Risk Level 1 Annual Report Questions GENERAL INFO A. B. Site Owner Information Owner Name: Owner Contact: Owner Address: E-Mail: City: Phone: State: Zip: Site Information Site Business Name: Site Contact: Site WDID No: E-Mail: Physical Address: Phone: City: State: Zip: FORM 1 C. STORMWATER POLLUTION PREVENTION PLAN (SWPPP) C.1. Has a SWPPP been prepared by a Qualified SWPPP Developer (QSD) for the construction project? YES NO If NO, Explain: __________________________________________________________________ C.2. Does the SWPPP include a Construction Site Monitoring Program (CSMP) section/element? YES NO If NO, Explain: __________________________________________________________________ C.3. Are these documents kept onsite? YES NO If NO, Explain: __________________________________________________________________ D. GOOD SITE MANAGEMENT “i.e.HOUSEKEEPING” D.1. Were good site management “i.e.housekeeping” measures for construction materials implemented on-site in accordance with CGP and SWPPP? YES NO If NO, Explain: __________________________________________________________________ Based on 2013 Annual Report Questions Risk Level 1 Annual Report Questions D.1.a. Was an inventory of the products used and/or expected to be used conducted? YES NO If NO, Explain: __________________________________________________________________ D.2. Were required good site management “i.e.housekeeping” measures for waste management implemented on-site in accordance with CGP and SWPPP? YES NO If NO, Explain: __________________________________________________________________ D.2.a. Is there a spill response and implementation element of the SWPPP? YES NO If NO, Explain: __________________________________________________________________ D.3. Were required good site management “i.e.housekeeping” measures for vehicle storage and maintenance implemented on-site in accordance with CGP and SWPPP? YES NO If NO, Explain: __________________________________________________________________ D.4. Were required good site management “i.e.housekeeping” measures for landscape materials implemented on-site in accordance with CGP and SWPPP? YES NO If NO, Explain: __________________________________________________________________ D.5. Was a list of potential pollutant sources developed? YES NO If NO, Explain: __________________________________________________________________ D.6. Were required good site management “i.e.housekeeping” measures to control air deposition of site materials and from site operations implemented on-site? YES NO If NO, Explain: __________________________________________________________________ E. NON-STORM WATER MANAGEMENT E.1. Were measures to control all non-storm water discharges during construction implemented? YES NO If NO, Explain: __________________________________________________________________ E.2. Were vehicles washed in such a manner as to prevent non-storm water discharges to surface waters or to MS4 drainage systems? YES NO N/A If NO, Explain: __________________________________________________________________ E.3. Were streets cleaned in such a manner as to prevent unauthorized non-storm water discharges from reaching surface waters or MS4 drainage systems? YES NO If NO, Explain: __________________________________________________________________ Based on 2013 Annual Report Questions Risk Level 1 Annual Report Questions F. EROSION CONTROLS F.1. Were required erosion controls implemented on-site in accordance with CGP and SWPPP? YES NO If NO, Explain: __________________________________________________________________ G. SEDIMENT CONTROLS G.1. Were required sediment controls implemented on-site in accordance with CGP and SWPPP? YES NO If NO, Explain: __________________________________________________________________ G.2. Were immediate access roads inspected on a daily basis? YES NO If NO, Explain: __________________________________________________________________ G.3. Was an Active Treatment System implemented on site? H. RUN-ON AND RUN-OFF CONTROLS H.1. Was all site run-on and run-off effectively managed? YES NO YES NO If NO, Explain: __________________________________________________________________ H.2. Did Risk level 2 dischargers monitor and report run-on from surrounding areas if there was reason to believe run-on may have contributed to an NAL exceedance? YES NO N/A If NO, Explain: __________________________________________________________________ I. Non Applicable for RL 1 J. INSPECTION, MAINTENANCE AND REPAIR J.1. Were all site inspections, maintenance, and repairs performed or supervised by a Qualified SWPPP Practitioner (QSP)? YES NO If NO, Explain: __________________________________________________________________ J.2. Were site inspections conducted weekly and at least once each 24-hour period during extended storm events? YES NO If NO, Explain: __________________________________________________________________ J.3. Were post rain event inspections conducted? Based on 2013 Annual Report Questions YES NO Risk Level 1 Annual Report Questions If NO, Explain: __________________________________________________________________ J.4. Do your inspection forms/checklists meet the minimum criteria listed in the CGP? YES NO If NO, Explain: __________________________________________________________________ J.5. During any site inspection was BMP maintenance or repairs required? YES NO If NO, Explain: __________________________________________________________________ J.6. If BMP maintenance/repair or design change was needed, did implementation begin within 72 hours? YES NO N/A If NO, Explain: __________________________________________________________________ K. VISUAL MONITORING K.1. Within 2 business days (48 hours) after each qualified rain event, were visual inspections conducted in compliance with the CGP? YES NO If NO, Explain: __________________________________________________________________ K.2. Were all storm water discharges that occurred from storage or containment systems visually observed prior to discharge? YES NO If NO, Explain: __________________________________________________________________ K.3. Were the time, date, and rain gauge reading recorded for each qualifying rain event? YES NO If NO, Explain: __________________________________________________________________ K.4. Within 2 business days (48 hours) prior to each predicted rain event, were visual inspections conducted in compliance with the CGP? YES NO If NO, Explain: __________________________________________________________________ K.5. Are all visual inspection records retained on-site? YES NO If NO, Explain: __________________________________________________________________ L. Not Applicable for Risk Level 1 YES M. NO NON-STORM WATER DISCHARGE MONITORING Based on 2013 Annual Report Questions N/A Risk Level 1 Annual Report Questions M.1. Were all drainage areas monitored for authorized/unauthorized non-storm water discharges quarterly? YES NO If NO, Explain: __________________________________________________________________ M.2. Did visual observations indicate any authorized/unauthorized non-storm water discharges? YES NO If YES, complete Form 2 M.3. Were effluent samples taken of the authorized/unauthorized non-storm water discharge? (Analytical data must be entered into the RAW DATA tab in SMARTS) YES NO N/A If NO, Explain: __________________________________________________________________ M.4. Were the effluent samples sent to a laboratory certified for such analyses by the State Department of Health Services? YES NO N/A If NO, Explain: __________________________________________________________________ M.5. Were unauthorized non-storm water discharges eliminated? YES NO N/A If NO, Explain: __________________________________________________________________ N. NON-VISIBLE POLLUTANT MONITORING N.1. Were any breaches, malfunctions, leakages, or spills observed during a visual inspection? YES NO N.2. How many potential discharges of non-visible pollutants were identified? ___________ N.3. For each discharge event (of non-visible pollutants), were samples collected in compliance with the CGP? (Analytical data must be entered into the RAW DATA tab in SMARTS) YES NO N/A If NO, Explain: __________________________________________________________________ N.4. For each discharge event was a comparison sample collected (uncontaminated sample that did not come into contact with the pollutant)? (Analytical data must be entered into the RAW DATA tab in SMARTS) YES NO N/A If NO, Explain: __________________________________________________________________ O. Not applicable to Risk Level 1 P. RECORDS P.1. Are all records of all storm water monitoring information retained on-site? Based on 2013 Annual Report Questions YES NO Risk Level 1 Annual Report Questions If NO, Explain: __________________________________________________________________ Q. Not applicable to Risk Level 1 R. Not applicable to Risk Level 1 S. Not applicable to Risk Level 1 T. TRAINING T.1. Was a Qualified SWPPP Practitioner (QSP) in reasonable charge of SWPPP implementation? YES NO If YES, Provide Name: _______________________________________________ and Certificate Number: _____________________________________________ If NO, Explain: __________________________________________________________________ T.2. Were all individuals conducting BMP installation, inspection, maintenance and repairs trained appropriately? YES NO If NO, Explain: __________________________________________________________________ T.3. Are complete training records kept on-site and available upon request? YES NO If NO, Explain: __________________________________________________________________ U. AUTHORIZED NSWDs DISCHARGED U.1. were any authorized NSWDs discharged observed from July-September? YES NO If YES, fill out FORM 2 U.2. Were any authorized NSWDs discharged observed from October-December? YES NO If YES, fill out FORM 2 U.3. Were any authorized NSWDs discharged observed from January-March? YES NO If YES, fill out FORM 2 U.4. Were any authorized NSWDs discharged observed from April-June? If YES, fill out FORM 2 V. UNAUTHORIZED NSWDs DISCHARGED Based on 2013 Annual Report Questions YES NO Risk Level 1 Annual Report Questions V.1. Were any unauthorized NSWDs discharged observed from July-September? YES NO If YES, fill out FORM 2 V.2. Were any unauthorized NSWDs discharged observed from October-December? YES NO If YES, fill out FORM 2 V.3. Were any unauthorized NSWDs discharged observed from January-March? YES If YES, fill out FORM 2 V.4. Were any unauthorized NSWDs discharged observed from April-June? YES If YES, fill out FORM 2 Based on 2013 Annual Report Questions NO NO Risk Level 1 Annual Report Questions FORM 2 DATE/TIME OF OBSERVATION AUTHORIZED OR UNAUTHORIZED (CHECK ONE) ___/___/___ Authorized ____:____ AM PM Unauthorized ___/___/___ Authorized ____:____ AM PM Unauthorized ___/___/___ Authorized ____:____ AM PM Unauthorized ___/___/___ Authorized ____:____ AM PM Unauthorized ___/___/___ Authorized ____:____ AM PM Unauthorized Based on 2013 Annual Report Questions SOURCE AND LOCATION OF NSWD NAME OF NSWD DESCRIBE NSWD CHARACTERISTICS Indicate whether NSWD is clear, cloudy, or discolored, causing staining, contains floating objects or oil sheen, has odors, etc. At the NSWD At the NSWD Source Drainage Area and Discharge Location DESCRIBE ANY REVISED OR NEW BMPs AND PROVIDE THEIR IMPLEMENTATION DATE Risk Level 1 Annual Report Questions FORM 3 Enter a general summary of any BMP deficiencies identified for each quarter and the corrective actions taken. Maximum up to 1000 characters. July-Sept Quarter Oct-Dec Quarter Jan-March Quarter April-June Quarter Based on 2013 Annual Report Questions Risk Level 1 Annual Report Questions Certification of Annual Report “I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to ensure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information including the possibility of fine and imprisonment for knowing violations.” I and/or personnel acting under my direction and supervision, have reviewed the responses to these Annual Report questions and find that it meets the requirements of the State Water Resources Control Board (SWRCB), National Pollution Discharge Elimination System (NPDES) General Permit for Stormwater Discharges Associated with Construction Activities. Signature of QSP _____________________________ Signature of Construction/Project Manager Based on 2013 Annual Report Questions _____________________________