ID 1 Action JAXA to check the uplink ranging tones frequency for Planet-C support 2 Jaxa shall check on maximum Planet C telemetry rate and subcarrier position, to determine whether telemetry subcarrier can be used to perform Delta-DOR The results shown highlight that DSN/DSN and DSN/ESA baselines do not match with DSN/Jaxa baseline The reason for that is under investigation NASA to verify that the request for the 2009 campaign is issued 3 4 5 NASA to check whether the current campaign (presently limited to 2009) shall be extended to 2010 or not. 6 7 8 9 JAXA to identify suitable date(s) to join ESA for VEX tracking ESA to provide Jaxa with VEX frequency plan JAXA/ESA/JPL to complete the validation of the Hayabusa passes of November 2008 ESA to notify NASA on station upgrades completion and VEX validation, for wideband DDOR October 2009 In order to get NASA/ESA support for Planet C, JAXA to request such support formally The process is already on-going, between NASA and JAXA, for Planet C JAXA to request support to ESA for Ikaros, in the frame of the annual JAXA/ESA meeting (typically in January 2010) and check whether such support can be requested also for PlanetC JAXA to formalise request for support from ESA for Hayabusa re-entry (2010) by September 2009 in the frame of annual JAXA/ESA meeting Each WG member to go back and check existing implementations in terms of: Digital and analogue frequency/phase synthesis in d/l Related correlation algorithms Future expansions and come back with proposals for the “grey” parameters by 1st of June Review of the above inputs by 1st of July Consolidated proposal for the “grey” parameters by end of September Same process for the “yellow” parameters, but the cycle will be closed by 1st of July As a result, by mid of October a revised Blue Book draft will be compiled 10 11 12 13 14 15 16 17 Status Closed. See Mom 2009 Fall meeting Closed. See Mom 2009 Fall meeting Closed, the new digital system is now in use Closed. IA now at NASA for signature (checked 23/09/09) Closed. Campaign extended with limitation on ESA side (nonavailability of stations). 15/08/09 Closed Closed. 10/08/09 Closed Closed Closed Closed Closed Closed. First round performed 01/06/09 Closed. 01/07/09 Closed. 23/09/09 Closed. 23/09/09 Closed, 19/10/09 18 WG to read current VLBI Data Interchange Format (VDIF) Specification (v. A.5.7), with the scope of verifying that such spec contains, in the Data Frame Header, all parameters needed for a DDOR observation. In case it does not, the WG will comment on which parameters to add. This, for the purpose to ease raw data translation from the VDIF to the Closed, three parameters missing, see action 40. 04/05/10 19 Closed. 04/05/10 23 ESA and JAXA to draft a plan by end of October to enable cross-support for Planet-C / IKAROS JAXA to provide JPL and ESA power information on subcarrier even harmonics at high mod. index ESA to provide JPL NNO data for scan 4 and 5 on Hayabusa to check the bias issue on JAXA data JPL to provide ESA with DDOR passes dates foreseen for Hayabusa in March and May 2010 JAXA to send ESA the original date request to JPL for Hayabusa support in 2010 24 25 JPL to provide ESA with MRO/Odyssey DDOR schedule for 2010 JPL to provide ESA with DDOR recording configurations for MRO/Odyssey 26 ESA to check with the CCSDS Editor whether reference number for the draft Blue and Green books can be assigned ESA to update References of MB including Time Code Formats (CCSDS 301.0-B-3, Jan 2002) JAXA to check which binary floating point format is used in most CPUs and update reference in Section 5.2 of the BB ESA To update BB and release new version WG to check parameter list to be agreed on in the IA (Annex D of BB and Annex C of MB) The MB version with corrections for RIDs of category ‘E’ will be distributed Changes on ‘E’-corrected version of MB agreed The first version of MB with corrections for all categories will be released The MB version should