PRJ-11-4259 ENGINEERING , PROCUREMENT CONSTRUCTION ,STARTUP & COMMISSIONING OF GAS PIPE LINE ( 24 " X 0.375" ) LUHIES – G.T.U ( EPC) (TURN KEY PROJECT) AUGUST - 2011 DESIGN DEPT. – PROJECTS DIVISION ((PRESENTATION)) COMPANIES INTENDING TO PARTICIPATE IN A/M PROJECT CONCERNING THE CONSTRUCTION & ERACTION OF EPC PIPELINE PROJECTS SIZE 24" WITH ALL ACCESSORIES FITTINGS, VALVES AND OTHER COMPLETION SYSTEMS FROM LUHAIS OIL FIELD TO GTU (NORTH RUMAILA) FOR GAS TRANSMISSION ARE REQUESTED TO ATTEND THE PRESENTATION ABOUT THE PROJECT WHICH WILL BE HELD IN THE HEAD QUARTER OF SOC (BAB AL ZUBAIR) IN THE 1ST FLOOR(PROJECTS DIVISION) ON: - FIRST TIME :- THURSDAY 25/8/2011 AT 9:30 AM. - SECOND TIME: TUESDAY 30/8/2011 AT 9:30 AM. AND SITE VISIT WILL BE HELD ON :- FIRST TIME :- SUNDAY 21/8/2011 - SECOND TIME: WEDNESDAY 24/8/2011 THAT WILL BE STARTING FROM BAB AL-ZUBAIR HEAD QUARTER AT 8:30 AM. 1) INTRODUCTION THE PROJECT CONSISTS OF SUPPLY AND EXECUTION & COMMISSIONING OF X 0.375" GAS PIPELINE REQUIRED IS CARBON STEEL ACC. TO API SPEC. 5 L PSL2 E, LATEST EDITION.(LASW) EXTERNALLY COATED (3) MM OF THICKNESS EXTRUDED POLYETHYLENE HIGH DENSITY ACCORDING TO DIN 30670 ,CONSISTING OF ALL COATING & JOINING ACCESSORIES, THE PROPOSAL MUST COVER ALL ENGINEERING, DESIGN DETAILS, SUPPLY OF MATERIALS AND CONSTRUCTION FROM LUHIES DEGASSING STATION TO G.T.U GAS TREATMENT UNIT IN NORTH RUMIALA , THE PROJECT SHOULD BE DONE AS (EPC) CONTRACT WITH INSPECTION COMMISSIONING &START UP ACC. TO PLAN & PROFILE ATTACHED THE EXIST SERVICE ROAD CAN BE USED FOR EXECUTION OF PIPER LINE. 2) LOCATION IRAQ-BASRAH LUHIES – G.T.U (NORTH OF ARAB GULF) ON SHORE PIPE LINE 3) SCOPE OF WORK 1) DREDGING OF PIPE LINE ROUTE SHOULD BE ACC. TO DESIGN REQUIREMENTS . 2) WELDING PROCEDURE AND INCLUDED WORK SHOULD BE EXCELLED ALL – TO AND TO BE SUBMITTED IN OFFER . API STD 3) SIDE BOOMS SHOULD BE USED FOR PIPE LIFT & TRANSPORT, A SAND BED BURRING REQUIRED UNDER AND ABOVE THE PIPELINE. 4) INSTALLATION OF GAS PIPELINE (EXCAVATION OF TRENCH , TRENCH DETAILS, TRENCH BEDDING , AND PIPELINE CROSSING WITH ROADS, RAILWAYS , ANY UNDERGROUND FACILITIES AS WELL) SHALL BE DESIGN AND CONSTRUCTED AS PER THE INTERNATIONAL CODES AND STANDARDS. 5) ALL REINFORCED CONCRETE WORKS FOR VALVES CHAMBERS, EQUIPMENTS FOUNDATIONS SHALL BE DESIGN AND CONSTRUCT ACCORDING TO BRITISH AND AMERICAN CODES AND STANDARDS (BS 8110,AC1 318, AND ASTM 615 … ETC) 6) USE OF BORING PROCEDURE FOR CROSSING WITH ROADS , RAILWAY CABLES … ACC. TO APPLICABLE STDS. 7) TIE IN WORKS WITH LUHIES – G.T.U SHOULD BE INCLUDED. 