PROGRAMME NAME RISK REGISTER TEMPLATE Project Title Release Status: DRAFT, REVIEW, FOR INFORMATION or FINAL Author: Project Support Date: 08 November 2013 Filename & Version: Insert details Project ID: Insert ID Methodology: PRINCE2™ 2009 FMD Consultants Limited assumes no responsibility for the usage of any information contained in this document and the way it is handled and disclaims all liability in respect of such information and its provision. Subject to this disclaimer, you may copy and utilise the material contained in the document. This information is based on OGC PRINCE2™ material. PRINCE2™ is a registered trade mark of the Office of Government Commerce in the United Kingdom and other countries. All registered trademarks recognised & accepted. 1 Document History 1.1 Location This document is stored in the following location: Filename P2_risk_register_template_v01 Location www.fmdconsultants.co.uk\web 1.2 Revision History This document has been through the following revisions: Version No. 01 Revision Date 13/09/11 Filename/Location stored: P2_risk_register_template_v01 Brief Summary of Changes FINAL VERSION 1.3 Authorisation This document requires the following approvals: AUTHORISATION Name Signature Project Manager Project Assurance (reviewer) 1.4 Related Documents Summary of filenames and locations of related documents: Document Type Filename/Location stored: Risk Management Strategy Risk Checklist Project ID: BLANK TEMPLATE Doc Ref: Page 2 of 4 Date of Issue: Date 2 Contents 1 DOCUMENT HISTORY ................................................................................................ 2 1.1 1.2 1.3 1.4 LOCATION ......................................................................................................................2 REVISION HISTORY ..........................................................................................................2 AUTHORISATION .............................................................................................................2 RELATED DOCUMENTS .....................................................................................................2 2 CONTENTS ................................................................................................................ 3 3 OVERVIEW ............................................................................................................... 3 4 QUALITY CRITERIA .................................................................................................... 3 3 Overview A Risk Register provides a record of identified risks relating to the project, including their status and history. It is used to capture and maintain information on all of the identified threats and opportunities relating to a project. Overleaf is an example which may be appropriate to a project. A risk register can be: A document or spreadsheet or database designed specifically for a project A stand-alone risk register A record which is carried forwards in progress review minutes and presented at Project Board Meetings An entry in a project management tool Part of an integrated Risk Register for company (or programme) wide management of risks, actions, decisions, assumptions, issues and project or programme lesson The format, structure and mechanism for managing risks should be defined in the Risk Management Strategy, although for established organisations this Risk Management Strategy is usually clearly defined therefore needs only to be followed. 4 Quality Criteria The status of the risk indicates whether any action has been taken Risks are uniquely identified, including information about which product they refer to Access to the Risk Register is controlled and it is kept in a safe place Project ID: BLANK TEMPLATE Doc Ref: Page 3 of 4 Date of Issue: FORM [Form ID if applicable] Ref:[Location/Filename] Project Name: RISK REGISTER Programme Name:[If applicable] Risk Identifier: Version: Risk Description: Risk Category: [A unique reference for every risk [In terms of the cause, event (threat or opportunity) and effect (description in entered into the Risk Register words of the impact)] e.g. 0001] Probability: Impact: Expected Value: [These should be recorded in accordance with the project’s chosen scales] Pre-Response Post-Response [Estimate the [Estimate the inherent values residual values (pre-response (post-response action)] action)] [These should be recorded in accordance with the project’s chosen scales] Pre-Response Post-Response [Estimate the [Estimate the inherent values residual values (pre-response (post-response action)] action)] [These should be recorded in accordance with the project’s chosen scales] Pre-Response Post-Response [Estimate the [Estimate the inherent values residual values (pre-response (post-response action)] action)] [Type of risk in terms of the project’s chosen categories (e.g. schedule, quality, legal] Proximity: [How close to the present time the risk event is anticipated to happen] Risk Response Category: [How the project will treat the risk – in terms of the project’s chosen categories e.g. - For threats: avoid, reduce, fallback, transfer, accept, share - For opportunities: enhance, exploit, reject, share] Risk Response: [Actions to resolve the risk (should be aligned to the chosen response categories. Note that more than one risk response may apply to a risk)] Date Registered: [Date the identified] risk Risk Author: was [Person who raised the risk] Risk Owner: Risk Actionee: [Person responsible for [Person(s) managing the risk] implement described response] Risk Status: who will [Active or Closed] the action(s) in the risk