
Gudivada
Barapureddy
Satyanarayana
Dalayya
L-6.8
NTH
0
299
45+720
Gudivada
Sammangi Ramarao
Appalaswamy
R-6
NTH
0
300
45+800
Gudivada
Valiveti Satyanarayana
Jayaharinadh
L-6.2
TH
2
301
45+800
Gudivada
Oleti Satyavathi
Apparao
R-7
NTH
0
302
45+800
Gudivada
maddala Venkateswararo
Person Not
Available
L-8
NTH
0
303
45+800
Gudivada
Pokuri Balakrishanarao
Perisetty
L-7.5
NTH
304
45+800
Gudivada
Visnepalli Sitaravamma
Yesudas
R-8
305
45+810
Gudivada
Valiveti Seshagirirao
Jayaharinadh
306
45+820
Gudivada
Pakuri Laxmanarao
307
46+180
Gudivada
308
46+200
309
Katcha
Semipucc
a
Katcha
Semipucc
a
Res
Com
Res&Co
m
Com
Kiosk
2
Kiosk
Semipucc
a
NTH
0
Kiosk
L-6.9
TH
5
Katcha
Kiosk
Res&Co
m
Perisetty
L-8
NTH
3
Pucca
Res
Sarasamma
Person Not
Available
R-8
NTH
0
Katcha
Res
Gudivada
Juturi Durgarao
Srinivasarao
R-9
NTH
4
Katcha
res
46+220
Gudivada
Rajasani mutyalu
Sancharao
R-9
NTH
2
Katcha
res
310
46+240
Gudivada
Ramakuri Ragavulu
parasaram
R-8
NTH
2
Katcha
res
311
46+400
Gudivada
Kollu Someswararao
Mallikarjunarao
L-6.7
NTH
0
Katcha
Res
46+400
Gudivada
Mukkala Yesuamma
Yesu
R-7
NTH
1
res
48+700
Gudivada
Suvari Narasimhamurthy
Ramachandrarao
R-6.2
NTH
0
Katcha
SemiPucc
a
48+700
Gudivada
Thota Chinayya
Ramachandrarao
R-6.7
NTH
0
Kiosk
Kiosk
312
313
314
Shivayyapak
alu
Shivayyapak
alu
Com
Com
2
HouseHold
Father\husband
name
Arugolanu
50+500
50+520
Nuzvid
Nuzvid
Thota Venkataramana
Anjayya(Late)
R-7.2
koturi Srinivasarao
Kanakarao`
L-8.8
3
50+600
Nuzvid
Reddysobhana chalapathirao
Atchiyya
L-7.8
4
50+610
Nuzvid
Betha Rangamma
Rangarao
R-8.2
5
50+630
Nuzvid
Kunuku Sivashankararao
Mohanarao
L-8.5
6
50+650
Nuzvid
Chukkapu Nageswararo
L-5.8
7
50+700
Nuzvid
Veeram Samrajayyam
Atchiyya
Venkateswararao(lat
e)
8
50+720
Nuzvid
Chekati Chnnabbie
Late)Chettemma
R-8.5
9
50+740
Nuzvid
V.Kesavarao
Varalaxmi
R-6.2
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
L-8.6
No of Family Members
Name of the
Head(HHH)
Chanage
Sl.No
1
Division
Title
holder(TH)/NonTitleHold
er(NTH)
Name of the
Village
Location (Left\ Right)
Nuzvid Division Project Affected Famalies(PAF'S) of PEDNA - NUZVID -VISANNAPETA Road.
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
Type of
Structure
Nature of
Structure
Res &Com
6
Katcha
5
Katcha
2
Kiosk
Kiosk
1
Katcha
Com
4
Katcha
Com
4
Com
1
Katcha
Semipucc
a
Semipacc
a
3
Kiosk
Kiosk
1
Page 45
Res &Com
Res
Res
Pedana-Nuzvid-Visannapeta
Andhra Pradesh Road Sector Project
7
Semipucc
a
Res
TH
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
4
Pucca
Semipucc
a
5
Katcha
Com
Katcha
Com
2
Katcha
Com
6
Katcha
Semipucc
a
Res &Com
Com
7
Katcha
Semipacc
a
Semipucc
a
3
Katcha
Res
6
Katcha
Com
Katcha
Com
Katcha
Res & Com
Com
TH
NT
H
2
Katcha
Semipucc
a
Semipucc
a
Res &Com
TH
NT
H
NT
H
NT
H
2
Katcha
Semipucc
a
Semipacc
a
Semipucc
a
Kiosk
Kiosk
10
50+740
Nuzvid
Dogga Chinabbaie
Rangayya(Late)
R-8.6
TH
11
50+750
Nuzvid
Chekka Chandrayya
Bapujirao
R-8
TH
12
50+760
Nuzvid
Nadendla Chandram
R-7.5
13
50+780
Nuzvid
Veeram Nageswararo
Venkataratnam(late)
Venkateswararao(lat
e)
14
50+790
Nuzvid
Gottapu Sivanagamani
Apparao
R-6.5
15
50+810
Nuzvid
Balagam Satyanarayana
Papa
R-7.2
16
50+810
Nuzvid
Nalla Sivanagaraju
krishana`
R-9
17
50+820
Nuzvid
Kunuku Sivashankararao
Mohanarao
L-7.8
18
50+820
Nuzvid
Dokala Apparao
Appalaswamy
L-8.3
19
50+820
Nuzvid
Gottapu Simhachalam
Paprao
R-7.5
20
50+830
Nuzvid
Punuku Sitamahalaxmi
koteswararao
L-8.5
21
50+840
Nuzvid
Belagam Srinivasarao
Sitaramayya
L-8.5
22
50+850
Nuzvid
Terli Venkateswararao
Pentayya(late)
L-8.5
23
50+850
Nuzvid
Gottapu Kormaiah
Paprao
R-7.3
24
50+900
Nuzvid
Cheera Anilkumar swamy
Shankararao
R-7.3
25
50+900
Nuzvid
Arisimilli Prasad
Venkateswarao
R-8
26
51+000
Nuzvid
Sk Kareemulla
Murella(late)
L-8
27
51+000
Nuzvid
Pasupuleti Subbarao
Nagayya
L-8
28
51+010
Nuzvid
Shaik Bharani
meerasaheb
L-8
29
51+050
Nuzvid
Poteneni lalithakumari
Sambasivarao
R-7
30
51+110
Nuzvid
Devarakonda Subbarao
Pitchayya
L-9
31
51+120
Nuzvid
Teku nagaraju
Dharmarao
L-8
32
51+150
Nuzvid
Vadavalli Sivabully challyya
Manikyarao
L-6.5
33
51+150
Nuzvid
Pamarthi Sudharani
Sivaramaprasad(late)
L-7.8
34
51+180
Nuzvid
Naraharasetty Somayya
Laxmeswari(late)
L-7.2
35
51+180
Nuzvid
katuri Venkatarao
H/0 babysorojini
L-8.8
36
51+180
Nuzvid
Katuri Sivanageswararao
Venkateswararao
L-9
37
51+180
Nuzvid
Visaie Parvathi
Durgarao(Late)
L-8
38
51+180
Nuzvid
Geddala Sugunarao
Subbarao
L-9
39
51+200
Nuzvid
Padurthi Venkatasubbayya
Chenyyasetti
R-8.3
40
51+200
Nuzvid
Padurthi Chenyyasetti
Satyanarayana
R-8.3
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
L6.2
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
4
2
2
9
1
4
3
1
2
3
Semipucc
a
Semipacc
a
Semipacc
a
Semipucc
a
Semipacc
a
Res &Com
Res &Com
Com
Res & Com
Res &Com
Com
Com
Res
Com
Res
Res
Res
Res & Com
Res & Com
Res & Com
Katcha
Res
Katcha
Res
Katcha
Res
Page 46
Pedana-Nuzvid-Visannapeta
Andhra Pradesh Road Sector Project
R-8.2
NT
H
NT
H
Applaswamy(late)
R-7
TH
7
Poteneni Sivaramaprasad
Nagabhusan
R8.3
2
Nuzvid
Mulipudi Venkateswararao
Sesayya
L-8.5
4
Katcha
Com
51+400
Nuzvid
Batula venkateswararao
2
Katcha
Res
47
51+400
Nuzvid
Mulupudi Butciyyachowdari
Ramayya(late)
R-7.8
Katcha
Com
48
53+650
Nuzvid
Varri Chakravarthi
Rajarao
R-8
4
Katcha
Res&Com
49
53+650
Nuzvid
Varri Chakravarthi
Rajarao
R-8
5
Katcha
Cattele shed
55+410
Nuzvid
Ramalle Chinna
DaVid
R-5
2
Katcha
Com
51
55+420
Nuzvid
Bethapudi Pramila
Villasambabu
R-4.5
2
Katcha
Com
52
55+420
Nuzvid
Katumalla Kishorebabu
Bisuff
R-5.3
4
Katcha
Res
53
55+430
Nuzvid
Dodda Koteswrarao
Ratnam
L-6
6
Katcha
Cattleshed
54
55+640
Nuzvid
Shaik Mohhidin
Meerasaheb
R-8.5
2
Katcha
Res & Com
55
55+645
Nuzvid
Chintapalli Prasannakumari
Prabhakar(late)
R-8
3
Kiosk
Kiosk
56
55+650
Nuzvid
Darmavarapu Sambhasivarao
Ramudu
L-8
2
55+655
Nuzvid
Nerella sarveswarao
Narayana
R-7
Katcha
Semipucc
a
Res
57
58
55+670
Nuzvid
Chinnam Siyyaon
Somayya
R-7
55+670
Nuzvid
Turak Esobu
Karunavaraprasad
L-8.3
60
55+670
Nuzvid
Kandhula Kesavarao
Venkateswararao
R-8.6
TH
3
Kiosk
Semipucc
a
Semipucc
a
Kiosk
59
TH
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
Katcha
Semipucc
a
61
55+680
Nuzvid
Kandula veeravenkatanagaprasad
Chinavenkateswarao
L-6.2
3
55+700
Nuzvid
Gopalarao
OLD BUILDING
L-6.2
Pucca
Semipucc
a
Res
62
63
55+740
Nuzvid
kattumala Adrutstarao
Imannual
R-5.5
1
Kiosk
Kiosk
64
55+780
Nuzvid
Narikimalli Seshachalam
Suryanarayana
L-5.5
TH
NT
H
NT
H
NT
H
4
Katcha
Res
65
55+780
Nuzvid
Karamsetti sikshamani
Denoji
R-8.8
1
Katcha
Res
66
55+790
Nuzvid
Polimetta vijayaratna kumari
Chinni(late)
R-8.5
2
55+795
Nuzvid
Kurupati parisuddam
Gonnaprakash
R-6.2
68
55+800
Nuzvid
Bejwada Nageswararao
Hanumantharao
L-6.3
69
55+800
Nuzvid
Matta Narayanarao
Venkataswamy
L-6.3
Pucca
Semipucc
a
Semipucc
a
Semipucc
a
Res
67
TH
NT
H
NT
H
NT
H
NT
H
70
55+810
Nuzvid
Chamarthi Subbarajamma
Vekateswararao(late)
L-7.3
71
55+810
Nuzvid
Pilli Edukondalu
Srinivasarao
L-7.3
72
55+820
Nuzvid
Chalamarasetty Suryaprakasarao
Ramayya
L-6
41
51+200
Nuzvid
Pedarthi Venkateswararao
42
51+200
Nuzvid
Chippada Papayamma
43
51+250
Nuzvid
Singanapalli Venkateswararao
44
51+250
Nuzvid
45
51+370
46
50
Kanumolu
chanchayya
R-8.3
6.8
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
NT
H
NT
H
NT
H
1
1
1
5
2
1
4
3
Katcha
Semipacc
a
Res & Com
Res
Semipucc
a
Semipucc
a
Pucca
Page 47
Res & Com
Res &com
Res
Res
Res
Res
Res
Com
Com
Res
Com
Res
Pedana-Nuzvid-Visannapeta
Andhra Pradesh Road Sector Project
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
73
55+820
Nuzvid
Chamarthi venkatanarasimharao
Viswanadham
R-6.2
74
55+820
Nuzvid
Chamarthi Venkateswarao
Viswanadham
R-5.5
75
55+830
Nuzvid
Chamarthi Anjeneyulu
venkatappayya
R-6.2
76
55+860
Nuzvid
Allamuri Murali Krishana
Prasadarao
L-6.2
77
55+870
Nuzvid
Chamarthi Venketeswararao
Rammohanarao
R-5
78
55+870
Nuzvid
Chamarthi Anjeneyulu
Venkatappayya
R-5
79
55+870
Nuzvid
Mareedu Subbarao
Chalapathirao(late)
L-8
80
55+880
Nuzvid
Majjiga Nagraju
Keratalu
L-8
81
55+890
Nuzvid
Garikipati Umamaheswarao
Venkateswararao
L-5.2
82
55+900
Nuzvid
Vanamala Eswararao
Nageswararao
R-6.5
83
55+930
Nuzvid
Vemulapalli Subramanyam
Srivenkataramalinga
charya
R-5.7
84
55+930
Nuzvid
Morla Venkateswramma
Vasantharao
R-5.5
85
55+930
Nuzvid
polasi Pothuraju
Abimanyarao
R-5.5
86
55+940
Nuzvid
Maredu Rambabu
Sobhanachalam
R-5.7
87
55+940
Nuzvid
Suri Satyanarayana
Venkoji
L-6
88
55+950
Nuzvid
Tavva Badrinadh
Krishana murthy
L-7.3
89
55+950
90
55+960
Nuzvid
Bhemavarapu Rangarao
mangayya
R-5
TH
NT
H
91
55+960
Nuzvid
Chintala
Ravivenkatasatyanarayana
Satyavenkataramara
o
R-5.7
92
55+960
Nuzvid
China Srinivasarao
Ramarao
93
55+980
Nuzvid
Reddi Chinalaxmayya
94
55+980
Nuzvid
95
56+980
96
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
2
Pucca
Res&Com
2
Pucca
Res
7
Pucca
Res
4
Pucca
Res&Com
Pucca
Res&Com
Katcha
Semipucc
a
Semipucc
a
Res
Com
4
Pucca
Semipucc
a
1
Semipucc
a
Semipucc
a
7
2
3
2
Com
Res&Com
Com
Res&Com
Res&Com
4
Pucca
Semipucc
a
Semipucc
a
3
Pucca
Com
3
Pucca
Com
3
Pucca
Res&Com
NT
H
4
Pucca
Res&Com
R-5.7
TH
4
Pucca
Com
Chittemma
L-5.7
TH
2
Pucca
Res
Chinta Muralikrishana
Satyavenkataramara
o
R-5.5
Pucca
Com
Nuzvid
Panchakarla Satyanarayana
Venkataramana
R-8
4
Kiosk
Kiosk
56+980
Nuzvid
Lingamallu veravenkata
jaganmohanarao
Venkataratnam
L-5.5
3
Pucca
Res
97
56+980
Nuzvid
Vijayakumar
Bhyragi
R-4.2
56+000
Chinta Apparao
Swamulu
L-5.5
5
99
56+000
Nuzvid
N.V.Ramanarao
ChinaSurayya
R-4
TH
Kiosk
Semipucc
a
Semipucc
a
Kiosk
98
NT
H
NT
H
NT
H
100
56+000
Nuzvid
Nanduri Venkatamma
Krishana
murthy(late)
R-5
TH
101
56+000
Nuzvid
Volusuri Venugopal
L-4.2
102
56+000
Nuzvid
Anisetty Timmaraju
Boogeswararao
L-5
103
56+050
Nuzvid
Gandimeda Venkatasivarao
kottayya(late)
R-8
TH
NT
H
NT
H
104
56+050
Nuzvid
Rellu Subbarao
Ngeswrarao
R-6.2
TH
Dondi Durgarao
L-7
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
NT
H
NT
H
4
Res&Com
4
4
Res&Com
Com
Res
Res
Semipucc
a
Res
5
Pucca
Res&Com
4
Pucca
Res
3
Pucca
Res&Com
7
Pucca
Com
Page 48
Pedana-Nuzvid-Visannapeta
Andhra Pradesh Road Sector Project
105
56+060
Nuzvid
Rellu nageswararao
Bhemayya
R-9
106
56+070
Nuzvid
Vaddi Venkateswararo
Sobhanachalam
L-8
TH
NT
H
107
56+070
Nuzvid
Pulla Nageswarrao
R-9
TH
108
56+070
109
56+200
110
7
Pucca
Res&Com
3
Katcha
Com
Pucca
Res
Kiosk
Semipucc
a
Kiosk
Vanukuri Edukondalu
Satyanarayana(late)
L-10
Nuzvid
Bandili Satyanarayana singh
Subbisingh
L-6
NT
H
NT
H
56+210
Nuzvid
Bayya Ratnagandi
Ranganayakulu
R-8
TH
6
Pucca
Res
111
56+210
Nuzvid
Bayya Ramamohanarao
Ranganayakulu
R-8
TH
4
Pucca
Res
112
56+210
Nuzvid
Sunkara Laxmanarao
Surayya
L-5.5
2
56+300
Nuzvid
Moganti Chandra sekhar
krishanarao
R-6
Pucca
Semipucc
a
Res
113
TH
NT
H
114
56+320
Nuzvid
Chamarthi Anjeneyulu
laxminarayana
R-8
TH
5
Pucca
Res&Com
115
56+340
Nuzvid
Chamarthi Sambasivarao
Venkatakrishanarao
R-9
TH
5
Pucca
Res
116
56+340
Nuzvid
Chamathi mallikarjunarao
Venkatakrishanarao
R-9
TH
Semipucc
a
Res&Com
117
56+340
Nuzvid
Chintapalli Umameheaswararao
Venkatakanadurgara
o
L-7.5
NT
H
4
118
56+350
Nuzvid
Naraharasetty Venkateswraro
Venkataratnam
R-7
TH
2
119
56+350
Nuzvid
Venkataratnam
R-7
TH
4
120
56+350
Nuzvid
Naraharasetty Gangadhar
Naraharasetty Venkatasatya
Gangadhar
Venkataratnam
R-7
4
121
56+360
Nuzvid
Sunkara Laxmanarao
Surayya
L-5.5
122
56+370
Nuzvid
MD.Salem,Jafarali,Halem Bro's
(Reg.off)
R-7.5
TH
NT
H
NT
H
123
56+390
Nuzvid
Naraharasetty Prabhavathi
Venkataratnam
R-7
TH
2
124
56+390
Nuzvid
Naraharasetty Gangadhar
Venkataratnam
R-9
125
56+450
Nuzvid
Badicherla Narasimharao
Koteswararo
R-7.5
126
56+450
Nuzvid
Badicherla Narasimharao
Koteswararo
R-7.5
127
56+460
Nuzvid
Chintapalli Durgarao
Venkateswarao
R-9
TH
NT
H
NT
H
NT
H
56+950
Nuzvid
Annala Bujji
D/0.Krishana
L-8.8
TH
2
129
56+975
Nuzvid
Venkatakonda Gandhi
Koteswararo
L-6.8
TH
3
130
56+980
Nuzvid
Kamella Satyanarayana
Ragavayya
