Building Permit Miscellaneous Fees At time of submittal, a 15% non-refundable deposit is required. Effective July 6, 2009 - Building Permit Fees Only. Additional fees may apply. Effective October 1, 2010 a 3% surcharge fee will be added to all permits associated with the enforcement of the Florida Building Code. Work Item Fee After hours special inspection $ 160.00 Air Conditioning Change Out* $ 100.00 ALS Impact Fee Residential New Construction Non 1 & 2 Family Antenna/tower and equipment Awning/Shutter with Electric- Commercial* Awning/Shutter with Electric-Residential* Awnings / shutters – Commercial Awnings / shutters – Residential $ $ $ $ $ $ $ 35.15 0.0091 361.00 300.00 147.00 200.00 107.00 Boat Canopy Boatlifts / davits - Commercial (Stand Alone Permit Only) Boatlifts / davits - Residential (Stand Alone Permit Only) Building Move – Commercial* Building Move – Residential* $ $ $ $ $ 147.00 220.00 107.00 487.00 467.00 Canopy - Commercial-(gas station)* Captains Walk - Residential Carport – Commercial* Certificate of Use Building Plan Review (Change of Occupancy) Certificate of Use - handicap compliance Commercial Irrigation Well Completion Permit/Extension Fee - Commercial Completion Permit/Extension Fee - Residential Computer reports and duplicate records Concrete Dock Concrete Wall/entry wall $ $ $ $ $ $ $ $ $ $ $ 381.00 120.00 268.00 26.00 53.00 381.00 126.00 115.00 26.00 280.00 192.00 Demolition – Commercial* Demolition – Residential* Documents - block and lot zoning book Dumpster Enclosure - Commercial Duplicate Permit Board $ $ $ $ $ 341.00 127.00 26.00 200.00 26.00 Electrical Misc - with Plan Review* Electrical Misc - with no Plan Review* Elevator Shaft* Enclosure - Commercial (New Construction)* Enclosure - Residential (New Construction)* Enclosure Replacement/Screen Room Pan* $ $ $ $ $ $ 220.00 80.00 401.00 188.00 168.00 284.00 Fences – Commercial** Fences - Concrete Fence* Fences – Residential** $ $ $ 148.00 328.00 107.00 F-DCD-7046 06/03/15 tw (school impact change issued after 6/2/15) -1- per dwelling unit per sq. ft. Miscellaneous Fees/Impacts Building Permit Miscellaneous Fees At time of submittal, a 15% non-refundable deposit is required. Fire Impact Non 1 & 2 Family (Located in a structure that is less than thirty feet (30') in height and less than 30,000 square feet in gross floor area) (Located in a structure that is thirty feet (30') or more in height and/or 30,000 square feet or more in gross floor area) Residential New Construction (Located in a structure that is less than thirty feet (30') in height and less than 30,000 square feet in gross floor area) (Located in a structure that is thirty feet (30') or more in height and/or 30,000 square feet or more in gross floor area) $ 0.149 per sq. ft. $ 0.153 per sq. ft. $ 574.96 per dwelling unit $ 591.58 per dwelling unit $ $ $ $ $ $ $ $ $ $ 40.00 2.45 40.00 7.85 180.00 40.00 40.00 457.00 521.00 381.00 Minimum per $1,000 Minimum per $1,000 $ $ $ 427.00 507.00 387.00 Fire Permit Fees Non 1 & 2 Family New Construction based on valuation Miscellaneous/Renovation based on valuation Fire Alarm – Commercial* Fire Sprinkler – Commercial* (Permit Processing Only on Behalf of Fire Dept.) Fire Suppression – Commercial* (Permit Processing Only on Behalf of Fire Dept.) Firewall* (Permit Other than New Construction) Fountain - Commercial Fuel Tank* Gazebo* General Permit** (Any Unclassified Permit) Generator Permit* Impact Fees (Road) Single Family Dwelling Two-Family Dwelling or Duplex Multi-Family Dwelling Hotel / Motel Retail/Shopping Center Bank Car Wash, Self Service Convenience Store w/Gas Sales Golf Course (open to the public) Movie Theater Restaurant, Sit-Down Restaurant, Fast-Food House of Worship Office General Office Medical Hospital Nursing Home Day Care Center Elem/Sec. School (private) Industrial Park Warehouse Mini-Warehouse Time