Setting up 33 sewage treatment plants to clean Yamuna river

advertisement
GOVERNMENT OF INDIA
MINISTRY OF WATER RESOURCES,
RIVER DEVELOPMENT AND GANGA REJUVENATION
RAJYA SABHA
STARRED QUESTION NO. †*120
ANSWERED ON 09.03.2015
SETTING UP 33 SEWAGE TREATMENT PLANTS
TO CLEAN YAMUNA RIVER
†*120. SHRI RAM NATH THAKUR
Will the Minister of WATER RESOURCES, RIVER DEVELOPMENT AND GANGA
REJUVENATION be pleased to state:
(a) whether Government has decided to set up 33 sewage treatment plants with the help of IIT
experts to clean the Yamuna river as per the directive of the National Green Tribunal;
(b) if so, the details thereof and the action plan to make the other rivers pure and clean apart from
Yamuna; and
(c) the details of action taken by Government to make the rivers in Bihar pure and clean?
ANSWER
THE MINISTER OF WATER RESOURCES, RIVER DEVELOPMENT AND GANGA
REJUVENATION
(SUSHRI UMA BHARTI)
(a) to (c)
A Statement is laid on the Table of the House.
*****
STATEMENT REFERRED TO IN REPLY TO PARTS (A) TO (C) OF RAJYA SABHA
STARRED QUESTION NO.120 TO BE ANSWERED ON MONDAY, THE 09TH MARCH,
2015 ON ‘SETTING UP 33 SEWAGE TREATMENT PLANTS’ RAISED BY SHRI RAM
NATH THAKUR.
(a) The National Green Tribunal (NGT) in the matter of Manoj Mishra vs. Union of India &Others,
has directed on 13th January, 2015 that the action plan for installation of STPs on 32 major and
minor drains should be prepared, in accordance with the recommendations of the Expert Committee,
within three months from the date of their order. NGT has further ordered, that all the newly
proposed 32 STPs should be constructed and installed within the time frame indicated in the
judgment, i.e. 31st March, 2017.
(b) Yes, Sir. Delhi Jal Board (DJB) has proposed to construct the new STPs by March, 2017. The
details of the proposed new STPs are enclosed as Annexure-I.
The Union Government has taken a new initiative to set up an Integrated Ganga Conservation
Mission namely “Namami Gange” for Ganga Rejuvenation, incorporating the existing projects, and
covering major tributaries of river Ganga including River Yamuna. Financial and technical support is
also being provided for various pollution abatement schemes under National River Conservation
Plan (NRCP) & National Ganga River Basin Authority (NGRBA) programmes, which presently
cover polluted stretches of 42 rivers (including Ganga and its tributaries) in 199 towns spread over
21 States, enclosed as Annexure- II, at a sanctioned cost of Rs. 12462.50 crore. Till December, 2014
an expenditure of Rs. 6842.45 crore (including State’s share) has been incurred on pollution
abatement works and a sewage treatment capacity of 5054 mld has been created under NRCP &
NGRBA.
(c) The Government has sanctioned 11 sewerage projects for generation of 222 mld sewage
treatment capacity (including 64 mld for rehabilitation of old STPs), sewerage network and 1 River
Front Development project in Bihar at an estimated cost of Rs. 1702.06 crore for abatement of
pollution in River Ganga, enclosed as Annexure-III.
Annexure-I
Annexure-I referred to in reply to Parts (b) of Rajya Sabha Starred Question No. 120 to be answered
on 09.03.2015 reg. setting up 33 STPs
List of proposed new STPs for implementing orders of Hon'ble NGT
S.No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
Location of STP
Sonia Vihar
Palla
Zindpur
SalahpurMajra
Kanjhawala Village
SawdaGaon
Ghewara
Katewara
Daryapur
Bawana Village
SutanpurDabas
PoothKhurd
Bankner
Sanooth
Kazipur
KheraDabarExtn
Shikarpur
Zafarpur
SamaspurKhalsa
PandwalaKalan
JhulJhuli
Raota Village
TikriKalan
Mitraon
DichaonKalan
TajpurKhurd
GoyalaVihar
Badu Sarai
Tajpur
Kapashera
FatehpurBeri
Capacity (MGD)
7.00
6.00
3.33
4.00
11.00
3.50
4.60
4.60
3.70
4.80
3.00
5.80
6.30
11.80
2.10
1.90
1.10
2.10
3.20
3.20
3.80
1.80
4.70
9.10
9.60
12.00
4.50
3.40
17.00
6.40
39.20
Note: An additional new STP is proposed as a replacement for an older STP at Okhla for 136 MLD.
