CATEGORY PLACE TARGETS TECHNICAL SOLUTION PRIORITY ACTION PLAN Boston 8 bgys Garbage disposal Garbage bin Sanitary landfill Municipal garbage collection Consider MRF?? Identification site for municipal garbage landfill Latrines -existing-functional Damaged – to be repaired COMMUNITY Cateel Baganga 18 bgys – Mikit, Dapnan, San Victor, San Isidro 5129- totally damaged & no access to latrines pre Pablo 3366 – partially damaged 671 latrines Identification of dunping sites, collection and segregation Provision /tech solid Lingig/Caraga/Bislig 2394 fam validated 60 latrines 920 fam validated (B) – 20 sanitary latrines 650 fam validated (C) – 10+10 latrines Monitor listing? Construction of toilets For HH with totally damaged facilities & with no access to latrines Provision of repair kits (superstructure and septic) For HH with partially damaged facilities, provision of toilet bowls with or without cement Construction of latrines with proper/ideal septic tank with handwashing facility Identification of landfill Rehab of existing damaged H2O sources Construction of semi per sanitation facilities Construction of tap stands Note: Cleaning, maintenance and de-sludging solutions need to be included IMPLEMENTING ORG/INDIV Municipal ways and means committee RSI/HRC/PLAN Reconcile HH data from CRS and RHU on sanitation damages Consolidate and filter for category Interventions: need to reassess/do actual survey so as to avoid duplication based on NGO implementation Data gathering to other 14 bgys Full package of WASH Distribution of HK & WK Provision of cleaning kits (SWM) Water analysis HP TOT/HP session 1 month Long term goal 1 month (see sheets here to see times) Data gathering/ HHS Survey? TIME FRAME 1. CRS (300* latrine repair kits) Category A 1 = March-Ap 2= May-June 2. 900 latrines for category B (*target 340 communal latrines) RSI/BSI (NGO/LGU partnership) March 11-25 – 3 weeks SCF, RC, DSWD, HRC 3 months CATEGORY PLACE TARGETS TECHNICAL SOLUTION PRIORITY ACTION PLAN Boston Water source Garbage disposal Latrines Flush toilets Bathing Water source for food preparation 32 (existing) EC and TRS Purchase garbage bin Monitoring of defective latrines General monitoring Operation and maintenance of WASH facilities bunkhouses Cateel TIME FRAME Data gathering IMPLEMENTING ORG/INDIV RSI/HRC/PLAN Identify desludging areas and sanitary landfill HRC RHU/PHO No funds available Validation of data available RSI/BSI (NGO/LGU partnership) March 11-25 2 weeks 1 month??? EC/TRS Provision of access to water Baganga 20 bunkhouses/32 tents Accessible H2O source Construction of emergency/temp latrines with HW facility and regular desludging Provision of hygiene kit (hygiene promotion activity) Provision of bathing cubicles / facilities Target -Toilets Salingcomot Central Saoqugue Kinablangan Ban-ao (check spells) -garbage collection/management Lingig/Caraga/Bislig Note: Cleaning, maintenance and de-sludging solutions need to be included CATEGORY PLACE TARGETS Boston Garbage disposal Latrines Toilets Bathing Targets: 50 HH - 100 HH Spontaneous Settlements Semi perm TECHNICAL SOLUTION PRIORITY ACTION PLAN IMPLEMENTING ORG/INDIV TIME FRAME Data gathering RSI/HRC/PLAN 1 month Cateel 686 families transferred to San Raphael from various bgys (2 sites Papag EC and Pop San Papa? Provision of temporary water and sanitation facilities Strengthen camp management and DSWD/IOM and identified camp leader CRS and Papag EC (300 families) done Baganga No data on loc H2O source Latrines (semi perm 36 mts) Bathing facility Desludging Waste disposal/ solid waste management Access to safe H2O Construction of temp or emergency latrines Construction of bathing facility Garbage collection/ management Data gathering to other 14 bgys (see community list of 4 bgys) RSI/BSI (NGO/LGU partnership) March 11-21 – 2 weeks Lingig/Caraga/Bislig Note: Cleaning, maintenance and de-sludging solutions need to be included CATEGORY PLACE TARGETS Boston Garbage disposal Toilets TECHNICAL SOLUTION PRIORITY ACTION PLAN IMPLEMENTING ORG/INDIV TIME FRAME Data gathering RSI/HRC/PLAN 1 month 13 schools 74 TLS Temp learning spaces Check the paper?? Cateel 25 schools (elem & HS)need 136 toilet bowls Construction /rehab of permanent latrines Validation of identified schools with damage to latrines CRS (8 schools with WASH intervention in 7 bgys March -April Baganga No data H2O source Latrines (semi perm) Desludging Waste disposal/ solid waste management Access to safe H2O Construction of temp emergency latrines Garbage collection management Data gathering to other 14 bgys (see community list of 4 bgys) RSI/BSI (NGO/LGU partnership) Dep Ed March 11-21 2 weeks Identification of water source Identification of latrine gathering Hygiene session Provision of IEC materials (poster/flipcharts) Construction of san facilities Hand washing facilities ACF, WFP 3 months Lingig 95 pupils Palo alto elem school Note: Cleaning, maintenance and de-sludging solutions need to be included ACTIONS Data finalise 2 weeks Targets redefined Photocopy – redo send to parners Targets – municip, regional, country, Cluster level Dep ed data on TLS/ prioritised get list in 2 weeks Advocacy to LGUs of BBC and New Batan for sanitary landfills Note: Cleaning, maintenance and de-sludging solutions need to be included