AI List 2015-11-12 - The CCSDS Collaborative Work

advertisement
ID
1
Action
JAXA to check the uplink ranging tones frequency for Planet-C support
2
Jaxa shall check on maximum Planet C telemetry rate and subcarrier position, to determine
whether telemetry subcarrier can be used to perform Delta-DOR
The results shown highlight that DSN/DSN and DSN/ESA baselines do not match with
DSN/Jaxa baseline
The reason for that is under investigation
NASA to verify that the request for the 2009 campaign is issued
3
4
5
NASA to check whether the current campaign (presently limited to 2009) shall be extended
to 2010 or not.
6
7
8
9
JAXA to identify suitable date(s) to join ESA for VEX tracking
ESA to provide Jaxa with VEX frequency plan
JAXA/ESA/JPL to complete the validation of the Hayabusa passes of November 2008
ESA to notify NASA on station upgrades completion and VEX validation, for wideband
DDOR October 2009
In order to get NASA/ESA support for Planet C, JAXA to request such support formally
The process is already on-going, between NASA and JAXA, for Planet C
JAXA to request support to ESA for Ikaros, in the frame of the annual JAXA/ESA meeting
(typically in January 2010) and check whether such support can be requested also for PlanetC
JAXA to formalise request for support from ESA for Hayabusa re-entry (2010) by
September 2009 in the frame of annual JAXA/ESA meeting
Each WG member to go back and check existing implementations in terms of: Digital and
analogue frequency/phase synthesis in d/l Related correlation algorithms
Future expansions and come back with proposals for the “grey” parameters  by 1st of June
Review of the above inputs  by 1st of July
Consolidated proposal for the “grey” parameters by end of September
Same process for the “yellow” parameters, but the cycle will be closed by 1st of July
As a result, by mid of October a revised Blue Book draft will be compiled
10
11
12
13
14
15
16
17
Status
Closed. See Mom 2009 Fall
meeting
Closed. See Mom 2009 Fall
meeting
Closed, the new digital system is
now in use
Closed. IA now at NASA for
signature (checked 23/09/09)
Closed. Campaign extended with
limitation on ESA side (nonavailability of stations). 15/08/09
Closed
Closed. 10/08/09
Closed
Closed
Closed
Closed
Closed
Closed. First round performed
01/06/09
Closed. 01/07/09
Closed. 23/09/09
Closed. 23/09/09
Closed, 19/10/09
18
WG to read current VLBI Data Interchange Format (VDIF) Specification (v. A.5.7), with
the scope of verifying that such spec contains, in the Data Frame Header, all parameters
needed for a DDOR observation. In case it does not, the WG will comment on which
parameters to add. This, for the purpose to ease raw data translation from the VDIF to the
Closed, three parameters
missing, see action 40. 04/05/10
19
Closed. 04/05/10
23
ESA and JAXA to draft a plan by end of October to enable cross-support for Planet-C /
IKAROS
JAXA to provide JPL and ESA power information on subcarrier even harmonics at high
mod. index
ESA to provide JPL NNO data for scan 4 and 5 on Hayabusa to check the bias issue on
JAXA data
JPL to provide ESA with DDOR passes dates foreseen for Hayabusa in March and May
2010
JAXA to send ESA the original date request to JPL for Hayabusa support in 2010
24
25
JPL to provide ESA with MRO/Odyssey DDOR schedule for 2010
JPL to provide ESA with DDOR recording configurations for MRO/Odyssey
26
ESA to check with the CCSDS Editor whether reference number for the draft Blue and
Green books can be assigned
ESA to update References of MB including Time Code Formats (CCSDS 301.0-B-3, Jan
2002)
JAXA to check which binary floating point format is used in most CPUs and update
reference in Section 5.2 of the BB
ESA To update BB and release new version
WG to check parameter list to be agreed on in the IA (Annex D of BB and Annex C of MB)
The MB version with corrections for RIDs of category ‘E’ will be distributed
Changes on ‘E’-corrected version of MB agreed
The first version of MB with corrections for all categories will be released
The MB version should be finalised and submitted to Secretariat for Editorial Review
The WG will distribute the status of each RID (and the related WG action) to the relevant
reviewer
20
21
22
27
28
29
30
31
32
33
34
35
Closed (see Action 4.1) for ESA
Closed
Closed 04/05/10
Closed. Superseeded by action
22
Closed 04/05/10
Closed 04/05/10 for MRO,
closed for Odyssey on 10/05/10
Closed 04/05/10
Closed 31/10/09
