B.C. Ministry of Environment Climate Investment Branch Verification Report, Cover Letter and Statement of Assurance Template November 2014 Visit the Climate Investment Branch web page for more information Verification Report Project Plan Title: Project Proponent: Document Prepared For: [Name, Address, Contact] Document Prepared by: [Name, Address, Contact] Date: [month, day, year] [Reference/Project/Number] [Grey text within square brackets [] provides explanatory text. However, verification bodies should refer to the Regulation and the guidance documents provided on the Climate Investment Branch website to ensure requirements are met. Please ensure that all fields are completed and that explanatory text is deleted prior to submission. Note - Electronic records management: 1. Documents submitted electronically to the Climate Investment Branch must use the following file name format: Verification Report-[Project Name]-[Name of Verification Body]-[month-day-year] 2. This document file name must be included as a footnote on all pages of the Verification Report along with the page number. Right click the file name in the footer to update this field or see MS Word help “Add or update the file name to the footer”.] Page 2 of 19 File name: Document1 TABLE OF CONTENTS 1 VERIFICATION REPORT - COVER LETTER ....................................................................................................... 4 2 VERIFICATION REPORT – STATEMENT OF ASSURANCE ................................................................................ 6 3 VERIFICATION REPORT - CONTENT ............................................................................................................... 8 3.1 INTRODUCTION / VERIFICATION OBJECTIVE ................................................................................... 8 3.2 VERIFICATION BODY ........................................................................................................................ 9 3.3 EMISSION OFFSET PROJECT DETAILS ............................................................................................. 11 3.4 GHG ASSERTION ............................................................................................................................. 12 3.5 VERIFICATION METHODOLOGY ..................................................................................................... 13 3.6 SUMMARY OF VERIFICATION RESULTS .......................................................................................... 15 3.7 IDENTIFIED DISCREPANCIES AND RESOLUTIONS ........................................................................... 18 4 APPENDIX A: VERIFICATION PLAN .............................................................................................................. 19 Page 3 of 19 File name: Document1 1 VERIFICATION REPORT - COVER LETTER [Project Proponent] [Project Proponent’s Address] [City], BC [Postal Code] [Date] Dear [Project Proponent], Verification Body Qualifications [Verification Body] maintains an accredited business management system consistent with ISO 14065 for the verification of [sectoral scope of the Project Report] projects. [Verification Body]’s accreditation number is [Accreditation Number] issued by [Accreditation Body]. -or[Verification Body] maintains a business management system undergoing ISO 14065 accreditation with [Accreditation Body] for verification of [sectoral scope of Project Report] projects. This verification was conducted in conjunction with a witness audit by [Witness Auditor] from [Accreditation Body]. Verification Team Qualifications [Verification Body]’s verification team was comprised of individuals with the education, experience, accreditation, professional designation, knowledge, and competency in the project’s sectoral scope to verify the Project Report. The verification team consisted of individuals with the following qualifications: [Position on the Verification Team]: [Verifier’s Name], [Title] [Qualifications including the verifier’s educational background, experience in verifying projects in the project’s sectoral scope, accreditation and training, professional designation, knowledge and competency within the project’s sectoral scope] [Position on the Verification Team]: [Verifier’s Name], [Title] [Qualifications including the verifier’s educational background, experience in verifying projects in the project’s sectoral scope, accreditation and training, professional designation, knowledge and competency within the project’s sectoral scope] [Include the above information for each additional member of the verification team] Page 4 of 19 File name: Document1 Independence and Conflict of Interest [Verification Body] and the verification team have avoided any actual or potential conflicts of interest with [Project Proponent] and the intended users of the GHG assertions in the Project Report. The parties involved in the verification of the Project Report were not, in any way, involved in GHG consultancy services for the development of [Project Name] or the validation of the [Project Name] Project Plan dated [Month, Day, Year]. To ensure independence and avoid conflicts of interest [Verification Body] requires [description of