L-7.8
7
131
57+300
Nuzvid
Singireddy Narakumari
Chennakesavarao
L-7
132
57+300
Nuzvid
Vegireddy Apparao
Applaswamy
R-8.7
133
57+300
Nuzvid
Vegireddy Gandhi
Applaswamy
R-8.7
134
57+300
Nuzvid
Vegireddy Suryanarayana
Applaswamy
R-8.7
135
57+300
Nuzvid
Vegireddy Paparao
Applaswamy
R-8.7
136
57+300
Nuzvid
Vegireddy Apparao
Applaswamy
R-8.7
137
57+300
Nuzvid
Vegireddy Paparao
Applaswamy
R-8.7
TH
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
128
Perikeedu
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
Res&Com
Res
Katcha
Semipucc
a
Semipucc
a
Semipucc
a
Com
Com
4
Katcha
Semipucc
a
Semipucc
a
Semipucc
a
6
Katcha
Res
6
Cattleshed
4
Katcha
Semipucc
a
Semipucc
a
Semipucc
a
Semipucc
a
Semipucc
a
7
Pucca
Res
8
Pucca
Res
9
Pucca
Res
10
Pucca
Semipucc
a
Semipucc
a
Res
2
3
7
10
Page 49
Res&Com
Res
Res&Com
Com
Res
Com
Res
Res
Res
Res
Res&Com
Com
Com
Pedana-Nuzvid-Visannapeta
Andhra Pradesh Road Sector Project
138
57+310
Nuzvid
Sammangi Sateshkumar
Nageswararao
L-7
TH
4
139
57+310
Nuzvid
Sammangi Mohanasuresh kumar
Nageswararao
L-7
4
140
57+320
Nuzvid
Gottapu Koteswararao
Paparao
L-7
141
57+320
Nuzvid
Bandaru Swetha satyanarayana
Krishanarao
L-7
142
57+350
Nuzvid
Maradani Sivanagaraju
Tatayya
L-7
143
57+350
Nuzvid
Vankuri Hunumantharao
Verayya
L-7
144
57+360
Nuzvid
Rajamahendravarapu satyaswathi
Venkateswararaju
L-7
145
57+360
Nuzvid
Allu Trimurtulu
Narayanarao
L-6.5
146
57+360
Nuzvid
Terli Puspalatha
Venkateswarao
R-8.5
147
57+365
Nuzvid
Suggisetty tulasi
Subbarao
R-8.5
148
57+560
Nuzvid
Tavva Suryaprakasarao
Purnayya
L-7.2
149
57+650
Nuzvid
Lanka Gopalarao
Appalarao
L-6.5
150
57+650
Nuzvid
Kella Apparao
Satyanarayana
R-7.5
151
57+650
Nuzvid
Pabolu SS varaprasad
Nageswararao
L-6.5
152
57+650
Nuzvid
Singarapu Durgarao
Simhachalam
R-7.5
153
57+650
Nuzvid
Bayya Mohanarao
Pitchiyya(late)
L-7
TH
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
154
57+700
Nuzvid
Jalidi Balakrishana
Raeddiyya
R-6.5
155
57+700
Nuzvid
Botcha.Krishanarao
Venkayya
R-7
156
57+720
Nuzvid
Chintapenta krishanarao
Seshagirirao
R-8
157
57+720
Nuzvid
Valiveti Anil(Naveen)
158
58+150
Nuzvid
Akkubolu Koteswararao
krishanamurthy
R-7.5
159
58+400
Nuzvid
Nagulapalli Edukondalu
Nageswararao
R-7
160
58+500
Nuzvid
Maddila Ganga
Venkateswarao
R-7
161
58+550
Nuzvid
Battu Manikyalarao
Baskararao
R-7
162
58+650
Nuzvid
Partipati Agnesamma
Prabakar
L-7
163
58+660
Nuzvid
Partipati Nageswararo
manikayam
R-8
164
58+670
Nuzvid
Gujjala veraswamy(israyulu)
Ramaswamy
L-7
165
58+750
Nuzvid
Partipati Vijaykumar
Balaswamy
R-6.5
166
58+880
Nuzvid
Padmala Venkateswararo
Venkatanarasayya
L-7
58+880
Nuzvid
Padmala Venkateswararo
Venkatanarasayya
L7
64+300
Nuzvid
Pidugu Prasad
Anjeneyulu
R-7
169
64+500
Nuzvid
Nadakudur Muttaiah
Subbarao
L-7
170
64+500
Nuzvid
Nadakudur Chinabrahmam
Subbarao
R-9
171
64+530
Nuzvid
Peddoji Rangachari
Nagachari
L-8
167
168
Marribanda
m
R-8.5
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
TH
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
Semipucc
a
Res
3
Semipucc
a
Semipucc
a
5
Katcha
Res
3
Katcha
Res
Kiosk
Kiosk
Katcha
Semipucc
a
Res
Com
5
Katcha
Semipucc
a
6
Katcha
Cattleshed
Katcha
Com
Katcha
Semipucc
a
Com
Kiosk
Kiosk
Res
2
Pucca
Semipucc
a
Semipucc
a
Semipucc
a
Semipucc
a
Semipucc
a
13
Katcha
Com
4
Com
9
Katcha
Semipucc
a
Semipucc
a
3
Katcha
Res
3
Katcha
Res
8
Katcha
Com
5
Katcha
Res
6
Katcha
Cattleshed
4
Katcha
Com
3
Katcha
Com
6
Katcha
Com
4
Katcha
Com
4
5
6
4
7
4
3
3
Page 50
Res
Res&Com
Res&Com
Com
Com
Res
Com
Com
Res
Com
Com
Com
Pedana-Nuzvid-Visannapeta
Andhra Pradesh Road Sector Project
172
64+500
Nuzvid
Shaik Babji
Mabu
L-6.7
173
64+600
Nuzvid
Kowkuri Soroja
rimannarayana
R-9
NT
H
NT
H
174
64+680
Nuzvid
Chandrakala
Person Not
Available
R-9
NT
H
175
64+680
Nuzvid
Sk Baji
Person Not
Available
L-8
176
64+700
Nuzvid
Rayavarapu Swami
Rangarao
L-6.4
177
64+720
Nuzvid
Aladangi Ugadi
Chinnarao
L-6
178
64+745
Nuzvid
Vaddadi Trinadh
Appalaswamy
L-7
179
64+780
Nuzvid
Rayavarapu Subbarao
Person Not
Available
L-7
180
64+800
Nuzvid
Vajja Someswararo
Subbarao
R-8.2
181
64+800
Nuzvid
Chirugudu Nagaraju
Appalaswamy
L-6.5
182
64+810
Nuzvid
Ponikanti Ramarao
Ragavayya
R-8
183
64+810
Nuzvid
Machavarapu Tirupatayya
Ramdhar
L-6
184
65+100
Nuzvid
Podhuri Srinu
Rattayya
R-7
185
65+550
Nuzvid
Kanikanti Prasad
Nagabhusan
R-8
186
65+800
Nuzvid
Potakamuri Rajababu
Gandhi
L-7
187
65+850
Nuzvid
Vadduluri Venkateswararo
Raghavalu
L-8.1
188
65+850
Nuzvid
Vemuluri Nageswaramma
Satyanarayana
L-8.1
189
65+850
Nuzvid
Jakkula Laxmi
Venkataramana
L-8.1
190
65+850
Nuzvid
Chabathina Ratnasamual
Samual
R-8
191
65+850
Nuzvid
Peddaji Ragavachari
Person Not
Available
R-9
192
65+850
Nuzvid
Palakurthi Ammulu
Putalayya
R-9
193
65+890
Nuzvid
Chinathadu Bhupathi
Varahalu
L-8
65+900
Nuzvid
Kombati Satyanarayana
Gopalam
R-6.8
67+450
Nuzvid
Kota Simhachalam
Krishana
R-7
196
67+460
Nuzvid
Vallepu Parameswararao
Raju
R-7.1
197
67+490
Nuzvid
Merapadu Baskhararao
Maranna
L-6
198
67+500
Nuzvid
Olipi Venkateswarrao
Verayya
R-6.4
199
67+500
Nuzvid
Tegala Chittemma
Verayya
R-6
200
67+510
Nuzvid
Garika Bhagyam
Sambayya
R-6
201
67+520
Nuzvid
Busi Adam
Prabhakararao
R-6
202
67+540
Nuzvid
Mindiya Venkateswararao
Maddiramayya
R-6
203
67+550
Nuzvid
Tegala Guruvulu
Veerayya
R-5.4
194
195
Meerjapura
m
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
10
3
Katcha
Semipucc
a
0
Semipucc
a
Res
0
Semipucc
a
Com
4
Kiosk
Kiosk
4
Kiosk
kiosk
0
Kiosk
kiosk
4
Katcha
Com
8
Katcha
Com
4
Katcha
Com
3
Katcha
Com
2
Kiosk
kiosk
3
Katcha
cattleshed
4
Katcha
Com
Katcha
Com
6
Kiosk
Kiosk
4
Katcha
Kiosk(2sh
ops
Res & Com
Kiosk
kiosk
Semipucc
a
Com
2
Katcha
Res
8
Katcha
Res & Com
Katcha
Com
3
Katcha
Res
6
Katcha
Res
3
Katcha
Com
3
Katcha
Res
3
Katcha
res
2
Katcha
Res
2
Katcha
Res
5
Katcha
Res
6
Katcha
Res
2
Page 51
Com
Com
Kiosk
Pedana-Nuzvid-Visannapeta
Andhra Pradesh Road Sector Project
NT
H
NT
H
NT
H
204
67+550
Nuzvid
Dasari Yesu
Baalaraju
R-5.4
205
67+560
Nuzvid
Gandikota Anjeneyulu
Venkateswararao
R-6.5
206
67+570
Nuzvid
Paramanthi Prabhakararao
Sriramamurthy
L-8
207
67+620
Nuzvid
Badipati Isak
Person Not
Available
L-6.2
208
67+620
Nuzvid
Mareedu Nancharamma
Nageswararao
R-8
209
67+660
Nuzvid
Rajulapati Nageswararo
Venkateswararao
L-6.9
210
67+700
Nuzvid
Vaka Baskararao
Venkateswararao
L-8
211
67+740
Nuzvid
Kothala Apparao
Person Not
Available
L-8
212
67+785
Nuzvid
Moduri Ranganadham
Laxminarasimha
L-7.2
213
67+790
Nuzvid
Tegala Chantibabu
Ramulu
L-7
214
67+800
Nuzvid
Tegala Tirupathirao
Ramulu
L-7
215
67+801
Nuzvid
Tegala Tirupathirao
Ramulu
L-7
216
68+480
Nuzvid
Mathina Subbarao
Veerayya
L-7
217
68+580
Nuzvid
Seelam Sekhar
Raghavayya
l-8
218
68+800
Nuzvid
Selam Satyanarayana
Seshagirirao
R-6
219
68+850
Nuzvid
Pamidikondala Radhakrishana
Ramachandrarao
L-5
220
68+850
Nuzvid
Gollapu Satyanarayanamma
Venkateswarulu
R-9
221
68+900
Nuzvid
Varagala Prasad
Subbarao
R-9
222
68+905
Nuzvid
Varala Nancharamma
Sobhanadri
R-8
223
68+910
Nuzvid
Sk Hamid
Abbulnabi
R-7
224
68+910
Nuzvid
Sedirala Koteswararao
Venkatasubbarao
L-8
225
68+910
Nuzvid
SK Kadarvali
Mastansaheb
l-8
226
68+920
Nuzvid
Sk Mastan
Parisaheb
L-6
227
68+940
Nuzvid
Goduguri Sivaprasad
Muralikrishana
R-9
228
68+940
Nuzvid
Sutrala Rangarao
Subbarao
R-7.3
229
68+940
Nuzvid
Maragani Nehrukanth
Ayanna
R-9
230
68+940
Nuzvid
Maragani Nehrukanth
Ayanna
R-9
231
68+960
Nuzvid
Sk.Mastanvali
Nagusaheb
L-9
232
68+960
Nuzvid
Sk.Anwar
Hussain
L-9
233
68+960
Nuzvid
Sk.Kalishavali
Person Not
Available
L-9
234
68+960
Nuzvid
Maddirala NagaSriragavarao
Venu
L-9
235
68+960
Nuzvid
Sk.Meera
Sherlu
L-9
NT
H
NT
H
NT
H
236
68+960
Nuzvid
Jogi Venkateswarao
Gurumurthy
L-9
NT
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
4
Katcha
Res
3
Katcha
Res
4
Katcha
Res
5
Katcha
Res & Com
1
Katcha
Res & Com
10
Katcha
Semipucc
a
Res
Res
4
Katcha
Semipucc
a
2
Katcha
Res
6
Katcha
Res
7
Katcha
Cattleshed
2
Com
4
Katcha
Semipucc
a
Semipucc
a
2
Katcha
Res & Com
3
Katcha
Com
2
Katcha
Com
2
Katcha
Com
2
Katcha
Com
kiosk
Kiosk
Katcha
Com
Katcha
Com
Katcha
Com
kiosk
Kiosk
5
kiosk
Kiosk
6
Katcha
Semipucc
a
Res & Com
Katcha
Com
Katcha
Res & Com
kiosk
Semipucc
a
Kiosk
Semipucc
Com
4
1
2
Page 52
Com
Res & Com
Com
Com
Com
Com
Pedana-Nuzvid-Visannapeta
Andhra Pradesh Road Sector Project
H
237
68+990
Nuzvid
Naidu Srininvasarao
Venkateswararao
R-7.8
238
68+995
Nuzvid
Durga
Person Not
Available
R-7
239
69+000
Nuzvid
Maridu Rangamma
Raghavulu
L-8.8
240
69+000
Nuzvid
Tellaboiena Srinivasarao
Pedavenkanna
L-8.8
241
69+030
Nuzvid
Yarramsetty Loknadh
Tirupatiayya
L-8.5
72+000
Nuzvid
Irrala Baskararao
Pottiyya
R-8
243
72+000
Nuzvid
Pakandi Dhanalaxmi
Laxmayya
R-8
244
72+050
Nuzvid
Pamarthi Venkamma
Laxmayya
R-8
245
72+050
Nuzvid
Battula Srinivasarao
Sriramulu
R-8
246
72+050
Nuzvid
Venula Durgaprasad
kameswarao
R-7
247
72+070
Nuzvid
Pamarthi Kriskanakumari
Radhakrishana
L-7
Nuzvid
Chodagani Laxmi
Nani
L-9
242
Gollapalli
248
249
72+100
Nuzvid
Penumada Kalebu
Venkataratnam
L-9
250
72+100
Nuzvid
Reddi Gopalarao
Sriramulu
R-8
251
72+100
Nuzvid
Attili Brahmam
Person Not
Available
R-6
252
72+100
Nuzvid
Tata Pullarao
Srirangam
R-7
253
72+140
Nuzvid
Boodu Nagaraju
Ayodhayaramayya
R-8
254
72+160
Nuzvid
Vinnakota Veeraragavamma
BalaramSwamy
L-9
255
72+180
Nuzvid
Tummala Ramakrishana
Adinarayana
R-8
256
72+180
Nuzvid
Koduru Nageswararao
Subbarao
L-7
257
72+200
Nuzvid
Owner not Available
Person Not
Available
258
72+210
Nuzvid
Parusuri Vijayalaxmi
Person Not
Available
R-8
259
72+210
Nuzvid
Konda vaddikasulu
Anjeneyulu
R-7
260
72+220
Nuzvid
Nandigama Ammaji
Bhaskarrao
R-8
261
72+220
Nuzvid
Tata Rangarao
Person Not
Available
R-6.1
262
72+220
Nuzvid
Gollapalli Pothuraju
Suryanarayana
L-8
263
72+220
Nuzvid
Tata Nageswararamma
Venkateswararao
L-8
264
72+230
Nuzvid
Katta `Sakuntala
Somulu
R-8
265
72+265
Nuzvid
Shaik Meerjavali
Kaream
R-6
266
72+380
Nuzvid
Pamarthi Koteswararao
Anjeneyulu
L-8
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
a
4
Katcha
Res
Katcha
Res
Katcha
Com
Katcha
Res & Com
kiosk
Kiosk
5
Katcha
Res
7
Katcha
Res
2
Katcha
Res
5
Katcha
Res
3
Katcha
Res
1
Katcha
Res & com
katcha
Com
3
kiosk
Kiosk
3
Katcha
Res
Katcha
Com
4
Katcha
Res
4
Res
1
Katcha
Semipucc
a
4
Katcha
Res
2
kiosk
Kiosk
kiosk
Kiosk
1
Katcha
Res
4
Katcha
Res
3
Katcha
Res
2
Katcha
Res
2
Katcha
Res
1
Katcha
Res
2
katcha
Res
4
Kiosk
Semipucc
a
Kiosk
5
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
0
Page 53
Com
Res
Pedana-Nuzvid-Visannapeta
Andhra Pradesh Road Sector Project
267
72+380
Nuzvid
Pamarthi Srinivasarao
Krinayya
L-8
268
72+400
Nuzvid
Shaik Dilshadbagem
Munnabasha
R-5.4
269
72+405
Nuzvid
Valiveti Satyanarayana
Venkatakrishana
R-5.6
270
72+405
Nuzvid
Shaik Babu
Abdhul
L-5.7
271
72+410
Nuzvid
Seeram Shivashankaraaro
Rosayya
R-7.3
272
72+410
Nuzvid
Mylavarapu Tirapatirao
Raghunadam
L-6.8
273
72+480
Nuzvid
Bonala VijayaRangarao
Gopayya
R-9
274
72+500
Nuzvid
Namala Jayaolaiah
Rangarao
R-6
275
72+530
Nuzvid
Shaik Choti
Mahaboob
R-6.8
276
72+565
Nuzvid
Talam Sriramulu
Ramayya
L-5.9
277
72+565
Nuzvid
Taluri Prubudas
Yesudas
L-6
278
72+590
Nuzvid
Aripalli Suryanarayana
Veerayya
L-5
279
72+600
Nuzvid
Bokinala Subbarao
Raghunadam
L-6
280
72+610
Nuzvid
Chittiboiena Rani
Kittarao
L-6
281
72+630
Nuzvid
Gandikota Rajarao
Ragunadam
R-8
282
72+680
Nuzvid
Kokilagedda Vajrakumari
Kantharao
L-8
283
72+680
Nuzvid
Adumalli Venkatarao
Subbarao
R-9
284
72+680
Nuzvid
Pallipamula Prakasam
Venkateswararao
L-8.7
285
72+710
Nuzvid
Ulaga Krishana
Venkayya
L-5.7
286
72+720
Nuzvid
Mohamad Basha
Sulemansaheb
L-7.7
287
72+720
Nuzvid
Mylavarapu Venkateswararao
Subbarao
R-5.3
288
72+720
Nuzvid
Kamaravalli Salman
Jalachandrudu
R-8
289
72+730
Nuzvid
Ketineni Kasturamma
Ramachandrarao
L-7
290
72+730
Nuzvid
Arepalli Bhushanam
Nageswararao
L-7.1
291
72+770
Nuzvid
Arepalli mohanarao
Chinaverayya
L-4.9
292
72+770