Closed 04/05/10
Closed 31/10/09
Closed 10/02/10
Closed 30/11/09
Closed 30/12/09
Closed 30/03/10
Closed 13/04/10
Closed 31/10/09
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
BB Draft 6 editing will be completed by the 31/10/09. By that date the book will be sent to
the other WG members for further revision and comments
A telecon will be held on the 20/January/2010 (TBC) to discuss the above mentioned
comments on BB
The revised WB (BB) will be then submitted for Secretariat processing
The WG agreed that an outline of the remaining sections shall be due before the next
CCSDS Spring Meeting (15/April/2010)
 Outline for chapter 2  Action: MM
 Outline for chapter 5  Action: JB
 Outline for chapter 6  Action: MM
 Outline for chapter 7  Action: MM
 Outline for chapter 8  Action: HT
JAXA to forward comments contained into JB mail of 31-March to the VDIF task force
checking whether such parameters can be embedded in the VDIF format
JPL to provide ESA with Planet-C DSN pass schedule to check whether ESA can perform
listen in tracking and with information on power of subcarrier even harmonics
ESA and JAXA to iterate possible dates, channelisation and exchange information on noncoherent carrier frequency (as per Annex A of MB) for IKAROS
JPL to provide ESA with a yearly report on quality of VEX data
JPL to provide ESA information of the new MK-V downconverter being developed at
Haystack
JPL to provide ESA MRO orbital information and meteo data to enable ESA to process
MRO data
JAXA to check ESA-provided schedule of VEX DDOR and find suitable opportunities for
joint activities on VEX
ESA to correlate JPL MRO data
ESA to send JPL VEX schedule for JPL to check whether there are opportunities to track
VEX in wideband mode
WG to ask TG to provide source file for the latest edited MB
Each Agency in the WG to identify internally the reviewers for the Red (Magenta) Book v2
and forward them the Book.
Agencies in the WG to forward the received RID to all other WG members
Closed 31/10/09
Closed. Super-seeded
Closed 10/05/10
Open (JB part closed).
Superseeded.
Closed
Closed
Closed
Closed
Closed. Report received for 2009
Closed
Closed
Closed
Closed
Closed 20/05/10
Closed 10/05/10
Closed 15/05/10
Closed
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
MM and JB to Draft two new pictures for Figure 3.1 and a picture for a Figure in Section 4
of the MB
WG to update chart and text in the document Inter-Agency DDOR Service Management:
Specific Events Draft 1.2 and send it to the SMWG
JPL to find a representative template of a Yellow Book to be used to derive the DDOR
Yellow Book
WG chair to send the latest BB version to TG for editorial review
All Agencies of the WG to complete the prototyping, testing and evaluation of BB data
format
ESA to draw a figure showing the channelisation + signal characteristics in Delta-DOR for
the Green Book (Section 3.1.3)
WG to produce a reviewed version 1.7 of GB
WG to propose a modification of 401 (2.5.6B) with a table of received power level on
DDOR tones vs. achievable accuracy to be proposed to the RF WG
JAXA to send Planet-C DSN DDOR schedule to ESA
ESA to check feasibility of shadow tracking on Planet-C
ESA and JAXA to process IKAROS data, once their S/W issues are solved
ESA to check if any solution is possible at S/W translator level concerning the LO phase
reset problem with IKAROS data acquired in wideband DDOR (since part of the spectrum is
recorded on both DC chains)
ESA to send JAXA the schedule for the VEX DDOR in November
JAXA to check feasibility of VEX tracking in 2011
ESA to send JAXA the plan for VEX DDOR in second half in 2011
ESA to process Odyssey data of DOY191 and find whether there is any clock offset issue
(as per JPL analysis)
JPL to send ESA the schedule for MRO/Odyssey/MSL Delta-DOR in 2012
JPL to check internally whether MSL has requested DDOR support to ESA and, in case this
is negative, to report that the DDOR support shall be requested asap, in order to insert such
request in ESA station scheduling plan
JAXA to translate IKAROS data in VSR and RDEF and provide them to ESA and ESA to
translate IKAROS data in VSR and RDEF and provide them to JAXA
ESA to send JAXA the schedule for the VEX DDOR in 2012 (first semester)
Closed
Closed
Closed
Closed 10/05/10
Closed
Closed by JB
Closed. See action 39
Closed 6/10/10
Closed on 25/10/10
Closed
Closed (see AI 70)
Closed
Closed
Closed
Closed
Superseded by latest findings.