8) HYDROSTATIC TEST ACC. TO ASME STD . THE EXECUTION TIME IS VERY IMPORTANT AT EVALUATION 4-1) X 0.375" ACC. TO SURVEY PLAN(55 KM) LENGTH WITH HEAT SHRINKABLE SLEEVE JOINTS (24") AND ALL ACCESSORIES. 4-2) SUPPLY AND CONSTRUCTION COMPLETE CONDENSATE SKID THE FUNCTION OF THIS SYSTEM IS TOGETHER CONDENSATES OR CARRYOVER AND COLLECT ACCUMULATED LIQUIDS THAT ACCOMPANIES LIBRATED GASES THEN TRANSFERD AUTOMATICALLY TO DRAINGE SYSTEM. 4-3) PRESSURE & TEMPERATURE GAUGES AND TRANSMITTERS IN LUHIES AND G.T.U 4-4) (TIE IN) IN LUHIES & G.T.U . 4-5) PIPES BEND ACC. TO PIPE LINE ROUTE . 4-6) NECESSARY BALL VALVES ACC. TO DESIGN THAT IS SUITABLE FOR GAS SERVICES. 4-7) INSPECTION ACTIVITIES INCLUDING HYDROSTATIC TEST & RADIO GRAPHIC. . 4-8) ESDV( EMERGENCY SHUT DOWN VALVES) WELDED END TYPE WITH ALL ACCESSORIES. 4-9) PIG. LAUNCHER& RECEIVER 4-10) CATHODIC PROTECTION SYSTEM FOR THE PIPE WITH ROOM 4-11) ALL VALVES PUT IN THE OPEN ROOM ( WITHOUT CEILING) 4-12) LEAK DETECTION SYSTEM FIBER OPTIC WITH SCADA SYSTEM 5) CODES AND STANDARDS THE DESIGN , FABRICATION AND INSTALLATIONS OF THE EQUIPMENT & SYSTEMS SHALL BE IN ACCORDANCE WITH GOODS INDUSTRIAL PRACTICES AND IN COMPLIANCE WITH THE LATEST EDITIONS AND REVISIONS OF THE FOLLOWING CODES AND STANDARDS AS APPLICABLE :- AMERICAN NATIONAL STANDARDS INSTITUTE , ANSI ANSI B1.20.1 , ANSI B16.9 , ANSI B16.11 , ANSI B16.13 , ANSI B16.15 , ANSI B31.3 , ANSI B31.4 , ANSI B16.34 , ANSI B16.20 , ANSI B16.21 - AMERICAN PETROLEUM INSTITUTE (API) API RP 14E , API 600,API 650 , API 601 , API 610 , RP 500B PART1,API 650 , RP 520 PART1 , PARTII ,API616,ETC RP 520 RP 550B PARTI - AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME) ASME SEC.VIII , DIV1.AWS D.1 - HSE (HEALTHE , SAFETY , ENVIRONMENT & SECURITY ) PLAN - THE IRAQI LAWS SHOULD BE APPLY FOR PROJECT ACTIVITIES IN ADDITION TO THE INTERNATIONAL APPLICABLE CODES 6- ENVIRONMENTAL CONDITION AMBIENT TEMP. : -5 , 55 °C HUMIDITY ( NOVEMBER TO MARCH ) % : 80 - 90 MAX RAIN FALL PER DAY mm : 200 MAX WIND VELOCITY : 140 KM/HR WIND VELOCITY FOR DESIGN : 160 KM/HR 7- GENERAL SPECIFICATION :DESIGN CODE API 5L LATEST ad. LSAW LENGTH OF PIPE 55 KM GAS FLOW RATE 120 MM SCFD X GR. X 60 PSL 2 GAS SP. GR, DRY BASIS 0.6862 GAS OPERATING TEMP. 39 C IN WINTER , OPERATION PRESSURE 28 KG / CM2 GAS HUMIDITY SATURATED IN SUMMER * SEE ATTACHED CHROMATOGRAPHIC GAS ANALYSIS. 