Melink Corporation recommends the following specification template be used when writing a construction specification involving the Intelli-Hood Control System. Because the installation of the Intelli-Hood product involves many divisions of a construction project, the Intelli-Hood Control System should be included in its own Section of the Specification.
Spec Writer may insert the Special Section below in a Special Section of the Construction Spec. The special Intelli-Hood Section may be included in the Food Service Equipment Division (Division 11),
Mechanical Division (Division 23), Electrical Division (Division 26), or the Controls Division (Division 25).
Each of the listed Section above shall have references to the Intelli-Hood Control System Section. At the end of this document, Melink has provided suggested language for the Specification Writer to include in those sections.
As Specification Writer uses this temple, section numbers must be modified and other adjustments may be made to work in the full Construction Specification.
At a minimum the following language is recommended for Demand Control Ventilation (DCV) system(s);
The kitchen hood Demand Control Ventilation (DCV) control system shall include controls that sense temperature and smoke under the hood and vary the fan speed to maintain safe and effective kitchen exhaust per ASHRAE / ANSI / IES Standard 90.1 2010. Melink Intelli-
Hood Demand Control Ventilation (DCV) control system shall monitor cooking activity under the kitchen hood via auto-calibrated infrared Optic Sensors consisting of an Emitter and Receiver mounted on either side of the hood canopy as well as duct or canopy mounted three-wire Temperature Sensor. System shall be capable of operating exhaust fan motors at minimum speeds of 30%-50%. Optic Sensors, with dedicated Air Purge Units, shall immediately increase fan speeds to 100% upon detection of smoke or effluent in the hood canopy with a response time of 0.2 seconds. Upon evacuation of smoke or effluent the fans will modulate according to exhaust temperature for optimal energy savings.
System will actively modulate makeup airflow according to exhaust load to maintain correct space airflow balance.
Demand Control Ventilation (DCV) system that only includes a temperature sensor to detecting cooking activity shall not be permitted. Additionally a DCV system that includes infrared heat sensors without a dedicated air purge unit and auto-recalibration of sensors shall not be permitted. Modulating dampers or other devices that may impede exhaust airflow and grease extraction may not be permitted. melinkcorp.com
│
5140 River Valley Road, Milford, OH 45150
│
513.965.7300
®
Specification Writer shall determine the Division and Section Number of the Kitchen Control system.
DIVISION XX
SECTION XXXXX
INTELLI-HOOD KITCHEN HOOD VENTILATION CONTROL SYSTEM
TABLE OF CONTENTS
PART 1 GENERAL
1.1 RELATED DOCUMENTS
1.2 SUMMARY
1.3 SUBMITTALS
1.4 QUALITY ASSURANCE
1.5 COORDINATION
PART 2 COMPONENT SPECIFICATIONS
2.1 INTELLI-HOOD CONTROL SYSTEM
2.2 VARIABLE FREQUENCY DRIVES
2.3 MOTORS
PART 3 EXECUTION
3.1 INSTALLATION
3.2 STARTUP- SERVICE
3.3 ADJUSTING
3.4 DEMONSTRATION
1.1. RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and other Division 01 Specification Sections, apply to this Section.
1.2. SUMMARY
A. This Section includes the following:
1. Intelli-Hood Kitchen Hood Ventilation Control System
B. Related Sections include the following:
Specification Writer should fill in the correct Division and Section numbers below as applicable.
1. Division 11 Section XX , Food Service Equipment for kitchen hoods.
2. Division 23 Section XX , Heating, Ventilating, and Air Conditioning for hood make-up units.
Intelli-Hood
®
Project Specification Template
3. Division 23 Section XX , Heating, Ventilating, and Air Conditioning for hood exhaust fans.
4. Division 23 Section XX , Heating, Ventilating, and Air Conditioning for Air Handling System serving the kitchen area.
5. Division XX Section XX , Motors
6. Division XX Section XX , Variable Frequency Drives
7. Division XX Section XX , Instrumentation & Controls of HVAC & Plumbing Systems for temperature control and sequences of operation.