Closed
Closed
Closed (negative answer from
NASA HQ)
Superseded by latest findings.
Closed
Closed
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
JAXA to check feasibility of VEX tracking in 2013 and Rosetta in 2014.
Alternatively an IKAROS pass will be organised after IKAROS de-hibernation (summer
2013)
ESA and JAXA to provide input to GB sections 5.2 and 5.3
NASA to finalise the GB and distribute to WG
WG members to send comments to GB
ESA to finalise editing the RDEF YB and distribute it to the WG
All to finish interoperability testing (RDEF translation and data exchange for validation) and
draft test results to be included in the RDEF YB
JPL and ESA to produce a first draft on the Yellow Book on Quasar Catalogue update
The WG took the action to read again the modified Red (Blue) Book and check consistency
of the document and of the related implementation
ESA to edit the Blue Book figures in order to make them consistent with a Little Endian
representation (revert byte order in Figures)
JPL to add paragraph in the GB on performance evaluation versus DOR tone power and edit
the book prior to publication, and distribute the book
All to finalise comments for latest GB version and discuss them in a telecom (if necessary)
JPL and JAXA to write chapter 5 and 6 of the yellow book addressing category 1 (and 2 for
JPL) tests
JPL/ESA/JAXA to perform data exchange for preliminary checks to verify RDEF
translation compatibility (JPL/ESA to be performed on Phoenix data, ESA/JAXA with
Hayabusa data)
All to perform the agreed category 4 tests, including data exchange
- ESA to provide JPL with full JUNO dataset, correlate data and compare results with
ESA
- JAXA to provide JPL with full IKAROS dataset, correlate data and compare results
with JAXA
All to populate chapter 7 with the results of the agreed category 4 tests
- ESA will populate the section concerning ESA/JPL tests (section 7.1)
- JPL will populate the section concerning the JPL/JAXA tests (section 7.2)
WG members to review the Yellow Book on RDEF validation and send comments
Closed (superseded by action
105)
Closed
Closed
Closed (book discussed during
2012 Spring meeting)
Closed (sent 14/03/12)
Closed. Superseded by actions
83-86
Closed for JPL. Superseded by
action 88 for ESA
Closed
Closed
Closed
Closed
15/05/2012 (JPL) - Closed
15/12/2012 (JAXA) - Closed
Closed
Closed.
Closed
Closed
88
89
90
ESA to write chapter 8 of the Yellow Book on RDEF validation and distribute for WG
comments.
After comments are processed the book will go for Editorial Review and publication
together with the Blue Book (subject to book availability after Editorial review)
ESA to complete the remaining part of the Yellow Book on Quasar catalogue update
JPL to prepare an input for RF & Mod WG to include in section 2.5.6B (trade off between
DOR Tone S/N0 and achievable accuracy). Input to be derived GB Section 4.2
91 ESA - In order to complete the RDEF validation tests (cat 4), ESA to send all JUNO
(DOY267) raw data and latest MLG coordinates to JPL
92 ESA and JPL to reschedule Ka-band quasar tests (24 hours) before the end of 2012
93 Concerning RIDs JPL-31 to JPL-34 (concerning downconversion) to the RDEF BB the
following was discussed/agreed:
 AI: WG Agencies to perform relevant analysis and assess the impact on
performance and S/W implementation
94 ESA to draft an updated recommendation for the RF&Mod WG concerning the 2.5.6B by
05/Nov/2012
95 JPL to rework Section 4.2 of GB and distribute it to WG before GB publication
96 ESA to add a subsection in section 5.2 with the description of the operational interfaces
97 ESA to investigate Ka-band DDOR on BepiColombo and possibility to do it in conjunction
with JPL/JAXA. ESA to update the WG regularly.
