Ref.1 MODIFICATIONS AND SUPPLEMENTS TO THE FINAL DESIGN OF THE UBORAK SOLID WASTE LANDFILL - MOSTAR Project title Name of legal entity Country IPSA INSTITUT d.o.o. Sarajevo Bosnia and Herzegovina Total contract value (BAM) Proportion carried out by legal entity (%) 49,000.00 100 % Number of staff provided 5 Name of client JKP Deponija Mostar (Public Cantonal Company Deponija Mostar) Source of funding Dates (start/end) Name of consortium members, if any JKP Deponija Mostar 2012/2013 - Detailed project description The final design of the municipal waste disposal site, suitable for a population of 60,000 and commissioned by the City of Mostar, was developed. The existing design documents were finalised and aligned with local and international technical and legal requirements for municipal solid waste disposal sites. The following technical solutions were developed as part of the final design: Enabling works concerning landscaping and the regulation of the Sušice river channel, Entrance/exit zone (administration building, weigh-bridge, washing facility for the bottom surface of lorries, petrol station, equipment and vehicle maintenance workshop), Recycling facility, Landfill body, Road infrastructure at the access to and within the landfill compound, External lighting and power supply, Drinking water supply, hydrant network, water reservoir, Rain and foul water sewerage, Treatment of leachate from the landfill body and the recycling facility. Type of services provided Geodetic survey of the site Geotechnical investigation works Hydraulic analysis and study Ref.1 Project title MODIFICATIONS AND SUPPLEMENTS TO THE FINAL DESIGN OF THE UBORAK SOLID WASTE LANDFILL - MOSTAR Development of the technical report and the priced BoQ Development of technical solutions and working drawings Key staff Adnan Habibović, graduated civil engineer – team lead Design team Adnan Habibović, graduate civil engineer Lejla Hajro, graduate architect Amir Sinanović, graduated civil engineer Alija Šunje, graduate civil engineer Hamid Lihić, graduate electrical engineer Ref.2 CONCEPTUAL DESIGN OF THE TREŠNJICA SANITARY LANDFILL, GORAŽDE Project title Name of legal entity Country IPSA INSTITUT d.o.o. Sarajevo Bosna i Hercegovina Total contract value (BAM) Proportion carried out by legal entity (%) Number of staff provided 7,000.00 100 % 6 Name of client Source of funding Dates (start/end) Goražde Municipality Goražde Municipality December 2010 – February 2011 Name of consortium members, if any - Detailed project description The task of the consultant was to develop a preliminary design of the Trešnjica sanitary landfill in Goražde Municipality, to be used as the sanitary landfill for the Gornje Podrinje region. The following technical solutions were developed as part of the design: landfill with an approximately 750m long access road, fencing and entrance area (guard booth, weigh-bridge, washing facility for the bottom surface of lorries, administration building, laboratory, storeroom and work shop, car parks for private and freight vehicles and a dog shelter), three-level landfill body with eight compartments, solution for roads within the compound, water supply and fire safety, foul and rain water sewerage, filtrate treatment by recirculation power supply. Type of services provided Calculation of the required disposal space with and without recycling Low voltage electric installations: connection to the external 10kV distribution panel network, lighting installations (general and emergency), lightning protection