Share Mobile Home/RV Park Impact Fee Deferral Lien F-DCD-7046 06/03/15 tw (school impact change issued after 6/2/15) $ 3,347.00 $ 4,695.00 $ 2,347.00 $ 2,520.00 $ 5,709.00 $ 9,060.00 $ 1,897.00 $ 12,679.00 $ 971.00 $ 8,369.00 $ 7,329.00 $ 14,384.00 $ 1,664.00 $ 2,634.00 $ 8,634.00 $ 4,200.00 $ 1,458.00 $ 4,629.00 $ 802.00 $ 2,310.00 $ 1,646.00 $ 572.00 $ 2,347.00 $ 1,747.00 $ 120.00 -2- per unit per room per 1,000 sq. ft per 1,000 sq. ft. per stall per 1,000 sq. ft. per acre per 1,000 sq. ft. per 1,000 sq. ft. per 1,000 sq. ft. per 1,000 sq. ft. per 1,000 sq. ft. per 1,000 sq. ft. per 1,000 sq. ft. per 1,000 sq. ft. per 1,000 sq. ft. per 1,000 sq. ft. per 1,000 sq. ft. per 1,000 sq. ft. per 1,000 sq. ft. per Dwelling per Pad Miscellaneous Fees/Impacts Building Permit Miscellaneous Fees At time of submittal, a 15% non-refundable deposit is required. Kitchen Hood* - Commercial $ 180.00 Landscaping fee - 1 and 2 Family Residences - Other than New Construction Landscaping fee - Commercial - Other than New Construction Lawn Irrigation - Commercial Lawn Irrigation - Residential $ $ $ $ 68.00 248.00 160.00 66.00 $ 244.00 $ $ $ $ 175.00 199.00 135.00 207.00 Natural Gas* Notarize $ $ 361.00 10.00 Paint Booth* Park Impact Parking Lot (Site Development Review) Permit extension - 2nd & subsequent extensions - Commercial Permit extension - 2nd & subsequent extensions - Residential Permit extension - First - Commercial Permit extension - First - Residential Piling Plan Re-submittal first time - Residential (While there is no charge for a first re-submittal for Code item corrections, applications whose drawings and supporting documents are deficient, (i.e.: missing sections from the mechanical or structural drawings), are checked for sufficiency to assign a permit number. However, failure to attach all technical documentation will require a first time re-submittal fee. This fee will not be charged for Code correction comments or requests for additional documentation, only for technically incomplete applications and supporting documents.) Plan Re-submittal, first time - Commercial (While there is no charge for a first resubmittal for Code item corrections, applications whose drawings and supporting documents are deficient, (i.e.: missing sections from the mechanical or structural drawings), are checked for sufficiency to assign a permit number. However, failure to attach all technical documentation will require a first time re-submittal fee. This fee will not be charged for Code correction comments or requests for additional documentation, only for technically incomplete applications and supporting documents.) Plan Re-submittal, 2nd and third - Commercial Plan Re-submittal, 2nd and third - Residential Plan Re-submittal, 4th time (4x the plan review fee) - Commercial Plan Re-submittal, 4th time (4x the plan review fee) - Residential Play equipment Plug Permits (Well Permits) Plumbing Misc* - Miscellaneous Permits Other than New Construction Plumbing Re-pipe* POD - Commercial Zoning Permit POD - Residential (temporary storage unit) Zoning Permit Police Protection Impact Fee Residential New Construction Non 1 & 2 Family $ $ $ $ $ $ $ $ $ 530.00 1,115.00 320.00 27.00 27.00 27.00 27.00 320.00 160.00 $ 549.00 $ $ $ $ $ $ $ $ $ $ 449.00 104.00 341.00 187.00 140.00 180.00 40.00 40.00 $ $ 596.55 0.1543 Marine Improvements - Commercial (Other than Seawalls, Concrete Docks, and Retaining Walls) Marine Improvements - Residential (Other than Seawalls, Concrete Docks, and Retaining Walls) Mechanical Misc* - Miscellaneous Permits Other than New Construction Miscellaneous Demo- partial Monitor Well F-DCD-7046 06/03/15 tw (school impact change issued after 6/2/15) -3- per living unit per dwelling unit per sq. ft. Miscellaneous Fees/Impacts Building Permit Miscellaneous Fees At time of submittal, a 15% non-refundable deposit is required. Pool