Annexure-II
Annexure-II referred to in reply to Parts (b) of RajyaSabha Starred Question No. 120 to be
answered on 09.03.2015 reg. setting up 33 STPs
Details of rivers covered, State-wise under the National River Conservation Plan &
National Ganga River Basin Authority (NGRBA) programmes
Sl. No
State
River
1,2
3
Andhra
&Telangana
Bihar
4
Jharkhand
Damodar, Ganga & Subarnarekha
5
Gujarat
Sabarmati, Mindhola
6
Goa
Mandovi
7.
Karnataka
Bhadra, Tunga-bhadra, Cauvery, Tunga&Pennar
8
Maharashtra
Krishna, Godavari, Tapi&Panchganga
9
Madhya Pradesh
Betwa, Tapti, Wainganga, Khan, Narmada,
Kshipra, Beehar, Chambal &Mandakini.
10
Odisha
Brahmini& Mahanadi
11
Punjab
Satluj& Beas &Ghaggar
12
Rajasthan
Chambal
13
Tamil Nadu
Cauvery,
Adyar,
Vaigai&Tambarani
14
Delhi
Yamuna
15
Haryana
Yamuna
16
Uttar Pradesh
Yamuna, Ganga &Gomti&Ramganga
17
Uttarakhand
Ganga
18
West Bengal
Ganga, Damodar&Mahananda
19
Kerala
Pamba
20
Sikkim
Rani Chu
21
Nagaland
Diphu&Dhansiri
Pradesh Godavari &Musi
Ganga
Cooum,
Vennar,
Annexure-III
Annexure-III referred to in reply to Parts (c) of RajyaSabha Starred Question No. 120 to be answered on 09.03.2015 reg. setting up 33 STPs
Status of Approved Projects under National Ganga River Basin Authority (NGRBA) (As on 31st December, 2014)
Rs.
Sl
No.
State/ Town
Project
code
Approved Project cost
Capital
5
years
O&M
Date of
Sanction
Name/Natur
e of works
STP
Capacity
to be
created
(in
MLD)
Creation
of
capacity
through
rehabilita
tion of old
STP (in
mld)
STP
Capacity
created
(in
MLD)
Sewer
network
to be
laid
(in Km)
Sewer
network
laid
(Km)
Funds
released
by GoI&
State
Total
expenditu
re
incurred
(including
State
share)
Overall
Physical
Progress
(%)
Brief Physical
Status - Not yet
started (A), Ongoing (B),
Completed (C),
O&M stage (D) &
Bidding Stage (X)
T
co
Total
Bihar (Fund Release - Central Share : 126.51 cr. State Share : 41.25 cr.) Total Expenditure : 75.53 cr.
1
2
Begusarai (EAPWorld Bank/
Retroactive)
Buxar (EAP-World
Bank/Retroactive)
4.1.01
4.1.02
65.40
74.95
0
0
65.40
74.95
08.03.10
08.03.10
Sewer
Network,
SPS and STP
(EAP-World
Bank/Retroa
ctive)
Sewer
Networks,
SPS and STP
(EAP-World
Bank/Retroa
ctive)
17.00
16.00
105.00
95.21
21.20
34.25
20.09
19.68
13.21
12.25
28
32
21.20 Km out of
105 Km pipe laying
and 602 no. out of
5374 No. manhole
completed. Road
Restoration works
is in progress.
Project is under
implementation. (B)
Boundary wall of
STP completed.
34.25 Km out of
95.21 Km pipe
laying and 1100 No.
out of 4015 no.
manhole
completed. Work in
progress for 1 IPS
Project. (B)
2
Status of Approved Projects under National Ganga River Basin Authority (NGRBA) (As on 31st December, 2014)
Rs.
Sl
No.
3
4
5
State/ Town
Hajipur (Gandak)
Munger (EAPWorld Bank/
Retroactive)
Patna (EAP World Bank)
Project
code
4.1.03
4.1.04
4.2.01
Approved Project cost
113.62
187.89
243.27
0
0
0
113.62
187.89
243.27
Date of
Sanction
Name/Natur
e of works
STP
Capacity
to be
created
(in
MLD)
Creation
of
capacity
through
rehabilita
tion of old
STP (in
mld)
STP
Capacity
created
(in
MLD)
Sewer
network
to be
laid
(in Km)
Sewer
network
laid
(Km)
Funds
released
by GoI&
State
Total
expenditu
re
incurred
(including
State
share)
Overall
Physical
Progress
(%)
08.03.10
Sewer
Networks,
SPS and STP
22.00
198.00
56.00
40.72
26.01
42
p
Sewer
Networks,
SPS and STP
(EAP-World
Bank/Retroa
ctive)
27.00
143.00
14.50
35.41
3.22
21
19.06.13
Ganga River
Front
Developmen
t at Patna
(EAP - World
Bank)
22.13
20.84
6
Brief Physical
Status - Not yet
started (A), Ongoing (B),
Completed (C),
O&M stage (D) &
Bidding Stage (X)
Boundry wall of STP
completed. 56 Km out
of 198 Km pipe laying
and 1330 No. out of
11382 no. manhole
completed.
