Attachment J-5, Direct Flux Covariance Sensor RFP Optical Instruments Proposals: Conformance Checklist Offeror: ______________________________________ * Proposal conformance to the RFP should include, but not be limited to the following: Volumes Submitted (Per Section L.-4.1) Volume Name / # Volume 1 Volume 2 Volume 3 Volume 4 Content Technical Proposal Past Performance Management Cost / Price Submitted (Y/ N) General Section Reference A.3 and L.4.2 A.4 and Attachment J-5 L.4.2 L.4.2 L.4.3 K Requirement Proposal Reference Comments Mail: One (1) signed original, two (2) hard copies, and two (2) electronic copies of each proposal volume on CDs Conformance Checklist Cover page with volume identified 8 ½” x 11” paper with 1-inch margins around all edges, 12-font type Complete information for Offeror Points of Contact Signed Representations and Certifications Volume 1—Technical Section Reference Throughout Section L-4.4.2 L-4.4.2.1 L.-4.4.2.1 L-4.4.2.2 L-4.4.2.3 L-4.4.2.4 Ver 1-00 Requirement Proposal Reference Comments Technical specifications and technical characteristics for the Direct Flux Covariance Sensor Instrument Completed Table L-1 (Word version to complete is included in an attachment to this RFP) Completed Table L-2 (Word version to complete is included in an attachment to this RFP) Describe calibration procedures and details Describe bio-fouling susceptibility and mitigation Describe risks and risk reduction steps Page 1 of 2 Attachment J-5, Direct Flux Covariance Sensor RFP Optical Instruments Proposals: Conformance Checklist Volume 2—Past Performance Section Reference L-4.4.3 L-4.4.3 L-4.4.3 L-4.4.3 Proposal Reference Requirement Comments Fill out Table L-3 and include in Volume 2 Descriptions of three relevant past efforts Contact information for all Points of Contact for all references supplied Production Capacity to deliver Direct Flux Covariance Sensor instruments Volume 3—Management Section Reference L-4.4.4 and C-2.1 L-4.4.4 L-4.4.4 L-4.4.4 L-4.4.4 L-4.4.4 Requirement Proposal Reference Comments Proposal Reference Comments Project Management and Communications Document Attach Existing Quality Management Plan Management techniques employed to meet delivery, schedule, management techniques Include Schedule for conducting testing Existing internal test procedures Direct Flux covariance Sensor instruments All management requirements Volume 4—Cost Section Reference L-4.5.1.1 L-4.5.1.2 L-4.5.1.3 B.5 and L4.5.1.3 L-4.5.1.4 Requirement Narrative support for cost methodology Cost assumptions Completed Table B-1 for proposed FFP CLINs 0001 through 0002 Address availability of spare parts and sensing components in options 0003 and 0003A, for information only Provide proof of financial stability, including documentation from past 2 fiscal years End of Checklist Ver 1-00 Page 2 of 2