SECTION 302 SPECIFICATIONS FOR THE REMOVAL OF STRUCTURES, OBSTRUCTIONS, SURFACING, AND MISCELLANEOUS ITEMS 302-1 DESCRIPTION This work shall include the removal, razing, demolition, and disposal of buildings, foundations, structures, fences, asphalt, and concrete pavement, sidewalks, driveways, curb and gutters, manholes, pipes, and other similar items shown on the plans or designated by the Engineer. 302-2 CONSTRUCTION REQUIREMENTS Unless otherwise specified, all salvageable material shall become the property of the Contractor. All material removed from the site may be disposed of at the Municipal Landfill at no charge to the Contractor. All building and basement foundations shall be completely removed. All building sewers shall be plugged with concrete. All building water and sewer services shall be located and left exposed until the Engineer has measured their locations. All building and basement foundation excavations or any other cavity resulting from the removal work shall be backfilled with suitable material and compacted to 95% dry density as determined by the Standard Proctor Test Method. No separate payment shall be made for excavating, backfilling, or compacting these cavities. Items designated for removal and salvage shall be removed and stored without breakage or damage. Items broken or damaged by the Contractor shall be replaced at the Contractor's expense. Asphalt pavement to be removed shall be cut by the means of a saw, colter wheel, jack hammer, or similar means producing a reasonably straight and vertical cut. Concrete pavement, driveways, sidewalks, and other surfaces to be removed shall be removed to an existing joint or saw cut. Removal of asphalt and concrete surfaces shall be to the limits designated by the Engineer. Any surfaces damaged or destroyed by the Contractor's operations beyond these limits shall be removed and replaced at the Contractor's expense. Section 302, Page 1 of 2 302-3 MEASUREMENT AND PAYMENT Items to be removed or removed and salvaged shall be listed in the Bidder's Proposal. The removal or removal and salvage of items shown on the plans, but not listed on the Bidder's Proposal, shall be considered incidental to the project. Items encountered during the work which are not shown on the plans and whose removal or removal and salvage are necessary to complete the work or are required by the Engineer, shall be considered extra work. Removal or removal and salvage shall be measured on any of the following basis: Lump Sum (L SUM), Each (EA), Square Foot (SF), Square Yard (SY), Cubic Yard (CY), Ton (TON), or Linear Foot (LF) complete and accepted by the Engineer. Section 302, Page 2 of 2