installations, potential equalisation installations. Ref.2 Project title CONCEPTUAL DESIGN OF THE TREŠNJICA SANITARY LANDFILL, GORAŽDE Extra-low voltage installations: telephone system, LAN network, fire alert system and video surveillance system Solution for the L= 733.83 m long access road suitable for a design speed of 40 km/h Outline for the landfill filtrate treatment Outline for water supply to the landfill, including interception and a V=2x100 m3 reservoir Key staff Đemil Fejzić, graduate civil engineer Design team Đemil Fejzić, graduate civil engineer Nerma Ligata, graduate civil engineer Ref.3 Name of legal entity IPSA INSTITUT d.o.o. Sarajevo REVIEW OF THE TECHNOLOGICAL REPORT ON AND FINAL DESIGN OF REHABILITATING THE EXISTING VIŠNJIK MUNICIPAL WASTE LANDFILL AT ZRNIĆI AND CONSTRUCTION OF ACCOMPANYING STRUCTURES SUITABLE FOR SANITARY DISPOSAL UNTIL THE LANDFILL IS SHUT DOWN - GRADAČAC Total Proportion Name of contract carried out by Number of Name of Source of consortium Country value legal entity staff provided Dates (start/end) client funding members, if any (BAM) (%) JP "Komunalac" JP Bosnia and April 2013- May 7,000.00 100 % 7 d.d. Gradačac "Komunalac" Herzegovina 2013 (Public dd Gradačac Company) Detailed project description Project title The existing landfill at Zrnići in Gradačac is earmarked for phasing out, because it does not meet the standards of sanitary disposal of solid municipal waste and conform to the regional solid waste disposal system in the Federation of BiH. Environmental impacts of the landfill and its stretched capacities dictate that it is rehabilitated and phased out. Type of services provided Ref.3 Project title REVIEW OF THE TECHNOLOGICAL REPORT ON AND FINAL DESIGN OF REHABILITATING THE EXISTING VIŠNJIK MUNICIPAL WASTE LANDFILL AT ZRNIĆI AND CONSTRUCTION OF ACCOMPANYING STRUCTURES SUITABLE FOR SANITARY DISPOSAL UNTIL THE LANDFILL IS SHUT DOWN - GRADAČAC The review of the Technical Report included the following design portions: Technical report, Architectural portion of the design, Structural portion of the design, Hydraulic portion of the design, Road portion of the design, Electrical portion of the design, Key staff Design team Prof.dr.Munir Jahić, Jasmina Čomić, graduate chemical engineer E.Mašnić, graduate civil engineer Mirza Bašalić, graduate architect Adnan Habibović, graduate civil engineer Amir Sinanović, graduate civil engineer Ref.4 Project title Name of legal entity Country IPSA INSTITUT d.o.o. Sarajevo Bosnia and Herzegovina Total contract value (BAM) 24,570.00 CONCEPTUAL AND FINAL DESIGNS OF DRAINAGE OF ALL AREAS WITHIN THE SARAJEVO INTERNATIONAL AIRPORT, IN LINE WITH THE MASTER PLAN Proportion Number of Name of carried out staff consortium by legal Name of client Source of funding Dates (start/end) provided members, if any entity (%) 100 % 5 Detailed project description Conceptual and final drainage designs were developed for all surface areas within the airport in line with the Master Plan. Technical solutions for rainwater caption and evacuation, pertaining to two separate basins – Željeznica and Dobrinja, were provided for a trafficked surface area exceeding 30 ha as well as for other surfaces measuring 25 ha. A hydrologic precipitation analysis was developed. SARAJEVO INTERNATIONAL AIRPORT SARAJEVO INTERNATIONAL AIRPORT 2007-2011 - Ref.4 Project title CONCEPTUAL AND FINAL DESIGNS OF DRAINAGE OF ALL AREAS WITHIN THE SARAJEVO INTERNATIONAL AIRPORT, IN LINE WITH THE MASTER PLAN Type of services provided Apart from conceptual and final design