procedures or policies the verification body implements to ensure independence and conflict of interest]. Quality Assurance and Quality Control [Verification Body] maintains an accredited business management system designed to ensure quality assurance and quality control consistent with ISO 14065. To ensure compliance with ISO 14065 [Verification Body] requires [description of procedures or policies the verification body implements to ensure compliance with ISO 14065]. Record Keeping and Data Management [Verification Body] maintains an accredited record keeping and data management system consistent with ISO 14065. To ensure compliance with ISO 14065 [Verification Body] requires [description of procedures or policies the verification body implements to ensure compliance with ISO 14065, the location of the records and data and the time period the data will be maintained for]. Sincerely, [Verifier’s Signature] [Verifier’s Name] [Position] Authorized on behalf of [Verification Body] [Address] [City], [Province/State] [Postal/Zip Code], [Country] [Date] Page 5 of 19 File name: Document1 2 VERIFICATION REPORT – STATEMENT OF ASSURANCE [Project Proponent] engaged [Verification Body] to conduct a verification of the Project Report, dated [month, day, year] submitted by [Project Proponent] for the [Project Name] Offset Project (the Project) located [Project Location and Province]. The Project Report describes emission [reductions or removals] occurring from [brief description of the project activities] during the period [month, day, year] to [month, day, year], with the asserted emission reduction (or removal enhancement) of [XXX] tonnes of carbon dioxide equivalent (tCO2e). In this work, [Project Proponent] was responsible for the preparation of the Project Report in accordance with the Project Plan as specified by the British Columbia Emission Offsets Regulation (the Regulation). This responsibility included the design, implementation and maintenance of internal control relevant to the preparation of a Project Report that is free from material misstatement, whether due to error, omission or misrepresentation. This responsibility included the development of the Project Report, which encompasses the collection of data, performance of calculations and presentation of information. As an independent verification body, [Verification Body] was responsible for planning and executing the verification in order to deliver an opinion as to whether the Project Plan is presented fairly and in accordance with the verification criteria as specified by the Regulation. [Verification Body] is accredited by a member of the International Accreditation Forum (IAF), in accordance with ISO 14065 (Accreditation ID #[XXXX]) for greenhouse gas (GHG) verification. [Verification Body] is also accredited under the [applicable sectorial scope] and is therefore eligible under the Regulation to complete the verification of the Project. The verification criteria require that the verification be planned and executed in a means to obtain reasonable assurance about whether the assertion(s) in the Project Report are materially correct and are a fair and reasonable representation of the project’s GHG reduction and that there have been no material changes to how the project was carried out compared to the validated Project Plan. Based on the procedures undertaken and described in this report, the Project’s GHG emission reductions and removal enhancements for the period of [month, day, year] to [month, day, year] are free from material discrepancies, a fair and reasonable representation of the Project’s GHG reduction in accordance with the verification criteria specified by the Regulation, in all material respects, and are substantiated by sufficient and appropriate evidence. This independent reasonable verification statement is intended for [Project Proponent], and Climate Investment Branch (CIB). [Verifier’s Signature] [Verifier’s Name] [Position] Authorized on behalf of [Verification Body] Page 6 of 19 File name: Document1 [Address] [City], [Province/State] [Postal/Zip Code], [Country] [Phone Number] [Date] Page 7 of 19 File name: Document1 3 VERIFICATION REPORT - CONTENT 3.1 INTRODUCTION / VERIFICATION OBJECTIVE The objective of the verification was to assess whether the GHG assertion for the [Project Name] Project Report dated [month, day, year] satisfied all verification criteria under the British Columbia Emission Offsets Regulation (Regulation)1. [Verification Body] considers completeness, relevance, conservativeness, consistency, accuracy, and transparency as criterion to facilitate the assessment of whether the Project Report and greenhouse gas (GHG) assertion(s) are presented fairly and substantiated by sufficient and appropriate evidence. The following verification report describes the scope of the engagement and the verification procedures for the Project. The report includes the techniques and processes used to test the GHG information and associated assertions, along with any additional information used in verification. The verification was conducted in accordance with ISO 14064:2007 Part 3, ISO 14065:2013 and the Regulation. A copy of the final Verification Plan is provided in Appendix A. The activities described therein were executed during the course of the verification. The sampling plan, a subset of the verification plan, is outlined along with the final results in Section 3.6 of this report. The Verification Statement is included in Section 1. 