1.3. SUBMITTALS
A. Comply with the requirements of Division 01 Section Submittal Procedures .
B. Submit the following for approval:
1. Product Data Sheets including the following data if applicable: a Electrical Ratings b Dimensions c Weights d Loads e Required Clearances f Field Connections
2. Shop Drawings: a Indicate hoods, exhaust, and supply equipment being controlled by the system. b Indicate locations of sensors, system controller, VFDs and other components. c Provide wiring diagrams for power, signal, and control wiring. d Provide a description of Sequence of Operation
3. Installation Instructions a Indicate Installation Procedures and Scopes of Work
4. Reference Information: a Intelli-Hood Operation and Maintenance Manual. b Sample Startup Report c VFD Manuals
1.4. QUALITY ASSURANCE
A. All electrical components, devices, and accessories shall be listed and labeled as defined in
NFPA 70, Article 100, by a testing agency acceptable to authorities having jurisdiction, and marked for intended use.
B. Control System shall be tested and certified to conform to the following standards.
1. UL2017 – Standard for General-Purpose Signaling Devices and Systems.
2. UL710 – Standard for Exhaust Hoods for Commercial Cooking Equipment.
3. FCC Class B Standard CFR47 Part 15.109 on Radiated Emissions.
4. FCC Class B Standard CFR47 Part 15.109 on Conducted Emissions.
Intelli-Hood
®
Project Specification Template
5. CSA C22.2 No. 205-M1983 – Signal Equipment.
6. CE Class B Directive 98/34/EEC: Technical Standards & Regulations Directive
7. CE Class B Directive 2004/108/EC: Electromagnetic Compatibility with Amending Directives
92/31/EEC, 93/68/EEC and 91/263/EEC
8. CE Standard EN 61000-6-3: 2007 – Emissions
9. CE Standard EN 61000-3-2: 2006 – Harmonic Current Emissions
10. CE Standard EN 61000-3-3: 1995 +A1:2001, +A2:2005 – Voltage Fluctuations and Flicker
11. CE Standard EN 61000-6-1: 2007 Electrostatic Discharge
12. CE Standard EN 61000-6-1: 2007 Radiated Immunity
13. CE Standard EN 61000-6-1: 2007 Electrical Fast Transients.
14. CE Standard EN 61000-6-1: 2007 Surge.
15. CE Standard EN 61000-6-1: 2007 Conducted Immunity.
16. CE Standard EN 61000-6-1: 2007 Voltage Dips and Short Interruptions.
1.5. COORDINATION
A. Coordinate installation of hood sensors in kitchen hoods listed in Division 11 Food Service
Equipment.
B. Coordinate installation of the System Controller(s), Touchpad(s), and Aux Touchpad(s)
C. Coordinate installation of Variable Frequency Drives
D. Coordinate installation of hood sensor wiring
E. Coordinate power wiring of System Controller, Auxiliary Power Supplies, and Auxiliary Light
Controllers.
F. Coordinate VFD and motor power wiring.
G. Coordinate installation of VFD control wiring.
H. Coordinate installation and connections of control wiring for make-up air unit(s), air handling unit(s), pollution control exhaust fan, and any other HVAC equipment related to the kitchen ventilation system.
I. Coordinate supply fan speed and/or damper control of make-up air units or other air handlers to maintain building balance as exhaust fans modulate in speed.
J. Coordinate installation and control wiring of special hood systems such as water wash systems, ultraviolet light cleaning systems, back draft damper systems, etc.
K. Coordinate fire mode interlock and Sequence of Operation.
L. Coordinate interface of Intelli-Hood Control system to building automation network via
BACnet protocol over TCP/IP
M. Coordinate connection of Intelli-Hood Control System to an internet gateway such that
Intelli-Hood System Controller can connect to the Melink Intelli-Hood Server.
Intelli-Hood
®
Project Specification Template
2.1. KITCHEN VENTILATION CONTROL SYSTEM
A. MANUFACTURERS
1. Acceptable Manufacturers of the kitchen ventilation control system are: a Melink Corporation: www.melinkcorp.com
, 5140 River Valley Rd. Milford OH, 45150, phone: (513) 965-7300
B. SYSTEM DESCRIPTION
Melink Intelli-Hood Demand Control Ventilation (DCV) control system will monitor cooking activity under the kitchen hood via auto-calibrated infrared Optic Sensors consisting of an
Emitter and Receiver mounted on either side of the hood canopy as well as duct mounted three-wire Temperature Sensor. System shall be capable of operating exhaust fan motors at minimum speeds of 30%-50%. Optic Sensors, with dedicated Air Purge Units, shall immediately increase fan speeds to 100% upon detection of smoke or effluent in the hood canopy with a response time of 0.2 seconds. Upon evacuation of smoke or effluent the fans will modulate according to exhaust temperature for optimal energy savings. System will actively modulate makeup airflow according to exhaust load to maintain correct space airflow balance.