Deck Addition* Propane tank & lines- commercial* Propane tank & lines- residential* $ $ $ 361.00 240.00 167.00 Re-inspection Fee First re-inspection, per discipline - Commercial/Residential Re-inspection Fee Second re-inspection of like kind - Commercial/Residential Re-inspection Fee Third re-inspection of like kind - Commercial/Residential Re-inspection Fee Fourth and subsequent re-inspections of like kind (4x $48) Commercial/Residential Re-stamp fee, per set of plans Retaining walls – Commercial** Retaining walls – Residential** Revision Fee - Building Revision Fee - Electrical Revision Fee - Mechanical Revision Fee - Plumbing $ $ $ 48.00 67.00 86.00 $ $ $ $ $ $ $ $ 192.00 64.00 320.00 207.00 96.00 136.00 136.00 136.00 $ $ 99.00 99.00 $ $ 62.00 .78 $ $ $ $ $ $ 800.00 5.85 160.00 170.00 100.00 441.00 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 2043.00 46.99 609.30 14.01 160.00 120.00 267.00 200.00 147.00 240.00 167.00 99.00 127.00 347.00 162.00 113.00 180.00 87.00 87.00 441.00 255.00 147.00 187.00 107.00 Right of Way Construction Permit Fees Right-of-way review (except for Telecommunications companies) Driveway, culverts stakeout and appurtenant work (per access cut) Sod, swale stakeout and appurtenant work (minimum fee for improvements up to 80 linear feet) (additional fee for improvements in excess of 80 linear feet) Curb, gutter, sidewalk, sod and pavement (minimum fee for improvements up to 80 linear feet) (additional fee for improvements in excess of 80 linear feet) Miscellaneous improvement of existing construction Restaking, whenever necessary Roofing Miscellaneous Sales Trailer/Construction Trailer* per ft. per ft. School Impact Fees Single Family Single Family Admin. Fee Multi-Family (Duplex, Townhouse, etc.) Multi-Family Admin. Fee Scrape and Fill - Commercial Scrape and Fill - Residential Seawall Alternative Seawall - Commercial Seawall - Residential Seawall Repair Sheds - Residential Sign – Electrical* Sign Foundation* Single Domestic Well Slabs - Commercial (Other than New Construction) Slabs - Residential (Other than New Construction) Soffit / Fascia – Commercial* Soffit / Fascia – Residential* Solar Heater* Spa – Commercial* Spa – Residential* Spa -Above Ground* Stop Work Order - Commercial Stop Work Order - Residential F-DCD-7046 06/03/15 tw (school impact change issued after 6/2/15) -4- per unit per unit Miscellaneous Fees/Impacts Building Permit Miscellaneous Fees At time of submittal, a 15% non-refundable deposit is required. Storm-Water Fee Storm-water Fee - Retention plans review and related inspections for commercial, industrial, professional, and multi-family (not including duplexes) Surface water miscellaneous Storm-water Fee, driveway, culvert Process Only (Other than New Construction) Storm-water Re-sod Process Only (Other than New Construction) Surface Water Miscellaneous Swimming Pools – Commercial* Swimming Pools – Residential* Swimming Pools - Above Ground with electric $ 397.00 $ $ $ $ $ $ $ 40.00 26.00 26.00 40.00 561.00 307.00 87.00 Temporary electrical pole - Commercial Temporary electrical pole - Residential Test Boring Tiki Huts/Chiki Huts $ $ $ $ 147.00 60.00 307.00 200.00 Underground Fire Line* $ Walk-in cooler* (Stand Alone Permit) Window and Door Replacement – Commercial* Window and Door Replacement – Residential* $ $ $ 40.00 461.00 147.00 113.00 Note: Permit Types with a * represents an added surcharge fee per the state of 3% to be applied based on Building Permit cost. Permit Types with ** represents a 3% surcharge fee that may or may not be applied. A 3% surcharge fee will be applied to all New Construction/Additions/Remodels and any other additional permits that require signed and sealed plans. Surcharge fee is passed on Building Permit cost only. F-DCD-7046 06/03/15 tw (school impact change issued after 6/2/15) -5- Miscellaneous Fees/Impacts