1 Relavent guidance documents can be found on the Climate Investment Branch web page. Page 8 of 19 File name: Document1 3.2 VERIFICATION BODY General Information Verification Body [Verification Body Name] Verification Body Contact Information [Name] [Title of Lead Verifier on Verification Body Team] [Address] [Phone] [Email] Accreditation Agency [Accreditation Agency] Accreditation ID [ID#] Scope of Accreditation [Identify Scope(s) Verification Body is accredited to.] Date Accreditation Expires [month, day, year] Statement of Compliance with the Regulation [Describe how the Verification Body is in compliance with the Regulation] Verification Body Team Lead Verifier Independent Peer Reviewer Technical Expert Verifier(s) [Lead Verifier’s Name], [Title] [Qualifications including the lead verifier’s educational background, experience in verifying projects in the project’s sectoral scope, accreditation and training, professional designation, knowledge and competency within the project’s sectoral scope] [Peer Reviewer’s Name], [Title] [Qualifications including the peer reviewer’s educational background, experience in verifying projects in the project’s sectoral scope, accreditation and training, professional designation, knowledge and competency within the project’s sectoral scope] [Technical Expert’s Name], [Title] [Qualifications including the technical expert’s educational background, experience in verifying projects in the project’s sectoral scope, accreditation and training, professional designation, knowledge and competency within the project’s sectoral scope] [Verifier’s Name], [Title] [Qualifications including the verifier’s educational background, experience in verifying projects in the project’s sectoral scope, accreditation and training, professional designation, knowledge and competency within the project’s sectoral scope] Independence/Impartiality Assessment of Conflict of Interest (COI) [Verification Body] and the verification team have avoided any actual or potential conflicts of interest with [Project Proponent] and the intended users of the GHG assertions in the Project Report. The parties involved in the Page 9 of 19 File name: Document1 verification of the Project Report were not, in any way, involved in GHG consultancy services for the development of [Project Name] or the validation of the [Project Name] Project Plan [Version and Date] used in the Project Report. To ensure independence and avoid conflicts of interest [Verification Body] implements [description of procedures or policies the verification body implements to ensure independence and to mitigate conflict of interest].[Verification body should also identify if there is a COI and how it is mitigated] Quality Assurance/Controls Quality Assurance and Quality Control Record Keeping and Data Management To ensure compliance with ISO 14065 [Verification Body] requires [description of procedures or policies the verification body implements to ensure compliance with ISO 14065]. [Verification Body] requires [description of procedures or policies the verification body implements to ensure compliance with ISO 14065, the location of the records and data and the time period the data will be maintained for]. Other Considerations Intended User This report has been prepared for the [Project Proponent] and the BC Ministry of Environment Climate Investment Branch (CIB) for the express purpose of facilitating the creation of emission offsets under the British Columbia Emission Offsets Regulation (B.C. Reg. 393/2008). Limitation of Liability [Verification body to insert limitation of liability clause here] Page 10 of 19 File name: Document1 3.3 EMISSION OFFSET PROJECT DETAILS General Information Project Name Project Contact Project Location [Project Name] [Name] [Title] [Address] [Phone] [Email] [Identify project location. Include project coordinates (latitude and longitude or similar). Include as an appendix if there are many project locations.] Project Overview Project Plan Version and Date Project Report Version and Date [month, day, year] [Version] [month, day, year] Project Start Date [month, day, year] Validation Period [month, day, year] to [month, day, year] Expected Lifetime of the Project [XX Years] Project Description Applicable Quantification Protocol (Version & Date) Changes to the Project Since Project Start Date Applicable Project Scope [Provide a summary description of the project (no more than one page) which should include a description of project boundaries, technologies and processes.] [Identify Project & Baseline Sources and Applicable GHGs for the project (e.g. Mobile Fuel Combustion (CO2, CH4, N2O) - Project Source: on-site gasoline and diesel-fuelled vehicles] [Identify applicable protocols and modules, versions and dates] [Identify any changes to the project or deviations from Project Plan.] [Identify accredited scope applicable to project sector] Page 11 of 19 File name: