Issue 18-4 AGREEMENT FOR THE PROVISION OF THE WHOLESALE BROADBAND MANAGED CONNECT SHARED SERVICE SCHEDULE 4: PRICING SCHEDULE CONTENT 1. Definition 2. Introduction 3. End User Access Charges 4. Contracted Bandwidth Charges 5. Host Link Charges 6. Time Related Charges 7. Notes Name: Issue: Date: BT WBMC Shared Service - Schedule 4 (Pricing Schedule) Issue 18-5 1 October 2013 © British Telecommunications plc Page 1 of 8 Issue 18-4 AGREEMENT FOR THE PROVISION OF THE WHOLESALE BROADBAND MANAGED CONNECT SHARED SERVICE SCHEDULE 4: PRICING SCHEDULE SCHEDULE 4: PRICING 1. DEFINITION 1.1 In this Schedule, a reference to a paragraph, unless stated otherwise, is to a paragraph of this Schedule. Unless expressly stated otherwise below, words and expressions have the meaning given in Schedule 1 of this Agreement. 2. INTRODUCTION 2.1 This Schedule contains the Charges for the Service. 2.2 All Charges in this Schedule are in GB Pounds and exclusive of VAT. 2.3 The Schedule should be read in conjunction with the Service Schedule and the Handbook. 2.4 All references to months in this Schedule refer to calendar months. 2.5 If the Service is ceased within the Minimum Period, the Customer will be liable to pay rental Charges for the remainder of the Minimum Period. 3. END USER ACCESS CHARGES WBC ADSL End User Access - All types as set out in the BT Price List Modification, cancellation, migration, cessation and abortive Charges of WBC ADSL End User Access - All types as set out in the BT Price List IPsC End User Access - All types as set out in the BT Price List Modification, cancellation, migration, cessation and abortive prices of IPsC End User Access - All types as set out in the BT Price List WBC FTTC End User Access - All types as set out in the BT Price List Modification, cancellation, migration, cessation and abortive Charges of WBC FTTC End User Access - All types as set out in the BT Price List WBC FTTP End User Access - All types as set out in the BT Price List Modification, cancellation, migration, cessation and abortive Charges of WBC FTTP End User Access - All types as set out in the BT Price List WBMC fixed charge per End User (for all types of WBC ADSL, WBC Name: Issue: Date: Operative Date 01.05.2008 Connection (Exc. VAT) As per WBC ADSL Rental (Exc. VAT) As per WBC ADSL 01.05.2008 As per WBC ADSL As per WBC ADSL 05.05.2009 As per IPsC As per IPsC 05.05.2009 As per IPsC As per IPsC 25.01.2010 As per WBC FTTC As per WBC FTTC 25.01.2010 As per WBC FTTC As per WBC FTTC 11.11.2011 As per WBC FTTP As per WBC FTTP 11.11.2011 As per WBC FTTP As per WBC FTTP 01.08.2008 £0.00 £0.35 BT WBMC Shared Service - Schedule 4 (Pricing Schedule) Issue 18-5 1 October 2013 © British Telecommunications plc Page 2 of 8 Issue 18-4 AGREEMENT FOR THE PROVISION OF THE WHOLESALE BROADBAND MANAGED CONNECT SHARED SERVICE SCHEDULE 4: PRICING SCHEDULE FTTC,WBC FTTP and IPsC End User Accesses as set out in the BT Price Lists) Annex M WBC ADSL Real Time QoS 02.08.2010 01.10.2011 As per WBC ADSL As per WBC ADSL AS per WBC ADSL As per WBC ADSL The WBMC fixed Charge per End User, as set out above, will be calculated by BT, based on the number of live End User Accesses shown on the bill back-up files as issued to WBMC by its suppliers. This Charge will be applied to the next monthly bill. Any increases or decreases in the number of live End User Accesses will be reflected on the following monthly bill. No refunds will be made in relation to any End User Accesses ceased after the bill back-up files have been produced. 