Demand Control Ventilation (DCV) system that only includes a temperature sensor to detecting cooking activity shall not be permitted. Additionally a DCV system that includes infrared sensors without a dedicated air purge unit and auto-recalibration of sensors shall not be permitted. Modulating dampers or other devices that may impede exhaust airflow and grease extraction may not be permitted.
1. Factory assembled, modular, control system, consisting of the following components: a System Controller i Communicates to Hood Controller, Touchpad(s), Temperature and Optic
Sensors via proprietary RS-485 Protocol. ii Controller capable of communicating with up to (39) Hood Controllers, (10)
Touchpads, (10) Auxiliary Touchpads, (10) Auxiliary Power Supplies, and (10)
Auxiliary Light Controllers. iii Communicates with up to (64) Variable Frequency Drives via Modbus Protocol. iv Programmable I/O containing (3) Digital Inputs, (4) Digital Outputs, (1) Analog
Input and (1) Analog Output. v Adjustable Temperature range vs. Fan Speed Curve. vi Automatic On/Off based on hood temperature or programmable clock for individual fan schedules. vii Removable USB memory storage for setup files and operational performance history data. viii Calculates appropriate speeds for exhaust and supply fans based on cooking temperature demand and optical infrared monitoring.
Intelli-Hood
®
Project Specification Template
ix Internet-based Service Application for monitoring, programming and troubleshooting. x BACnet over TCP/IP Interface for communication to Building Automation
System. b Hood Controller i Monitors Temperature and Optic Sensors on each kitchen hood and sends the sensor data to the System Controller via RS-485 Protocol communications. ii Steel beam clamps for installation on hoods or other mechanical structures above kitchen hood. iii Hood Controller Temperature Rating: 0 ° to 50°C, 32° to 120°F c Temperature Sensor i Platinum three-wire resistive temperature device (RTD) encased in stainless steel tube. ii Threaded housing shall be assembled in UL-Listed grease-tight fittings for installation in exhaust duct or kitchen hood canopy. iii Temperature sensors shall be wired to Hood Controller via 8-pin, RJ-45 connectors to the RS-485 Protocol Hood Network Cables. iv Temperature Rating: 0° to 535°C, 32° to 1000°F d Optic Sensors i Optic Sensors shall consist of conformal coated Emitter and Receiver boards housed in stainless steel enclosures on opposite ends of the kitchen hood interior. ii Infrared sensors capable of detecting effluent in the air at any point along the length of the beam with a response time of 0.2 seconds. iii Sensors shall be capable of spanning 3 to 40 feet of kitchen hood interior with automatic gain adjustment. iv Optic sensors shall auto-calibrate every day at start up and/or every 24 hours. v Sensors shall be wired to Hood Controller with liquid-tight connectors at sensor board via the Air Purge Unit. vi Optic Sensor Temperature Rating: 0 ° to 85°C, 32° to 185°F e Air Purge Unit (APU) i Air Purge Unit (APU) consisting of a 12VDC blower and interface PCB inside an 18 gauge galvanized steel enclosure shall be installed to reduce the accumulation of contamination on the Optic Sensor lenses and reduces heat buildup inside the Optic Sensor enclosure. ii APU shall physically connect to the Optic Sensor enclosure via stainless steel conduit pipe. iii Blower fan bearings shall be permanently lubricated. iv APU Temperature Rating: 0 ° to 50°C, 0° to 125°F
Intelli-Hood
®
Project Specification Template
f Touchpad i Full color screen, 2.8
” diagonal, QVGA resolution screen to display operating status and programmable menus. ii Integrated membrane FANS switch for turning fans from Active Mode (On) and
Standby Mode (off). iii Integrated membrane LIGHTS switch for turning hood lights On / Off via line voltage relays to change state of line voltage. iv Soft keys and Directional integrated membrane switches for user to boost fans to full speed, access programming menus, access diagnostic and help screens. v Fully programmable graphical interface to conform to operator s’ hood and fan nomenclature. g Aux Touchpad i Aux Touchpad shall be used as an additional user interface, if applicable, for the control of the FANS, LIGHTS and 100% switches. ii Integrated membrane FANS switch shall change associated hoods between
Active Mode (fans running) to Standby Mode (fans off). iii Integrated membrane LIGHTS switch shall change the state of associated line voltage relays which may be used to control Hood Lights circuits. iv Integrated membrane 100% Switch shall allow users to temporarily boost fan speeds to full speed on associated hoods. v Stainless steel cover plate (304L) for durable construction and smooth finish. vi Synthetic overlay for water protection. h Aux Power Supply i Aux Power Supply shall be used for large installations when additional power is needed to power Hood Controllers, Optic Sensors and Touchpads. ii Aux Power Supply Temperature Rating: 5 ° to 40°C, 41° to 104°F i Aux Lighting Controller i Aux Lighting Controller shall be used for large installations where there is a need to control multiple hood light circuits. ii Aux Lighting Controller Temperature Rating: 5 ° to 40°C, 41° to 104°F
Intelli-Hood
®
Project Specification Template
2.2. VARIABLE FREQUENCY DRIVES
A. Melink Corporation shall furnish VFDs that comply with Division XX Section XX , Variable
Frequency Drive Specification.