8- CARBON STEEL GAS PIPE LINE :PIPE LINE CARBON STEEL API SPEC.5L PSL2 E, LONGITUDINALLY SUBMERGED ARC WELDING (LSAW ) PIPE BEVELED ENDS ACCORDING TO API STANDARD LATEST EDITION (30 DEGREE (+5 DEGREE , -0 DEGREE)). THE PIPE SHALL BE EXTERNALLY COATED WITH (3)MM (AS A MINIMUM) EXTRUDED POLYETHYLENE HIGH DENSITY AND SHOULD BE ACCORDING TO DIN STANDARD 30670 THE LENGTH OF PIPE SHALL BE DRL ACC. TO API 5L. WITH PROTECTIVE END RINGS AND MARKING ACCORDING TO API STANDARD WITH COMPLETE SPECIFICATIONS THE CORROSION ALLOWANCE REQUIRED FOR PIPE (3) MM AS MINIMUM. P/L LSAW 5L 24" X GR. X 60 PSL 2 ORIGIN: PIPE PLATES ( ROW MATERIAL) SHOULD BE FROM WEST EUROPEAN, JAPAN, USA. PIPE MANUFACTURER(WEST EUROPEAN ,JAPAN , USA 9- HEATSHIRINKABLE SLEEVE :HEAT SHRINKABLE SLEEVE JOINTS FOR COATING OF GIRTH WELDS, WITH SPECIFICATIONS IDENTICAL “ AS A MINIMUM “ TO THOSE OF PIPE COATING OF OPEN TYPE .H.S.S. SHOULD BE SUPPLIED WITH ALL ACCESSORIES AND REQUIREMENTS AND THICKNESS OF H.S.S SHOULD BE NOT LESS THAN (3 MM). H.S.S 24" ORIGIN SHOULD BE WEST EUROPEAN , JAPAN , USA. MEXICO , CANADA . 10 - PIG. LAUNCHER & RECEIVER :COMPLETE SCRAPER LAUNCHING & RECEIVING TRAP WITH SCRAPER LOADING – UNLOADING DEVICE. JIB CRANE ,QUICKL REMOVABLE COVER , WITH FLANGED END CLASS 300# RF FOR 24" DIA NATURAL GAS PIPELINE, CONSTRUCTION CODE ASME B31.8THIS TRAP SHALL BE UTILIZE FOR INTELLIGENT PIGGING SYSTEM THE CORROSION ALLOWANCE REQUIRED FOR SCRAPER (3) MM AS MINIMUM. THE ORIGIN SHOULD BE WEST EUROPEAN , JAPAN , USA. 11– PIPE FITTING FLANGE W/N (RTJ) , & RING JOINT MADE OF ASTM WPHY –X60 DIMENSION AND SURFACE TEST CHECK ACC. TO ANSI . ORIGIN OF PIPE FITTINGS SHOULD BE WEST EUROPEAN , JAPAN , USA 12 - X - - EMERGENCY SHUTDOWN VALVE (LINE BREAKDOWN VALVES) (ESDV) ORIGIN OF BALL VALVES & ESDV CONTROL VALVES SHOULD BE WEST EUROPEAN , JAPAN , USA TYPE : BALL VALVE , C/W ALL ACCESSORIES, WELDED INNER VALVE : S.S.316 OPERATING PHILOSOPHY : VALVE BASED ON GAS AND OIL BALL VALVE DESIGN CODE : API 6D BODY : ASTM A216 WCB CLASS FLANGE : ASTM B16.5-600# HYDROSTATIC : API 598 MARKING : MSS – SP - 5 DESIGN PRESSURE : (45 BAR) OPERATING PRESSURE : 28 KG/CM2 ACTUATOR : CONTROL SIGNAL : NATURAL GAS BODY : CSLT TRIM : CR – SR – N FLUID : NATURAL GAS ACTUATOR SHAFER OPERATOR OR EQUIVALENT CLASS 300 BALL VALVE , THE OPERATOR IS FITTED WITH GAS – HYDRAULIC TANK AND POWERED BY LINE PRESSURE. - ISOLATING MANUAL BALL VALVES UP-STREAM, DOWN-STREAM WITH HAND WHEEL - TWO YEARS SPARE PARTS FOR THE ABOVE. - FAT SHOULD BE INCLUDED AT MANUFACTURER WORKSHOP VALVES AND ACTUATOR ORIGIN SHOULD BE FROM WEST EUROPEAN , JAPAN , USA. 13 – EQUIPMENT LIST:- SHOULD BE SUBMITTED ALL EQUIPMENT LIST WILL BE USED IN THE PROJECT ) 14)- CATHODIC PROTECTION SYSTEM: THIS SYSTEM SHALL BE DESIGN BY SUPPLIER. (LIST OF REQUIRED MATERIAL, QUANTITY), CATALOGUES, DRAWING AND OTHER SPECIFICATION SHOULD BE SUBMITTED BY SUPPLIER. Cathodic Protection System for Pipe: QTY Transformer unit Output (50V/100A) DC Manual control Oil cooled Input voltage 220V AC 50 HZ Ambient temperature 60°C By supplier U Other specification IP 55 No. CU/CU Winding Location/Out of Ex-proof area Surge protection Oil level/ Temperature indication Silica gel breathe By supplier No. By supplier Set By supplier Set By supplier m By supplier kg XLPE/PVC 1C x 50mm2 cable(-) By supplier m XLPE/PVC 1C x 50mm2 cable(+) By supplier m By Set Control panel ( Analogue) Tubular Mixed Metal Oxide Anode (MMO) string comprising 5 No. ( Ø25 x 1000 ) mm anode at 1 meter spacing between anodes on 125 meter length of 1C x 50mm2 XLPE/PVC/CU cable fitted to 4mm Dia. 6x7 SWG gal rope covered with 5mm Dia. PVC coating ,125 meter Length design life time 30 year Splice Kit 1 inch or more Galvanized pipe, 2 inch Hard PVC pipe Calcined petroleum coke Portable Ref. Electrode Cu/CuSO4 supplier Cooling oil By supplier kg Bolt & Nut By supplier Set XLPE/PVC/SWA/PVC 3C x 50mm2 with junction box 4nos or more. By supplier m Spare parts for 5 years By supplier Set Test point ( 6- Tap ) type PE or PVDE , Dia. 4inch. C/w all accessories By supplier No. XLPE/PVC 1C x 10mm2 By supplier m 15) - ALL SPECIFICATION AND DRAWING FOR EACH ITEM TO BE SUBMITTED CLEARLY AND INCLUDING ALL DIMENSION 16) BASIC DESIGN DOCUMENTS :THE CONTRACTOR MUST SUBMIT THE FOLLOWING DOCUMENTS AFTER TWO MONTHS FROM L/C OPENING DATE FOR APPROVAL BY S.O.C AS BELOW:- THREE HARD COPIES & THREE ELECTRONIC COPIES FOR BASIC DESIGN. 17) DESIGN APPROVAL AFTER THE CONTRACT START, THE CONTRACTOR SHOULD SUBMIT ALL THE DETAILED DESIGN , PROCESS, MECHANICAL, ELECTRICAL ,INSTRUMENTS……etc FOR SOC APPROVAL IN A ( 2 ) HARD COPIES AND ( 2 ) ELECTRONIC COPIES , SOC WILL STUDY THESE DESIGN AND COME BACK WITH ITS REMARKS WITHIN FOURTEEN WORKING DAYS . -THE CONTRACTOR SHOULD MAKE THE NECESSARY CHANGES WITHIN FOURTEEN DAYS AFTER RECEIVING SOC NOTIFICATION THE FINAL APPROVAL WILL BE HELD IN THE VENDOR COUNTRY BY SOC REPRESENTATIVES , ( 14 ) OF SOC ENGINEERS WILL ATTEND THE APPROVAL , THE VENDOR SHOULD BEAR ALL THE EXPENSE OF THIS PROCEDURE INCLUDING TRAVELING , TRANSPORTATIONS , LIVING EXPENSES , ACCOMMODATION………..etc (14 WORKING DAYS EXCLUDED TRAVELING DAYS) 18) TRAINING OFFER MUST INCLUDE AN INVITATION OF ( 10 ) ENGINEERS / ( 7 ) DAYS EXCLUDING TRAVELING TIME FOR TRAINING AT THE MANUFACTURER WORK SHOP ALL THE COSTS OF TRAVEL , LIVING , TRANSPORTATIONS AND FULL ACCOMMODATIONS WILL BE AT THE CONTRACTOR RESPONSIBILITY AND COST . VENDOR LIST PIPE LINE SUPPLIERS COMPANIES VENDOR LIST 1 Europipe Gmbh Germany 2 Nippon Japan 3 Vallourc France 4 sumitomo Japan 5 Groupe genoyer France 6 Thyssen Germany 7 Sumitomo metal industries Japan 8 Kawasaki steel cooperation Japan 9 Dalmain s.p.a Italy 10 Riva hi corpora fire group Italy 11 Marubeni Japan 12 Mitsubishi corporation Japan 13 Nkk tube Japan 14 Sicom Italy 15 Tps Germany 16 pm Germany 17 Ilva taranto Italy 18 Van leeuwen Holland 19 Mannesmann linepipe gmbh Germany 20 Corus tubes Uk 21 Houston energy USA 22 Tioga pipe USA 23 Am steel pipe USA 24 Stupp corp. USA 25 Camrose pipe Canada 26 Sidarca Italy, Spain 27 Stemcore Switzerland 28 Cornith pipe Greece PIPE FITTING SUPPLIERS COMPANIES VENDOR LIST 29 p.b.v valves USA 30 Abz Valves & controls North america 31 Alfa valvole srl (milon)-Italy 32 Quadrant valve USA 33 Dsi valve Houston-usa 34 Itochi Japan 35 Marubni Japan 36 Phoceenne France 37 Vallouric and Mannesmann France 38 Chero Piping Italy 39 Vanleeuwen Pipe and Tube LTD. The Netherlands 40 Kurvers Group France 41 Trouvay & cauvin Limited UK 42 John crane UK Ltd-Manchester UK 43 TPS Germany 44 Fitech Italia S.R.I Italy 45 Global Flow Technologies Canada 46 Virgo Europe Italy 47 Rbr Valae S.P.A Italy 48 En Flowindus Tries Canada 49 Valbart Italy 50 Petrol Valves USA BREAK DOWN LIST ITEM DESCRIPTION 1 SUPPLY OF PIPE LINE 2 DESIGN ENGINEERING AND DRAWING ACC. TO API 5L STANDARD. FINAL DETAILED DESIGN DOCUMENTS , DATA SHEETS , ASSEMBLY DETAILS & PLANT INSTALLATIONS TO BE SUBMITTED IN 3 HARD X GR. X 60 PSL 2 E UNIT QTY MTR 55000 SET 1 UNIT PRICE TOTAL PRICE COPIES & 3 ELECTRONIC COPIES . 3 PIPE CONSTRUCTION & ERECTION INCLUDING TIE IN CONNECTION AT LUHIES AND G.T.U MTR 55000 4 ESDV( EMERGENCY SHUT DOWN VALVES) WELDED END WITH ALL ACCESSORIES NOS 2 5 PIG. LAUNCHER& RECEIVER WITH ISOLATINGVALVES SET 1 6 PIPE FITTINGS , VALVES … ETC. LOT 7 SUPPLY CATHODIC PROTECTION SYSTEM LOT 8 SUPPLY THE ELECTRICAL SYSTEM FOR MOTORIZED VALVES IN LUHIES AND G.T.U INCLUDING PMCC AND CABLING SET 2 9 CONSUMABLE MATERIALS (DETAIL SHOULD BE LISTED ). SET 1 10 CROSSING WITH ROADS RAILWAYS , CABLES , PIPES ,... ETC ( BOARING MACHINE) LOT 11 