4. CONTRACTED BANDWIDTH CHARGES Operative Date WBMC (WBC) Total Best Efforts Contracted Bandwidth charge(Note 1) 01.01.2010 Connection (Exc. VAT) £0.00 Rental (Exc. VAT) £48.55 per Mbit/s per month WBMC (WBC) Total Best Efforts Contracted Bandwidth charge – 95th percentile WBMC (IPsC) Best Efforts Contracted Bandwidth charge (Markets 2 and 3)* WBMC (IPsC) Best Efforts Contracted Bandwidth charge 95th percentile (Markets 2 and 3)* 01.06.2013 £0.00 £51.40 per Mbit/s per month 01.08.2009 £0.00 £131.20 per Mbit/s per month 01.06.2013 £0.00 £138.90 per Mbit/s per month WBMC (IPsC) Best Efforts Contracted Bandwidth charge (Market 1)* (Note 2) WBMC (IPsC) Best Efforts Contracted Bandwidth charge – 95th percentile (Market 1)* (Note 2) WBMC (WBC) Total Best Efforts Contracted Burst Bandwidth charge (Note 4) WBMC (IPsC) Best Efforts Contracted Burst Bandwidth charge Real Time QoS Contracted Bandwidth supplemental Charge (Note 3) Real Time QoS Contracted Bandwidth burst bandwidth Charge 01.07.2013 £0.00 £69.86 per Mbit/s per month 01.07.2013 £0.00 £75.67 per Mbit/s per month 01.06.2013 £0.00 £83.55 per Mbit/s per month 01.11.2009 £0.00 01.11.2011 £0.00 01.11.2011 £0.00 £188.55 per Mbit/s per month £5.00 per Mbit/s per month £88.55 per Mbit/s per month *Note 1: Total Best Efforts Contracted Bandwidth is the combination of Best Efforts and Real Time QoS Contracted Bandwidth, as further described in the Handbook. *Note 2: A Customer must purchase Contracted Bandwidth at each Host Link rather than on the basis of the applicable broadband Market. The per Mbit/s deduction will be based on the proportion of contracted bandwidth measured in Market 1 in total across all 10 nodes. Each month BT will estimate the amount of IPstream Connect Market 1 bandwidth a CP is expected to use based on the Name: Issue: Date: BT WBMC Shared Service - Schedule 4 (Pricing Schedule) Issue 18-5 1 October 2013 © British Telecommunications plc Page 3 of 8 Issue 18-4 AGREEMENT FOR THE PROVISION OF THE WHOLESALE BROADBAND MANAGED CONNECT SHARED SERVICE SCHEDULE 4: PRICING SCHEDULE peak actual usage data from two months prior and apply an adjustment to the invoice. Two months later a second adjustment will be made reflecting the actual Market 1 bandwidth consumed. Note 3: For Real Time QoS Contracted Bandwidth the supplemental Charge will be raised in addition to the Total Best Efforts Contracted Bandwidth Charge. Note 4: For the period of 1 June to 31 December 2013 a special offer will be in place with WBMC (WBC) Total Best Efforts Contracted Burst Bandwidth charged at rates that varies by time of day. The offer terms are summarised in the table below. The adjustments to reflect the lower rates would be applied two months in arrears. WBMC shared over WBC pricing – £ per Mbit/s per month Bandwidth utilised above contracted bandwidth Time of day 0 - 5% 5 - 25% > 25% Best Efforts Bandwidth 100th percentile 7.00am to 6.00pm 48.55 48.55 83.55 6.00pm to 7.00am 48.55 83.55 83.55 Best Efforts Bandwidth 95th percentile 7.00am to 6.00pm 51.40 51.40 83.55 6.00pm to 7.00am 83.55 83.55 83.55 4.1 Contracted Bandwidth is measured at the Host link. 4.2 The following WBMC Contracted Bandwidth (WBC and IPsC) steps will be available for the Service: Bandwidth 1 Mbps – 10 Mbps 10 Mbps – 50 Mbps 50 Mbps – 100 Mbps 100 Mbps – 500 Mbps 500 Mbps – 1 Gbps 1 Gbps – 2 Gbps 2 Gbps – 4 Gbps 4 Gbps – 8.6 Gbps 8.86 Gbps – 17.18 Gbps 17.72 Gbps – 34.36 Gbps 4.3 Name: Issue: Date: Step Size (Mbps) 1 2 5 10 20 509 100 134 268 536 A Minimum Period of 1 month for WBMC (WBC) or (IPsC) Contracted Bandwidth applies. Following any Modification as set out in Schedule 2, paragraph 8.3, if such Modification is an Order to: (a) reduce the amount of WBMC (WBC) or (IPsC) Contracted Bandwidth outside of any Minimum Period, the new Charge will take effect from the date of Modification; (b) reduce the amount of WBMC (WBC) or (IPsC) Contracted Bandwidth within any Minimum Period, the Customer will be liable for the Charges due for the remainder of the Minimum Period and the new Charge for the reduced amount of bandwidth will take effect from the date of Modification; BT WBMC Shared Service - Schedule 4 (Pricing Schedule) Issue 18-5 1 October 2013 © British Telecommunications plc Page 4 of 8 Issue 18-4 AGREEMENT FOR THE PROVISION OF THE WHOLESALE BROADBAND MANAGED CONNECT SHARED SERVICE SCHEDULE 4: PRICING SCHEDULE (c) increase the amount of WBMC (WBC) or (IPsC) Contracted Bandwidth, the new Charge will take effect from the date of the Modification and the Minimum Period will be reset for a further 1 month. Additional information on the management of WBMC (WBC) or (IPsC) Contracted Bandwidth can be found in paragraph 8 of Schedule 2. 