Nuzvid
Makaraju Rangaraju
Subbaraju
L-5.2
293
72+780
Nuzvid
Mallavalli Rambabu
Poturaju
L-7.8
294
73+700
Nuzvid
Sodagiri Vilasana
Bhusanam
R-9
75+040
Nuzvid
Parasa Sesayya
Sriramulu
R-8
296
75+100
Nuzvid
MD Yusuf
Ibraheem
L-5
297
75+110
Nuzvid
Bejawada Bujji
Rangarao
R-5.5
298
75+120
Nuzvid
Vamula Jayalaxmi
Venkateswararao
L-8.5
299
75+200
Nuzvid
G.Apparao
Person Not
Available
R-6.4
300
75+200
Nuzvid
Buddala Prabhakararao
Ramadasu W/0
R-6.4
295
Morsapudi
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
NT
H
NT
H
0
Katcha
Res
3
Katcha
Semipucc
a
Semipucc
a
Semipucc
a
Com
Kiosk
4
kiosk
Semipucc
a
0
Katcha
Res
4
Katcha
Res
3
Katcha
Res
6
katcha
Res
2
Katcha
Res
6
katcha
Res
6
Katcha
Res
3
katcha
Res
3
Katcha
Res
3
Katcha
Res
5
Katcha
Res
TH
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
2
4
Kiosk
Kiosk
TH
NT
H
NT
H
NT
H
NT
H
NT
H
5
Katcha
Res
4
Kiosk
Kiosk
0
Katcha
Com
0
Katcha
Res
0
Katcha
Res
4
Res
TH
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
2
Katcha
Semipucc
a
0
Katcha
Com
3
Katcha
Com
4
Katcha
Com
4
Katcha
Com
4
Katcha
Com
2
Katcha
Res & Com
4
Kiosk
Kiosk
5
Katcha
Res
NT
H
NT
H
6
3
0
Page 54
Res
Res & Com
Res & Com
Res
Com
Pedana-Nuzvid-Visannapeta
Andhra Pradesh Road Sector Project
301
75+210
Nuzvid
Boddupathi Sandya
Apparao
R-7.2
302
75+220
Nuzvid
Mekhala Nagamma
Sayilu
R-6.6
303
75+220
Nuzvid
Arepalli Bhushanam
Sayidulu
L-7.8
304
75+220
Nuzvid
Devarakonda Mahalaxmi
Darmayya
L-7.5
305
75+220
Nuzvid
Shaik Mastansaheb
Hussainsaheb
R-8.2
306
75+230
Nuzvid
Chintala Nirma
Mariyadas
R-7.8
307
75+230
Nuzvid
Poturu Rangamma
Venkateswararao
R-7.5
78+380
Nuzvid
Polimetala Devasahayam
Abraham
R-6.5
309
78+410
Nuzvid
Palagani Rangarao
Peerayya
L-7.2
310
78+420
Nuzvid
Mohamad Kareemulla
Ibraheem
L-6.8
311
78+420
Nuzvid
Sk Kalisha
Ismail
L-8
312
78+420
Nuzvid
Gonduboiena Sekhar
Venkatesh
R-6
313
78+430
Nuzvid
Badugu Venkateswararao
Kondayya
L-8
314
78+430
Nuzvid
Kosuri Srinivasarao
Venkateswararao
R-6.8
315
78+430
Nuzvid
Kosaraju Rajarao
Person Not
Available
R-7.2
316
78+600
Nuzvid
Kosaraju Ramesh
Rajarao
R-9
84+200
Nuzvid
Polavarapu Narasimharao
Rajasekar weigh
bridge
R-9
318
84+200
Nuzvid
Puram Samrajyam
Venkateswararo
L-5
319
84+440
Nuzvid
Bala Vijayalaxmi
Rammohanarao
R-6.2
320
84+440
Nuzvid
Atluri Venugopalarao
Amarayya
R-6.2
321
84+415
Nuzvid
Kandikatla Bullemma
Ramarao
R-5.5
322
84+415
Nuzvid
Andela Kotamma
Changayya
R-6.2
323
84+480
Nuzvid
Vanapalli Laxmanarao
Narayana
R-6.4
324
84+520
Nuzvid
Balani Atcharao
Gangaraju
L-7.3
325
84+520
Nuzvid
Balani Veerababu
Atcharao
L-8
326
84+600
Nuzvid
Chikka Asirinaidu
Appalaswamy
L-6.5
327
84+610
Nuzvid
Devarakonda Venkateswararo
Late)Gurvayya
L-8
328
84+615
Nuzvid
Sriramulu Satyanarayana
Sambayya
L-8
329
85+400
Nuzvid
Naradala Baskararao
Venkataswamulu
L-6.5
86+310
Nuzvid
Mulugumati Subbarao
Ramulu
R-7
331
86+310
Nuzvid
Chodapamula Maratamma
(late) Esu
R-8
332
86+310
Nuzvid
Kanaparthi Vasantharao
Nagindra
R-7.2
333
86+310
Nuzvid
SK Nanasaheb
Ameersaheb
L-5.6
308
317
330
Tukkuluru
Nuzvid
Annavaram
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
TH
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
TH
NT
H
4
Katcha
Res
4
Katcha
Res
4
Katcha
Res
3
Katcha
Res
0
Katcha
Res
0
Katcha
Res
0
Katcha
Res
3
Res
0
Katcha
Semipucc
a
Semipucc
a
Semipucc
a
2
Katcha
Com
5
Kiosk
Kiosk
4
Kiosk
Kiosk
6
Kiosk
Kiosk
5
Pucca
Res
Com
3
2
Pucca
Semipucc
a
Semipucc
a
Semipucc
a
Semipucc
a
2
Katcha
Res
5
Katcha
Semipucc
a
Com
Katcha
Res
4
Katcha
Res
3
Katcha
Res
3
Katcha
Res
5
Katcha
Res
4
Katcha
Res
0
Katcha
Res
0
Katcha
Semipucc
a
Res
6
4
2
2
0
Page 55
Com
Com
Com
Com
Res
Res
Res
Res
Res
Pedana-Nuzvid-Visannapeta
Andhra Pradesh Road Sector Project
NT
H
NT
H
334
86+310
Nuzvid
Sk Chandbasha
Ameersaheb
L-5.8
335
86+320
Nuzvid
Pilli Venkateswararo
Venkayya
R-6.9
336
86+320
Nuzvid
Sudagani Saibabu
Gopiraju
R-6.4
337
86+330
Nuzvid
Bejawada Venkatanarasanna
Koteswararao
R-8
338
86+340
Nuzvid
Modepalli Suryanarayana
Person Not
Available
L-8.5
339
86+390
Nuzvid
Chukkala Nageswarrao
Kurmayya
R-4.6
340
86+400
Nuzvid
Abdurao(late)
Person Not
Available
R-7
341
86+400
Nuzvid
Kolusu Sambasivaraju
Peddiraju
L-7.5
NT
H
NT
H
342
86+500
Nuzvid
Yadala Rajarao
Ramulu
L-5.8
TH
343
86+505
Nuzvid
P.Madhusudhanarao
Person Not
Available
R-6.2
344
86+505
Nuzvid
Kumpati Rajarao
Veerayya
R-8
345
86+505
Nuzvid
Ede Savitri
Sambasivarao
R-5.4
346
86+520
Nuzvid
Akula Srinivasarao
Somayya(late)
R-8
347
86+600
Nuzvid
Ganapuvarapu Chinayya
kotayya
R-8
348
86+610
Nuzvid
Katuri Laxmanarao
Venkateswararao
L-8
349
86+610
Nuzvid
Shaik Lalahmad
Ameersaheb
L-7.8
350
86+630
Nuzvid
Somu Nageswararao
Kotiveraragavalu
R-8.5
351
86+720
Nuzvid
Ramisetti Venkateswararo
Nageswararao
L-6.3
352
86+720
Nuzvid
Pamarthi Satyanarayana
Ramaswamy
R-9
353
86+720
Nuzvid
Katuri Subbarao
Venkayya
L-6.7
354
86+750
Nuzvid
Shaik Kaleeshavali
Kasimsaheb
R-6.7
355
86+750
Nuzvid
Shaik Chanbasha
Ameersaheb
R-6.7
356
86+760
Nuzvid
Nerusu Upendhra
Koteswararao
L-7
357
86+760
Nuzvid
Gholla Laxmayya
Chintayya
L-7.2
358
86+770
Nuzvid
Satyanarayana
Jaganadham
L-7.8
359
86+795
Nuzvid
Ganduboiena Nagaraju
Ramarao
R-8
360
86+820
Nuzvid
Kolusu Renukamma
Kanakayya
L-8
361
86+820
Nuzvid
Koppakala Sitaramayya
Venkateswrarao
L-7.5
362
86+820
Nuzvid
Ganduboiena Nagaraju
Ramarao
R-8
363
86+820
Nuzvid
Indala Pullayyya
Rajesh
L-6.3
364
86+840
Nuzvid
A.Krishanachai
Badrayyya
L-6.2
365
86+820
Nuzvid
Mareedu Chennakesavarao
Narayana
L-5.9
366
87+020
Nuzvid
Dasireddy Satyanarayana
Venkatakrishana
L-5.8
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
TH
NT
H
NT
H
NT
H
0
4
Semipucc
a
Res
Res
3
Katcha
Semipucc
a
0
Katcha
Res
4
Semipucc
a
Com
4
Katcha
Com
3
Semipucc
a
Res
4
5
NT
H
NT
H
Res
Katcha
Semipucc
a
Com
Katcha
Res
Katcha
Res
Com
TH
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
4
Katcha
Res & Com
0
Katcha
Com
0
Katcha
Res&Com
0
Res
0
Katcha
Semipucc
a
0
Katcha
Res&Com
4
Katcha
Res
0
Katcha
Com
0
Res & Com
TH
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
6
4
Katcha
Semipucc
a
Semipucc
a
0
Katcha
Com
0
Katcha
Cattleshed
0
Kiosk
Kiosk
3
Com
0
Katcha
Semipucc
a
0
Kiosk
Kiosk
3
Katcha
Cattleshed
0
Pucca
Res
0
Katcha
Semipucc
a
Semipucc
a
Res
5
3
Page 56
Res
Com
Com
Com
Res & Com
Com
Pedana-Nuzvid-Visannapeta
Andhra Pradesh Road Sector Project
367
87+190
Nuzvid
Kota Suryanarayana
Venkataswamy
R-7
368
87+190
Nuzvid
SK.Nagulu
Daveed
L-6.3
369
87+190
Nuzvid
Ramadasu Narasimhapatrudu
Ayyannapatrudu
L-6.2
370
87+210
Nuzvid
Modipalli Suryanarayana
Ramakrishana
R-6.5
NT
H
NT
H
NT
H
NT
H
NT
H
371
Venkatadhr
ipuram
88+350
Nuzvid
Velpuri Ramarao
Somayya
R-8.5
372
Hunumuntu
lagudem
89+700
Nuzvid
Banavathi Symku
Laxmayya(late)
R-8
373
89+710
Nuzvid
Ippagunta krishana
Narasimharao
R-6
374
89+880
Nuzvid
Polapaka Sudhakar
Prasadarao
L-8
375
89+900
Nuzvid
Polapaka nageswararo
Pullayya
L-8.5
376
90+100
Nuzvid
Rankuri Puspa
Asiyya
L-7.2
377
90+350
Nuzvid
Reddi Krishana
Venkatadri
L-8.5
378
90+350
Nuzvid
Peddavarapu Venkateswarulu
Laxmayya
L-7.5
379
90+350
Nuzvid
Nalliboiena Malleswararao
Sriramulu
L-7.3
380
90+400
Nuzvid
Patra Balakrishana
Sesayya
R-8
381
90+400
Nuzvid
Pilli Venkataraju
Venkateswararao
R-7.8
90+400
Nuzvid
Vilavalli Muralikrishana
Adinarayana
L-8.2
383
90+680
Nuzvid
Velivela Narasimharao
Venkataratnam
R-6
384
90+680
Nuzvid
Velivela Gopalaswamy
Venkataratnam
R-8.8
385
90+700
Nuzvid
Batta Lalitha
Subbarao
R-9
386
90+700
Nuzvid
Palagi Rambabu
Ayodya
L-8.2
387
90+700
Nuzvid
Palagani Ayodya
Subbayya
L-8.2
388
90+700
Nuzvid
Ambati Srinu
Kotesh
L-9
389
90+705
Nuzvid
Chalamala Sambasivarao
Bulliramayya
R-7.8
390
90+760
Nuzvid
Jalasutram Pullarao
Madiramayya
R-8
391
90+795
Nuzvid
Dovvadi Suseela
narasingarao
R-8
392
90+795
Nuzvid
Mulagani Pitchayya
Subbayya
R-8
393
90+800
Nuzvid
Konakala Krishana
Rambabu
R-7.3
394
90+900
Nuzvid
Srihari
395
90+900
Nuzvid
Janga Somasundhar
Yakobu
L-7.5
396
90+960
Nuzvid
Kalangi Devid
Kanakambaram
L-8.3
92+180
Nuzvid
Kethe Jaganadharao
Seetayya
L-8
398
92+180
Nuzvid
Kethe Sheshamma
Tirupatayya
L-6.9
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
NT
H
399
92+240
Nuzvid
Pilla Venkateswaramma
Rangarao
R-5.8
TH
382
397
Mittagudem
Leelanager
L-7.3
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
2
Katcha
Com
0
Katcha
Res
3
Katcha
Res
0
Katcha
Res
4
Semipucc
a
Res&Com
0
Semipucc
a
Semipucc
a
5
kiosk
kiosk
2
Katcha
Com
3
Katcha
Res
6
Katcha
Com
0
Katcha
Com
0
Katcha
Com
4
Katcha
Res
4
Katcha
Res & Com
0
Katcha
Semipucc
a
Com
Kiosk
0
Kiosk
Semipucc
a
Semipucc
a
Semipucc
a
2
Katcha
Com
6
Kiosk
5
Kiosk
Semipucc
a
1
Katcha
Res
0
Katcha
Res
4
Katcha
Com
0
Katcha
Com
0
Kiosk
Kiosk
0
Katcha
Com
4
Kiosk
Kiosk
5
Kiosk
Kiosk
8
Katcha
Res
0
4
2
0
0
Page 57
Res
Com
Res
Com
Res &Com
Res &Com
Res
Pedana-Nuzvid-Visannapeta
Andhra Pradesh Road Sector Project
400
92+270
Nuzvid
Simhadri Sitaramaya
h/0Nagamalleswari
R-5.9
401
92+300
Nuzvid
J.Subramanneswararao
402
92+300
Nuzvid
Dontu Sitaramayya
Sobanachalam
R-9
403
92+300
Nuzvid
Doddula Satyanarayana
Jaganadham
R-9
404
92+300
Nuzvid
Mustina Koteswararao
Anjayya
L-7.8
L-5.6
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
TH
NT
H
NT
H
NT
H
NT
H
2
Katcha
Res
4
Katcha
Com
0
Katcha
Com
0
Katcha
Com
0
Katcha
Com
Page 58
Pedana-Nuzvid-Visannapeta
Andhra Pradesh Road Sector Project
ANNEXURE : 2.2 PROJECT DISPLACED FAMILIES
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
HouseHold
Father\husband name
Pedna
7+000
Pedna
7+020
Pedna
7+120
Pedna
7+140
Pedna
7+140
Pedna
7+200
Pedna
7+200
Pedna
7+220
Pedna
7+240
Pedna
7+260
Pedna
7+280
Pedna
7+280
Pedna
7+300
Pedna
7+310
Pedna
7+320
Pedna
7+320
Pedna
7+325
Pedna
7+325
Pedna
7+325
Pedna
7+350
Pedna
7+360
Pedna
7+420
Pedna
7+430
Pedna
7+450
Pedna
7+450
Pedna
7+450
Machilipat
nam
Machilipat
nam
Machilipat
nam
Machilipat
nam
Machilipat
nam
Machilipat
nam
Machilipat
nam
Machilipat
nam
Machilipat
nam
Machilipat
nam
Machilipat
nam
Machilipat
nam
Machilipat
nam
Machilipat
nam
Machilipat
nam
Machilipat
nam
Machilipat
nam
Machilipat
nam
Machilipat
nam
Machilipat
nam
Machilipat
nam
Machilipat
nam
Machilipat
nam
Machilipat
nam
Machilipat
nam
Machilipat
nam
No of Family Members
Name of the
Head(HHH)
Title
holder(TH)/NonTitleHolder(NTH)
Sl.No
1
Revenue
Division
Chanage
Name of the
Village
Location (Left\ Right)
PDF LIST - Pedana - Nuzvid - Visannapeta ROAD - Residential Category
Type of
Structure
Moganti Prasad
Narayanna Rao
L-1
TH
4
Varudhu malleswararao
Subbarao
R-3
TH
3
jonabattula koteswaramma
Nancharayya
R-3
NTH
6
Garikimukkala Sriramulu
Mahamkali
R-4.5
NTH
3
Chinnam Suramraju
Person not Available
L-4
TH
0
Varudhu Venkateswararo
Govind
L-2
NTH
4
Varudhu Nagamalleswaramma
Venkateswarulu
R-6
TH
4
Varudhu Nancharayya
Subbarao
R-4.5
TH
6
Bulusuru Symalarao
Subramanyam
L-7
TH
4
maddemsetty Rambabu
Nancharayya
R-6
TH
5
Varudhu Venkaranarayana
Marillu
L-3
TH
2
Varudhu Venkateswararo
Subbayya
R-5
NTH
3
Varudhu kondayya
Krishana
R-6
TH
6
Varudhu Venkataswamy
Krishana
R-6
TH
3
Varudhu Venkanna
Nageswarao
R-2
TH
4
Varudhu Balaji Kumar
Nageswarao
R-2
TH
5
Maruboiena Naga malleswararao
Nageswarao
R-5
TH
4
Maruboiena SriniVasarao
Nageswarao
R-5
TH
5
Koutarapu Naga Durga Bhavani
Ganapathi
L-3
TH
4
Varudhu Baburao
Seetayya
L-3
TH
2
Varudhu Venkateswararo
Koteswararo
L-4
NTH
4
Maddisetty Anasuya
Koteswararo
R-5
TH
7
Varudhu Suryachanrraro
Venkatasubbayya
R-7
NTH
1
1
Varudhu Durgarao
Madavarao
R-6
NTH
3
Varudhu Subbarao
Madavarao
R-6
NTH
6
Varudhu Venkata
Ramanjeyaneyulu
Nageswarao
L-2
TH
4
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
Page 59
Katcha
Katcha
Katcha
Katcha
Pucca
Pucca
Katcha
Semipucca
Katcha
Semipucca
Semipucca
Katcha
Katcha
Semipucca
Pucca
Semipucca
Katcha
Katcha
Semipucca
Pucca
Katcha
Katcha
Semipucca
Pucca
Katcha
Semipucca
Pedana-Nuzvid-Visannapeta
Machilipat
nam
Machilipat
nam
Machilipat