B. Intelli-Hood system shall control the VFDs via Modbus Protocol
C. Building Automation System may acquire VFD control data (stop, start, speed, fault status) from Intelli-Hood System Controller via BACnet Protocol over TCP/IP Communication.
2.3. MOTORS
A. General requirements for motors are specified in Division 23 Section "Motors."
B. Motors controlled by Variable Frequency Drives should be designed and tested to meet recommendations of NEMA MG1, Part 31.
1. 230 and 460 VAC motors shall have a winding insulation with a minimum voltage withstand rating of 1600V peak-to-peak at 0.1µs rise time.
2. 575V motors require a 1700Vp-p rating.
Intelli-Hood
®
Project Specification Template
3.1. INSTALLATION SCOPES OF WORK
A. Responsibilities and scopes of work of divisions are listed in table(s) below.
Venti l a ti on Hoods
Hood Control l ers , Opti c a nd Tempera ture Sens ors
Sens or Network Control Wi ri ng
Condui t for Opti c a nd Tempera ture Sens or Control
Wi ri ng i f a ppl i ca bl e
Intel l i -Hood Sys tem Control l er(s )
Intel l i -Hood Sys tem Control l er Power Wi ri ng
Venti l a ti on Hood Li ghts
Venti l a ti on Hood Li ghts Power Wi ri ng
Intel l i -Hood Touchpa d(s )
Intel l i -Hood Touchpa d Wi ri ng
Condui t for Intel l i -Hood Touchpa d i f a ppl i ca bl e
Intel l i -Hood Auxi l i a ry Touchpa d(s ) i f a ppl i ca bl e
Control Wi ri ng of Aux Touchpa d(s ) i f a ppl i ca bl e
Condui t for Aux Touchpa d(s ) Control Wi ri ng i f a ppl i ca bl e
X
X
X X
X X
X
X
X X
X X
X
X X
X
X
X
X X
X X
X X
X X
X X
Intelli-Hood
®
Project Specification Template
Intel l i -Hood Auxi l l i a ry Power Suppl y i f a ppl i ca bl e
Intel l i -Hood Aux Power Suppl y i nput power
(120VAC) i f a ppl i ca bl e
Control Wi ri ng for Aux Power Suppl y i f a ppl i ca bl e
Condui t for Intel l i -Hood Control Wi ri ng of Aux
Power Suppl i es i f a ppl i ca bl e
Intel l i -Hood Auxi l l i a ry Li ghti ng Control l er i f a ppl i ca bl e
Power Wi ri ng of Intel l i -Hood Aux Li ght Control l er i f a ppl i ca bl e
Control Wi ri ng for Aux Power Suppl y i f a ppl i ca bl e
Condui t for Control Wi ri ng of Aux Li ghti ng Control l er i f a ppl i ca bl e
Va ri a bl e Frequency Dri ves
Power Wi rng of VFDs a nd Motors
VFD Li ne Rea ctors i f a ppl i ca bl e
VFD Output Fi l ters i f a ppl i ca bl e
Intel l i -Hood Control Wi ri ng for VFDs
Condui t for Control Wi ri ng of VFDs i f a ppl i ca bl e
X
X X
X
X X
X
X
X
X X
X X
X
X X
X X
X
X X
X X
X X
X
X X
Intelli-Hood
®
Project Specification Template
Intel l i -Hood Auxi l l i a ry I/O Devi ce(s ) i f a ppl i ca bl e
Control Wi ri ng of Auxi l l i a ry I/O Devi ce(s ) i f a ppl i ca bl e
Exha us t Fa ns
Motors ra ted for us e wi th VFDs per NEMA MG1 Pa rt
31
Suppl y Ai r Equi pment (Ma ke Up Ai r Uni ts , Ai r
Ha ndl ers , etc)
Low Vol ta ge Control Ca bl e from Intel l i -Hood
Sys tem Control l er to HVAC Equi pment
Low Vol ta ge Control Ca bl e from Intel l i -Hood
Sys tem Control l er to Hood Acces s ory Devi ces (wa ter wa s h pa nel , ul tra vi ol et s ys ten pa nel )
BACnet wi ri ng to Intel l i -Hood Sys tem
Internet wi ri ng to Intel l i -Hood Sys tem
Fi re Sys tem Interl ock Wi ri ng
Progra mmi ng a nd Confi gura ti on of Intel l i -Hood
Sys tem
Progra mmi ng a nd Confi gura ti on of VFDs
Progra mmi ng a nd Confi gura ti on of Suppl y Ai r HVAC
Equi pment
Progra mmi ng a nd Confi gura ti on of Bui l di ng
Automa ti on Sys tem
Progra mmi ng a nd Confi gura ti on of i nternet communi ca ti ons s ys tem
.
