BUILDING CONTINUOUS IMPROVEMENT PLAN (CIP) Building: Tussing Elementary 2014-2015 Building Strengths: Reading Achievement Differentiation with reading regarding students’ specific needs. Offer several intervention opportunities throughout the year. Staff collaborates and works as a team to plan OIP process is up and running Staff is highly qualified Staff intentionally builds deep relationships with students. Building Areas of Challenge: High economically disadvantaged population Subgroup Gap Closing in Math - Learning progressions within/across the grade level Mathematical Content Knowledge Differentiating Instruction to meet student needs Use of formative instructional practices Focus: (Goal # 1) In the area of Gap Closing - All students will meet their proficiency goals of 82.5% in Mathematics, except IEP students and LEP students, which will increase by 10% for Spring of 2015 as indicated on the PARCC EOY Assessment. Actions: Mid Year Check: All Teachers intentionally teach Math first thing in the morning session. Master Schedule and Lesson Plans reflect that this is occurring daily. Continue to Implement Guided Math- Specific teaching and learning based on skills in a small group/individual setting. Classroom Observation Possible Instructional Rounds in Spring 2015 During E&I Time, Teachers will utilize STAR Instructional Planning Reports and Formative Assessments (Exit Tickets) to Identify Individual Areas of Need. Classroom Observation Pre-Mid-End of Module Assessment, Exit Tickets or other Formative Assessments Charted and Graphed during TBT Meetings. September – December - March Close Monitoring of STAR Reports Usage Reports ST MATH for All Students K-4 Results we expect: In Mathematics, 100% of teachers will fully implement guided math. STAR Reports will show Student Growth Measures of at least 40 SGP. Mid Year Check: Fidelity Checks Star Reports BUILDING CONTINUOUS IMPROVEMENT PLAN (CIP) Building: Tussing Elementary 2014-2015 Focus: (Goal # 2) In the area of Gap Closing - All students will meet their proficiency goals of 86.4% in Reading, except IEP students, which will increase by 10% for Spring of 2015 as indicated on the PARCC EOY Assessment. Actions: Full Implementation of Close Reading Instructional Strategies. Imagine Learning for LEP Reading Eggs for Students K-4 Mid Year Check: -September 2014 PD Provided to Support to Ensure It is Taking Place with Fidelity with Rachel Lang of ESC -Demonstrate through Lesson Planning and Classroom Observations Usage Reports Usage Reports Use STAR Instructional Planning Reports during E&I Time to Guide Instruction and Centers Results we expect: Mid Year Check: In Reading, 100% of teachers will fully Fidelity Checks implement Close Reading in the Content Copy of Lesson Plans – Turned in by Areas. January 15th. OAA Results in the Spring of 2015 DRA Data Link to District CIP District Goal 2 – Increase Gap Closing points earned to 80.