be finalised and submitted to Secretariat for Editorial Review The WG will distribute the status of each RID (and the related WG action) to the relevant reviewer 20 21 22 27 28 29 30 31 32 33 34 35 Closed (see Action 4.1) for ESA Closed Closed 04/05/10 Closed. Superseeded by action 22 Closed 04/05/10 Closed 04/05/10 for MRO, closed for Odyssey on 10/05/10 Closed 04/05/10 Closed 31/10/09 Closed 04/05/10 Closed 31/10/09 Closed 10/02/10 Closed 30/11/09 Closed 30/12/09 Closed 30/03/10 Closed 13/04/10 Closed 31/10/09 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 BB Draft 6 editing will be completed by the 31/10/09. By that date the book will be sent to the other WG members for further revision and comments A telecon will be held on the 20/January/2010 (TBC) to discuss the above mentioned comments on BB The revised WB (BB) will be then submitted for Secretariat processing The WG agreed that an outline of the remaining sections shall be due before the next CCSDS Spring Meeting (15/April/2010) Outline for chapter 2 Action: MM Outline for chapter 5 Action: JB Outline for chapter 6 Action: MM Outline for chapter 7 Action: MM Outline for chapter 8 Action: HT JAXA to forward comments contained into JB mail of 31-March to the VDIF task force checking whether such parameters can be embedded in the VDIF format JPL to provide ESA with Planet-C DSN pass schedule to check whether ESA can perform listen in tracking and with information on power of subcarrier even harmonics ESA and JAXA to iterate possible dates, channelisation and exchange information on noncoherent carrier frequency (as per Annex A of MB) for IKAROS JPL to provide ESA with a yearly report on quality of VEX data JPL to provide ESA information of the new MK-V downconverter being developed at Haystack JPL to provide ESA MRO orbital information and meteo data to enable ESA to process MRO data JAXA to check ESA-provided schedule of VEX DDOR and find suitable opportunities for joint activities on VEX ESA to correlate JPL MRO data ESA to send JPL VEX schedule for JPL to check whether there are opportunities to track VEX in wideband mode WG to ask TG to provide source file for the latest edited MB Each Agency in the WG to identify internally the reviewers for the Red (Magenta) Book v2 and forward them the Book. Agencies in the WG to forward the received RID to all other WG members Closed 31/10/09 Closed. Super-seeded Closed 10/05/10 Open (JB part closed). Superseeded. Closed Closed Closed Closed Closed. Report received for 2009 Closed Closed Closed Closed Closed 20/05/10 Closed 10/05/10 Closed 15/05/10 Closed 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 MM and JB to Draft two new pictures for Figure 3.1 and a picture for a Figure in Section 4 of the MB WG to update chart and text in the document Inter-Agency DDOR Service Management: Specific Events Draft 1.2 and send it to the SMWG JPL to find a representative template of a Yellow Book to be used to derive the DDOR Yellow Book WG chair to send the latest BB version to TG for editorial review All Agencies of the WG to complete the prototyping, testing and evaluation of BB data format ESA to draw a figure showing the channelisation + signal characteristics in Delta-DOR for the Green Book (Section 3.1.3) WG to produce a reviewed version 1.7 of GB WG to propose a modification of 401 (2.5.6B) with a table of received power level on DDOR tones vs. achievable accuracy to be proposed to the RF WG JAXA to send Planet-C DSN DDOR schedule to ESA ESA to check feasibility of shadow tracking on Planet-C ESA and JAXA to process IKAROS data, once their S/W issues are solved ESA to check if any solution is possible at S/W translator level concerning the LO phase reset problem with IKAROS data acquired in wideband DDOR (since part of the spectrum is recorded on both DC chains) ESA to send JAXA the schedule for the VEX DDOR in November JAXA to check feasibility of VEX tracking in 2011 ESA to send JAXA the plan