CONSTRAINTS MANAGEMENT STRATEGY – WEBSITE REFERENCES Cottingham et al (November 2003). Environmental Flow Recommendations for the Goulburn River below Lake Eildon. SKM (November 2006). Goulburn Campaspe Loddon Environmental Flow Delivery Constraints Study – Final report. Goulburn Broken CMA Cottingham et al (June 2007). Evaluation of Summer Inter-Valley Transfers from the Goulburn River (for GBCMA). Water Technology (August 2008). Goulburn River Environmental Flows Hydraulics Study – Topographic Data Review (for GBCMA). Water Technology (September 2009). Goulburn River Environmental Flows Hydraulics Study – Asset Mapping – Data Collation and Review (for GBCMA). Water Technology (October 2009). Goulburn River Environmental Flows Hydraulics Study – Real Time Flow Management – Framework Scoping (for GBCMA). Water Technology (October 2009). Goulburn River Environmental Flows Hydraulics Study – Hydrologic Analysis – Streamflow Data Assessment and Tributary Inflow Analysis (for GBCMA). Water Technology (March 2010). Goulburn River Environmental Flows Hydraulics Study – Hydraulic Model Application and Affected Asset Assessment – Environmental Flow Scenarios (for GBCMA). Water Technology (April 2010). Goulburn River Environmental Flows Hydraulics Study – Hydraulic Model Construction and Calibration (for GBCMA). Water Technology (April 2010). Goulburn River Environmental Flows Hydraulics Study – Executive Summary – Environmental Flow Scenarios (for GBCMA). URS (March 2010). Goulburn River Environmental Flows Hydraulics Study – Potential Flood Damage Assessment (for GBCMA). Department of Sustainability and Environment (February 2011). Overbank flow recommendations for the lower Goulburn River. Water Technology (October 2011). Hydraulic Modelling Analysis for the Lower Goulburn River (for GBCMA). Water Technology (August 2012). Mid Goulburn River Elevation Analysis - Final Report (for GBCMA) and Thiess Services (November 2011). Goulburn River Environmental Flow Monitoring (for GBCMA) 1 Murray-Darling Basin Authority (October 2012). Hydrologic modelling of the relaxation of operational constraints in the southern connected system: Methods and results. Commonwealth Government (November 2012). Murray-Darling Basin Plan Water Technology (January 2013). Rural Levees Assessment – Final Report (of Lower Goulburn River Levees) (for GBCMA) Murray-Darling Basin Authority (July 2013). Preliminary Overview of Constraints to Environmental Water Delivery in the Murray-Darling Basin – Technical Support Murray-Darling Basin Authority (November 2013). Constraints Management Strategy 2013 to 2024. Cottingham et al (August 2014). Mid Goulburn River Flows Study – Issues Paper (for GBCMA) MDBA (September 2014). Goulburn River Reach Report – Constraints Management Strategy Water Technology (November 2014). Analysis of Goulburn River Constraints Modelling (for MDBA). GHD (December 2014). Constraints Management Strategy Costing Project – Easement Costing Methodology (for MDBA) GHD (December 2014). Constraints Management Strategy Prefeasibility – Goulburn – Estimate of the cost to establish easements (for MDBA) URS (December 2014). Constraints Management Strategy Prefeasibility – Regional Infrastructure Costing (for MDBA) MDBA (December 2014). Costs Estimates Report - Constraints Management Strategy Prefeasibility MDBA (December 2014). Flow Inundation Mapping & Impact Analysis – CMS Prefeasibility Technical Report MDBA (December 2014). Priority Constraints Analysis – Methods and Results MDBA (December 2014). Constraints Management Strategy Annual Progress Report 201314 Cottingham et al (December 2014). Mid Goulburn River Flows Study – Final Report: Flow Recommendations (for GBCMA) MDBA (August 2015). Goulburn River Reach Report (updated) – Constraints Management Strategy 2