MOTORIZE BALL VALVE (LUHIES - G.T.U ) NOS 2 12 COMPLETE CONDENSTE SYSTEM IN (LUHIES ) SET 1 13 COMPLETE LEAK DETECTION SYSTEM SET 1 14 HYDROSTATIC TEST AND GUARANTEES CHROMATOGRAPHIC GAS ANALYSIS NATURAL GAS FROM LUHAIS DEGASSING STATION LIS ON STREAM :1,2,6,7 FORMATION : ZUBAIR DATE OF SAMPLING : 9-3-2000 DATE OF ANALYSIS : 20-3-2000 ITEM STAGES 1 ST 1 GAS PRESSURE (KG/CM2) 28 2 NITROGEN 0.76 3 GARBON DIOXIDE 1.16 4 HYDROGEN SULPHIDE ----- 5 METHANE 80.96 6 ETHANE 11.87 7 PROPANE 3.88 8 I-BUTANE 0.25 9 N- BUTANE 0.76 10 I-PENTANE 0.12 11 N-PENTANE 0.14 12 HEXANES 0.09 13 HEPTANES 0.01 14 OCTANES ----- 15 NONANES ----- 16 TOTAL 100.00 17 GAS SP. GR. (CALCULATED 0.6862 18 GAS MOLECULAR WEIGHT 19.87 GENERAL CONDITIONS TO BE ADHERED BY CONTENDERS :- 1) THE CONTRACTOR REQUESTED TO SUBMIT QUALITY PLAN FOR MANUFACTURING PROCESS & INSPECTION ACTIVITIES BEFORE MANUFACTURING FOR APPROVAL BY SOC. 2) SUBMIT CERTIFICATE OF ORIGIN FOR RAW MATERIAL (PLATE) BEFORE PIPE SHIPMENTS IT SHOULD BE AUTHENTICATED BY THE IRAQI COMMERCIAL ATTACHÉ OR THEIR AUTHORIZED REPRESENTATIVE AT THE COUNTRY OF ORIGIN . 3) PARTY, IT SHOULD BE AUTHENTICATED BY THE IRAQI COMMERCIAL ATTACHÉ OR THEIR AUTHORIZES REPRESENTATIVE AT THE COUNTRY OF ORIGIN . 4) 3RD PARTY ACTIVITIES ARE OBLIGATION OF SOC ACC. TO A CONTRACT BETWEEN SOC AND A WELL KNOWN INSPECTION COMPANY THAT HAVE THE RIGHT TO INSPECT ALL MATERIALS ACCORDING TO QUALITY PLAN SUBMITTED TO SOC ( ITEM 1 ABOVE) . THE INSPECTIONS INCLUDES MANUFACTURING OF PIPES , COATING MATERIALS AND FINALLY COATED PIPES ACCORDING TO API STD & DIN STANDARD FOR COATINGS INSPECTION COMPANY ALSO HAVE THE RIGHT TO REJECT THE DEFECTED ONE DURING THE MANUFACTURING PROCESS TO BE REPAIRED ACC. TO API 5L , STD . 5) SUBMIT MILL TEST CERTIFICATE FOR PIPES & PLATES APPROVED BY SOC PARTY . 6) CERTIFICATE OF INSPECTION BY SOC 3RD PARTY INSPECTOR THAT THE MATERIALS UNDER EACH SHIPMENT ( FOR THE WHOLE PROJECT ) ARE IN COMPLIANCE WITH TECHNICAL SPECIFICATIONS AND QUANTITIES CONTAINED WITHIN THE CONTRACT . 7) CERTIFICATE OF ORIGIN FOR VALVES , LAUNCHER & RECEIVER , CATHODIC PROTECTION MATERIALS AND ALL IMPORTANT PARTS UNDER THIS CONTRACT APPROVED BY SOC 3RD PARTY . 8) MILL TEST CERTIFICATES FOR MAIN ITEMS UNDER THIS CONTRACT( VALVES ,LAUNCHER & RECEIVER , CATHODIC PROTECTION MATERIALS AND ALL IMPORTANT PARTS UNDER THIS CONTRACT APPROVED BY SOC 3RD PARTY) . 