nam
Machilipat
nam
Machilipat
nam
Andhra Pradesh Road Sector Project
Pedna
7+500
Nadupuru
10+700
Nadupuru
10+940
Nadupuru
11+660
Nadupuru
11+670
32
Reddipalaem
13+410
Gudivada
B.Nancharayya
33
Reddipalaem
13+420
Gudivada
Chittibomma Srinivasarao
34
Reddipalaem
13+510
Gudivada
Kandula Sesayya
35
Reddipalaem
13+530
Gudivada
36
Reddipalaem
13+550
37
Reddipalaem
13+750
38
Vaddlamannadu
15+190
39
Vaddlamannadu
40
Vaddlamannadu
41
27
28
29
30
31
Varudhu Pitchemma
Narasimharao
R-2
TH
8
Parusa Pandurangarao
Durgarao
L-6.2
NTH
2
Yarlagedda Sethratnam
Venkataratnam
R-6.5
NTH
1
kanakavalli Subadra
Benarji
R-6.5
NTH
2
NTH
2
Katcha
Nimmagedda Rajarao
Katcha
Katcha
Katcha
Katcha
Person not Available
L-7
H|0 Venkamma
L-6.2
NTH
3
Katcha
Subramanyam
R-6.4
NTH
5
Nancharayya
R-6.4
NTH
6
Katcha
Katcha
Bethapudi Srinivasarao
pandu
R-6.2
NTH
4
Katcha
Gudivada
Kagitha Pabma
Nancharayya
L-6.5
TH
2
Katcha
Gudivada
Gudivada
Modugumudi Haribabu
Ramachandrarao
L-5.7
NTH
4
SemiPucca
Abdhul Azeez
Basha
R-6.8
NTH
3
Katcha
15+160
15+400
Gudivada
AvarlanDammidayya
Kolusu Reddayya
Veerayya
R-6.5
Veraraju
L-6.5
NTH
TH
2
Gudivada
4
Katcha
Katcha
Vaddlamannadu
15+400
Gudivada
Kolusu Veraraju
Ragavulu
L-5.5
TH
2
Katcha
42
Vaddlamannadu
15+400
Gudivada
Kolusu Koteswarararo
Veraraju
L-6.5
NTH
4
Katcha
43
Vaddlamannadu
15+420
Gudivada
Pari devamani
Late)Yakobu
L-6.5
TH
6
Katcha
44
Vaddlamannadu
15+430
Gudivada
Iku Adilaxmi
Late)Gopayya
L-5.2
TH
1
Katcha
45
Vaddlamannadu
15+430
Gudivada
S.Bayrasi
Not Available
R-5.6
NTH
0
Katcha
46
Vaddlamannadu
15+600
Gudivada
Atchuta jaganmohanarao
Subbarao
R-5.9
NTH
3
Katcha
47
Vaddlamannadu
15+650
Gudivada
Degala Srinu
Venkataswamy
R-6.5
NTH
4
Katcha
48
Vaddlamannadu
15+650
Gudivada
Degala Venkataswamy
Rammurthy
R-6.2
NTH
4
Katcha
49
Vaddlamannadu
15+660
Gudivada
Maddela Veramma
Durgapraasad
R-6.5
NTH
3
Katcha
50
Vaddlamannadu
15+670
Gudivada
Atchuta kasturi
Person Not Available
R-4.4
NTH
1
Katcha
51
Vaddlamannadu
15+670
Gudivada
Atchuta Srinivasarao
Nancharayya
L-5.1
TH
3
Katcha
52
Vaddlamannadu
15+750
Gudivada
Atchuta Sivashankararo
Subbarao
L-5.3
NTH
4
Katcha
53
Vaddlamannadu
15+750
Gudivada
Penta Ramu
Laxmayya
R-5.5
NTH
3
Katcha
54
Vaddlamannadu
R-6.2
NTH
2
Gudivada
DegalanSubbarao
Parasa Venkatasubbamma
Chinnappayya
55
15+360
16+740
Gudivada
Vemavaram
Krishanamurthy
L-4.7
NTH
4
Katcha
Katcha
56
Vemavaram
16+780
Gudivada
Padamata Pandu
Basavayya
L-6.9
TH
4
Katcha
57
Vemavaram
16+785
Gudivada
Venka Nageswarao
Rammurthy
L-6.3
TH
3
Katcha
58
Vemavaram
16+785
Gudivada
Veranji Kanakam
Krishanamurthy
R-4.5
NTH
2
Katcha
59
Vemavaram
16+785
Gudivada
Chillimuntha Badrachalam
Gangadaram
L-5.8
NTH
0
Katcha
60
Vemavaram
16+880
Gudivada
Padamati Veraswamy
Venkanna
L-4.3
NTH
3
Katcha
61
Vemavaram
16+890
Gudivada
Madugu Pedaverayya
Subbarao
R-4.5
NTH
0
Katcha
62
Vemavaram
16+900
Gudivada
Mannem Venkateswarama
Venkateswaralu
L-5.2
NTH
2
Katcha
63
Vemavaram
L-6.2
NTH
2
Vemavaram
Gudivada
Mannem Basavayya
Yarlagadda Nagapanindhra
Laxmayya
64
16+900
16+900
Gudivada
M/o Vijayamma
L-5.5
NTH
2
Katcha
Katcha
65
Vemavaram
17+050
Gudivada
Sonti Venkateswarao
Veraswamy
L-5.2
TH
4
Katcha
66
Vemavaram
17+050
Gudivada
Mulala edukondalu
Pakeer
R-5.1
NTH
8
Katcha
67
Vemavaram
17+060
Gudivada
Borra Durgamma
Ragavulu
L-6.2
NTH
1
Katcha
68
Vemavaram
Gudivada
L-5.3
NTH
3
69
Gudivada
pandiri Kurmarao
Shaik Adem
narasimharao
Vemavaram
17+070
17+120
H\o Haseenabegum
L-4.3
NTH
5
Katcha
Katcha
70
Vemavaram
17+200
Gudivada
Abdhul Baseer
Sattar
L-4.1
NTH
1
Katcha
71
Vemavaram
17+200
Gudivada
Naragani Venugopal
Ankinaidu
L-4.5
NTH
5
Katcha
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
Page 60
Pedana-Nuzvid-Visannapeta
72
kowthvaram
Andhra Pradesh Road Sector Project
22+100
Gudivada
Geduturi Rajarao
Yarayya
R-6.6
NTH
2
Katcha
Gudivada
Nasethi Ramesh
Subbarao
R-6.8
TH
Katcha
73
kowthvaram
22+120
74
kowthvaram
22+120
koripalli Sanyasirao
Appannna
R-6.7
NTH
3
1
2
75
kowthvaram
22+140
Gudivada
Javvari Nageswarao
Venkateswarao
R-6.8
NTH
5
Katcha
Gudivada
Katcha
76
kowthvaram
22+200
Gudivada
Allu Bullemma
Appalaswamy
R-6.3
NTH
2
Katcha
77
kowthvaram
22+200
Gudivada
muttireddy Srinivasarao
Person Not Available
R-6.3
NTH
5
Katcha
78
kowthvaram
22+125
Gudivada
Ramabalapala Durgaprasad
Satyanarayana
R-5.3
NTH
4
Katcha
79
Gudlavalleru
23+790
Gudivada
Jupudi Krishana mohanarao
Person Not Available
R-6
TH
2
Pucca
Paruchuri Tripurantharao
80
Gudlavalleru
23+800
Gudivada
R-5.6
TH
4
Pucca
81
Gudlavalleru
23+800
Gudivada
vallabhapurapu Eswararao
Ramachandararao
R-4.6
TH
5
Pucca
82
Gudlavalleru
23+980
Gudivada
Kunchapati Venkateswwarao
Pandurangarao
R-4.6
TH
3
Pucca
83
Gudlavalleru
24+000
Gudivada
V.Narasimharao
Person Not Available
R-4.8
TH
1
Pucca
84
Gudlavalleru
24+000
Gudivada
Polavarapu Rajeswarao
Person Not Available
R-5.5
TH
1
Pucca
85
Gudlavalleru
24+000
Gudivada
Gudlavalleti Venkateswarao
Gangajalam
R-4.5
TH
4
SemiPucca
86
Gudlavalleru
24+050
Gudivada
Bulla Ravibabu
Koteswararao
L-6.8
TH
5
SemiPucca
87
Bommuluru
31+100
Gudivada
Gutta Venuprasad Chowdary
Venkata swamy
R-7
NTH
4
Semipucca
88
Bommuluru
31+150
Gudivada
Gutta krishana
narayana
R-5.5
TH
2
Pucca
89
Bommuluru
31+550
Gudivada
Penumarthi Srinu
nagendrudu
L-5.6
NTH
4
Katcha
90
Bommuluru
31+620
Gudivada
Talaie Satyanarayana
Venkateswararo
R-7.2
NTH
4
Katcha
91
Bommuluru
31+790
Gudivada
Saradala Nagaraju
Brahmayya
L-6.5
NTH
0
Katcha
92
Bommuluru
31+790
Gudivada
Mocherla mamatha
Srinu
R-4.5
NTH
4
Katcha
93
Bommuluru
31+790
Gudivada
Vara samual
Mosa
R-5.2
NTH
0
Katcha
94
Bommuluru
31+790
Gudivada
Ganta Israyulu
peddiraju
L-5.9
TH
2
Katcha
95
Bommuluru
31+800
Gudivada
Akunoori Yesobu
Eliya
R-5.1
NTH
3
Katcha
96
Bommuluru
31+800
Gudivada
Chebrolu Ramarao
Ramayya
L-5.7
NTH
2
Katcha
97
Bommuluru
31+800
Gudivada
Sura Apparao
Tatabbie
L-5.8
NTH
3
Katcha
98
Bommuluru
31+815
Gudivada
Kandavalli Edukondalu
Adishesu
L-6.6
NTH
5
Katcha
99
Bommuluru
31+820
Gudivada
Usalla Devakanya
Krishana
L-6.8
NTH
3
Katcha
100
Bommuluru
31+840
Gudivada
Varigani Devamatha
Adama
L-4.6
NTH
2
Katcha
101
Bommuluru
31+600
Gudivada
Bura Srininvasarao
Dasu(samual)
L-5.1
NTH
5
Katcha
102
Janardhanapuram
40+820
Gudivada
Pullareddy Rangareddy
Person Not Available
L-6
TH
0
Pucca
103
Janardhanapuram
40+840
Gudivada
NVS Nagireddy
Rammohnareddy
L-6.5
TH
0
Pucca
104
Janardhanapuram
40+840
Gudivada
Konapalli narayanareddy
Narayanaereddy
L-6.5
TH
2
Pucca
105
Janardhanapuram
41+125
Gudivada
Veruvada NarayanaNagabhusanam
Venkateshawararao
L-6
NTH
4
Katcha
106
Janardhanapuram
41+150
Gudivada
Vanapalli Adilaxmi
Laxmanarao
L-6.5
NTH
2
Katcha
107
Janardhanapuram
41+150
Gudivada
Saripalli Rameshreddy
Rangareddy
L-5.9
TH
3
semiPucca
108
Janardhanapuram
41+240
Gudivada
Tallaparthi Ramarao
Appalasuri
R-7.1
NTH
3
Katcha
109
Janardhanapuram
41+240
Gudivada
malliboiena Lingayya
Chinaramulu
R-7.2
NTH
4
Katcha
110
Janardhanapuram
41+240
Gudivada
Nakka Narasimharao
Mahalaxmayya
L-6.8
NTH
0
Katcha
111
Janardhanapuram
41+245
Gudivada
laveti Durgarao
Venkateswararao
R-6.5
NTH
2
Katcha
112
Janardhanapuram
41+400
Gudivada
Devarapalli Satyanarayana
Nomulu
L-6.1
NTH
3
Katcha
113
Janardhanapuram
41+450
Gudivada
Vanam Venkateseararao
Durgamma
R-6.8
NTH
3
Katcha
114
Janardhanapuram
41+460
Gudivada
Katari Kotayya
Anjeneyulu
R-6.1
NTH
4
Katcha
115
Janardhanapuram
41+515
Gudivada
Ekba Peddirajulu
Ramayya
L-6.4
NTH
0
Katcha
116
Janardhanapuram
41+550
Gudivada
Kadekollu Nagaraju
Nallayya
L-5.6
TH
4
Katcha
117
Janardhanapuram
41+550
Gudivada
Jalasuthram Rangamma
Baskararao
L-6.2
NTH
2
Katcha
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
Page 61
Pedana-Nuzvid-Visannapeta
Andhra Pradesh Road Sector Project
118
Janardhanapuram
41+565
Gudivada
Nakka Puttalamma
Late) Bodayya
L-6.4
TH
4
Katcha
119
Janardhanapuram
41+600
Gudivada
Kotaru Nagaraju
Sitayya
L-6.8
NTH
0
Katcha
120
Janardhanapuram
41+600
Gudivada
Ebba Srinivasu
Ramayya
R-7.2
NTH
4
Katcha
121
Janardhanapuram
41+770
Gudivada
Nagalam Venkateswararao
Krishanamurthy
R-6.2
NTH
5
Katcha
122
Janardhanapuram
41+770
Gudivada
Kagga Padma
Srinu
R-6.8
NTH
4
Katcha
123
Janardhanapuram
41+770
Gudivada
Nangalam Venkatarammayya
Krishanamurthy
R-6.8
NTH
3
Katcha
124
Puttagunta
45+200
Gudivada
Ranchari Laxmi
Nageswararao
L-6.6
NTH
0
Katcha
125
Puttagunta
45+600
Gudivada
Vinjavarapu Appalachari
Bhrahmam
R-5.5
TH
2
Pucca
126
Puttagunta
45+630
Gudivada
Pamulapati Ramireddy
Person Not Available
R-5.8
TH
2
Pucca
127
Puttagunta
45+650
Gudivada
Valiveti Purna
Subbarao
R-6.5
NTH
0
Semipucca
128
Puttagunta
45+650
Gudivada
Vankayalapati Murali
Person Not Available
R-7
TH
0
Pucca
129
Puttagunta
45+700
Gudivada
Barapureddy Satyanarayana
Dalayya
L-6.8
NTH
0
Katcha
130
Puttagunta
46+400
Gudivada
Kollu Someswararao
Mallikarjunarao
L-6.7
NTH
0
Katcha
131
Puttagunta
Arugolanu
46+400
Gudivada
Mukkala Yesuamma
Yesu
R-7
NTH
1
Katcha
132
51+050
Nuzvid
Poteneni lalithakumari
Sambasivarao
R-7
TH
2
Semipucca
133
Arugolanu
51+250
Nuzvid
Singanapalli Venkateswararao
Applaswamy(late)
R-7
TH
7
Katcha
134
Kanumolu
55+420
Nuzvid
Katumalla Kishorebabu
Bisuff
R-5.3
NTH
4
Katcha
135
Kanumolu
55+655
Nuzvid
Nerella sarveswarao
Narayana
R-7
NTH
136
Kanumolu
55+680
Nuzvid
Kandula veeravenkatanagaprasad
Chinavenkateswarao
L-6.2
TH
137
Kanumolu
55+700
Nuzvid
Gopalarao
OLD BUILDING
L-6.2
NTH
138
Kanumolu
55+780
Nuzvid
Narikimalli Seshachalam
Suryanarayana
L-5.5
NTH
4
Katcha
139
Kanumolu
55+795
Nuzvid
Kurupati parisuddam
Gonnaprakash
R-6.2
NTH
2
Semipucca
140
Kanumolu
55+820
Nuzvid
Chalamarasetty Suryaprakasarao
Ramayya
L-6
NTH
3
Pucca
141
Kanumolu
55+820
Nuzvid
Chamarthi Venkateswarao
Viswanadham
R-5.5
NTH
2
Pucca
142
Kanumolu
55+830
Nuzvid
Chamarthi Anjeneyulu
venkatappayya
R-6.2
NTH
7
Pucca
143
Kanumolu
55+870
Nuzvid
Chamarthi Anjeneyulu
Venkatappayya
R-5
NTH
7
Katcha
144
Kanumolu
55+980
Nuzvid
Chittemma
L-5.7
TH
2
Pucca
145
Kanumolu
56+980
Nuzvid
Reddi Chinalaxmayya
Lingamallu veravenkata
jaganmohanarao
Venkataratnam
L-5.5
NTH
3
Pucca
146
Kanumolu
56+000
Chinta Apparao
Swamulu
L-5.5
NTH
5
Semipucca
147
Kanumolu
56+000
Nuzvid
N.V.Ramanarao
ChinaSurayya
R-4
TH
4
Semipucca
148
Kanumolu
56+000
Nuzvid
Nanduri Venkatamma
Krishana murthy(late)
R-5
TH
149
Kanumolu
56+000
Nuzvid
Anisetty Timmaraju
Boogeswararao
L-5
NTH
4
Pucca
150
Kanumolu
56+210
Nuzvid
Sunkara Laxmanarao
Surayya
L-5.5
TH
2
Pucca
151
Kanumolu
56+300
Nuzvid
Moganti Chandra sekhar
krishanarao
R-6
NTH
152
Kanumolu
56+350
Nuzvid
Naraharasetty Gangadhar
Venkataratnam
R-7
TH
4
Semipucca
153
Kanumolu
56+390
Nuzvid
Naraharasetty Prabhavathi
Venkataratnam
R-7
TH
2
Semipucca
154
Perikeedu
56+975
Nuzvid
Venkatakonda Gandhi
Koteswararo
L-6.8
TH
3
Semipucca
155
Perikeedu
57+310
Nuzvid
Sammangi Sateshkumar
Nageswararao
L-7
TH
4
Semipucca
156
Perikeedu
57+310
Nuzvid
Sammangi Mohanasuresh kumar
Nageswararao
L-7
TH
4
Semipucca
157
Perikeedu
57+320
Nuzvid
Bandaru Swetha satyanarayana
Krishanarao
L-7
NTH
5
Katcha
158
Perikeedu
57+350
Nuzvid
Maradani Sivanagaraju
Tatayya
L-7
NTH
3
Katcha
159
Perikeedu
57+360
Nuzvid
Rajamahendravarapu satyaswathi
Venkateswararaju
L-7
NTH
160
Perikeedu
57+650
Nuzvid
Bayya Mohanarao
Pitchiyya(late)
L-7
NTH
161
Perikeedu
57+700
Nuzvid
Jalidi Balakrishana
Raeddiyya
R-6.5
TH
162
Perikeedu
58+670
Nuzvid
Gujjala veraswamy(israyulu)
Ramaswamy
L-7
NTH
3
Katcha
163
Perikeedu
58+880
Nuzvid
Padmala Venkateswararo
Venkatanarasayya
L-7
NTH
5
Katcha
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
Semipucca
3
Pucca
Semipucca
Semipucca
Semipucca
Katcha
7
Pucca
Semipucca
Page 62
Pedana-Nuzvid-Visannapeta
Andhra Pradesh Road Sector Project
164
Meerjapuram
67+450
Nuzvid
Kota Simhachalam
Krishana
R-7
NTH
3
Katcha
165
Meerjapuram
67+460
Nuzvid
Vallepu Parameswararao
Raju
R-7.1
NTH
6
Katcha
166
Meerjapuram
67+500
Nuzvid
Olipi Venkateswarrao
Verayya
R-6.4
NTH
3
Katcha
