Building Permit Miscellaneous Fees
At time of submittal, a 15% non-refundable deposit is required.
Effective July 6, 2009 - Building Permit Fees Only. Additional fees may apply.
Effective October 1, 2010 a 3% surcharge fee will be added to all permits associated with the
enforcement of the Florida Building Code.
Work Item
Fee
After hours special inspection
$
160.00
Air Conditioning Change Out*
$
100.00
ALS Impact Fee
Residential New Construction
Non 1 & 2 Family
Antenna/tower and equipment
Awning/Shutter with Electric- Commercial*
Awning/Shutter with Electric-Residential*
Awnings / shutters – Commercial
Awnings / shutters – Residential
$
$
$
$
$
$
$
35.15
0.0091
361.00
300.00
147.00
200.00
107.00
Boat Canopy
Boatlifts / davits - Commercial (Stand Alone Permit Only)
Boatlifts / davits - Residential (Stand Alone Permit Only)
Building Move – Commercial*
Building Move – Residential*
$
$
$
$
$
147.00
220.00
107.00
487.00
467.00
Canopy - Commercial-(gas station)*
Captains Walk - Residential
Carport – Commercial*
Certificate of Use Building Plan Review (Change of Occupancy)
Certificate of Use - handicap compliance
Commercial Irrigation Well
Completion Permit/Extension Fee - Commercial
Completion Permit/Extension Fee - Residential
Computer reports and duplicate records
Concrete Dock
Concrete Wall/entry wall
$
$
$
$
$
$
$
$
$
$
$
381.00
120.00
268.00
26.00
53.00
381.00
126.00
115.00
26.00
280.00
192.00
Demolition – Commercial*
Demolition – Residential*
Documents - block and lot zoning book
Dumpster Enclosure - Commercial
Duplicate Permit Board
$
$
$
$
$
341.00
127.00
26.00
200.00
26.00
Electrical Misc - with Plan Review*
Electrical Misc - with no Plan Review*
Elevator Shaft*
Enclosure - Commercial (New Construction)*
Enclosure - Residential (New Construction)*
Enclosure Replacement/Screen Room Pan*
$
$
$
$
$
$
220.00
80.00
401.00
188.00
168.00
284.00
Fences – Commercial**
Fences - Concrete Fence*
Fences – Residential**
$
$
$
148.00
328.00
107.00
F-DCD-7046
06/03/15 tw (school impact change issued after 6/2/15)
-1-
per dwelling unit
per sq. ft.
Miscellaneous Fees/Impacts
Building Permit Miscellaneous Fees
At time of submittal, a 15% non-refundable deposit is required.
Fire Impact
Non 1 & 2 Family (Located in a structure that is less than thirty feet (30') in
height and less than 30,000 square feet in gross floor area)
(Located in a structure that is thirty feet (30') or more in height and/or 30,000
square feet or more in gross floor area)
Residential New Construction (Located in a structure that is less than thirty
feet (30') in height and less than 30,000 square feet in gross floor area)
(Located in a structure that is thirty feet (30') or more in height and/or 30,000
square feet or more in gross floor area)
$
0.149
per sq. ft.
$
0.153
per sq. ft.
$
574.96
per dwelling unit
$
591.58
per dwelling unit
$
$
$
$
$
$
$
$
$
$
40.00
2.45
40.00
7.85
180.00
40.00
40.00
457.00
521.00
381.00
Minimum
per $1,000
Minimum
per $1,000
$
$
$
427.00
507.00
387.00
Fire Permit Fees
Non 1 & 2 Family
New Construction based on valuation
Miscellaneous/Renovation
based on valuation
Fire Alarm – Commercial*
Fire Sprinkler – Commercial* (Permit Processing Only on Behalf of Fire Dept.)
Fire Suppression – Commercial* (Permit Processing Only on Behalf of Fire Dept.)