9) MATERIAL ORIGIN & MANUFACTURING MILL OF THE PLATES TO BE STATED CLEARLY IN THE OFFER , IT SHOULD BE FROM WEST EUROPE , USA, JAPAN . THE MILL SHOULD HAVE LONG EXPERIENCE IN THIS FIELD, RELATED CERTIFICATES (API & ISO) VALID TO BE SUBMITTED WITH THE OFFER . 10) API & ISO CERTIFICATES FOR THE MANUFACTURING MILL OF PIPES TO BE SUBMITTED WITH THE OFFER WITH CATALOGUES . 11) PRESENT AN INVITATION TO (8) ENGINEERING STAFF TO VISIT RAW MATERIAL (PLATE) AND PIPING MANUFACTURING MILL DURING MANUFACTURING PROCESS FOR MONITORING PRODUCTION, DURATION TO BE FIXED BY SOC AND THE SUPPLIER HAVE TO COMPLETE ALL THE ARRANGEMENT OF VISA TRANSPORTATION , TICKET , ACCOMMODATION . 12) AUTHORIZATION FROM MANUFACTURER OF PIPES (STAMPED & SIGNATURE) TO SOC SHOULD BE SUBMITTED WITH THE TECHNICAL OFFER TO SHOW THAT THE SUPPLIER IS THEIR REPRESENTATIVE . 13) THE CONTRACTOR SHOULD UNDERTAKE TO SPECIFY A FURNISHED ROOM FOR SOC 3RD PARTY INSPECTOR 14) NUMBERING AND MARKING FOR EACH ITEM BY HEATING STAMP , INCLUDING THE NECESSARY DATA SUCH AS , DIAMETER , THICKNESS , TYPE OF MATERIAL WITH GRADE ACCORDING TO API STD, ANY ITEM WITHOUT MARKING SHALL NOT BE ACCEPTED . 15) POINT OF ENTRY TO BE CIP BASRAH . 16) COMMERCIAL OFFER SHOULD BE IN U.S. DOLLAR ONLY . 17) DELIVERY PERIOD TO BE (12) MONTHS FROM DATE OF OPENING OF L/C . 18) PERFORMANCE BOND A PERFORMANCE BOND OF (5%) OF TOTAL AMOUNT OF SUPPLIED EQUIPMENTS UNDER THE SCOPE OF SUPPLY SUBJECTED IN THE FORM OF BANK GUARANTEE TO BE ISSUED BY SUPPLIER OR MANUFACTURERS BANK THROUGH THE BANK NOMINATED LATER IN FAVOR OF S.O.C THIS PERFORMANCE BOND WILL BE EFFECTIVE FROM THE DATE OF OPINING L/C FOR (365) DAYS FROM THE DATE OF THE LAST CONSIGNMENT CIP BASRAH . 19) INSURANCE THE CONTRACTOR IS REQUIRED TO INSURE ALL THE EQUIPMENTS AND MATERIALS FOR VALUE OF 110% OF THE TOTAL VALUE OF THE MATERIALS AND EQUIPMENTS FOR THE SAKE OF THE BUYER , THE INSURANCE WILL ALLOW FOR A (3) WEEKS CLAIMS AFTER THE ARRIVAL OF THIS MATERIALS AND EQUIPMENT TO BASRAH AND UNLOADING THEM . 20) BID BOND CONTRACTOR SHOULD ISSUE A BID BOND OF ( 1% ) TOGETHER WITH HIS COMMERCIAL OFFER IN FAVOR OF SOC AND FOR A PERIOD OF THREE MONTHS AND TO BE EXTENDED UP TO SIX MONTHS IF NEEDED OTHERWISE COMMERCIAL OFFER WOULD BE NEGLECTED 21) END USER CERTIFICATE END USER CERTIFICATE STATING THAT THE MATERIALS OR EQUIPMENTS ARE SUPPLIED WITHIN THE REQUIRED SPECIFICATIONS AS REQUESTED IN THE PURCHASE ORDER IS PART OF THE PAYMENT TERMS 22) BANK CHARGES : ALL BANK CHARGES INSIDE IRAQ ARE TO THE BUYERS ACCOUNT, AND ALL BANK CHARGES OUTSIDE IRAQ SHALL BE TO THE CONTRACTORS ACCOUNT, INCLUDING ALL THE BOND SERVICES.