Building 1400 needs: Chabot College Facilities & Sustainability Committee Installation of a TV monitor to provide program specific, college general, information to students. Campus Tour 12 September 2013 Replacement of sink installed in 1426. Installation of additional material to reduce Replace chairs /stools in lab classrooms 1602 and 1616 with adjustable-height stools patrons. Currently 6 stalls in the women’s and 28 stools and 25 chairs in 1602 24 stools restroom must serve at times 600-1000 and 9 chairs in 1616 users per event. Add a study area to Building 1600, similar to Also, add an additional state of the art Reduce the curb size at the base of the New elevator from House to Balcony level. Concession area to serve beverage and food as allowed by policy. Revenue generator. courses to use. And also, at the end of 1600, near the CMC computer lab in 1600 for online hybrid better utilize the outdoor lift. Paint the external building surfaces CMC equipment storage is outside of 1600 and currently has walls, but no ceiling, two LED lighting installed initially in the main house (108 current 300-500 watt lamps) LED stage lighting to reduce carbon footprint and reduce cost to College gates, an air conditioning unit cement pad, perimeter walls to improve vehicle parking, operations. and a partial floor. Remove the gates and driveway clearance, and reduce potential add a double door keyed access, enclose vehicle damage. with a ceiling, add electricity and lighting, type that has ceased being used. Also very air conditioning pad. unsightly and not in keeping with a 21st Measure B enabled Chabot College to add Building 1800 Building 3400's new BMW facilities Building (IOB, building 400), the Building 1400's remodeled spaces Community and Student Services Center Building 1600's CNC machine lab (CSSC, building 700), and the PE Strength Building 1600's upstairs classroom and Fitness Center (B 4000. Chabot's PAC and its backstage areas Building 700 South Building 700 North lobby, and staff room Hesperian Blvd. at the front of campus Building 400 Building 100 upstairs, to see the Library Building 2300 upstairs Learning Connection Building 2600 Building 2700 under construction Building 2900 Building 4000 Building 2200 Building 2100 Century Campus. (3) new buildings: the Instructional Office Performing Arts Center needs: Backstage storage for staging, lighting equipment, chairs, tables, props, sound equipment, tools, & other items required to serve the close to 200 events per year. Serious remodeling of classrooms to better Upgrade the network in Bldg. 1600 lowered. Partial updates were provided for 1000, 1300, and 2200; Building 700 plans: Installation of an electronic information board at the west end of first floor lobby. A comfort issue but at time presents a safety furniture, including standard chairs Computer Desks that could be raised and 1800, 1900, 2500, 2600, 2700, 2800, and 2900; Expanded lobby space. Initially designed for 1400, & no additional space was allocated. technology, and to provide functional buildings: 300, 500, 800, 900, 1200, 1400, 1700, New and expanded backstage rehearsal, about 800 attendees, but the facility seats utilize the space, to provide current Measure B enabled Chabot College to renovate 14 holding, bathroom, & makeup room areas. Building 1600 needs: New electronic/LCD marquee display. The current marquee is a 1965 style plastic letter finish the cement floor and remove the old Tour Stops! Additional restroom area and stalls for upgraded improvements in Building 1800. exposure to inclement weather to be able to issue. Keycard access to Staff Lounge Door replacement. Almost all of the internal Bulletin Boards for Student announcements and some external doors are in need of replacement. Athletic Field needs: Building 100 plans: energy efficiency significantly, with Renovation of ¾ of first floor to provide All weather javelin runway. Replace current bleachers (over fifty years Plant with distribution system, photovoltaic panels over parking areas, and & staff offices, group study rooms, faculty, staff, and students to work together Renovate the cafeteria, and create more The track surface (over 10 years old) has A track surface, with high usage has a life Resource Center in 2300 with study space Revision of room 2256 and 2254 into a computer lab that will accommodate 65 students. Classroom are tired and dirty need new New Electronic signs, furnishings, décor, Building 2900 needs: Add two roof training props with lighting for Carpeting, furniture in the library, and improved ADA elevator access. The health center needs a more practical space that will accommodate the students seeking services. The TV Studio needs immediate help with students to place ladders against and climb upon so that the ladders do not cause damage to the roof surface. Currently, students perform roof access techniques onto PE Complex roofs with fire ladders. furniture, paint etc Workroom in 2200 cabinets not working. Faculty office furniture is falling apart in space. Upgrade to plant growth facility off 2130 Adequate restroom facilities for women in appropriate proportions to match enrollment within the programs served by Larger lecture rooms And although our tour won’t include time to visit every building and area on campus, we can’t forget: Building 3500 needs Child Development Laboratory must be safe, such that only parents, teachers and enrolled 2200. students have access Patio outside 3100 Room 3521 needs new chairs, tables and carpeting, sunscreen shade. Building 2100 needs: Measure B enabled Chabot’s Athletic Program to make improvements including the new tennis courts, softball field, soccer field and football field Measure B helped to enable Chabot’s Public Cadaver room upgrade (Currently under construction) the wiring and equipment organization; long term, relocation to a new facility with more requirement) Building 2200 needs: Office in Building 2300 into the KCRH 89.9 2300 cafeteria area. Fume hood in 2124 (immediate the building. Convert Previous Campus Safety Dispatch sound, projection, and paint required for span of eight years. for veterans. FM Radio Station On-Air Studio. Eyewash and showers in 2130 & 2124 worn through and needs to be replaced. study space in 2300. Open Veterans lower energy costs and increase visibility. Building 2300 needs: create a larger computer lab, student study Relocation of projector screens Lighting in the stadium is becoming a safety hazard. The lights need to be upgraded to a Renovation of ¼ of second floor (library) to old) and now a safety hazard. parking lot improvements communications/video lab, opportunities for Building 100 needs: computer/microscopes/projectors sitework, infrastructure, a Central Utility Connection tutoring, computer labs, faculty and meeting rooms, and faculty/staff spaces. Replacement or repair of inoperable blinds and lighting control for Measure B enabled the district to advance student study spaces, ESL/WRAC/Learning Artwork project, too! “Spark,” “Soar,” “Swallow,” and the “Homecoming” installations grace our campus today! Classrooms Improved wiring of computer projection systems in all classrooms