Firewall* (Permit Other than New Construction)
Fountain - Commercial
Fuel Tank*
Gazebo*
General Permit** (Any Unclassified Permit)
Generator Permit*
Impact Fees (Road)
Single Family Dwelling
Two-Family Dwelling or Duplex
Multi-Family Dwelling
Hotel / Motel
Retail/Shopping Center
Bank
Car Wash, Self Service
Convenience Store w/Gas Sales
Golf Course (open to the public)
Movie Theater
Restaurant, Sit-Down
Restaurant, Fast-Food
House of Worship
Office General
Office Medical
Hospital
Nursing Home
Day Care Center
Elem/Sec. School (private)
Industrial Park
Warehouse
Mini-Warehouse
Time Share
Mobile Home/RV Park
Impact Fee Deferral Lien
F-DCD-7046
06/03/15 tw (school impact change issued after 6/2/15)
$ 3,347.00
$ 4,695.00
$ 2,347.00
$ 2,520.00
$ 5,709.00
$ 9,060.00
$ 1,897.00
$ 12,679.00
$
971.00
$ 8,369.00
$ 7,329.00
$ 14,384.00
$ 1,664.00
$ 2,634.00
$ 8,634.00
$ 4,200.00
$ 1,458.00
$ 4,629.00
$
802.00
$ 2,310.00
$ 1,646.00
$
572.00
$ 2,347.00
$ 1,747.00
$
120.00
-2-
per unit
per room
per 1,000 sq. ft
per 1,000 sq. ft.
per stall
per 1,000 sq. ft.
per acre
per 1,000 sq. ft.
per 1,000 sq. ft.
per 1,000 sq. ft.
per 1,000 sq. ft.
per 1,000 sq. ft.
per 1,000 sq. ft.
per 1,000 sq. ft.
per 1,000 sq. ft.
per 1,000 sq. ft.
per 1,000 sq. ft.
per 1,000 sq. ft.
per 1,000 sq. ft.
per 1,000 sq. ft.
per Dwelling
per Pad
Miscellaneous Fees/Impacts
Building Permit Miscellaneous Fees
At time of submittal, a 15% non-refundable deposit is required.
Kitchen Hood* - Commercial
$
180.00
Landscaping fee - 1 and 2 Family Residences - Other than New Construction
Landscaping fee - Commercial - Other than New Construction
Lawn Irrigation - Commercial
Lawn Irrigation - Residential
$
$
$
$
68.00
248.00
160.00
66.00
$
244.00
$
$
$
$
175.00
199.00
135.00
207.00
Natural Gas*
Notarize
$
$
361.00
10.00
Paint Booth*
Park Impact
Parking Lot (Site Development Review)
Permit extension - 2nd & subsequent extensions - Commercial
Permit extension - 2nd & subsequent extensions - Residential
Permit extension - First - Commercial
Permit extension - First - Residential
Piling
Plan Re-submittal first time - Residential (While there is no charge for a first re-submittal
for Code item corrections, applications whose drawings and supporting documents are
deficient, (i.e.: missing sections from the mechanical or structural drawings), are
checked for sufficiency to assign a permit number. However, failure to attach all
technical documentation will require a first time re-submittal fee. This fee will not be
charged for Code correction comments or requests for additional documentation, only
for technically incomplete applications and supporting documents.)
Plan Re-submittal, first time - Commercial (While there is no charge for a first resubmittal for Code item corrections, applications whose drawings and supporting
documents are deficient, (i.e.: missing sections from the mechanical or structural
drawings), are checked for sufficiency to assign a permit number. However, failure to
attach all technical documentation will require a first time re-submittal fee. This fee will
not be charged for Code correction comments or requests for additional documentation,
only for technically incomplete applications and supporting documents.)
Plan Re-submittal, 2nd and third - Commercial
Plan Re-submittal, 2nd and third - Residential
Plan Re-submittal, 4th time (4x the plan review fee) - Commercial
Plan Re-submittal, 4th time (4x the plan review fee) - Residential
Play equipment
Plug Permits (Well Permits)
Plumbing Misc* - Miscellaneous Permits Other than New Construction
Plumbing Re-pipe*
POD - Commercial Zoning Permit
POD - Residential (temporary storage unit) Zoning Permit
Police Protection Impact Fee
Residential New Construction
Non 1 & 2 Family
$
$
$
$
$
$
$
$
$
530.00
1,115.00
320.00
27.00
27.00
27.00
27.00
320.00
160.00
$
549.00
$
$
$
$
$
$
$
$
$
$
449.00
104.00
341.00
187.00
140.00
180.00
40.00
40.00
$
$
596.55
0.1543
Marine Improvements - Commercial (Other than Seawalls, Concrete Docks, and
Retaining Walls)
Marine Improvements - Residential (Other than Seawalls, Concrete Docks, and
Retaining Walls)
Mechanical Misc* - Miscellaneous Permits Other than New Construction
Miscellaneous Demo- partial
Monitor Well
F-DCD-7046
06/03/15 tw (school impact change issued after 6/2/15)
-3-
per living unit
per dwelling unit
per sq. ft.
