Planning Matters 549 - 21 January 2016 (DOCX 136.6 KB)

advertisement
Planning Matters
Department of Environment, Land, Water & Planning email subscriber service
549 | 21 JANUARY 2016
Amendments Online
APPROVALS

Ballarat C185: rezones land adjoining the Sunraysia Highway and Western Highway in Miners Rest to
Special Use Zone Schedule 15, and amends the Schedules to Clauses 52.03 and 81.01 to introduce
Incorporated Document Central Victoria Livestock Exchange, Ballarat October 2015 to facilitate the
development of the new Ballarat Saleyards. It includes a concurrent EPA Works Approval Application for
the saleyards.

Bayside C146: applies to the area affected by Schedule 4 of Design and Development Overlay which is
zoned Public Use Zone Schedule 4 (Transport). The amendment changes the overlay schedule to
include a clause exempting railway infrastructure works in the Public Use Zone Schedule 4 from the
permit requirements of the overlay, and replaces references to the former Residential 1 Zone with
General Residential Zone 1.

Cardinia C161: implements the findings of the Cardinia Local Heritage Study Review Volumes 1, 2 and 3
- Sept 2015, by applying the Heritage Overlay to sites identified as having heritage significance, applying
Schedule 7 to the Significant Landscape Overlay to 4 Edenmont Road, Emerald, incorporating and
referencing documents, and correcting mapping anomalies. The Amendment also makes minor
corrections in schedules to the Environmental Significance Overlay (ESO), Vegetation Protection
Overlay, Significant Landscape Overlay and the Land Subject to Inundation Overlay; and deletes referral
requirements from the Schedule to Clause 66.04 to reflect referral requirements deleted in the Schedules
to the ESO.

Casey C197: updates bushfire provisions within the Botanic Ridge Precinct Structure Plan and
Development Contributions Plan, inserts and applies the Bushfire Management Overlay – Schedule 1 to
land in the Botanic Ridge Precinct Structure Plan that is within 150 metres of the Royal Botanic Gardens
Cranbourne, amends the requirements for bushfire management in Schedule 4 to the Urban Growth
Zone and updates the Schedule to Clause 52.17 to allow native vegetation removal where it is either
consistent with Commonwealth environment approvals or where the native vegetation is not identified in
the Thompsons Road, Clyde Creek, Casey Fields South Residential and Berwick Waterways growth
corridor precincts.

Port Phillip C131: extends the expiry date in Schedule 3 to the Design and Development Overlay until 20
July 2016.

Warrnambool C78 Part 1: implements the North Warrnambool Flood Study (2010), South Warrnambool
Flood Study (2007) and Dennington Flood Study (2007) as they relate to land in the Russell Creek and
Merri River floodplains.
1 of 2
EXHIBITIONS

Baw Baw C89: Proposes to delete redundant Development Plan Overlays; implement the
Drouin Structure Plan; facilitate development and ongoing use of the Warragul Leisure Centre,
intersection roadworks near the Warragul Golf Club, ownership and management of water/sewerage
infrastructure and ongoing management of public open space; introduce and delete the Heritage Overlay
for various properties; apply the underlying zones of roads that are no longer under VicRoads; and
correct anomalies.

Mornington Peninsula C191: Proposes to introduce and apply Development Plan Overlay Schedule 20 to
470-474 Browns Road, Rye and amend the Schedule to Clause 52.01; introduce and apply Development
Plan Overlay Schedule 21 to 11-13 Mountain View Road, Mt Eliza to facilitate a two lot subdivision;
rezone 318 Wallaces Road, Dromana to Green Wedge Zone Schedule 3 and 50 Spray Street, Rosebud
to General Residential Zone Schedule 1 to reflect their private ownership.

Northern Grampians C42: Proposes to implement key recommendations of the Northern Grampians
Shire Council, Report for Landslide Susceptibility Zoning, Halls Gap Township, September 2011 by
amending Clause 21.10 and 22.04 and introducing and applying Erosion Management Overlay Schedule
2 to land susceptible to landslides in the township of Halls Gap; and also update the existing erosion
management map for St Arnaud.

Yarra Ranges C153: Proposes to delete redundant Restructure Overlay maps and make consequential
changes, correct an error in the Restructure Overlay Incorporated Document; rezone 13 Leith Road,
Montrose to a Commercial 1 Zone and apply a Design and Development Overlay, and rezone 347
Warburton Highway, Wandin North and apply appropriate Overlays to reflect the private ownership of the
land.
PANEL REPORTS

Brimbank C157, Melton C143 and EES: Upgrade of the Palmers Road Corridor

Horsham C72: Horsham Bypass Public Acquisition Overlay

Melton C100: Dry Stone Walls local policy

Mount Alexander C60: Apply the Heritage Overlay to three site in Castlemaine (HO1183, HO1204 and
HO1214)
GIS UPDATE
The following planning schemes have had datasets realigned to match current cadastral boundaries:
 Ballarat Planning Scheme LI
NKS
Quick Links
Planning Services Directory
Practice and Advisory Notes
Planning Schemes Online
Planning Property Report
Planning Permit Application Forms
Local Provisions in Word
Victoria Planning Provisions
Planning Panels and Committees
Employment
Subscribe to Planning Matters
Planning Matters Archive
Planning Scheme Histories
Spatial Datamart
Get involved in planning
Planning Permit Activity in Victoria
Policy and Strategy
Contact planning
Department of Environment, Land, Water & Planning
www.delwp.vic.gov.au/planning | Email : planning.subscribers@delwp.vic.gov.au
Tel: (03) 9947 1210
2 of 2