167
Meerjapuram
67+500
Nuzvid
Tegala Chittemma
Verayya
R-6
NTH
3
Katcha
168
Meerjapuram
67+510
Nuzvid
Garika Bhagyam
Sambayya
R-6
NTH
2
Katcha
169
Meerjapuram
67+520
Nuzvid
Busi Adam
Prabhakararao
R-6
NTH
2
Katcha
170
Meerjapuram
67+540
Nuzvid
Mindiya Venkateswararao
Maddiramayya
R-6
NTH
5
Katcha
171
Meerjapuram
67+550
Nuzvid
Tegala Guruvulu
Veerayya
R-5.4
NTH
6
Katcha
172
Meerjapuram
67+550
Nuzvid
Dasari Yesu
Baalaraju
R-5.4
NTH
4
Katcha
173
Meerjapuram
67+560
Nuzvid
Gandikota Anjeneyulu
Venkateswararao
R-6.5
NTH
Katcha
174
Meerjapuram
67+660
Nuzvid
Rajulapati Nageswararo
Venkateswararao
L-6.9
NTH
3
1
0
175
Meerjapuram
67+790
Nuzvid
Tegala Chantibabu
Ramulu
L-7
NTH
2
Katcha
176
Meerjapuram
67+800
Nuzvid
Tegala Tirupathirao
Ramulu
L-7
NTH
6
Katcha
177
Meerjapuram
68+995
Nuzvid
Durga
Person Not Available
R-7
NTH
178
Gollapalli
72+050
Nuzvid
Venula Durgaprasad
kameswarao
R-7
NTH
3
Katcha
179
Gollapalli
72+100
Nuzvid
Tata Pullarao
Srirangam
R-7
NTH
4
Katcha
180
Gollapalli
72+210
Nuzvid
Konda vaddikasulu
Anjeneyulu
R-7
NTH
4
Katcha
181
Gollapalli
72+220
Nuzvid
Tata Rangarao
Person Not Available
R-6.1
NTH
2
Katcha
182
Gollapalli
72+405
Nuzvid
Valiveti Satyanarayana
Venkatakrishana
R-5.6
TH
2
Semipucca
183
Gollapalli
72+500
Nuzvid
Namala Jayaolaiah
Rangarao
R-6
NTH
0
Katcha
184
Gollapalli
72+530
Nuzvid
Shaik Choti
Mahaboob
R-6.8
NTH
4
Katcha
185
Gollapalli
72+565
Nuzvid
Talam Sriramulu
Ramayya
L-5.9
NTH
3
Katcha
186
Gollapalli
72+565
Nuzvid
Taluri Prubudas
Yesudas
L-6
NTH
6
katcha
187
Gollapalli
72+590
Nuzvid
Aripalli Suryanarayana
Veerayya
L-5
NTH
2
Katcha
188
Gollapalli
72+600
Nuzvid
Bokinala Subbarao
Raghunadam
L-6
NTH
6
katcha
189
Gollapalli
72+610
Nuzvid
Chittiboiena Rani
Kittarao
L-6
NTH
6
Katcha
190
Gollapalli
72+730
Nuzvid
Ketineni Kasturamma
Ramachandrarao
L-7
NTH
0
Katcha
191
Gollapalli
72+730
Nuzvid
Arepalli Bhushanam
Nageswararao
L-7.1
NTH
0
Katcha
192
Gollapalli
72+770
Nuzvid
Arepalli mohanarao
Chinaverayya
L-4.9
NTH
4
Katcha
193
Morsapudi
75+200
Nuzvid
Buddala Prabhakararao
Ramadasu W/0
R-6.4
NTH
5
Katcha
194
Morsapudi
75+220
Nuzvid
Mekhala Nagamma
Sayilu
R-6.6
NTH
4
Katcha
195
Tukkuluru
78+380
Nuzvid
Polimetala Devasahayam
Abraham
R-6.5
NTH
3
Katcha
196
Nuzvid
84+440
Nuzvid
Bala Vijayalaxmi
Rammohanarao
R-6.2
NTH
3
Semipucca
197
Nuzvid
84+440
Nuzvid
Atluri Venugopalarao
Amarayya
R-6.2
NTH
2
Semipucca
198
Nuzvid
84+415
Nuzvid
Kandikatla Bullemma
Ramarao
R-5.5
NTH
2
Semipucca
199
Nuzvid
84+415
Nuzvid
Andela Kotamma
Changayya
R-6.2
NTH
2
Katcha
200
Nuzvid
84+600
Nuzvid
Chikka Asirinaidu
Appalaswamy
L-6.5
NTH
4
Katcha
201
Nuzvid
85+400
Nuzvid
Naradala Baskararao
Venkataswamulu
L-6.5
NTH
5
Katcha
202
Annavaram
86+310
Nuzvid
Mulugumati Subbarao
Ramulu
R-7
NTH
4
Katcha
203
Annavaram
86+310
Nuzvid
SK Nanasaheb
Ameersaheb
L-5.6
NTH
0
Semipucca
204
Annavaram
86+310
Nuzvid
Sk Chandbasha
Ameersaheb
L-5.8
NTH
0
Semipucca
205
Annavaram
86+320
Nuzvid
Pilli Venkateswararo
Venkayya
R-6.9
NTH
4
Katcha
206
Annavaram
86+320
Nuzvid
Sudagani Saibabu
Gopiraju
R-6.4
TH
3
Semipucca
207
Annavaram
86+400
Nuzvid
Abdurao(late)
Person Not Available
R-7
NTH
3
Semipucca
208
Annavaram
86+505
Nuzvid
P.Madhusudhanarao
Person Not Available
R-6.2
NTH
209
Annavaram
86+720
Nuzvid
Ramisetti Venkateswararo
Nageswararao
L-6.3
NTH
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
Katcha
Katcha
Katcha
4
Page 63
Katcha
Pedana-Nuzvid-Visannapeta
Andhra Pradesh Road Sector Project
210
Annavaram
86+820
Nuzvid
Indala Pullayyya
Rajesh
L-6.3
NTH
0
Pucca
211
Annavaram
86+840
Nuzvid
A.Krishanachai
Badrayyya
L-6.2
NTH
0
Katcha
212
Annavaram
87+190
Nuzvid
SK.Nagulu
Daveed
L-6.3
NTH
0
Katcha
213
Annavaram
87+190
Nuzvid
Ramadasu Narasimhapatrudu
Ayyannapatrudu
L-6.2
NTH
3
Katcha
214
Annavaram
87+210
Nuzvid
Modipalli Suryanarayana
Ramakrishana
R-6.5
NTH
0
Katcha
215
Mittagudem
90+680
Nuzvid
Velivela Narasimharao
Venkataratnam
R-6
NTH
4
Semipucca
216
Leelanager
92+240
Nuzvid
Pilla Venkateswaramma
Rangarao
R-5.8
TH
8
Katcha
217
Leelanager
92+270
Nuzvid
Simhadri Sitaramaya
h/0Nagamalleswari
R-5.9
TH
2
Katcha
HouseHold
Father\husband name
Sl.No
No of Family Members
Name of the
Head(HHH)
Chanage
Division
Title
holder(TH)/NonTitleHolder(N
TH)
Name of the
Village
Location (Left\ Right)
PDF LIST - Pedana - Nuzvid - Visannapeta ROAD - Commercial Category
Type of
Structure
1
Pedna
7+000
Machilipatnam
Moganti Prasad
Narayanna Rao
L-1
TH
4
Semipucca
2
Pedna
7+000
Machilipatnam
Varudhu Balaji Kumar
Narayanna Rao
R-1
TH
5
Semipucca
3
Pedna
7+000
Machilipatnam
Dinduluri Srinivasarao
Kalkimurthy
R-1
TH
4
Semipucca
4
Pedna
7+000
Machilipatnam
Madisetty Maruthi
Late Satyanarayana
R-1
TH
5
5
Nadupuru
12+050
Machilipatnam
Parasa Ramachandrarajulu
Nancharayya
R-4.5
NTH
3
Semipucca
Semipucca
6
Vaddlamannadu
15+440
Gudivada
Jakkula Sureshbabu
Balayya
L-5
NTH
4
SemiPucca
7
Vaddlamannadu
15+450
Gudivada
Gudivada Venkateswarao
Person Not Available
R-6.2
NTH
0
Katcha
8
Vaddlamannadu
15+480
Gudivada
Vallabapurapu nancharayya
Venkateswarulu
R-6.5
NTH
3
Katcha
9
Vaddlamannadu
15+520
Gudivada
Thota Laxmayya
krishanamurthy
R-6.8
NTH
4
SemiPucca
10
Vaddlamannadu
15+560
Gudivada
Penneru jayapattabiramayya
Venugopalarao
L-6.8
NTH
2
SemiPucca
11
Vaddlamannadu
15+560
Gudivada
Garikipathi Tulasiram
Ragavulu
R-6.8
NTH
4
SemiPucca
12
Vaddlamannadu
15+560
Gudivada
Meda Venkateswarao
Adinarayana
R-7.2
NTH
4
Katcha
13
Vaddlamannadu
15+560
Gudivada
manda prasad
Ramarao
L-7
NTH
3
Katcha
14
Vaddlamannadu
15+590
Gudivada
kundeti Verayya
Ramayya
R-6.6
NTH
2
Katcha
15
Vemavaram
16+900
Gudivada
Vemula Srinivasarao
Veraragavulu
R-4.3
NTH
5
Katcha
16
Vemavaram
17+690
Gudivada
Mannem Srinu
Venkateswaralu
l-4.5
NTH
4
Katcha
17
Vemavaram
17+690
Gudivada
Mannem Somulu
Venkateswaralu
l-4.6
NTH
5
Katcha
18
Vemavaram
17+690
Gudivada
Mannem Ragavulu
Anjayya
L-4.5
NTH
5
Katcha
19
Vemavaram
17+690
Gudivada
Bolla Ankalu
nageswarrao
L-4.6
NTH
5
Katcha
20
Vemavaram
17+690
Gudivada
Mannem Ramachandrudu
Subbayya
L-4.6
NTH
5
Katcha
21
Vemavaram
17+690
Gudivada
Matta Ragavayya
Saianna
L-4.6
NTH
4
Katcha
22
Vemavaram
17+690
Gudivada
Chettibomma Tulasamma
Malleswararao
L-4.5
NTH
4
Katcha
23
Vemavaram
17+700
Gudivada
Pappula Peramma
Nancharayya
L-4.5
NTH
1
Katcha
24
Vemavaram
17+710
Gudivada
Tammisetty nookalu
nookalu
L-4.5
NTH
3
Katcha
25
Vemavaram
17+720
Gudivada
Tammisetty Durgarao
Suryanarayana
L-4.5
NTH
4
Katcha
26
Vemavaram
17+730
Gudivada
Matta Ragavayya
Saianna
L-4.5
NTH
4
Katcha
27
Vemavaram
17+730
Gudivada
mannem Pitchemma
pothuraju
L-4.5
NTH
4
Katcha
28
Vemavaram
17+750
Gudivada
Narepalli Srinivasarao
Rangarao
L-4.5
NTH
4
Katcha
29
Vemavaram
17+780
Gudivada
Manda Nagamani
Ramanjeneyulu
R-4.5
NTH
5
SemiPucca
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
Page 64
Pedana-Nuzvid-Visannapeta
30
kowthvaram
Andhra Pradesh Road Sector Project
22+120
Gudivada
Juvvadi Edukondalu
Venkateswarao
L-6.9
NTH
3
SemiPucca
Gudivada
Nara janardhanarao
Sobanadri
TH
0
SemiPucca
Rajulapati Srinivasarao
Merugumalla
Durgamaheswararao
Subbarao
NTH
5
Katcha
Venkataratnam
L-6
L6.75
L6.75
NTH
4
Katcha
31
Gudlavalleru
23+995
32
Angalur
27+860
Gudivada
Gudivada
33
Angalur
27+875
34
Bommuluru
31+600
Gudivada
Pallakattu veeraragavulu
venkatasubbayya
L-5.6
NTH
4
Katcha
35
Janardhanapuram
40+800
Gudivada
Kasimreddy
L-6.6
NTH
4
Semi
36
Janardhanapuram
41+100
Gudivada
Manda Srinu
Puttalamm Ammavari Shoping
complex
Person Not Available
R-6.3
NTH
0
Pucca
37
Janardhanapuram
41+170
Gudivada
Girijala Rammurthy
Apparao
R-7.2
NTH
0
SemiPucca
38
Janardhanapuram
41+220
Gudivada
Badam Venkatanarayana
Ragavayya
L-7
NTH
3
Katcha
39
Puttagunta
45+720
Gudivada
Sammangi Ramarao
Appalaswamy
R-6
NTH
0
Semipucca
40
Puttagunta
45+800
Gudivada
Oleti Satyavathi
Apparao
R-7
NTH
0
Semipucca
41
Shivayyapakalu
Arugolanu
48+700
Gudivada
Suvari Narasimhamurthy
Ramachandrarao
R-6.2
NTH
0
SemiPucca
42
50+650
Nuzvid
Chukkapu Nageswararo
Atchiyya
L-5.8
NTH
4
Katcha
43
Arugolanu
50+780
Nuzvid
Veeram Nageswararo
Venkateswararao(late)
L6.2
NTH
5
Katcha
44
Arugolanu
50+790
Nuzvid
Gottapu Sivanagamani
Apparao
R-6.5
NTH
45
Kanumolu
55+410
Nuzvid
Ramalle Chinna
DaVid
R-5
NTH
2
Katcha
46
Kanumolu
55+420
Nuzvid
Bethapudi Pramila
Villasambabu
R-4.5
NTH
2
Katcha
47
Kanumolu
55+800
Nuzvid
Bejwada Nageswararao
Hanumantharao
L-6.3
NTH
1
Semipucca
48
Kanumolu
55+800
Nuzvid
Matta Narayanarao
Venkataswamy
L-6.3
NTH
49
Kanumolu
55+890
Nuzvid
Garikipati Umamaheswarao
L-5.2
NTH
50
Kanumolu
55+930
Nuzvid
Vemulapalli Subramanyam
Venkateswararao
Srivenkataramalingach
arya
R-5.7
NTH
51
Kanumolu
55+940
Nuzvid
Suri Satyanarayana
Venkoji
L-6
NTH
4
Semipucca
52
Kanumolu
55+950
L-7
TH
3
Pucca
53
Kanumolu
55+960
Nuzvid
China Srinivasarao
Ramarao
R-5.7
TH
4
Pucca
54
Kanumolu
55+980
Nuzvid
Chinta Muralikrishana
Satyavenkataramarao
R-5.5
NTH
55
Kanumolu
56+050
Nuzvid
Rellu Subbarao
Ngeswrarao
R-6.2
TH
7
Pucca
56
Kanumolu
56+360
Nuzvid
Sunkara Laxmanarao
Surayya
L-5.5
NTH
2
Katcha
57
Perikeedu
57+650
Nuzvid
Lanka Gopalarao
Appalarao
L-6.5
NTH
58
Perikeedu
57+650
Nuzvid
Pabolu SS varaprasad
Nageswararao
L-6.5
NTH
4
Semipucca
59
Perikeedu
57+700
Nuzvid
Botcha.Krishanarao
Venkayya
R-7
NTH
4
Semipucca
60
Perikeedu
58+400
Nuzvid
Nagulapalli Edukondalu
Nageswararao
R-7
NTH
13
Katcha
61
Perikeedu
58+500
Nuzvid
Maddila Ganga
Venkateswarao
R-7
NTH
4
Katcha
62
Perikeedu
58+550
Nuzvid
Battu Manikyalarao
Baskararao
R-7
NTH
3
Semipucca
63
Perikeedu
58+650
Nuzvid
Partipati Agnesamma
Prabakar
L-7
NTH
9
Semipucca
64
Perikeedu
58+750
Nuzvid
Partipati Vijaykumar
Balaswamy
R-6.5
NTH
8
Katcha
65
Marribandam
64+300
Nuzvid
Pidugu Prasad
Anjeneyulu
R-7
NTH
4
Katcha
66
Marribandam
64+500
Nuzvid
Nadakudur Muttaiah
Subbarao
L-7
NTH
3
Katcha
67
Marribandam
64+500
Nuzvid
Shaik Babji
Mabu
L-6.7
NTH
10
Katcha
68
Marribandam
64+780
Nuzvid
Rayavarapu Subbarao
Person Not Available
L-7
NTH
4
Katcha
69
Marribandam
64+800
Nuzvid
Chirugudu Nagaraju
Appalaswamy
L-6.5
NTH
4
Katcha
70
Marribandam
65+800
Nuzvid
Potakamuri Rajababu
Gandhi
L-7
NTH
71
Marribandam
65+900
Nuzvid
Kombati Satyanarayana
Gopalam
R-6.8
NTH
72
Meerjapuram
67+490
Nuzvid
Merapadu Baskhararao
Maranna
L-6
NTH
3
Katcha
73
Meerjapuram
68+480
Nuzvid
Mathina Subbarao
Veerayya
L-7
NTH
2
Katcha
74
Meerjapuram
68+800
Nuzvid
Selam Satyanarayana
Seshagirirao
R-6
NTH
4
Semipucca
Dondi Durgarao
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
Page 65
Katcha
Semipucca
2
Pucca
Semipucca
Pucca
Katcha
Katcha
Katcha
Pedana-Nuzvid-Visannapeta
Andhra Pradesh Road Sector Project
75
Meerjapuram
68+910
Nuzvid
Sk Hamid
Abbulnabi
R-7
NTH
2
Katcha
76
Meerjapuram
68+920
Nuzvid
Sk Mastan
Parisaheb
L-6
NTH
2
Katcha
77
Gollapalli
72+100
Nuzvid
Attili Brahmam
Person Not Available
R-6
NTH
78
Gollapalli
72+400
Nuzvid
Shaik Dilshadbagem
Munnabasha
R-5.4
NTH
3
Katcha
79
Gollapalli
72+770
Nuzvid
Makaraju Rangaraju
Subbaraju
L-5.2
TH
2
Semipucca
80
Morsapudi
75+100
Nuzvid
MD Yusuf
Ibraheem
L-5
NTH
4
Katcha
81
Morsapudi
75+110
Nuzvid
Bejawada Bujji
Rangarao
R-5.5
NTH
4
Katcha
82
Tukkuluru
78+420
Nuzvid
Mohamad Kareemulla
Ibraheem
L-6.8
NTH
4
Semipucca
83
Tukkuluru
78+420
Nuzvid
Gonduboiena Sekhar
Venkatesh
R-6
NTH
2
Katcha
84
Nuzvid
84+200
Nuzvid
Puram Samrajyam
Venkateswararo
L-5
NTH
85
Nuzvid
84+480
Nuzvid
Vanapalli Laxmanarao
Narayana
R-6.4
NTH
5
Katcha
86
Annavaram
86+390
Nuzvid
Chukkala Nageswarrao
Kurmayya
R-4.6
NTH
4
Katcha
87
Annavaram
86+500
Nuzvid
Yadala Rajarao
Ramulu
L-5.8
TH
5
Semipucca
88
Annavaram
86+750
Nuzvid
Shaik Kaleeshavali
Kasimsaheb
R-6.7
TH
6
Semipucca
89
Annavaram
86+750
Nuzvid
Shaik Chanbasha
Ameersaheb
R-6.7
NTH
4
Semipucca
90
Annavaram
86+760
Nuzvid
Nerusu Upendhra
Koteswararao
L-7
NTH
0
Katcha
91
Annavaram
87+020
Nuzvid
Dasireddy Satyanarayana
Venkatakrishana
L-5.8
NTH
3
Semipucca
92
87+190
Nuzvid
Kota Suryanarayana
Venkataswamy
R-7
