Jobwalk Notes 1. Existing PIC units 2. Existing coolers staying 3. Replace & raise ceiling t-bar & tile per plan 4. Existing beam going across middle of store to be wrap. 5. Reuse existing 3 compartment , faucet provided by Convenience Store Fixtures 6. Electrical and green board for WIC by G.C. 7. Soffit AFF 84" 8. Can lightning in the soffit 9. Cap existing bollards by old propane 10. Replaced sidewalk from planter curb to door to 5' to make ADA 11. Alternate to repair 20' fascia ( alternate ) 12. Epoxy paint for the interior of the trash enclosure 13. Grease trap on the outside underground 14. Box or wrap the beam going across store 15. Exterior wall in office half way up and window above 16. Convenience Store Fixtures is supplying a fan and curb for the Freeze/ICEE machine, this is not on the plans. You will need to add installation, ducting, grille and electrical for it. 17. The cabinet drawings that I gave you are not correct. The walk way into the backroom was moved. This change should not make any difference on you bid. We still need side walls for the freeze and fountain machines/cabinets. Plus soffits for the TO GO-COFFEE areas. 18. Provide unit price to install bumper post ( In front of each parking stall, alternate ) 19. Paint exterior of WIC in front of restroom ( not on plan, please review photos ) 20. Build filler in between WIC box and wall ( not on plan, please review photos )