development activities, such as: Geodetic site survey Hydraulic analysis and study Drafting of the technical report and the BoQ Development of technical solutions and working drawings the activities performed included daily monitoring of the quality and rate of execution of main sewerage construction works, approval of materials, updating and signing off the site diary, certifying interim payment certificates and reporting to and liaison with the Client. Key staff Enko Hubanić, graduate civil engineer – Team Lead Design team Enko Hubanić, graduate civil engineer Anis Pehilj, graduate civil engineer Elvir Alić, graduate civil engineer Vedran Ibrulj, graduate civil engineer Amra Zvizdić graduate civil engineer Ref.5 Name of legal entity IPSA INSTITUT d.o.o. Sarajevo Project title Total contract Country value (BAM) Bosnia and Herzegovina 47,000.00 FINAL DESIGN OF THE WATER SUPPLY SYSTEM FOR THE GUBAVICA – PIJESCI AREA Proportion carried out by legal entity (%) Number of staff provided 100 % 3 Detailed project description Development of the Final Water Supply Design for the Gubavica – Pijesci area, Mostar, as well as the final desing for two reservoirs with a capacity of V=2x75 m3 and V=2x200 m3 respectively. The total length of the water supply network measures around 25 km. Name of client Source of funding Dates (start/end) THE CITY OF MOSTAR THE CITY OF MOSTAR 2011 Name of consortium members, if any - Ref.5 Project title FINAL DESIGN OF THE WATER SUPPLY SYSTEM FOR THE GUBAVICA – PIJESCI AREA Type of services provided Preliminary and final design development activities: Geodetic site survey Hydraulic analysis and study Drafting of the technical report and BoQ Development of technical solutions and working drawings Key staff Muhamed Kapetanović, graduate civil engineer – Team Lead Design team Muhamed Kapetanović, dipl.ing.građ. graduate civil engineer Lejla Hadžović, dipl.ing.građ graduate civil engineer Željko Stare, engineering technician Ref.6 Project title Name of legal entity Country IPSA INSTITUT d.o.o. Sarajevo Bosnia and Herzegovina Total contract value (BAM) 99,450.00 PRELIMINARY AND FINAL DESIGNS OF THE SEWERAGE SYSTEM AND FOUL WASTE WATER TREATMENT SYSTEM – BOSANSKI PETROVAC Proportion Number of Name of carried out staff consortium by legal Name of client Source of funding Dates (start/end) provided members, if any entity (%) 100 % 9 BOSANSKI PETROVAC MUNICIPALITY BOSANSKI PETROVAC MUNICIPALITY 2010 Detailed project description Preliminary and final designs of the sewerage network with a design channel length of approx. 35.0 km, 300mm to 500mm profiles and a 10 000 ES central waste water treatment device. The Environmental Impact Assessment for the Sewerage System forms a part of the documents Type of services provided Preliminary and final design development activities: Geodetic site survey Hydraulic analysis and study Drafting of the technical report and BoQ - Ref.6 Project title PRELIMINARY AND FINAL DESIGNS OF THE SEWERAGE SYSTEM AND FOUL WASTE WATER TREATMENT SYSTEM – BOSANSKI PETROVAC Development of technical solutions and working drawings Key staff Muhamed Kapetanović, graduate civil engineer – Team Lead Design team Muhamed Kapetanović, graduate civil engineer Nerma Ligata, graduate civil engineer Ref.7 Name of legal entity IPSA INSTITUT d.o.o. Sarajevo FINAL DESIGNS: ZENICA - SARAJEVO – MOSTAR MOTORWAY, SECTION VLAKOVO-LEPENICA, - EXTERNAL DRAINAGE, INTERNAL DRAINAGE AND WATERPROOFING OF THE ROAD AND MOTORWAY Project title STRUCTURES; - WATER SUPPLY AND SEWERAGE INSTALLATIONS