NTH
2
Katcha
93
Annavaram
Hunumuntulagud
em
89+710
Nuzvid
Ippagunta krishana
Narasimharao
R-6
NTH
0
Semipucca
94
Leelanager
92+300
Nuzvid
J.Subramanneswararao
L-5.6
NTH
4
Katcha
Katcha
Semipucca
Nadupuru
10+800
Nadupuru
10+800
Nadupuru
11+020
4
Vemavaram
16+900
Machilipatna
m
Machilipatna
m
Machilipatna
m
Gudivada
5
Vemavaram
17+750
Gudivada
1
2
3
Name of the
Head(HHH)
HouseHold
Father\husband
name
Title
holder(TH)/NonTitle
Holder(NTH)
No of Family
Members
Division
Chanage
Sl.No
Name of the
Village
Location (Left\
Right)
PDF LIST - Pedana - Nuzvid - Visannapeta ROAD - Residential & Commercial Category
Type of
Structure
Pamarthi Bramajirao
Narasimharao
R-6.3
NTH
4
Rajulapati Gowri rajulu
Gurunadham
L-6
NTH
5
Gandikota Dhanaraju
Kotayya
L-7
NTH
7
Yaragani Mohanarao
Mamillu
L-5.2
NTH
4
Katcha
Tammesetti Satyanarayana
Suryanarayana
L-4.5
NTH
4
SemiPucca
Katcha
Katcha
Katcha
6
kowthvaram
22+090
Gudivada
Jakka Nagamani
S/o Sanganna
R-5.3
NTH
2
Katcha
7
kowthvaram
22+100
Gudivada
Allu Narasamma
Apparao
R-6.8
NTH
1
Katcha
8
Gudlavalleru
23+800
Gudivada
Sonti Amareswari
Venkanna
R-5.2
NTH
4
Pucca
9
Gudlavalleru
23+810
Gudivada
MD.Muzeeurrab
Abdhullah
R-6.2
TH
5
Pucca
10
Gudlavalleru
24+000
Gudivada
K.Kameswaramma
KVKrishanarao
R-5.7
TH
4
SemiPucca
11
Gudlavalleru
23+834
Gudivada
S.Venkanna
Person Not Available
R-6.3
NTH
1
Pucca
12
Janardhanapuram
41+150
Gudivada
Manepalli Subramanyam
Adinarayana
L-6
NTH
6
semiPucca
13
Puttagunta
45+800
Gudivada
Valiveti Satyanarayana
Jayaharinadh
L-6.2
TH
2
Katcha
14
Puttagunta
45+810
Gudivada
Jayaharinadh
L-6.9
TH
5
Katcha
15
Kanumolu
55+820
Nuzvid
Valiveti Seshagirirao
Chamarthi
venkatanarasimharao
Viswanadham
R-6.2
NTH
2
Pucca
16
Kanumolu
55+860
Nuzvid
Allamuri Murali Krishana
Prasadarao
L-6.2
NTH
4
Pucca
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
Page 66
Pedana-Nuzvid-Visannapeta
Andhra Pradesh Road Sector Project
17
Kanumolu
55+870
Nuzvid
Chamarthi Venketeswararao
Rammohanarao
R-5
NTH
Pucca
18
Kanumolu
55+900
Nuzvid
Vanamala Eswararao
Nageswararao
R-6.5
NTH
4
Semipucca
19
Kanumolu
55+930
Nuzvid
Morla Venkateswramma
Vasantharao
R-5.5
NTH
1
Semipucca
20
Kanumolu
55+930
Nuzvid
polasi Pothuraju
Abimanyarao
R-5.5
NTH
4
Pucca
21
Kanumolu
55+940
Nuzvid
Maredu Rambabu
Sobhanachalam
R-5.7
NTH
4
Semipucca
22
Kanumolu
55+960
Nuzvid
mangayya
R-5
NTH
3
Pucca
23
Kanumolu
55+960
Nuzvid
Bhemavarapu Rangarao
Chintala
Ravivenkatasatyanarayana
Satyavenkataramarao
R-5.7
NTH
4
Pucca
24
Kanumolu
56+000
Nuzvid
Volusuri Venugopal
L-4.2
TH
5
Pucca
25
Kanumolu
56+200
Nuzvid
Bandili Satyanarayana singh
Subbisingh
L-6
NTH
26
Kanumolu
56+350
Nuzvid
Venkataratnam
R-7
TH
2
Semipucca
27
Kanumolu
56+350
Nuzvid
Naraharasetty Venkateswraro
Naraharasetty Venkatasatya
Gangadhar
Venkataratnam
R-7
TH
4
Semipucca
28
Perikeedu
57+300
Nuzvid
Singireddy Narakumari
Chennakesavarao
L-7
NTH
4
Semipucca
29
Perikeedu
57+320
Nuzvid
Gottapu Koteswararao
Paparao
L-7
NTH
3
Semipucca
30
Perikeedu
57+360
Nuzvid
Allu Trimurtulu
Narayanarao
L-6.5
NTH
4
Semipucca
31
Meerjapuram
67+620
Nuzvid
Badipati Isak
Person Not Available
L-6.2
NTH
5
Katcha
32
Meerjapuram
68+850
Nuzvid
Pamidikondala Radhakrishana
Ramachandrarao
L-5
NTH
2
Katcha
33
Gollapalli
72+070
Nuzvid
Pamarthi Kriskanakumari
Radhakrishana
L-7
NTH
1
Katcha
34
Gollapalli
72+405
Nuzvid
Shaik Babu
Abdhul
L-5.7
NTH
6
Semipucca
35
Annavaram
86+505
Nuzvid
Ede Savitri
Sambasivarao
R-5.4
TH
4
Katcha
36
Annavaram
86+720
Nuzvid
Katuri Subbarao
Venkayya
L-6.7
NTH
0
Katcha
37
Annavaram
86+820
Nuzvid
Mareedu Chennakesavarao
Narayana
L-5.9
NTH
5
Semipucca
Semipucca
Sl.No
Pedna
7+020
Pedna
7+120
Pedna
7+220
Pedna
7+280
Pedna
7+325
Pedna
7+360
Pedna
7+430
Pedna
7+450
Nadupuru
10+930
10
Reddipalaem
13+420
11
Reddipalaem
13+425
12
Reddipalaem
13
Reddipalaem
14
Reddipalaem
1
2
3
4
5
6
7
8
9
Machilipatna
m
Machilipatna
m
Machilipatna
m
Machilipatna
m
Machilipatna
m
Machilipatna
m
Machilipatna
m
Machilipatna
m
Machilipatna
m
Name of the
Head(HHH)
HouseHold
Father\husband
name
Title
holder(TH)/NonTitle
Holder(NTH)
No of Family
Members
Division
Chanage
Name of the Village
Location (Left\ Right)
PDF LIST - Pedana - Nuzvid - Visannapeta ROAD - Cattleshed Category
Varudhu Ramachandrarao
Subbarao
R-3
TH
3
jonabattula koteswaramma
Nancharayya
R-2
NTH
5
Varudhu Nancharayya
Subbarao
R-4.5
TH
6
Varudhu Ragavayya
Subbayya
R-6
NTH
3
Maruboiena Srinivasarao
Nageswarao
R-6
TH
6
Varudhu Venkateswararo
Koteswararo
L-5
NTH
5
Varudhu Suryachanrraro
Venkatasubbayya
R-9
NTH
13
Varudhu Subbarao
Madavarao
R-6
NTH
7
Polagiri nageswararao
Srimahathi
R-6.5
NTH
4
Type of
Structure
Katcha
Katcha
Katcha
Katcha
Katcha
Katcha
Katcha
Katcha
Gudivada
Katta Laxminarayana
Subbayya
R-8.2
TH
5
Katcha
Katcha
Gudivada
Bellamkonda Venkateswarao
Mallikarjunarao
L-7.5
NTH
4
Katcha
13+425
13+510
Gudivada
Bellamkonda Sahademudu
Pamarthi VeeraVenkateswarao
Mallikarjunarao
L-7.5
Rangarao
R-8
NTH
NTH
3
Gudivada
5
Katcha
Katcha
13+525
Gudivada
Pamarthi Venkataswamy
Ramayya
R-7
NTH
4
Katcha
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
Page 67
Pedana-Nuzvid-Visannapeta
Andhra Pradesh Road Sector Project
15
Reddipalaem
13+890
Gudivada
Pamarthi Ramesh
Dasaradharamayya
R-7
NTH
4
Katcha
16
Reddipalaem
13+900
Gudivada
Pamarthi Ankalarao
Ragavulu
R-7.5
NTH
2
Katcha
17
Reddipalaem
Parasa Reddemma
Kolusu Reddayya
L-9
Veraraju
L-6.5
NTH
TH
3
18
Gudivada
Gudivada
Durgayya
Vaddlamannadu
14+400
15+400
5
Katcha
Katcha
19
Vaddlamannadu
15+420
Gudivada
Madamala Sivaleela
Venkateswararao
R-5
NTH
2
Katcha
20
Vaddlamannadu
15+560
Gudivada
Yadaala Ramarao
Rajarao
L-6.2
NTH
2
Katcha
21
Vemavaram
16+820
Gudivada
Yarlagadda hunumantharao
Rammurthy
L-4.5
NTH
4
Katcha
22
Vemavaram
L-4.5
NTH
2
Vemavaram
Gudivada
Pamarthi Samrajam
Yarlagadda Nagapanindhra
Rangarao
23
16+880
16+900
Gudivada
M/o Vijayamma
L-5.5
NTH
3
Katcha
Katcha
24
Vemavaram
17+050
Gudivada
Sonti Venkateswarao
Veraswamy
L-5.2
TH
5
Katcha
25
Vemavaram
L-4.5
NTH
2
Gudivada
Vemula Durgarao
Vemula Veraanjeneyulu
Danayya
26
17+100
17+140
Gudivada
Vemavaram
Venkateswaralu
L-4.5
NTH
2
Katcha
Katcha
27
Vemavaram
17+140
Gudivada
Mannem Gopalarao
Daharmayya
L-4.5
NTH
3
Katcha
28
Vemavaram
17+150
Gudivada
Mannem ChinaRagavulu
Daharmayya
L-4.5
NTH
2
Katcha
29
Vemavaram
17+160
Gudivada
Mannem Nageswararao
Venkateswaralu
L-4.5
NTH
4
Katcha
30
Vemavaram
17+180
Gudivada
Mannem Pedaragavayya
Venkateswaralu
L-4.5
NTH
5
Katcha
31
Bommuluru
31+100
Gudivada
Gutta jagadesh chandrachowdary
Venkata swamy
R-7
NTH
4
Katcha
32
Bommuluru
31+620
Gudivada
Uyyapatti koteswararo
Duravasulu
R-9
NTH
6
Katcha
33
Janardhanapuram
40+820
Gudivada
Kondapalli Ravi
Akiripalli
R-7
NTH
4
Katcha
34
Janardhanapuram
41+400
Gudivada
Pilli Srinivasaarao
L-7
NTH
4
Katcha
35
Janardhanapuram
41+650
Gudivada
Narapareddy
R-8
NTH
3
Katcha
36
41+650
Gudivada
Rajarao
R-8
NTH
4
Katcha
37
Janardhanapuram
Arugolanu
Subbarao
Person Not
Available
Person Not
Available
53+650
Nuzvid
Varri Chakravarthi
Rajarao
R-8
NTH
5
Katcha
38
Kanumolu
55+430
Nuzvid
Dodda Koteswrarao
Ratnam
L-6
NTH
6
Katcha
39
Kanumolu
56+450
Nuzvid
Badicherla Narasimharao
Koteswararo
R-7.5
NTH
6
Katcha
40
Perikeedu
57+560
Nuzvid
Tavva Suryaprakasarao
Purnayya
L-7.2
NTH
6
Katcha
41
Perikeedu
58+880
Nuzvid
Padmala Venkateswararo
Venkatanarasayya
L7
NTH
6
Katcha
42
Marribandam
65+100
Nuzvid
Podhuri Srinu
Rattayya
R-7
NTH
3
Katcha
43
Meerjapuram
67+801
Nuzvid
Tegala Tirupathirao
Ramulu
L-7
NTH
7
Katcha
44
Annavaram
86+760
Nuzvid
Gholla Laxmayya
Chintayya
L-7.2
NTH
0
Katcha
45
Annavaram
86+820
Nuzvid
Ganduboiena Nagaraju
Ramarao
R-8
NTH
3
Katcha
Pedna
9+650
Nadupuru
12+050
3
Vaddlamannadu
15+440
Machilipatna
m
Machilipatna
m
Gudivada
4
Vaddlamannadu
15+450
Gudivada
5
Vaddlamannadu
15+480
6
Vaddlamannadu
15+520
1
2
Name of the
Head(HHH)
HouseHold
Father\husband name
Title
holder(TH)/NonTitl
eHolder(NTH)
No of Family
Members
Division
Location (Left\
Right)
Sl.No
Name of the
Village
Chanage
PDF LIST - Pedana - Nuzvid - Visannapeta ROAD - Kiosks Category
Type of
Structure
MD.Sardhar
Awa
L-5
NTH
3
Parasa Gopalkrishana
Nancharayya
R-4.5
NTH
5
Sk.Raheman
Not Available
L-5
NTH
0
Kiosk
N.Sambasivarao
Not Available
L-5.5
0
Kiosk
Gudivada
Udayagiri Venkateswararao
Person Not Available
R-6.5
NTH
NTH
0
Kiosk
Gudivada
Thota Umashankar
Person Not Available
L-7
NTH
3
Kiosk
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
Page 68
Kisok
Kiosk
Pedana-Nuzvid-Visannapeta
Vaddlamannadu
15+550
Gudivada
8
Vaddlamannadu
15+560
Gudivada
9
Vaddlamannadu
10
Vaddlamannadu
15+560
15+560
Gudivada
Gudivada
11
Vaddlamannadu
15+580
12
Vemavaram
13
Vemavaram
14
Vemavaram
7
Andhra Pradesh Road Sector Project
Thota
venkatanagaanjeneyulu
G.Nageswararao
NTH
2
Kiosk
Hunumantharao
L-6.8
Person Not Available
L-6.5
NTH
0
Kiosk
Gandam Rangarao
Garikipati laxmayya
Venkatakrishanarao
R-6.5
R-6.8
NTH
NTH
0
Ragavayya
4
Kiosk
Kiosk
Gudivada
NKV Subbarao
Venu
R-6.8
NTH
4
Kiosk
17+630
Gudivada
M.Ismail
Kondayya
L-4.2
NTH
6
Kisosk
17+690
Gudivada
Mannem Nageswararao
Venkateswaralu
L-4.5
NTH
1
Kisosk
17+700
Gudivada
Mannem Nageswararao
Person Not Available
L-4.5
NTH
2
Kisosk
15
Vemavaram
17+710
Gudivada
Tammisetty nookalu
nookalu
L-4.5
NTH
3
Kisosk
16
Vemavaram
17+730
Gudivada
Akurathi hema
Srinivasarao
L-4.5
NTH
4
Kisosk
17
Vemavaram
17+730
Gudivada
Munagala Pramela
Danumjay
L-4.5
NTH
4
Kisosk
18
Vemavaram
17+730
Gudivada
Satyanarayana
Person Not Available
L-4.5
NTH
3
Kisosk
19
Vemavaram
17+780
Gudivada
Srisylam
Person Not Available
L-4.5
NTH
3
Kisosk
20
Vemavaram
17+810
Gudivada
Sarveswararao
Person Not Available
L-4.5
NTH
0
Kisosk
21
Vemavaram
17+810
Gudivada
Basaveswararao
Person Not Available
L-4.6
NTH
0
Kisosk
22
Vemavaram
17+820
Gudivada
Tammisetty Suryanarayana
Person Not Available
R-6
NTH
0
Kisosk
23
Vemavaram
17+820
Gudivada
kagita Veranjeneyulu
Person Not Available
R-6
NTH
0
Kisosk
24
Vemavaram
17+830
Gudivada
Bapanayya
Person Not Available
R-6
NTH
0
Kisosk
25
Vemavaram
17+830
Gudivada
Chetturu jaganadharao
nageswarrao
R-6
NTH
4
Kisosk
26
Vemavaram
17+840
Gudivada
Narapalem krishana
Rangarao
L-6
NTH
5
Kiosk
27
Vemavaram
17+840
Gudivada
Bodda Romahanaramesh
pullarao
L-6
NTH
3
Kiosk
28
kowthvaram
22+065
Gudivada
koreni Appayamma
Chittibabu
L-4.4
NTH
3
Katcha
29
kowthvaram
22+070
Gudivada
Allu suryanarayana
W/o Atchinaidu
L-6
NTH
3
SemiPucca
30
kowthvaram
22+120
Gudivada
Sonayala Suryanarayan a
Satyam
R-6.8
NTH
1
Kiosk
31
Gudlavalleru
22+780
Gudivada
Alajangi Lingamurthy
Sambayya
R-9
NTH
0
Kiosk
32
Gudlavalleru
23+000
Gudivada
Ch.Krishana
Musalayya
R-8
NTH
4
Kiosk
33
Gudlavalleru
23+000
Gudivada
Miriyala veranjeneyulu
Veravenkayya
R-8
NTH
6
Kiosk
34
Gudlavalleru
23+030
Gudivada
Mukkudi Rajasekhar
Setti narayana
R-6
NTH
2
Kiosk
35
Gudlavalleru
23+220
Gudivada
kaja pandu
Gangayya
R-7
NTH
5
Kiosk
36
Gudlavalleru
23+220
Gudivada
katuri Arjunrao
Person Not Available
R-7
NTH
4
Kiosk
37
Gudlavalleru
23+990
Gudivada
Mutthireddy Sekhar
Nagamalleswararao
L-6
NTH
4
Kiosk
38
Gudlavalleru
23+860
Gudivada
v.laxmiPrasadarao
Person Not Available
L-7.2
NTH
0
Kiosk
39
Angalur
27+820
Gudivada
Vadladi Jagadish
Subbarao
R-7.3
NTH
4
Kiosk
40
Angalur
27+820
Gudivada
Dhulupudi Nagamalleswar
Venkataramana
R-7.3
NTH
2
kiosk
41
Angalur
27+830
Gudivada
Kodali Madhu
Venkataratnam
L-6.7
NTH
5
Kiosk
42
Angalur
27+850
Gudivada
Merugumalla Srinivasarao
Bheemarao
R-8.8
NTH
4
Katcha
43
Bommuluru
31+200
Gudivada
Cheboiena Umadevi
Venkateswararao
R-8
NTH
2
kiosk
44
Bommuluru
31+430
Gudivada
Rangula Raju
Tadayya
R-8.5
NTH
4
kiosk
45
Bommuluru
31+600
Gudivada
Late)Harinadh
R-8.8
NTH
3
Kiosk
46
Bommuluru
31+610
Gudivada
Sonti Dhanalaxmi
Chilakabatthina
Chinakoteswararao
padalalu
L-7.3
NTH
3
Kiosk
47
Bommuluru
31+620
Gudivada
Chilakabatthula nagaraju
Sreeramulu
L-6.1
NTH
4
Kiosk
48
Gudiwada
37+220
Gudivada