for VEX DDOR in second half in 2011 ESA to process Odyssey data of DOY191 and find whether there is any clock offset issue (as per JPL analysis) JPL to send ESA the schedule for MRO/Odyssey/MSL Delta-DOR in 2012 JPL to check internally whether MSL has requested DDOR support to ESA and, in case this is negative, to report that the DDOR support shall be requested asap, in order to insert such request in ESA station scheduling plan JAXA to translate IKAROS data in VSR and RDEF and provide them to ESA and ESA to translate IKAROS data in VSR and RDEF and provide them to JAXA ESA to send JAXA the schedule for the VEX DDOR in 2012 (first semester) Closed Closed Closed Closed 10/05/10 Closed Closed by JB Closed. See action 39 Closed 6/10/10 Closed on 25/10/10 Closed Closed (see AI 70) Closed Closed Closed Closed Superseded by latest findings. Closed Closed Closed (negative answer from NASA HQ) Superseded by latest findings. Closed Closed 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 JAXA to check feasibility of VEX tracking in 2013 and Rosetta in 2014. Alternatively an IKAROS pass will be organised after IKAROS de-hibernation (summer 2013) ESA and JAXA to provide input to GB sections 5.2 and 5.3 NASA to finalise the GB and distribute to WG WG members to send comments to GB ESA to finalise editing the RDEF YB and distribute it to the WG All to finish interoperability testing (RDEF translation and data exchange for validation) and draft test results to be included in the RDEF YB JPL and ESA to produce a first draft on the Yellow Book on Quasar Catalogue update The WG took the action to read again the modified Red (Blue) Book and check consistency of the document and of the related implementation ESA to edit the Blue Book figures in order to make them consistent with a Little Endian representation (revert byte order in Figures) JPL to add paragraph in the GB on performance evaluation versus DOR tone power and edit the book prior to publication, and distribute the book All to finalise comments for latest GB version and discuss them in a telecom (if necessary) JPL and JAXA to write chapter 5 and 6 of the yellow book addressing category 1 (and 2 for JPL) tests JPL/ESA/JAXA to perform data exchange for preliminary checks to verify RDEF translation compatibility (JPL/ESA to be performed on Phoenix data, ESA/JAXA with Hayabusa data) All to perform the agreed category 4 tests, including data exchange - ESA to provide JPL with full JUNO dataset, correlate data and compare results with ESA - JAXA to provide JPL with full IKAROS dataset, correlate data and compare results with JAXA All to populate chapter 7 with the results of the agreed category 4 tests - ESA will populate the section concerning ESA/JPL tests (section 7.1) - JPL will populate the section concerning the JPL/JAXA tests (section 7.2) WG members to review the Yellow Book on RDEF validation and send comments Closed (superseded by action 105) Closed Closed Closed (book discussed during 2012 Spring meeting) Closed (sent 14/03/12) Closed. Superseded by actions 83-86 Closed for JPL. Superseded by action 88 for ESA Closed Closed Closed Closed 15/05/2012 (JPL) - Closed 15/12/2012 (JAXA) - Closed Closed Closed. Closed Closed 88 89 90 ESA to write chapter 8 of the Yellow Book on RDEF validation and distribute for WG comments. After comments are processed the book will go for Editorial Review and publication together with the Blue Book (subject to book availability after Editorial review) ESA to complete the remaining part of the Yellow Book on Quasar catalogue update JPL to prepare an input for RF & Mod WG to include in section 2.5.6B (trade off between DOR Tone S/N0 and achievable accuracy). Input to be derived GB Section 4.2 91 ESA - In order to complete the RDEF validation tests (cat 4), ESA to send all JUNO (DOY267) raw data and latest MLG coordinates to JPL 92 ESA and JPL to reschedule Ka-band quasar tests (24 hours) before the end of 2012 93 Concerning