FOR TOLL STATIONS VLAKOVO AND LEPENICA Total Proportion Number of Name of contract carried out staff consortium Country value by legal Name of client Source of funding Dates (start/end) provided members, if any (BAM) entity (%) FEDERAL FEDERAL DIRECTORATE FOR DIRECTORATE FOR MOTORWAY Bosnia and MOTORWAY 219,500.00 100 10 CONSTRUCTION, 2010 Herzegovina CONSTRUCTION, MANAGEMENT MANAGEMENT AND AND MAINTENANCE MAINTENANCE Detailed project description External and internal surface water drainage systems, including treatment solutions and layouts, were designed for an approx. 7km long motorway stretch. The channels are approx. 16.0 km long in total. The design channel diameters measure from 160 mm to 600 mm. The internal drainage system includes all bridge structures and three tunnels. Design of water supply and sewerage installations for 2 toll stations The share of hydraulic engineering design work in the overall design value is 10%. Ref.7 Project title FINAL DESIGNS: ZENICA - SARAJEVO – MOSTAR MOTORWAY, SECTION VLAKOVO-LEPENICA, - EXTERNAL DRAINAGE, INTERNAL DRAINAGE AND WATERPROOFING OF THE ROAD AND MOTORWAY STRUCTURES; - WATER SUPPLY AND SEWERAGE INSTALLATIONS FOR TOLL STATIONS VLAKOVO AND LEPENICA Type of services provided Apart from preliminary and final design development activities, such as: Geodetic site survey Hydraulic analysis and study Drafting of the technical report and BoQ Development of technical solutions and working drawings, hydraulic engineering works were supervised – daily monitoring of the quality and rate of execution of construction works, approval of materials, updating and signing off the site diary, certifying interim payment certificates and liaison with the Client. Ref.7 Project title FINAL DESIGNS: ZENICA - SARAJEVO – MOSTAR MOTORWAY, SECTION VLAKOVO-LEPENICA, - EXTERNAL DRAINAGE, INTERNAL DRAINAGE AND WATERPROOFING OF THE ROAD AND MOTORWAY STRUCTURES; - WATER SUPPLY AND SEWERAGE INSTALLATIONS FOR TOLL STATIONS VLAKOVO AND LEPENICA Key staff Amir Sinanović, graduate civil engineer – Supervision Engineer Design team Adnan Habibović, dipl.ing.građ, graduate civil engineer Amir Sinanović, dipl.ing.građ, graduate civil engineer Muhamed Kapetanović, dipl.ing.građ, graduate civil engineer Lejla Hadžović, dipl.ing.građ, graduate civil engineer Manja Palandžić, dipl.ing.građ, graduate civil engineer Indira Murtić, dipl.ing.građ, graduate civil engineer Tatjana Lovre, dipl.ing.građ, graduate civil engineer Ahmed el Sayed, dipl.ing.građ, graduate civil engineer Hanka Ohranović-Cocalić, dipl.ing.građ, graduate civil engineer Jasmina Marić, dipl.ing.arh. graduate architect Ref.8 Name of legal entity IPSA INSTITUT d.o.o. Sarajevo Project title Total contract Country value (BAM) Bosnia and Herzegovina CORRIDOR VC MOTORWAY, SECTION: POČITELJ - ZVIROVIĆI, LOT 1 Proportion carried out by legal entity (%) 4,523,278.00 45,7 Number of staff provided 12 Name of client Source of funding Dates (start/end) JP AUTOCESTE FBiH (PUBLIC COMPANY MOTORWAYS OF FBIH) JP AUTOCESTE FBiH 2014 Name of consortium members, if any DIVEL doo Sarajevo Detailed project description NORMALNI POPRECNI PRESJEK ODVODNJE TUNELA MJ 1:50 6.699 6.698 Teoretska linija iskopa Mlazni beton B 25/30 d=5-20 cm Izravnavajuci sloj malaznog betona d=3-5 cm PVC hidroizolaciona membrana sa geotekstilom Sekundarna obloga, d=30 cm, B 25/30 External and internal surface water drainage systems, including treatment solutions and treated water layouts, were designed for an approx. 7km long motorway stretch. The channels are approx. 