Ramanapudi Suresh
Venkateshswararao
l-8
NTH
5
Kiosk
49
Janardhanapuram
39+400
Gudivada
Godavalli Sambasivarao
Parasuramayya
L-5
NTH
2
Kiosk
50
Janardhanapuram
40+880
Gudivada
Marikayalareddy
L-9.5
NTH
0
Kiosk
51
Janardhanapuram
40+890
Gudivada
Tammi Narapureddy
Bommanapalli
Venkataswamy
Chinna
L-8.2
NTH
0
Kiosk
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
Page 69
Pedana-Nuzvid-Visannapeta
Andhra Pradesh Road Sector Project
52
Janardhanapuram
41+000
Gudivada
kokkerapati Subbaramayya
krishana
L-9.5
NTH
0
Kiosk
53
Janardhanapuram
41+080
Gudivada
Annem koteswararao
iyyanna
R-6
NTH
5
Kiosk
54
Janardhanapuram
41+100
Gudivada
Pavisa Rammohanarao
Venkatanarayana
L-6.9
NTH
2
Kiosk
55
Janardhanapuram
41+100
Gudivada
Manepalli subbarao
Adinarayana
R-6
NTH
2
Kiosk
56
Janardhanapuram
41+110
Gudivada
Muddula Gopalakrishana
Ramanjaneyulu
R-6.5
NTH
4
Kiosk
57
Janardhanapuram
41+150
Gudivada
Vempala Venkatalaxmi
Person Not Available
L-5
NTH
0
Kiosk
58
Janardhanapuram
41+150
Gudivada
C.Vijaya
Person Not Available
R-7
NTH
0
Kiosk
59
Janardhanapuram
41+155
Gudivada
S.Venkatasitaramayya
Amba lakshmaiah
L-6.8
NTH
0
Kiosk
60
Janardhanapuram
41+200
Gudivada
Awalomdhar Ajibabau
Hoozoor
L-7
NTH
2
Kiosk
61
Janardhanapuram
41+210
Gudivada
Mekala laxmi
kanakapothuraju
L-8
NTH
3
Kiosk
62
Janardhanapuram
41+500
Gudivada
pattumuri Satyanarayana
Krishana
L-7.2
NTH
4
Kiosk
63
Puttagunta
Arugolanu
45+800
Gudivada
maddala Venkateswararo
Person Not Available
L-8
NTH
0
Kiosk
64
50+600
Nuzvid
Reddysobhana chalapathirao
Atchiyya
L-7.8
NTH
2
Kiosk
65
Arugolanu
50+740
Nuzvid
Varalaxmi
R-6.2
NTH
3
Kiosk
51+150
Nuzvid
V.Kesavarao
Vadavalli Sivabully
challyya
Manikyarao
L-6.5
NTH
67
Kanumolu
55+645
Nuzvid
Chintapalli Prasannakumari
Prabhakar(late)
R-8
NTH
3
Kiosk
68
Kanumolu
55+670
Nuzvid
Chinnam Siyyaon
Somayya
R-7
NTH
1
Kiosk
69
Kanumolu
55+740
Nuzvid
kattumala Adrutstarao
Imannual
R-5.5
NTH
1
Kiosk
70
Kanumolu
56+980
Nuzvid
Panchakarla Satyanarayana
Venkataramana
R-8
NTH
4
Kiosk
71
Kanumolu
56+980
Nuzvid
Vijayakumar
Bhyragi
R-4.2
NTH
Kiosk
72
Kanumolu
56+070
Vanukuri Edukondalu
Satyanarayana(late)
L-10
NTH
Kiosk
73
Perikeedu
57+350
Nuzvid
Vankuri Hunumantharao
Verayya
L-7
NTH
Kiosk
74
Perikeedu
57+650
Nuzvid
Singarapu Durgarao
Simhachalam
R-7.5
NTH
75
Marribandam
64+700
Nuzvid
Rayavarapu Swami
Rangarao
L-6.4
NTH
4
Kiosk
76
Marribandam
64+720
Nuzvid
Aladangi Ugadi
Chinnarao
L-6
NTH
4
Kiosk
77
Marribandam
64+745
Nuzvid
Vaddadi Trinadh
Appalaswamy
L-7
NTH
0
Kiosk
78
Marribandam
64+810
Nuzvid
Machavarapu Tirupatayya
Ramdhar
L-6
NTH
2
Kiosk
79
Marribandam
65+850
Nuzvid
Vadduluri Venkateswararo
Raghavalu
L-8.1
NTH
6
Kiosk
80
Marribandam
65+850
Nuzvid
Jakkula Laxmi
Venkataramana
L-8.1
NTH
2
Kiosk(2shops
81
Marribandam
65+850
Nuzvid
Chabathina Ratnasamual
Samual
R-8
NTH
Kiosk
82
Meerjapuram
68+910
Nuzvid
Sedirala Koteswararao
Venkatasubbarao
L-8
NTH
kiosk
83
Meerjapuram
68+940
Nuzvid
Sutrala Rangarao
Subbarao
R-7.3
NTH
kiosk
84
Meerjapuram
68+940
Nuzvid
Maragani Nehrukanth
Ayanna
R-9
NTH
85
Meerjapuram
68+960
Nuzvid
Maddirala NagaSriragavarao
Venu
L-9
NTH
86
Meerjapuram
69+030
Nuzvid
Yarramsetty Loknadh
Tirupatiayya
L-8.5
NTH
87
Gollapalli
72+100
Nuzvid
Penumada Kalebu
Venkataratnam
L-9
NTH
3
kiosk
88
Gollapalli
72+180
Nuzvid
Koduru Nageswararao
Subbarao
L-7
NTH
2
kiosk
89
Gollapalli
72+200
Nuzvid
Owner not Available
Person Not Available
90
Gollapalli
72+265
Nuzvid
Shaik Meerjavali
Kaream
R-6
NTH
4
Kiosk
91
Gollapalli
72+410
Nuzvid
Mylavarapu Tirapatirao
Raghunadam
L-6.8
NTH
0
kiosk
92
Gollapalli
72+710
Nuzvid
Venkayya
L-5.7
NTH
4
Kiosk
93
Gollapalli
72+720
Nuzvid
Ulaga Krishana
Mylavarapu
Venkateswararao
Subbarao
R-5.3
NTH
4
Kiosk
94
Morsapudi
75+200
Nuzvid
G.Apparao
Person Not Available
R-6.4
NTH
4
Kiosk
95
Tukkuluru
78+430
Nuzvid
Badugu Venkateswararao
Kondayya
L-8
NTH
5
Kiosk
96
Tukkuluru
78+430
Nuzvid
Kosuri Srinivasarao
Venkateswararao
R-6.8
NTH
4
Kiosk
97
Tukkuluru
78+430
Nuzvid
Kosaraju Rajarao
Person Not Available
R-7.2
NTH
6
Kiosk
66
Arugolanu
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
Kiosk
Kiosk
5
kiosk
kiosk
kiosk
NTH
kiosk
Page 70
Pedana-Nuzvid-Visannapeta
Andhra Pradesh Road Sector Project
98
Annavaram
86+770
Nuzvid
Satyanarayana
Jaganadham
L-7.8
NTH
0
Kiosk
99
86+820
Nuzvid
Koppakala Sitaramayya
Venkateswrarao
L-7.5
NTH
0
Kiosk
100
Annavaram
Hunumuntulagude
m
89+880
Nuzvid
Polapaka Sudhakar
Prasadarao
L-8
NTH
5
kiosk
101
Mittagudem
90+680
Nuzvid
Velivela Gopalaswamy
Venkataratnam
R-8.8
NTH
2
Kiosk
102
Mittagudem
90+705
Nuzvid
Chalamala Sambasivarao
Bulliramayya
R-7.8
NTH
6
Kiosk
103
Mittagudem
90+900
Nuzvid
Janga Somasundhar
Yakobu
L-7.5
NTH
0
Kiosk
104
Leelanager
92+180
Nuzvid
Kethe Jaganadharao
Seetayya
L-8
NTH
4
Kiosk
105
Leelanager
92+180
Nuzvid
Kethe Sheshamma
Tirupatayya
L-6.9
NTH
5
Kiosk
ANNEXURE 2.3: COMMUNITY PROPERTY RESOURCES OF PEDNA- NUZVID- VISANNAPETA ROAD.
S.no
Name of the Common Property Resources
Chainage
Location
(Left/Right)
Distance from
the Centre line
in Mts)
Remarks
1
Eadgah
9+300
Right
3
Situated in Proposed By
pass
2
Hanuman Temple
12+020
Left
5
Direct Affect.
3
Human Temple
13+750
Left
6
Direct Affect.
4
Kondalamma Temple
17+700
Left
5
Direct Affect.
5
sai temple
22+100
Left
1.5
Indirect Affect.
6
Human Temple
23+650
Left
5
Direct Affect.
7
Ram temple
23+750
Left
5
Direct Affect.
8
Krishna Temple
24+000
Left
6.5
Direct Affect.
9
Hanuman Temple
27+850
Left
7.4
Direct Affect.
10
Krishana Temple
27+865
Right
7.3
Direct Affect.
11
Ram temple
31+160
Left
15
Indirect Affect.
12
Church
31+600
Left
6.5
Direct Affect.
13
Hunuman Temple
39+420
Right
8
Direct Affect.
14
Ayyappa Swami Temple
39+420
Right
9
Direct Affect.
15
Temple
39+450
Right
18
Indirect Affect.
16
Sivalayam Temple
41+000
Left
7
Direct Affect.
17
Ganapathi Temple
45+640
Left
5
Direct Affect.
18
Church
46+220
Right
8
Direct Affect.
19
Temple
47+800
Right
10
Direct Affect.
20
Temple
49+000
Left
10
Direct Affect.
21
Catalic Church
50+350
Left
8
Indirect Affect.
22
Temple
50+700
Left
8
Direct Affect.
23
Sai temple
50+975
Left
7
Direct Affect.
24
Sai temple
51+100
Right
8
Direct Affect.
25
Krishana temple
51+210
Left
8
Direct Affect.
26
Temple
51+400
Left
9
Direct Affect.
27
Temple
51+500
Left
12
Indirect Affect.
28
KrishanaTemple
53+700
Left
9
Direct Affect.
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
Page 71
Pedana-Nuzvid-Visannapeta
Andhra Pradesh Road Sector Project
29
Church
55+625
Left
9
Indirect Affect.
30
Church prayer hall
55+700
Right
9
Indirect Affect.
31
Statue(Jesus & CPI)
55+800
Left
7
Direct Affect.
32
Ramalayam Temple
55+810
Left
6
Direct Affect.
33
Ramalayam Temple
55+950
Left
7
Direct Affect.
34
Hanuman Temple & pond
56+050
Left
5.5
Direct Affect.
35
sai temple
56+200
Left
9
Direct Affect.
36
Temple
57+300
Left
4.5
Direct Affect.
37
Ayyappa Swami Statue
57+450
Left
5
Direct Affect.
38
Temple Ayyappa Swamy
57+450
Left
12
Indirect Affect.
39
Statues of Gandhi garu and Subashchandrabosu
garu
57+550
Right
8.5
Direct Affect.
40
VinayakaTemple
64+300
Left
4.5
Direct Affect.
41
HunumanTemple
64+500
Right
6.5
Direct Affect.
42
Temple & Tap
65+810
Left
5.5
Direct Affect.
43
Temple
67+600
Left
5.5
Direct Affect.
44
Hunuman Temple
68+000
Right
7
Direct Affect.
45
Veerabramamgari Tempel
69+100
Right
8
Direct Affect.
46
Hanuman Temple
72+450
Left
7
Direct Affect.
47
Hanuman Statue
75+100
Left
7
Direct Affect.
48
Jesus statue
75+200
Left
7
Direct Affect.
49
Ganesh temple
75+400
Right
8
Direct Affect.
50
Hanuman temple
77+200
Left
6.2
Direct Affect.
51
mosque
78+250
Right
12.5
Indirect Affect.
52
Temple
84+200
Right
12
Indirect Affect.
53
Hanuman Temple
85+400
Right
12
Indirect Affect.
54
Temple
86+400
Left
6
55
Ram temple
86+700
Left
7
56
Temple, School
88+400
Left
20
Indirect Affect.
57
Hanuman Statue
89+500
Right
6.5
Direct Affect.
58
Hanuman temple
89+600
Right
8
Direct Affect.
59
church
90+700
Right
7
Direct Affect.
60
Hunman temple
91+750
Left
10
Direct Affect.
61
Temple, water tap
92+290
Left
8
Direct Affect.
62
Temple troc
93+300
Right
5.5
Direct Affect.
63
Hanuman temple
94+700
Left
10
Indirect Affect.
64
Trees
62+500 to 94+ 770
Both Sides
5 to 6 mts
distance
Direct Affect.
65
Tree ( temple)
7+000
Right
1
Situated in Proposed By
pass
66
Tree
23+850
L/R
7
Direct Affect.
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
Page 72
Pedana-Nuzvid-Visannapeta
Andhra Pradesh Road Sector Project
67
Tree & Rachabanda
31+100
Left
8
Direct Affect.
68
Pond & Tree
45+650
Left
8
Direct Affect.
69
Tree ( temple)
56+100
Left
6
Direct Affect.
70
Tree & Rachabanda
64+720
Left
4
Direct Affect.
71
Tree & Rachabanda
72+220
Left
8
Direct Affect.
72
Tree & Rachabanda
90+700
Right
5
Direct Affect.
73
Big pond
23+820
Left
9
Indirect Affect.
74
Pond
31+100
Left
8
Direct Affect.
75
Pond
40+900
Right
5
Direct Affect.
76
Big pond
43+200 & 500
Right
4
Direct Affect.
77
Pond
44+450
Right
8
Direct Affect.
78
Pond
46+750
Right
10
Indirect Affect.
79
Pond
55+400
Left
9
Indirect Affect.
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
Page 73
Pedana-Nuzvid-Visannapeta
Andhra Pradesh Road Sector Project
OTHER STRUCTURES OF PEDNA- NUZVID- VISANNAPETA ROAD.
S.no
Name of the Other Property Resources
Chainage
Location
(Left/Right)
Distance from
the Centre line
in Mts)
Remarks
1
School
31+350
Left
10
Indirect Affect.
2
School
51+400
Left
9
Direct Affect.
3
School
55+600
Left
5
Direct Affect.
4
School
56+300
Left
10
5
High School
56+350
Left
6
Direct Affect.
6
School
77+800
Right
12
Indirect Affect.
7
Well
7+550
Right
1
Situated in Proposed By
pass
8
Tap
10+900
Right
5
Direct Affect.
9
Public Well
11+000
Left
6.5
Direct Affect.
10
Public Well
12+000
Left
6.5
Direct Affect.
11
Public Tap
12+020
Left
6.5
Direct Affect.
12
Well and Hand pump
17+000
Left
8
Direct Affect.
13
Public well
22+100
Left
10
Direct Affect.
14
tap
22+100
Left
6
Direct Affect.
15
Public well
22+200
Right
8
Direct Affect.
16
Water Tap
31+020
Right
6
Direct Affect.
17
Water Tap
37+350
Left
8.5
Direct Affect.
18
Direct Affect.
19
Tap
39+525
Right
7
Direct Affect.
20
Tap
41+600
Left
6
Direct Affect.
21
Tank, Tap, School
45+600
Right
15
Indirect Affect.
22
Tap
45+800
Right
7
Direct Affect.
23
Tap
45+850
Right
6
Direct Affect.
24
Tap
46+200
Right
6
Direct Affect.
25
Taps(Panchayathi)
50+500 to 50+750
Left -2taps Right5taps
6 to 7 mts
Direct Affect.
26
Temple & Tap
65+810
Left
5.5
Direct Affect.
27
Tap
67+640
Left
6
Direct Affect.
28
Tap
72+550
Left
8
Direct Affect.
29
Tap
75+180
Left
8
Direct Affect.
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
Page 74
Pedana-Nuzvid-Visannapeta
Andhra Pradesh Road Sector Project
30
Hand pump
84+650
Right
5
Direct Affect.
31
Hand pump
87+950
Left
5
Direct Affect.
32
Tap
88+400
Left
6
Direct Affect.
33
Hand pump
88+600
Left
6
Direct Affect.
34
Hand pump
89+580
Left
5
Direct Affect.
35
Hand pump
89+950
Left
6
Direct Affect.
36
Tap
90+580
Left
4
Direct Affect.
37
Temple, water tap
92+290
Left
8
Direct Affect.
38
Tap
92+500
Left
5
Direct Affect.
39
Tap
92+500
Right
5
Direct Affect.
40
Hand pump
93+300
Left
6
Direct Affect.
41
Govt.Ayurvedik Hospital
56+250
left
13
Indirect Affect.
42
BSNL tele Box
10+900
Left
7.8
Direct Affect.
43
Ele Bill Collection Center
23+650
Left
5
Direct Affect.
44
Milk Society
40+900
Right
5
Direct Affect.
45
Panchyat Office
41+100
Right
7
Direct Affect.
46
Panchyat Office
45+650
Right
7.6
Direct Affect.
47
Milk Society & Collection centre
51+240
8.5
Direct Affect.
48
library
51+250
Left
10
Direct Affect.
49
Panchyat Office
51+300
Left
9
Direct Affect.
50
Agriculturel Cooprative Socity Building
&Gowdown
51+350
Right
9
Direct Affect.
51
Panchyat Office
56+010
Left
7
Indirect Affect.
52
library
56+260
Left
11
Indirect Affect.
53
Agriculturel Cooprative Socity Building
56+270
Left
9
Direct Affect.