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
3.2. STARTUP SERVICE
A. A Factory-Authorized Service Representative shall perform startup service including:
1. Inspection of installed components. Verification of correct installation and operation.
2. Programming of system parameters for proper detection of cooking conditions.
3. Programming of system parameters for proper operation of control input/output points.
4. Programming of VFD parameters for proper control communication with control system.
5. Programming of VFD motor operational set points (maximum speed and allowable motor current).
6. Verification of Intelli-Hood system functionality.
7. Results shall be captured in a written report.
Intelli-Hood
®
Project Specification Template
3.3. ADJUSTING
A. Test and Balance Contractor shall adjust hood dampers, fan pulleys, and/or VFDs to achieve maximum design airflow at maximum speed.
3.4. DEMONSTRATION
A. A Factory-Authorized Service Representative shall train Owner's maintenance personnel to adjust, operate, and maintain Packaged Kitchen Hood Ventilation Control Systems. Refer to
Division 01 Section Closeout Procedures and Demonstration and Training .
END OF SECTION
Intelli-Hood
®
Project Specification Template
Specification Writer should include the following language in the Food Service Equipment Section, adjusting the item numbers as appropriate.
Specification should include the following items. Item ’s locations should be specified on design documents.
1.1. Kitchen Hood 1
The specification of each kitchen hood should include the following statement.
A. Intelli-Hood sensors shall be installed on kitchen hood. Refer to Division XX, Section XX,
Intelli-Hood Kitchen Ventilation Controls
1.2. Kitchen Hood 2
A. Intelli-Hood sensors shall be installed on kitchen hood. Refer to Division XX, Section XX,
Intelli-Hood Kitchen Ventilation Controls
1.3. Kitchen Hood X
A. Intelli-Hood sensors shall be installed on kitchen hood. Refer to Division XX, Section XX,
Intelli-Hood Kitchen Ventilation Controls
1.4. Intelli-Hood System Controller
A. NEMA 1 Type Steel Enclosure containing electronic control system.
B. Receives data from Temperature and Optic Sensors installed in a commercial kitchen hood via Hood Controller Devices.
C. Calculates appropriate speeds for exhaust and supply fans based on Temperature and
Optic Sensors to command Variable Frequency Drive(s).
D. Supports Internet communication for monitoring, programming, troubleshooting
E. Supports BACnet communication to Building Automation System
1.5. Intelli-Hood Touchpad
A. 4.5” x 4.5” control panel containing
1. Switches for turning fans and hood lights on and off
2. Override switch to send fans to full speed.
3. Setup switches provide a means of programming the system.
4. Full-color screen displays the status of the system, fans, and sensors.
Intelli-Hood
®
Project Specification Template
2.1. Coordinate the following items with respect to Intelli-Hood Division XX, Section XX
A. Coordinate installation of Intelli-Hood sensors in kitchen hoods.
B. Coordinate installation of the System Controller(s), Touchpad(s), and Auxiliary
Touchpad(s).
C. Coordinate installation of Variable Frequency Drives.
D. Coordinate installation of Melink-supplied plenum-rated low voltage Temperature and Optic sensor wiring
E. Coordinate installation and control wiring of special hood systems such as water wash systems, ultraviolet light cleaning systems, back draft damper systems, etc.