98 JPL/ESA/JAXA to plan an operational validation of the mixed-baseline scenario. This
would be accomplished in several steps:
1) Set-up servers at both hands for direct file transfer between JPL/ESA/JAXA
2) Organise mixed-baseline scans on Maven (plus other opportunities) to validate the
concept and the interfaces
99 JPL to send regularly to ESA/JAXA DDOR schedule for the missions that could be involved
in the operational validation of the mixed-baseline scenario: i.e. Maven JUNO, Dawn, New
Horizons and ESA/JAXA to check feasibility of shadow tracking from their antennas.
100 ESA to coordinate with FD the TDM validation with JAXA
Closed
Closed. Superseded by work replanning (MB on quasar
catalogue).
Closed
Closed
Closed
15/10/2016
Closed
Closed
Closed
On-going
On-going during
2014/2015/2016
Closed (2014/11/12)
Closed
101 ESA to provide JAXA with reliable guess on latency and data volume requirements for BC
and with expected processing time of ESA correlator and with the status and plans for the
comms infrastructure between ESA/JAXA.
ESA to check MoU and clarify whether the ESA/JAXA passes will be considered
operational.
102 All to set up a telecom to discuss ideas for a new white paper
103 JPL will send Maven DOR schedules to ESA as soon as available
104 ESA to investigate possible solutions to direct data transfer from ESA tracking stations to
JPL (in RDEF format)
105
106
107
108
ESA will provide JAXA with Rosetta and VEX DDOR schedules for 2014
JAXA to provide ESA with IKAROS schedule
JPL will verify the TDM content of JAXA
ESA to check maximum NCO sweep/rate in Open loop
109 JPL/ESA to propose a plan for the PRSR in MLG
110 DDOR WG to review the Simple Schedule book of CSSM and send comments
111 WG to review the current MB and exchange comments
112 ESA to produce:
- An outline of new chapter 5 MB
- A list of new parameters to be included in Annex A MB
113 JPL to propose an update format and content of Service Request in MB
114 ESA will review/expand the current MB Quasar catalogue and to distribute to WG and
SANA
115 JPL will review/expand (where necessary) the current GB ToC
116 ESA/JPL/JAXA to check HW implementation (fractional frequency downconversion),
check effects on correlator and report
Closed (2014/11/12)
Data volume in the order of 1015 GB, latency 24-48h
(depending on mission phases).
Closed
Closed. Maven passes
negotiated.
Closed (2014/11/12)
Baseline solution is to transfer
data to ESOC and then to JPL.
Closed.
Closed (2014/11/12)
Closed
Closed. Wideband recording is
preferred
Closed (2014/11/12).
PRSR left MLG in August and
will go back asap
Closed. Superseeded by action
118
Closed.
Closed
Closed.
Closed. Distributed in Feb 2015.
30/03/2016
On-going (in view of BB
revision), for 2016.
117 JPL to send ESA/JAXA details concerning access methods/plans to JPL data servers
118 JPL/JAXA/ESA to review the draft GB by CSSM and provide comments
119 JPL to review and provide inputs for discussion on MB on Quasar catalogue.
120 JAXA and FSA to investigate the feasibility to perform a test DDOR measurements with
HAYABUSA-2 by BearLakes/Kaliyazin stations.
121 ESA to provide a reply to FSA concerning collaboration on DDOR (in view of ExoMars
2018)
122 JAXA to distribute observation schedule for PROCYON/HAYABUSA-2 to NASA/ESA
123 JAXA to send Hayabusa-2 OEM to ESA
124 ESA to check mutual (ESA-JAXA) visibility in Jan-Apr 2015 and propose test passes to
JAXA to be included in ESA planning cycle
125 JAXA and ESA to check whether XML would be acceptable as the Service Request format
This will be also checked with SMWG
126 JPL/ESA/JAXA to review the Service Request and provide feedback
127 JPL to update section 6.2 of MB based on the feedback on the Service Request
128 JAXA to update the presentation on PROCYON test (e.g. link budget, objectives and
measurement type) and distribute it to the WG for comments
Closed (2014/11/12).