Construction work of
STP in progress.
Project is under
implementation. (B)
Contract
terminated.
Retender initiated.
The Mobilization
advance given to
contractor has been
realized. (X)
Revised release
order of central
fund issued vide
No. I19012/8/2011NMCG-NGRBA
dated 28th
February, 2014.
NOC received from
World Bank for
award of work.
Piling work is in
progress at 7 sites
&ghat construction
T
co
2
Status of Approved Projects under National Ganga River Basin Authority (NGRBA) (As on 31st December, 2014)
Rs.
Sl
No.
State/ Town
Project
code
Approved Project cost
Date of
Sanction
Name/Natur
e of works
STP
Capacity
to be
created
(in
MLD)
Creation
of
capacity
through
rehabilita
tion of old
STP (in
mld)
STP
Capacity
created
(in
MLD)
Sewer
network
to be
laid
(in Km)
Sewer
network
laid
(Km)
Funds
released
by GoI&
State
Total
expenditu
re
incurred
(including
State
share)
Overall
Physical
Progress
(%)
Brief Physical
Status - Not yet
started (A), Ongoing (B),
Completed (C),
O&M stage (D) &
Bidding Stage (X)
T
co
at
BarharwaGhat&Ran
ighat at advance
stage. (B)
6
7
8
Patna (Pahari)
(EAP - World
Bank)
Patna (PahariZone IVA (S) (EAP
- World Bank)
Patna (PahariZone V) (EAP World Bank)
4.2.02
4.2.03
4.2.04
104.80
123.40
196.36
22.50
10.24
17.95
127.30
133.64
214.31
26.12.13
26.12.13
20.02.14
Sewage
Treatment
Plant at
Pahari Patna, Bihar(
EAP - World
Bank)
Sewerage
scheme at
Pahari (Zone
IVA (S)),
Patna, Bihar
(EAP - World
Bank)
Sewerage
scheme at
Pahari Zone
V, Patna,
Bihar (EAP World Bank)
Project is under
bidding process.
(X)
35.00
25.00
7.34
0.00
Project is under
bidding process.
(X)
87.69
8.64
2
0.00
Project is under
bidding process.
(X)
110.65
13.75
0.00
Status of Approved Projects under National Ganga River Basin Authority (NGRBA) (As on 31st December, 2014)
Rs.
Sl
No.
9
State/ Town
Patna (Beur) (EAP
- World Bank)
10
Patna
(Karmalichak)
(EAP - World
Bank)
11
Patna (Beur) (EAP
- World Bank)
12
Patna
(Karmalichak)
(EAP - World
Bank)
Sub Total
Project
code
4.2.05
4.2.06
Approved Project cost
54.84
62.11
13.32
14.93
4.2.07
68.16
77.04
225.77
4.2.08
170.71
1226.64
78.94
1702.06
Date of
Sanction
Name/Natur
e of works
15.07.14
Sewage
Treatment
Plant - Beur
for Patna,
Bihar (EAP World Bank)
15.07.14
30.12.14
30.12.14
Sewage
Treatment
Plant Karmalichak
for Patna,
Bihar (EAP World Bank)
Sewerage
system with
Sewer
network
STP
Capacity
to be
created
(in
MLD)
8.00
33.00
Creation
of
capacity
through
rehabilita
tion of old
STP (in
mld)
STP
Capacity
created
(in
MLD)
Sewer
network
to be
laid
(in Km)
Sewer
network
laid
(Km)
Funds
released
by GoI&
State
Total
expenditu
re
incurred
(including
State
share)
35.00
Bid document
under preparation
by State agency.
(X)
4.00
Bid document
under preparation
by State agency.
(X)
Bid document
under preparation
by State agency.
(X)
Bid document
under preparation
by State agency.
(X)
179.74
Sewerage
system with
Sewer
network
95.54
158.00
Overall
Physical
Progress
(%)
Brief Physical
Status - Not yet
started (A), Ongoing (B),
Completed (C),
O&M stage (D) &
Bidding Stage (X)
64.00
1014.83
125.95
167.76
75.53
T
co
2
2
2
Download