Our tour map is available online!

advertisement
Building 1400 needs:
Chabot College
Facilities & Sustainability Committee

Installation of a TV monitor to provide
program specific, college general,
information to students.
Campus Tour
12 September 2013


Replacement of sink installed in 1426.

Installation of additional material to reduce

Replace chairs /stools in lab classrooms
1602 and 1616 with adjustable-height stools
patrons. Currently 6 stalls in the women’s
and 28 stools and 25 chairs in 1602 24 stools
restroom must serve at times 600-1000
and 9 chairs in 1616
users per event.
Add a study area to Building 1600, similar to
Also, add an additional state of the art
Reduce the curb size at the base of the
New elevator from House to Balcony level.

Concession area to serve beverage and food
as allowed by policy. Revenue generator.
courses to use.
And also, at the end of 1600, near the CMC


computer lab in 1600 for online hybrid
better utilize the outdoor lift.
Paint the external building surfaces

CMC equipment storage is outside of 1600
and currently has walls, but no ceiling, two
 LED lighting installed initially in the main
house (108 current 300-500 watt lamps)
 LED stage lighting to reduce carbon
footprint and reduce cost to College
gates, an air conditioning unit cement pad,
perimeter walls to improve vehicle parking,
operations.
and a partial floor. Remove the gates and
driveway clearance, and reduce potential
add a double door keyed access, enclose
vehicle damage.
with a ceiling, add electricity and lighting,

type that has ceased being used. Also very
air conditioning pad.
unsightly and not in keeping with a 21st
Measure B enabled Chabot College to add

Building 1800

Building 3400's new BMW facilities
Building (IOB, building 400), the

Building 1400's remodeled spaces
Community and Student Services Center

Building 1600's CNC machine lab
(CSSC, building 700), and the PE Strength

Building 1600's upstairs classroom
and Fitness Center (B 4000.

Chabot's PAC and its backstage areas

Building 700 South

Building 700 North lobby, and staff room

Hesperian Blvd. at the front of campus

Building 400

Building 100 upstairs, to see the Library

Building 2300 upstairs Learning Connection

Building 2600

Building 2700 under construction

Building 2900

Building 4000

Building 2200

Building 2100
Century Campus.
(3) new buildings: the Instructional Office
Performing Arts Center needs:

Backstage storage for staging, lighting
equipment, chairs, tables, props, sound
equipment, tools, & other items required
to serve the close to 200 events per year.

Serious remodeling of classrooms to better

Upgrade the network in Bldg. 1600

lowered.
Partial updates were provided for 1000, 1300,
and 2200;
Building 700 plans:

Installation of an electronic information
board at the west end of first floor lobby.
A comfort issue but at time presents a safety
furniture, including standard chairs
Computer Desks that could be raised and
1800, 1900, 2500, 2600, 2700, 2800, and 2900;
Expanded lobby space. Initially designed for
1400, & no additional space was allocated.
technology, and to provide functional

buildings: 300, 500, 800, 900, 1200, 1400, 1700,
New and expanded backstage rehearsal,
about 800 attendees, but the facility seats
utilize the space, to provide current

Measure B enabled Chabot College to renovate 14
holding, bathroom, & makeup room areas.
Building 1600 needs:

New electronic/LCD marquee display. The
current marquee is a 1965 style plastic letter
finish the cement floor and remove the old
Tour Stops!
Additional restroom area and stalls for
upgraded improvements in Building 1800.
exposure to inclement weather to be able to


issue.

Keycard access to Staff Lounge
Door replacement. Almost all of the internal

Bulletin Boards for Student announcements
and some external doors are in need of
replacement.
Athletic Field needs:
Building 100 plans:

energy efficiency significantly, with
Renovation of ¾ of first floor to provide

All weather javelin runway.

Replace current bleachers (over fifty years
Plant with distribution system, photovoltaic panels over parking areas, and
& staff offices, group study rooms,

faculty, staff, and students to work together

Renovate the cafeteria, and create more

The track surface (over 10 years old) has
A track surface, with high usage has a life
Resource Center in 2300 with study space

Revision of room 2256 and 2254 into a
computer lab that will accommodate 65
students.

Classroom are tired and dirty need new
 New Electronic signs, furnishings, décor,
Building 2900 needs:
 Add two roof training props with lighting for

Carpeting, furniture in the library, and
improved ADA elevator access.

The health center needs a more practical
space that will accommodate the students
seeking services.

The TV Studio needs immediate help with
students to place ladders against and climb
upon so that the ladders do not cause
damage to the roof surface. Currently,
students perform roof access techniques
onto PE Complex roofs with fire ladders.
furniture, paint etc

Workroom in 2200 cabinets not working.

Faculty office furniture is falling apart in
space.

Upgrade to plant growth facility off 2130

Adequate restroom facilities for women in
appropriate proportions to match
enrollment within the programs served by

Larger lecture rooms
And although our tour won’t include time to visit
every building and area on campus, we can’t
forget:
Building 3500 needs

Child Development Laboratory must be safe,
such that only parents, teachers and enrolled
2200.
students have access

Patio outside 3100

Room 3521 needs new chairs, tables and
carpeting, sunscreen shade.
Building 2100 needs:
Measure B enabled Chabot’s Athletic
Program to make improvements
including the new tennis courts, softball
field, soccer field and football field
Measure B helped to enable Chabot’s Public

Cadaver room upgrade (Currently under
construction)
the wiring and equipment organization; long
term, relocation to a new facility with more
requirement)
Building 2200 needs:
Office in Building 2300 into the KCRH 89.9
2300 cafeteria area.
Fume hood in 2124 (immediate
the building.
Convert Previous Campus Safety Dispatch
sound, projection, and paint required for

span of eight years.
for veterans.
FM Radio Station On-Air Studio.
Eyewash and showers in 2130 & 2124
worn through and needs to be replaced.
study space in 2300. Open Veterans


lower energy costs and increase visibility.
Building 2300 needs:
create a larger computer lab, student study
Relocation of projector screens
Lighting in the stadium is becoming a safety
hazard. The lights need to be upgraded to a
Renovation of ¼ of second floor (library) to

old) and now a safety hazard.
parking lot improvements
communications/video lab, opportunities for
Building 100 needs:
computer/microscopes/projectors
sitework, infrastructure, a Central Utility
Connection tutoring, computer labs, faculty
and meeting rooms, and faculty/staff spaces.
Replacement or repair of inoperable blinds
and lighting control for
Measure B enabled the district to advance
student study spaces, ESL/WRAC/Learning


Artwork project, too! “Spark,” “Soar,”
“Swallow,” and the “Homecoming”
installations grace our campus today!

Classrooms Improved wiring of computer
projection systems in all classrooms
Download