4.4 Burst Bandwidth (a) For bandwidth utilised up to a 5% threshold in addition to the Contracted Bandwidth Ordered by a Customer, the Best Efforts Contracted Bandwidth Charge as set out above will apply. (b) For bandwidth utilised above a 5% threshold on the Contracted Bandwidth Ordered by a Customer, the Best Efforts Contracted Bandwidth Burst Charge as set out above will apply. (c) If the Customer bursts above its WBMC (WBC)/(IPsC) Contracted Bandwidth plus 5% during a calendar month it may place a Modify Order to increase its WBMC (WBC)/(IPsC) Contracted Bandwidth in order to avoid further burst charges being raised. The WBMC (WBC)/(IPsC) Best Efforts Contracted Bandwidth Burst Charge will be pro rated for any burst bandwidth above the contracted level plus 5% for the period up until the effective date of such a Modify Order. If the Customer bursts above its WBMC (WBC)/(IPsC) Contracted Bandwidth plus 5% during a calendar month and does not submit a Modify Order to increase its WBMC (WBC)/(IPsC) Contracted Bandwidth, the burst bandwidth charges will be applied for the full calendar month. 4.5 Burst Bandwidth Capability between 51% to 100% (a) Burst Bandwidth Capability between 51% to 100% is a rental Product. The connection and rental Charges are as follows; Operative Date WBMC Burst Bandwidth capability between 51% to 100% 14.05.2012 Connection (Exc. VAT £0.00 Rental (Exc. VAT) 2% of Best Efforts Contracted Bandwidth charges for IPSC and WBC and RTQoS. . (b) In addition to the ongoing rental Charge, as set out in this paragraph 4.5 , normal Burst Bandwidth charges will apply as set out above. (c) A Minimum Period of 1 month will apply from the date the WBMC Burst Bandwidth Capability Order is processed. (d) The lead time for the WBMC Burst Bandwidth Capability Order to be actioned will be 5 Working Day. The ability to burst beyond 51% will only be available to Customers who take the Burst Bandwidth Capability as set out in this paragraph 4.5 and paragraph 8 of Schedule 2. . 4.6 Transition Period from IPstream and IPstream Centrals to WBMC over IPsC. Name: Issue: Date: BT WBMC Shared Service - Schedule 4 (Pricing Schedule) Issue 18-5 1 October 2013 © British Telecommunications plc Page 5 of 8 Issue 18-4 AGREEMENT FOR THE PROVISION OF THE WHOLESALE BROADBAND MANAGED CONNECT SHARED SERVICE SCHEDULE 4: PRICING SCHEDULE 5. (a) BT will not charge the Customer for the WBMC (IPsC) Contracted Bandwidth during the Migration Period. (b) During the Stabilisation Period the Customer will be charged for the 5-15% at the Burst Charges initially, as set out in this Pricing Schedule and these Charges will then be rebated to the Customer on the following monthly WBMC invoices. (c) Following the Transition Period, all relevant Charges for the WBMC (IPsC) Contracted Bandwidth will be applied, i.e. bandwidth up to 105% of the contracted level will attract Best Effort Contracted Bandwidth Charges; if the Customer bursts above this the Customer will pay Best Efforts Contracted Bandwidth Burst Charges as set out in this Pricing Schedule and no rebates will be paid. (d) Once all of a Customer’s End Users have migrated across to WBMC over IPsC, and the onboarding process to IPsC has also completed, should the Customer wish to end the Migration Period earlier than the maximum 2-month period allowed the Stabilisation Period will begin at