16.0 km long in total. The design channel diameters measure from 160 mm to 600 mm. The internal drainage system includes all 4 bridges and tunnel drainage. It is worth mentioning that an internal drainage system design was developed for the 975m long Počitelj bridge as well as for the 1100m long Počitelj twin-tube tunnel. Design of water supply and sewerage installations for 2 toll stations The share of hydraulic engineering design work in the overall value of IPSA’s Contract is 10%. Theoretical excavation profile Shotcrete B 25/30 d=5-20 cm Shotcrete backing for waterproofing d=3-5cm PVC waterproofing with geotextile Inner linning d=30 cm, B 25/30 4.701 NAPOMENA: Zaštitni filc je geotekstil sa neprekidnim nepletenim poli-propilenskim vlaknima min. težine 500g/m2 PVC (poli-vinil-hlorid) hidroizolaciona membrana je min. debljine 2,0 mm, vodonepropusna na pritisak od 10 bara u trajanju od 10 sati 4.699 Remark: Protective geotextile is a geotextile with unwoven polipropilene fibres with minimal weight 500 g/m2 PVC waterproof membrane with minimal thickness of 2.0 mm, waterproof at 10 bar pressure for duration of 10 hours 1.995 Liveni asfalt d=2,0 cm AB montažna ploca, d=12,0 cm Prefabricirani ivicnjak Izravnavajuci malter Drenažni beton Drenažna cijev DN-200 Traka za uzmeljenje Štap za uzemljenje PRESJEK I 0.087 0.000 2,5% 0.052 -0.087 30 -0.742 PP DN 200 SN8 i=2% -0.800 -0.939 PP DN 200 SN8 i=2% Drenažni beton / Porous concrete PP DN 250 SN8 i=3% Sifonski šaht Podužna drenaža / Longitudinal drainage PRESJEK I Asphalt pavement (4+7+7), d=18 cm Mixture of gravel and cement, d=20 cm Bearing course (MNS, D45), d=25 cm Geotextil Filter layer d=20cm Glavni kolektor / Internal drainage collector Asfaltni kolovoz (4+7+7), d=18 cm Cementna stabililzacija d=20 cm Nevezani nosivi sloj (MNS, D45) d=25 cm Geotekstil Filterski sloj d=20cm BETONSKA PODLOGA C25/35 / CONCRETE BASE C25/35 BETONSKA OBLOGA C25/35 / CONCRETE COATING C25/35 107.5 174.4 699.8 699.8 Cast asphalt d=2.0 cm RC precast slab d=12.0 cm Precast kerb Levelling mortar Porous concrete Drainage pipe DN-200 Earthing Spacer bar 109 177.5 Ref.8 Project title CORRIDOR VC MOTORWAY, SECTION: POČITELJ - ZVIROVIĆI, LOT 1 NORMALNI POPRECNI PRESJEK ODVODNJE TUNELA SA PODNOŽNIM SVODOM MJ 1:50 6.699 TUNNEL AXIS CLEARANCE AXIS 6.698 OSOVINA TUNELA 4.701 Theoretical excavation profile Shotcrete B 25/30 d=20 cm Shotcrete backing for waterproofing d=3-5cm PVC waterproofing with geotextile Inner linning d=30 cm, B 25/30 4.699 OSOVINA GABARITA Teoretska linija iskopa Mlazni beton B 25/30 d=20 cm Izravnavajuci sloj malaznog betona d=3-5 cm PVC hidroizolaciona membrana sa geotekstilom Sekundarna obloga, d=30 cm, B 25/30 1.995 1.748 92.7 85 Liveni asfalt d=2,0 cm AB montažna ploca, d=12,0 cm Prefabricirani ivicnjak Izravnavajuci malter Drenažni beton Drenažna cijev DN-200 Uzmeljenje 55 93.6 35 350 350 35 55 85 55 Cast asphalt d=2.0 cm RC precast slab d=12.0 cm Precast kerb Levelling mortar Porous concrete Drainage pipe DN-200 Earthing 55 0.248 0.087 0.000 2,5% 0.052 -0.087 30 30 -0.485 -0.641 07 -0.455 -0.631 R1 Drenažni beton / Porous concrete -2.374 Asfaltni kolovoz (4+7+7), d=18 cm Cementna stabililzacija d=20 cm Nevezani nosivi sloj (MNS, D45) d=25 cm Ispuna od tamponskoom materijala Beton podnožnog svoda d>50 cm C 25/30 -0.939 Asphalt pavement (4+7+7), d=18 cm Mixture of gravel and cement, d=20 cm Bearing course (MNS, D45), d=25 cm Lean gravel Invert concrete d>50 cm C 25/30 Glavni kolektor / Internal drainage collector BETONSKA PODLOGA C25/35 / CONCRETE