Miscellaneous Fees/Impacts
Building Permit Miscellaneous Fees
At time of submittal, a 15% non-refundable deposit is required.
Pool Deck Addition*
Propane tank & lines- commercial*
Propane tank & lines- residential*
$
$
$
361.00
240.00
167.00
Re-inspection Fee First re-inspection, per discipline - Commercial/Residential
Re-inspection Fee Second re-inspection of like kind - Commercial/Residential
Re-inspection Fee Third re-inspection of like kind - Commercial/Residential
Re-inspection Fee Fourth and subsequent re-inspections of like kind (4x $48) Commercial/Residential
Re-stamp fee, per set of plans
Retaining walls – Commercial**
Retaining walls – Residential**
Revision Fee - Building
Revision Fee - Electrical
Revision Fee - Mechanical
Revision Fee - Plumbing
$
$
$
48.00
67.00
86.00
$
$
$
$
$
$
$
$
192.00
64.00
320.00
207.00
96.00
136.00
136.00
136.00
$
$
99.00
99.00
$
$
62.00
.78
$
$
$
$
$
$
800.00
5.85
160.00
170.00
100.00
441.00
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
2043.00
46.99
609.30
14.01
160.00
120.00
267.00
200.00
147.00
240.00
167.00
99.00
127.00
347.00
162.00
113.00
180.00
87.00
87.00
441.00
255.00
147.00
187.00
107.00
Right of Way Construction Permit Fees
Right-of-way review (except for Telecommunications companies)
Driveway, culverts stakeout and appurtenant work (per access cut)
Sod, swale stakeout and appurtenant work (minimum fee for improvements up
to 80 linear feet)
(additional fee for improvements in excess of 80 linear feet)
Curb, gutter, sidewalk, sod and pavement (minimum fee for improvements up to
80 linear feet)
(additional fee for improvements in excess of 80 linear feet)
Miscellaneous improvement of existing construction
Restaking, whenever necessary
Roofing Miscellaneous
Sales Trailer/Construction Trailer*
per ft.
per ft.
School Impact Fees
Single Family
Single Family Admin. Fee
Multi-Family (Duplex, Townhouse, etc.)
Multi-Family Admin. Fee
Scrape and Fill - Commercial
Scrape and Fill - Residential
Seawall Alternative
Seawall - Commercial
Seawall - Residential
Seawall Repair
Sheds - Residential
Sign – Electrical*
Sign Foundation*
Single Domestic Well
Slabs - Commercial (Other than New Construction)
Slabs - Residential (Other than New Construction)
Soffit / Fascia – Commercial*
Soffit / Fascia – Residential*
Solar Heater*
Spa – Commercial*
Spa – Residential*
Spa -Above Ground*
Stop Work Order - Commercial
Stop Work Order - Residential
F-DCD-7046
06/03/15 tw (school impact change issued after 6/2/15)
-4-
per unit
per unit
Miscellaneous Fees/Impacts
Building Permit Miscellaneous Fees
At time of submittal, a 15% non-refundable deposit is required.
Storm-Water Fee
Storm-water Fee - Retention plans review and related inspections for
commercial, industrial, professional, and multi-family (not including duplexes)
Surface water miscellaneous
Storm-water Fee, driveway, culvert Process Only (Other than New Construction)
Storm-water Re-sod Process Only (Other than New Construction)
Surface Water Miscellaneous
Swimming Pools – Commercial*
Swimming Pools – Residential*
Swimming Pools - Above Ground with electric
$
397.00
$
$
$
$
$
$
$
40.00
26.00
26.00
40.00
561.00
307.00
87.00
Temporary electrical pole - Commercial
Temporary electrical pole - Residential
Test Boring
Tiki Huts/Chiki Huts
$
$
$
$
147.00
60.00
307.00
200.00
Underground Fire Line*
$
Walk-in cooler* (Stand Alone Permit)
Window and Door Replacement – Commercial*
Window and Door Replacement – Residential*
$
$
$
40.00
461.00
147.00
113.00
Note: Permit Types with a * represents an added surcharge fee per the state of 3% to
be applied based on Building Permit cost.
Permit Types with ** represents a 3% surcharge fee that may or may not be applied.
A 3% surcharge fee will be applied to all New Construction/Additions/Remodels and any
other additional permits that require signed and sealed plans. Surcharge fee is passed
on Building Permit cost only.
F-DCD-7046
06/03/15 tw (school impact change issued after 6/2/15)
-5-
Miscellaneous Fees/Impacts
Download