Document1 3.4 GHG ASSERTION [For each year, enter in the baseline, project and net reductions or removals in the table below. Should there be leakage or other discounts to the net emission reductions or removals, adjust table as required.] Projected Project Reporting Period (month/day/ year) Baseline Emissions or Removals (t CO2e) Project Emissions or Removals (t CO2e) Net Emission Reductions or Removals (t CO2e) Page 12 of 19 File name: Document1 3.5 VERIFICATION METHODOLOGY Verification Methodology Verification Standard(s) 14064:2007 Part 3, and ISO 14065:2013 • Verification Criteria • • Level of Assurance Verification Scope Materiality The British Columbia Emission Offsets Regulation (B.C. Reg. 393/2008); The Guidance Document To The BC Emission Offsets Regulation V2.0 (2012); and [Project Name] Project Plan [Version & Date]. The CIB requires the verifier to conduct sufficient procedures to deliver a reasonable level of assurance. The verification was planned and executed accordingly. The verification covers the project activities described in the Project Plan and specified gases under the Regulation. [The verification body is to specifically discuss the GHGs included within the scope of the verification (i.e. carbon dioxide (CO2), methane (CH4), nitrous oxide (N2O), sulphur hexafluoride (SF6), hydrofluorocarbons (HFCs) and perfluorocarbons (PFCs)). The total GHG emissions are reported as equivalent tonnes of carbon dioxide (tCO2e) emissions.] [Identity materiality threshold and justification] Verification Procedures Verification Procedures [Describe the verification procedures, including risk assessment and the sampling plan used for undertaking the verification. Procedures need to connect to risks identified by the verifier for the greenhouse gas statement and attribute level for each material line item, including the nature, timing, and extent of the procedures. These need to be described in sufficient detail to understand how the verification was done.] Risk Assessment [Describe outcomes of risk assessment process] Document Review Site / Office Visits Interviews [Describe how the verification was performed as an audit where the Project Plan, Project Report and any supporting documents were reviewed, cross checked and compared with the Regulation. Identify how this reduced audit risk.] [Describe the methods and objectives for any site/office visits performed. Include in the description details of all project activity locations visited, the physical and organisational aspects of the project inspected, the dates when such site/office visits took place and the rationale for selection. Identify how the site visits reduce/mitigate audit risk.] [Describe the interview process and identify personnel, including their roles, who were interviewed and/or provided information additional to that provided in the project description, monitoring report and append and describe any supporting documents.] Page 13 of 19 File name: Document1 Inherent Limitations [Describe any inherent limitations that relate to uncertainty with the GHG assertion.] Schedule of Verification Activities Verification Planning & Review [Insert dates] Site and Office Visits [Insert dates] Verification Finalization & Reporting [Insert dates] Page 14 of 19 File name: Document1 3.6 SUMMARY OF VERIFICATION RESULTS A summary of the key findings from the verification is provided in the table below. Details on the identified discrepancies and resolutions are provided in Section 3.7. [Note that the procedures in the table below are suggestions only and should be considered bare minimum. For each parameter, provide a summary in the Result column including the issues raised, the response(s) provided by the Project Proponent, and the final conclusions and any resulting changes to project documents. Identify whether the parameter is: • Satisfactory, • Immaterial/Material • Qualitative/Quantitative Discrepancy] Parameter Verification Assessment Procedures Project Eligibility [Describe the procedure(s) undertaken for the parameter] Demonstration of Ownership [Describe the procedure(s) undertaken for the parameter] Result [Identify, discuss and justify conclusions regarding the following: • Project start date and period. • Compliance with Project Plan. • Applicability of new Regulations • Statutory declarations. • Eligibility of GHGs reductions/removals. • Deviation of the Project from the Project Plan. • Eligibility of project activities (in the case of a Program of Activities) as documented and justified in the Project Information Design Documents (PADD) included with the project report. [Identify, discuss and justify conclusions regarding the following: • Project proponent and other entities involved in the project. • Right of use. • Whether offsets from the project have become included in an emissions trading program or any other mechanism that includes GHG allowance trading. • Whether the project has received or sought any other form of environmental credit, or has become eligible to do so since validation or previous verification.] Page 15 of 19 File name: Document1 Parameter Verification Assessment Procedures Accuracy and Conservativeness of GHG Assertion [Describe the procedure(s) undertaken