3.1. Intelli-Hood Control System Installation
A. Perform work as pertaining to Division 11 specified in Division XX, Section XX, Part 3,
Intelli-Hood Kitchen Ventilation Controls
Intelli-Hood
®
Project Specification Template
Specification Writer should include the following language in the Mechanical Division, adjusting the item numbers as appropriate.
1.1. Coordinate the following items with respect to Intelli-Hood Division XX, Section XX
A. Coordinate installation of Variable Frequency Drives for Intelli-Hood Control System
B. Coordinate installation of VFD control wiring
C. Coordinate installation and connections of control wiring for make-up air unit(s), air handling unit(s), pollution control exhaust fan, and any other HVAC equipment related to the kitchen ventilation system..
D. Coordinate supply fan speed and/or damper control of make-up air units or other air handlers to maintain building balance as exhaust fans modulate in speed.
E. Coordinate Fire Mode Interlock and Sequence of Operation.
F. Coordinate interface of Intelli-Hood Control system to Building Automation Network via
BACnet protocol over TCP/IP
A. Motors controlled by Variable Frequency Drives should be designed and tested to meet recommendations of NEMA MG1, Part 31.
1. For 480V motors, the winding insulation should be able to withstand a voltage peak of 1600
Vpp at 0.1µs rise time. 575V motors require a 1700Vp-p rating.
3.1. Intelli-Hood Control System Installation
A. Perform work as pertaining to Division 25 specified in Division XX, Section XX, Part 3,
Intelli-Hood Kitchen Ventilation Controls
4.1. Kitchen Test and Balance
A. Test and Balance Contractor shall adjust hood dampers, fan pulleys, and/or VFDs to achieve maximum design airflow at maximum speed.
Intelli-Hood
®
Project Specification Template
Specification Writer should include the following language in the Automation Controls Division, adjusting the item numbers as appropriate.
1.1. Coordinate the following items with respect to Intelli-Hood Division XX, Section XX
A. Coordinate supply fan speed and/or damper control of make-up air units or other air handlers to maintain building balance as exhaust fans modulate in speed.
B. Coordinate fire mode interlock and Sequence of Operation.
C. Coordinate interface of Intelli-Hood Control system to building automation network via
BACnet protocol over TCP/IP
D. Coordinate connection of Intelli-Hood Control System to an internet gateway such that
Intelli-Hood System Controller can connect to Melink Intelli-Hood Server.
E. Coordinate VFD Control and status monitoring
2.1. Intelli-Hood Control System Installation
A. Perform work as pertaining to Division 25 specified in Division XX, Section XX, Part 3,
Intelli-Hood Kitchen Ventilation Controls
Intelli-Hood
®
Project Specification Template
Specification Writer should include the following language in the Electrical Division, adjusting the item numbers as appropriate.
1.1. Coordinate the following items with respect to Intelli-Hood Division XX, Section XX
A. Coordinate installation of Variable Frequency Drives
B. Coordinate installation of hood sensor wiring
C. Coordinate power wiring of System Controller, Auxiliary Power Supplies, and Auxiliary Light
Controllers.
D. Coordinate VFD and motor power wiring.
E. Coordinate installation of Output Filters or Output Reactors for Variable Frequency Drives, if applicable. When appropriate motors are used (appropriate motors are defined under the mechanical section), output filters or output reactors shall be specified/installed if power wiring between the VFD and motor exceeds 200 feet.
F. Coordinate installation of Line Reactor of Variable Frequency Drives if applicable. Line reactors should be installed when any of the following conditions exist: generators can potentially be feeding the VFDs, incoming power quality is suspect, whenever using 575V input VFDs, where power-correction capacitors are present, transformer capacity feeding
VFDs exceeds 150kVA, or line has low impedance (less than 1% reactance).
G. Coordinate Fire Mode Interlock and Sequence of Operation.
2.1. Intelli-Hood Control System Installation
A. Perform work as pertaining to Division 26 specified in Division XX, Section XX, Part 3,
Intelli-Hood Kitchen Ventilation Controls
Intelli-Hood
®
Project Specification Template
Specification Writer should include the following language in the Communications Division, adjusting the item numbers as appropriate.
1.1. Coordinate the following items with respect to Intelli-Hood Division XX, Section XX
A. Coordinate connection of Intelli-Hood System Controller to an internet gateway such that it can connect to Melink Intelli-Hood Server.
2.1. Intelli-Hood Control System Installation
A. Perform work as pertaining to Division 27 specified in Division XX, Section XX, Part 3,
Intelli-Hood Kitchen Ventilation Controls
Intelli-Hood
®
Project Specification Template