JPL/JAXA connectivity tested.
JPL/ESA baseline solution
found. To be implemented/tested
Closed. (2014/11/12).
If a candidate MB/BB is out for
review, the WG will take the
action to review it.
Closed (2014/11/12).
Draft MB will be thoroughly
discussed at the next CCSDS
(spring 2015)
Closed
Closed (2014/11/12).
To be followed in the frame of
ExoMars 2018
Closed (2014/11/12).
Schedule distributed for
Hayabusa-2. Concerning
Procyon a tentative schedule has
been distributed (covering 2015)
Closed (2014/11/12).
File distributed
Closed (2014/11/12).
3 Hayabusa-2 passes scheduled.
On-going (TBD in 2016-17)
Closed (2014/11/12).
Closed
Closed (2014/11/12).
Hayabusa-2 can be calculated
from Procyon (+5dB, TBC)
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
MB: ESA to draft sections 5.3-5.4
JAXA to send actual Hayabusa-2 link budget (S/C EIRP) for December DDOR passes
ESA to check feasibility of Procyon passes in 2015
JPL/ESA to check whether Ka-band catalogue would be available in 2016
WG to update X-band catalogue on SANA in 2015
JPL/JAXA to send ESA the Ka-band DDOR schedule for Hayabusa-2/PROCYON
JAXA to send OEM of Hayabusa-2 and Procyon to ESA/JPL
JPL to propose a draft service request for the Hayabusa-Procyon passes involving JAXA.
Request is to be iterated and distributed after finalization
JAXA to finalise distribute the Service Request for Hayabusa-Procyon accordingly
WG chair to open the new MB Project and to add a Project for the BB revision
JPL to check (and provide ESA/JAXA) latest Maven Orbital solution (in OEM) in 2014 for
DDOR data evaluation
ESA to check data servers implementation and report
JPL-JAXA to send Hayabusa-2/PROCYON DDOR schedule (with related visibility) to ESA
for proficiency passes support (X-band only)
ESA to provide the model for MLG Tsys (provide Tsys measurements not possible)
JPL to provide 107D as soon as available for inclusion in SANA registry (formatted in txt or
excel)
ESA to contact Nav WG and check status of the request to include sigmas in the observables
and propose to join Nav meeting in Fall 2015
JPL/JAXA to communicate ESA the NASA test slots for Ka-band DDOR for early planning
of a co-observation from CEB or MLG.
JPL to provide results of Maven ESA TDM processed by JPL to ESA
For InSight support JPL to check if both 2MHz and 8MHz recording per pass are feasible
For InSight support JAXA to check if it is possible to support only 2MHz recording (not
8MHz)
ESA to check and report on status of servers for data exchange
ESA to give JAXA go-ahead for resuming data transfer tests
ESA/JAXA to check upload/download Service request from SPS. JPL to check in case of
problems
JAXA to send Hayabusa DOY 2014_363 quasar data sampled at 2MHz to JPL/ESA plus
S/C data at 50kHz (if not done yet).
Closed.
Closed
Closed
30/06/2016
Closed
Closed
Closed
Closed
Closed
Closed
Closed
20/11/2015
Closed
20/11/2015
Closed
Reverted to action 156. Closed
Second half 2017.
15/12/2015
30/03/2016
30/03/2016
15/12/2015
20/11/2015
15/12/2015
15/01/2016
153
154
155
156
ESA to send JPL/JAXA meteo data for 2014_363 pass in TDM
ESA to update SANA registry with new catalog format
ESA to check internal consistency of the whole MB and send it to AD for Agency review
JPL to contact Nav WG and propose the inclusion of DDOR sigma in the next revision of
the TDM
15/01/2016
27/11/2015
27/11/2015
Closed
Download