BASE C25/35 BETONSKA OBLOGA C25/35 / CONCRETE COATING C25/35 107.5 20 Podužna drenaža / Longitudinal drainage 50 20 07 R1 -0.742 699.8 109 NAPOMENA: Zaštitni filc je geotekstil sa neprekidnim nepletenim poli-propilenskim vlaknima min. težine 500g/m2 PVC (poli-vinil-hlorid) hidroizolaciona membrana je min. debljine 2,0 mm, vodonepropusna na pritisak od 10 bara u trajanju od 10 sati Remark: Protective geotextile is a geotextile with unwoven polipropilene fibres with minimal weight 500 g/m2 PVC waterproof membrane with minimal thickness of 2.0 mm, waterproof at 10 bar pressure for duration of 10 hours Type of services provided Preliminary and final design development activities: Geodetic site survey Hydraulic analysis and study Drafting of the technical report and BoQ Development of technical solutions and working drawings for internal drainage and waterproofing Key staff Adnan Habibović, graduate civil engineer – Project Coordinator Design team Adnan Habibović, graduate civil engineer Amir Sinanović, graduate civil engineer Muhamed Kapetanović, graduate civil engineer Lejla Hadžović, graduate civil engineer Manja Palandžić, graduate civil engineer Indira Murtić, graduate civil engineer Tatjana Lovre, graduate civil engineer Ahmed el Sayed, graduate civil engineer Hanka Ohranović-Cocalić, graduate civil engineer Jasmina Marić, graduate architect Ref.9 Project title Name of legal entity Country IPSA INSTITUT d.o.o. Sarajevo Bosnia and Herzegovina Total contract value (BAM) 49,000.00 PRELIMINARY REHABILITATION AND EXTENSION DESIGN OF THE TREBINJE WASTE WATER TREATMENT PLANT 50.000 PE Proportion Name of carried out Number of consortium by legal staff provided Name of client Source of funding Dates (start/end) members, if any entity (%) 100 5 THE CITY OF TREBINJE THE CITY OF TREBINJE 2014 Detailed project description Development of the final rehabilitation and extension design of the Trebinje waste water treatment plant. The preliminary design for phase I of the rehabilitation and extension of the Trebinje WWTP was developed in line with the feasibility study. The design is comprised of the technological, hydraulic engineering and electrical engineering portions. The existing plant has a total capacity of 50.000 PE, 30.000 PE generated by the population and 20.000 PE generated by the industry. The envisaged rehabilitation works comprise: - Replacement of the existing coarse and fine screens - Replacement of the drives of primary and secondary traps - Overhaul and installation of new drives for the raw water and primary sludge pumping stations - Overhaul of surface aerators - Rehabilitation of the sludge digestion plant – replacement of pumps, Type of services provided heat exchangers and the cogeneration plant Preliminary design development activities: Envisaged construction works on new structures: Geodetic site survey - Anaerobic pool Hydraulic analysis and study - Gravity belt sludge thickener Drafting of the technical report and BoQ - Digested sludge storage pool - Dewater sludge cake storage Development of technical solutions and working drawings New pipelines measuring 520m' in total are envisaged as part of the Key staff - Ref.9 Project title rehabilitation and extension works. PRELIMINARY REHABILITATION AND EXTENSION DESIGN OF THE TREBINJE WASTE WATER TREATMENT PLANT 50.000 PE Adnan Habibović, graduate civil engineer –Project Coordinator Design team Boštjan Žigon, graduate mechanical engineer Adnan Habibović, graduate civil engineer Hamid Lihić, dipl.ing.el graduate electrical engineer