54
Sub Register Office
56+350
Right
9
Indirect Affect.
55
BSNL office
58+950
Right
7.8
Indirect Affect.
56
Check Post
92+300
Left
5
Direct Affect.
57
Bus Shelter
10+650
Left
6
Direct Affect.
58
Bus Shelter
10+900
Left
7.8
Direct Affect.
59
Bus Shelter
13+750
Right
6.5
Direct Affect.
60
Bus Shelter
17+100
Right
8
Direct Affect.
61
Bus Shelter
17+820
Left
6
Direct Affect.
62
Bus Shelter
22+800
Left
7
Direct Affect.
63
Bus Shelter
23+650
Left
5
Direct Affect.
64
Committee Hall
23+800
Left
6
Direct Affect.
65
Subhasu Chandra Bose Statue
23+800
Left
6
Direct Affect.
66
Bus Shelter
23+900
Left
8
Direct Affect.
67
Krishna Temple Land
24+000
Left
6.5
Direct Affect.
68
Statue of NTR
24+050
Left
5
Direct Affect.
69
Bus Shelter
26+700
Left
5
Direct Affect.
70
Bus Shelter
27+820
Right
7.5
Direct Affect.
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
Page 75
Pedana-Nuzvid-Visannapeta
Andhra Pradesh Road Sector Project
71
Bus Shelter
27+875
Left
8.35
Direct Affect.
72
NTR Statue
31+150
Left
8.5
Direct Affect.
73
Bus Shelter
31+200
Right
8
Direct Affect.
74
Br.Ambedkar Statue
37+200
Right
10
Indirect Affect.
75
Bus Shelter
37+450
Left
6.5
Direct Affect.
76
Municipal Waste
38+900
Right
10
Indirect Affect.
77
Bus Shelter
39+300
Right
7
Direct Affect.
78
TDP Flag
40+800
Right
6
Direct Affect.
79
CPM Flag
40+800
Right
6
Direct Affect.
80
YSR Flag
40+810
Right
6
Direct Affect.
81
Community Hall
40+810
Right
6
Direct Affect.
82
Over Head Tank
41+000
Left
12
Indirect Affect.
83
YSR Statue
41+100
Left
8.5
Direct Affect.
84
Bus Shelter
41+100
Right
7
Direct Affect.
85
YSR Flag
45+790
Left
6
Direct Affect.
86
Community Hall
45+800
Left
8
Direct Affect.
87
Community Hall
46+400
Right
8
Direct Affect.
88
Ambedkar Statue
46+500
Right
13
Indirect Affect.
89
Bus Shelter
49+200
Left
6.4
Direct Affect.
90
Church Ground
50+350
Left
12
Indirect Affect.
91
Bus Shelter
50+800
Left
7
Direct Affect.
92
Abbedkar Statue
50+800
Left
8
Direct Affect.
93
Youth Community Hall
51+210
Left
9
Direct Affect.
94
Dr.Water Plant
51+230
Left
9
Direct Affect.
95
Nethaje Statue
50+300
Left
9
Direct Affect.
96
Over Head Tank
51+350
Left
8
Direct Affect.
97
Cemetery
55+300
Left
7
Direct Affect.
98
Over Head Tank
55+500
Right
15
Indirect Affect.
99
Ambedkar Statue
55+750
Right
12
Indirect Affect.
100
Statue(Jesus & CPI)
55+800
Left
7
Direct Affect.
101
Statue & Committee Hall
56+150
Left
9
Indirect Affect.
102
Bus Shelter
56+340
Left
8
Direct Affect.
103
Bus Shelter
57+550
Right
8.5
Direct Affect.
104
Statues of Gandhi garu and Subashchandrabosu
garu
57+550
Right
8.5
Direct Affect.
105
JMJ junior College
58+925
Right
8.2
Indirect Affect.
106
JMJ junior College
58+950
Right
8.2
Indirect Affect.
107
NTR Statue
64+850
Left
6
Direct Affect.
108
Bus Shelter
68+500
Right
10
Direct Affect.
109
Over Head Tank
69+100
Right
15
Indirect Affect.
110
Bus Shelter
72+200
Right
9
Direct Affect.
111
Bus Shelter
72+400
Left
6
Direct Affect.
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
Page 76
Pedana-Nuzvid-Visannapeta
Andhra Pradesh Road Sector Project
112
Bus Shelter
75+050
Left
6.5
Direct Affect.
113
TDP Flag
75+100
Left
6.5
Direct Affect.
114
Congrase Flage
75+110
Left
6
Direct Affect.
115
Bus Shelter
76+180
Left
7
Direct Affect.
116
Bus Shelter
78+500
Right
6.2
Direct Affect.
117
IFTU Flag
87+720
Left
5.5
Direct Affect.
118
CPI Statue
87+940
Left
5
Direct Affect.
119
TDP Flag
87+950
Left
6.5
Direct Affect.
120
Bus Shelter
87+950
Right
6
Direct Affect.
121
Bus Shelter
90+050
Left
7
Direct Affect.
122
NREGS Board
90+18
Right
5.5
Direct Affect.
123
NRGS Board
91+830
Left
5
Direct Affect.
124
Scheme NGRY - Display Board
94+400
Left
4.5
Direct Affect.
125
Trees
62+500 to 94+ 770
Both Sides
5 to 6 mts
distance
Direct Affect.
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
Page 77
Pedana-Nuzvid-Visannapeta
Andhra Pradesh Road Sector Project
ANNEXURE 2.4 : CONSULTATION FINDINGS
Participant
Issue
Discussed
Suggestion
Important
Finding
Venue-Janardhanpuram, Machilipatnam
Project Preparation Team: Social, environmental and technical expert of the consultant,
environmental officer APRDC, Stakeholders: Local engineers(R&B),MRO, Dy S.P., MLA
representatives, Revenue officials, Elected representatives of local self- Government
 Relocation of temple in general from road side
 Importance and utility of ponds
 Cost of agricultural Land
 Submerged stretches
 Migration and HIV/AIDS issues
 Relocation is possible if replacement is done
 Pond is source of potable water , fish farming is done thus source of livelihood so minimize
impact on pond
 Cost of land is very high because it is a productive land of lower deltaic flood plain
 Land acquisition should be minimized
 Direct purchasing of land should be done to avoid litigation
 HIV/AIDS is not considered important because of low level of awareness and people find
restricted themselves in discussing HIV/AIDS issue
 Land acquisition strategy should be devised
 HIV/AIDS awareness campaign should be part of social management plan to generate awareness
and BCC among general people
Future
course of
Action
Venue: Nadupuru,Pedna,Krishna
Project Preparation Team: Social, environmental and technical expert of the consultant,
environmental officer APRDC,
Participant
Stakeholders: Local engineers(R&B),MRO, MLA representatives, Revenue officials, Elected
representatives of local self- Government
 All ready encroachment have been compensated by 2 Cents and Rs 33000 per family for
construction
Issue
 Cost of relocation of pucca structure in the village and cost of land
Discussed
 Tree cutting
 Utility shifting
 Migration and HIV/AIDS issues
 Multiple displacement of commercial families should be avoided
 Acquisition of pucca structure should be avoided
Suggestion
 Cost of land is very high because it is a productive land of lower deltaic flood plain
 Tree cutting is part of Government so Government should take care of such issues
Important
 People are very cooperative.
 Involvement of local R&B engineers in project planning will be key to successful
Finding
implementation of land acquisition.
Future
 Land acquisition strategy has been devised
 HIV/AIDS awareness campaign has become of social management plan(SMP).
course of
Action
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
Page 78
Pedana-Nuzvid-Visannapeta
Andhra Pradesh Road Sector Project
Annexure: 3.1: CHAINAGE WISE ENCUMBRANCE DETAILS
Chainage
S.No
Type Of Encumberances
Village
Remarks
From
To
LA
LA and
R&R
R&R and
CPR
Encumbrance Free
Stretch
PNV - 8
1
Pedna
2
Nadupuru
3
Reddipalem
4
5
6
7
8
9
10
Vadlamadugu
Vemavaram
Kowtaram
Gudlavalleru
Anguluru
Bommuluru
Gudivada
11
Janardhanapuram
12
Puttagunta
13
14
Shivayypakalu
Arugolalu
7+000
7+500
7+500
9+650
9+650
9+850
9+850
10+700
10+700
12+100
12+100
13+400
13+400
14+400
14+400
15+190
15+190
15+360
15+360
16+740
16+740
17+840
17+840
18+900
18+900
21+000
21+00
22+065
22+065
22+200
22+200
22+760
22+760
23+860
23+860
25+500
25+500
25+750
25+750
27+820
27+820
28+010
28+010
31+000
31+000
31+330
31+330
31+430
31+430
37+220
37+220
37+400
37+400
39+400
39+400
41+770
41+770
45+200
45+200
46+400
46+400
48+700
48+700
48+710
48+710
50+500
50+500
51+400
51+400
54+000
500
2150
Bye Pass
200
850
1400
1300
1000
790
170
1380
1100
1060
2100
Bye Pass
1065
135
560
1100
1640
250
2070
190
2890
330
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
100
5790
180
2000
970
3430
1200
2300
10
1790
900
2600
Page 79
Pedana-Nuzvid-Visannapeta
15
16
Kanumolu
Perikeed
Andhra Pradesh Road Sector Project
54+000
54+400
54+400
54+760
54+760
55+200
55+200
55+410
55+410
56+460
56+460
56+600
56+600
57+200
57+200
57+300
57+300
58+880
58+880
59+000
Sub Total
59+000
62+000
400
360
440
210
1050
140
600
100
1580
200
5340
1430
11185
32625
It is not in the scope of the Project
PNV- 9
17
18
19
Marribandam
Meerjapuram
Gollapalle
62+000
64+300
64+300
65+900
65+900
67+450
67+450
70+200
70+200
71+250
71+250
72+000
72+000
72+780
72+780
75+040
75+040
75+230
20
Morsapudi
75+230
78+380
21
Tukkuluru
78+380
78+600
22
Nuzvid
78+600
83+400
83+400
84+200
84+200
84+615
84+615
86+100
86+100
86+175
86+175
86+310
86+310
87+210
87+210
88+350
88+350
88+350
88+350
89+700
23
24
Annavaram
Venkatdripuram
25
Hunumanthulagudem
89+700
90+400
26
Mittagudem
90+400
90+960
90+960
92+180
92+180
92+300
92+300
96+000
27
Leelanageer
2300
Hanuman Junction
( NH5)
1600
1550
2750
1050
750
780
2260
190
3150
480
Bye Pass
4800
800
415
1485
75
135
900
1140
0
1350
700
560
1220
120
3700
Sub Total
5625
3930
4565
20140
TOTAL
10965
5360
15750
55685
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
Page 80
Pedana-Nuzvid-Visannapeta
Andhra Pradesh Road Sector Project
ANNEXURE : 5.1 : G.O Rt No. 1615 : PLMC CONSTITUTION
GOVERNMENT OF ANDHRA PRADESH
ABSTRACT
R&B Dept. – Andhra Pradesh Road Sector Project – Appointment of Commissioner at State level &
Constitution of Project Level Monitoring Committee to monitor R&R Policy in the State - Orders-Issued.
TRANSPORT, ROADS & BUILDINGS (R.IV) DEPARTMENT
G.O.Rt.No.1615
Dt:03.11.2008.
Read the following:
From the CE(R&B) Core Road Network & MD,APRDC
Lr.No.1/APRDC/APRSP/R&R/2007, dt:16.9.2008.
** ** **
ORDER:
The Government of Andhra Pradesh through Government of India has applied for financial
assistance in the form of a Loan from the World Bank for the Andhra Pradesh Road Sector Project
(APRSP) to a tune of US$ 320 million. Already 50% of the work has been commenced and tender
processes also completed. As such it is felt that there is now necessity to appoint a Commissioner and
Administrator to monitor the Rehabilitation and Resettlement activity of the APRSP.
2. Government, after careful examination of the matter, keeping Chapter IV & VIII of R&R Policy and in
view of the recommendations of the Chief Engineer (R&B) Core Road Network & Managing
Director,Andhra Pradesh Road Development Corporation in the reference read above, hereby issue orders
for constitution of “Project Level Monitoring Committee” in each district of the State except Hyderabad.
3.
The Project Level Monitoring Committee will be headed by Joint Collector of the concerned
district in whose jurisdiction the main component of the project lies. In case the main component of the
project spreads over more than one district, the senior among the Joint collectors involved shall chair the
committee for reviewing and monitoring the progress of implementation of resettlement and rehabilitation
relating to the project. The committee shall meet at least once in two months. The members of the
committee will be as per the list under clause 8.3 of chapter VIII of R&R Policy with the Superintendent
Engineer (R&B) of the concerned district as Convenor.
4.
The Principal Secretary to Govt., T,R&B Department shall act as R&R Commissioner and
Convenor at the State level.
2
The Chief Engineer [R&B] Core Road Network & Managing Director,Andhra Pradesh Road
Development Corporation, Hyderabad shall take further action for constitution of Project Monitoring
Committees with members as mentioned in the list under clause 8.3 of chapter 8 of R&R Policy.
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
Page 81
Pedana-Nuzvid-Visannapeta
Andhra Pradesh Road Sector Project
(BY ORDER AND IN THE NAME OF THE GOVERNOR OF ANDHRA PRADESH)
DR T CHATTERJEE
PRINCIPAL SECRETARY TO GOVERNMENT
To
The Chief Engineer (R&B) Core Road Network & Managing Director, Andhra Pradesh Road
Development Corporation, Hyderabad.
Copy to:
The PS to Minister R&B. The PS to Prl.Secretary (TC).
// FORWARDED :: BY ORDER //
SECTION OFFICER
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
Page 82
Pedana-Nuzvid-Visannapeta
Andhra Pradesh Road Sector Project
ANNEXURE 5.2: G O Rt. No. 167 – APPOINTMENT OF PROJECT
ADMINISTRATOR
GOVERNMENT OF ANDHRA PRADESH
ABSTRACT
Roads & Buildings Department - Andhra Pradesh Road Sector Project - Appointment of Administrator
for implementation of Resettlement and Rehabilitation activities – Orders –Issued.
5. - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - -----TRANSPORT, ROADS & BUILDINGS (R.IV) DEPARTMENT
G.O.Rt.No. 167
Dated 19-02-2011.
Read:
From the CE(R&B) CRN & Managing Director, APRDC. Lr.No.
1/APRDC/APRSP/R&R/2007, Dt: 25.01.2011 and even No.
Dt.03.02.2011.
***
O R D E R:
The Government of Andhra Pradesh through Government of India has taken financial
assistance in the form of a Loan from the World Bank for the Andhra Pradesh Road Sector Project
(APRSP) to a tune of US$ 320 million. Some packages have already been grounded, and the tender
process for other packages is at various stages. As such, it is felt that there is now necessity to appoint
Project Administrators to perform functions and duties envisaged under the policy on R&R for PAFs
2005, chapters IV, V and VI relating to the Resettlement and Rehabilitation activities of the Andhra
Pradesh Road Sector Project. Implementation activities pertaining to Resettlement and Rehabilitation,
some of which have already been carried out and also those which are yet to be carried out have to be
taken up and completed by the Project Administrator i.e., the Joint Collector concerned.
1.The Chief Engineer (R&B) CRN & Managing Director, Andhra Pradesh Road Development
Corporation has requested the Government to issue orders appointing Joint Collectors as Project
Administrators of the districts, in which Widening and Strengthening of roads and PPP projects have
been taken up.
2
Government after careful examination of the entire matter hereby appoint the following Joint
Collectors as Project Administrators of the districts concerned against each road, in which Widening
and Strengthening of roads and PPP projects have been taken up.
Sl.
No.
I.
1.
Road Name
Chittoor Puttur
Distance in
kms
Districts
covered
Project Administrator
Widening and Strengthening Roads:
65
Chittoor
Joint
Collector,
Chittoor District.
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
Page 83
Pedana-Nuzvid-Visannapeta
2.
3.
4.
Andhra Pradesh Road Sector Project
Mydukur
Jammalamadug
u
Kurnool
Devanakonda
45
Kadapa
Joint
Collector,
Kadapa District
54
Kurnool
Joint
Collector,
Kurnool District.
Kandi
Shadnagar
65
Mahaboobnagar
Joint
Collector,
Mahaboobnagar
District.
Joint
Collector,
Rangareddy District.
Joint Collector, Medak
District.
Joint
Collector,
Karimnagar District.
Rangareddy
Medak
5.
6.
7.
II.
1.
Jagityal
Peddapalli
58
Karimnagar
Kakinada
Rajahmundry
62
East
Godavari
Joint
Collector,
Godavari District.
95
Krishna
Joint
Collector,
Krishna District.
207
Rangareddy
Joint
Collector,
Rangareddy District.
Medak
Joint
Collector, Medak
District.
Joint
Collector,
Karimnagar District.
Pedana – Nuzvid –
Vissanapeta
PPP Roads:
Hyderabad
Karimnagar
Ramagundam
Karimnagar,
Warangal
Adilabad.
2.
Narketpally
Addanki
Medarametla
213
Joint
Collector,
Warangal District.
Joint
Collector,
Adilabad District.
Nalgonda,
Joint
Collector,
Nalgonda District.
Guntur
Joint Collector, Guntur
District
Detailed Project Report VIII: Resettlement Action Plan (Annexures)
Page 84
East
Pedana-Nuzvid-Visannapeta
Andhra Pradesh Road Sector Project
Prakasam
3.
Renigunta
Naidupeta
58
Chittoor
Nellore
4.
Renigunta
Kadapa
138
Kadapa
Chittoor
5.
Khammam
Tallada
Deverapalli
177
Khammam
West
Godavari
Joint
Collector,
Prakasam District.
Joint
Collector,
Chittoor
District.
Joint
Collector, Nellore
District.
Joint
Collector,
Kadapa
District.
Joint
Collector,
Chittoor
District.
Joint Collector, Khammam
District.
Joint
Collector, West
Godavari District.
4. The Joint Collectors are informed that the functions relating to the implementation of R & R
activities such as approval of final Detailed Project Reports, minimizing displacements,
identification of Project Affected Families (PAFs), holding consultations with PAFs, ensuring
protection to the SC/STs and preparation of budgetary estimates etc. have been carried out and
they are requested to carry out the remaining activities and take expeditious actions for
immediate and complete implementation of Resettlement and Rehabilitation Plans.
(BY ORDER AND IN THE NAME OF THE GOVERNOR OF ANDHRA PRADESH)
S.P.SINGH
PRINCIPAL SECRETARY TO GOVERNMENT
The District Collectors concerned. The
Joint Collectors concerned. Copy to:
The Chief Engineer (R&B) Core Road Network & Managing Director, Andhra Pradesh Road
Development Corporation, Hyderabad.
The Chief Commissioner Land Administration AP, Hyderabad.
The Commissioner, Govt.Printing press, Chancalaguda, Hyderabad for publication in the AP
Gazette.
The Special Officer AP Portal, IT and C Department, Secretariat.