for the parameter] Quality of Evidence to Determine GHG Emission Reductions and Removals [Describe the procedure(s) undertaken for the parameter] Assessment of Uncertainty and Risk (Permanence & NonPermanence) [Describe the procedure(s) undertaken for the parameter] Consistency with Project Offset Plan Consistency with Verification Criteria [Describe the procedure(s) undertaken for the parameter] [Describe the procedure(s) undertaken for the parameter] Result [Identify, discuss and justify conclusions regarding the following: • Accuracy of GHG emission reductions and removals, including accuracy of spreadsheet formulae, conversions and aggregations, and consistent use of the data and parameters. • Whether methods and formulae for calculating baseline emissions, project emissions and leakage have been followed. • The appropriateness of any default values used in the Project Report.] [Identify, discuss and justify conclusions regarding the following: • Reliability of the evidence used to support GHG Assertion. • The robustness and transparency of the audit trail (data generation and aggregation, to recording, calculation and final reporting). [Identify, discuss and justify conclusions regarding the following: • Rationale, assumptions and justifications used to support the risk score. • Documentation and data provided to support the risk score. • Appropriateness of the risk score.] [Identify, discuss and justify conclusions regarding the following: • The existence of any material discrepancies between Project Plan and Project Report (e.g. monitoring program, methodology, etc.).] [Identify, discuss and justify conclusions regarding the following: • Documentation of all relevant assumptions and data are listed in the project description, including their references and sources. • All data and parameter values used in the project description are considered reasonable in the context of the project. • Adequate disclosure of material risks, Page 16 of 19 File name: Document1 Parameter Verification Assessment Procedures Implementation of GHG Data Management and Quality Control [Describe the procedure(s) undertaken for the parameter] Implementation of GHG Data Retention and Storage [Describe the procedure(s) undertaken for the parameter] Result assumptions, limitations and uncertainties. • All statutory declarations are included (baseline scenario is conservative, project additionality, project start date, project reductions are accurate and conservative for the reporting period, superior claim of ownership, project plan meets the Regulation).] [Identify, discuss and justify conclusions regarding the following: • The suitability of the implemented monitoring system (i.e., the process and schedule for obtaining, recording, compiling and analysing the monitored data and parameters). • The ability of the information management system to protect against unauthorized physical and logical access. • The ability of the information management system processes to provide complete, accurate, and timely data.] [Identify, discuss and justify conclusions regarding the following: Suitability of monitoring equipment and procedures to ensure that data can be stored and available to relevant parties in accessible electronic formats for a minimum of 10 years, and that appropriate archiving and security procedures are in place to protect data from accidental or intentional destruction or tampering. Page 17 of 19 File name: Document1 3.7 IDENTIFIED DISCREPANCIES AND RESOLUTIONS [Summarize the number of material and immaterial discrepancies that remain outstanding. With respect to the following table, provide a summary of issues raised, the response(s) provided by the project proponent, and the final conclusions and any resulting changes to project documents.] Identified Misstatement [Identify and describe misstatement] [Identify and describe misstatement] [Identify and describe misstatement] [Identify and describe misstatement] Material/Immaterial Resolution [Identify if the misstatement is material/immaterial and the impact on the GHG in both tonnes CO2e and percentage (%)] [Identify if the misstatement has been resolved or not. If resolved, describe how the proponent resolved the misstatement] [Identify if the misstatement is material/immaterial and the impact on the GHG in both tonnes CO2e and percentage (%)] [Identify if the misstatement is material/immaterial and the impact on the GHG in both tonnes CO2e and percentage (%)] [Identify if the misstatement is material/immaterial and the impact on the GHG in both tonnes CO2e and percentage (%)] [Identify if the misstatement has been resolved or not. If resolved, describe how the proponent resolved the misstatement] [Identify if the misstatement has been resolved or not. If resolved, describe how the proponent resolved the misstatement] [Identify if the misstatement has been resolved or not. If resolved, describe how the proponent resolved the misstatement] Summary Misstatements Total Absolute Misstatement [Enter absolute misstatement in both tonnes CO2e and percentage (%) as it relates to the GHG Assertion] Page 18 of 19 File name: Document1 4 APPENDIX A: VERIFICATION PLAN Page 19 of 19 File name: Document1