this point and the WBMC (IPsC) Contracted Bandwidth Charges will be applied. (e) This commercial offer will be available to the Customer until 31st April 2012, at which point it will be reviewed by BT and BT gives no commitment that such an offer will be made available after this date. HOST LINK CHARGES Operative Date Each 1Gb Host Link (Resilient) Ordered prior to 01.12.2009 01.04.2009 Connection (Exc. VAT) £7,990.00 Annual Rental (Exc. VAT) £24,760.00 Annual Rental Per Meter (Exc. VAT) £0.82 Each 1Gb Host Link (Resilient) Ordered after 01.12.2009 01.12.2009 £7,990.00 £23,760.00 £0.82 Each 10Gb Host Link (Resilient) 01.10.2010 £64,000.00 £78,000.00 £0.82 5.1 The Annual Rental per Meter Charge listed above relates to the radial distance of the Host Link. 5.2 Each Host Link has a Minimum Period of 12 months. If the Customer ceases a Host Link within the Minimum Period, the Customer will be liable for Host Link Charges for the remainder of the Minimum Period as set out above. 5.3 Each Host Link has a Minimum Period of 12 months. If the Customer ceases a Host Link within the Minimum Period, the Customer will be liable for Host Link Charges for the remainder of the Minimum Period as set out above. Name: Issue: Date: BT WBMC Shared Service - Schedule 4 (Pricing Schedule) Issue 18-5 1 October 2013 © British Telecommunications plc Page 6 of 8 Issue 18-4 AGREEMENT FOR THE PROVISION OF THE WHOLESALE BROADBAND MANAGED CONNECT SHARED SERVICE SCHEDULE 4: PRICING SCHEDULE 5.4 Host Link Cancellation Charges 1 Gbit/Sec Host Link (EAD) % of Connection Charge Cancellation Charges applicable from: 100 KCI 3 plus 5 Working Days% 10 Gbit/Sec Host Link (WES) % of Connection Charge Cancellation Charges applicable from: 95 75 5 PONR less 2 Working Days PONR less 10 Working Days to PONR -3 Working Days PONR less 11 Working Days or more 5.5 Termination Charges An Order for the cessation of a Host Link after the Point of No Return and before the end of any relevant Minimum Period for that Host Link will incur a termination Charge equivalent to the full connection Charge, if this has not already been paid by the Customer, and the rental for the Host Link for the remainder of the relevant Minimum Period. 6. TIME RELATED CHARGES Time Period Operative Date Monday to Saturday, 1600 to 0900 hours 01.01.2010 Per Hour Charge or part thereof £190.00 Saturday 0900 to Monday 0900 Public and Bank Holidays 01.01.2010 01.01.2010 £300.00 £300.00 7. NOTES 7.1 All Charges for WBC ADSL, WBC FTTC, WBC FTTP and IPsC End User Accesses will apply to the Service. 7.2 WBC ADSL, WBC FTTC and WBC FTTP End User Access Charges can be found at: BT Wholesale: PART 7 BT Wholesale Broadband Connect (WBC) 7.3 IPSC End User Access Charges can be found at: BT Wholesale: PART 8. BT IPstream Connect Name: Issue: Date: BT WBMC Shared Service - Schedule 4 (Pricing Schedule) Issue 18-5 1 October 2013 © British Telecommunications plc Page 7 of 8 Issue 18-4 AGREEMENT FOR THE PROVISION OF THE WHOLESALE BROADBAND MANAGED CONNECT SHARED SERVICE SCHEDULE 4: PRICING SCHEDULE 7.4 The Customer must purchase WBMC Host Links in order to take traffic from BT’s Network to the Customer’s premises. 7.5 Host Link Pricing Tool: Ethernet Pricing Tool link 7.6 Circuit Shift Charges: Circuit Shift Charges Link 7.7 Host Link Time Related Charges are detailed in the Service Products section of the Price List: Time Related Charges Link 7.8 Host Link Excess Construction Charges are detailed in the Service Products section of the Price List: Excess Construction Charges Link 7.9 Abortive Visit Charge (Openreach): Abortive Visit Charges Link 7.10 CRF Rejection Administration Fee as per BT Price List, Broadband Auxiliary Charges: Broadband Auxiliary Charges link Name: Issue: Date: BT WBMC Shared Service - Schedule 4 (Pricing Schedule) Issue 18-5 1 October 2013 © British Telecommunications plc Page 8 of 8