RIDs JPL-31 to JPL-34 (concerning downconversion) to the RDEF BB the following was discussed/agreed: AI: WG Agencies to perform relevant analysis and assess the impact on performance and S/W implementation 94 ESA to draft an updated recommendation for the RF&Mod WG concerning the 2.5.6B by 05/Nov/2012 95 JPL to rework Section 4.2 of GB and distribute it to WG before GB publication 96 ESA to add a subsection in section 5.2 with the description of the operational interfaces 97 ESA to investigate Ka-band DDOR on BepiColombo and possibility to do it in conjunction with JPL/JAXA. ESA to update the WG regularly. 98 JPL/ESA/JAXA to plan an operational validation of the mixed-baseline scenario. This would be accomplished in several steps: 1) Set-up servers at both hands for direct file transfer between JPL/ESA/JAXA 2) Organise mixed-baseline scans on Maven (plus other opportunities) to validate the concept and the interfaces 99 JPL to send regularly to ESA/JAXA DDOR schedule for the missions that could be involved in the operational validation of the mixed-baseline scenario: i.e. Maven JUNO, Dawn, New Horizons and ESA/JAXA to check feasibility of shadow tracking from their antennas. 100 ESA to coordinate with FD the TDM validation with JAXA Closed Closed. Superseded by work replanning (MB on quasar catalogue). Closed Closed Closed 15/10/2016 Closed Closed Closed On-going On-going during 2014/2015/2016 Closed (2014/11/12) Closed 101 ESA to provide JAXA with reliable guess on latency and data volume requirements for BC and with expected processing time of ESA correlator and with the status and plans for the comms infrastructure between ESA/JAXA. ESA to check MoU and clarify whether the ESA/JAXA passes will be considered operational. 102 All to set up a telecom to discuss ideas for a new white paper 103 JPL will send Maven DOR schedules to ESA as soon as available 104 ESA to investigate possible solutions to direct data transfer from ESA tracking stations to JPL (in RDEF format) 105 106 107 108 ESA will provide JAXA with Rosetta and VEX DDOR schedules for 2014 JAXA to provide ESA with IKAROS schedule JPL will verify the TDM content of JAXA ESA to check maximum NCO sweep/rate in Open loop 109 JPL/ESA to propose a plan for the PRSR in MLG 110 DDOR WG to review the Simple Schedule book of CSSM and send comments 111 WG to review the current MB and exchange comments 112 ESA to produce: - An outline of new chapter 5 MB - A list of new parameters to be included in Annex A MB 113 JPL to propose an update format and content of Service Request in MB 114 ESA will review/expand the current MB Quasar catalogue and to distribute to WG and SANA 115 JPL will review/expand (where necessary) the current GB ToC 116 ESA/JPL/JAXA to check HW implementation (fractional frequency downconversion), check effects on correlator and report Closed (2014/11/12) Data volume in the order of 1015 GB, latency 24-48h (depending on mission phases). Closed Closed. Maven passes negotiated. Closed (2014/11/12) Baseline solution is to transfer data to ESOC and then to JPL. Closed. Closed (2014/11/12) Closed Closed. Wideband recording is preferred Closed (2014/11/12). PRSR left MLG in August and will go back asap Closed. Superseeded by action 118 Closed. Closed Closed. Closed. Distributed in Feb 2015. 30/03/2016 On-going (in view of BB revision), for 2016. 117 JPL to send ESA/JAXA details concerning access methods/plans to JPL data servers 118 JPL/JAXA/ESA to review the draft GB by CSSM and provide comments 119 JPL to review and provide inputs for discussion on MB on Quasar catalogue. 120 JAXA and FSA to investigate the feasibility to perform a test DDOR measurements with HAYABUSA-2 by BearLakes/Kaliyazin stations. 121 ESA to provide a reply to FSA concerning collaboration on DDOR (in view of ExoMars 2018) 122 JAXA to distribute observation schedule for PROCYON/HAYABUSA-2 to NASA/ESA 123 JAXA to send Hayabusa-2 OEM to ESA 124 ESA to check mutual (ESA-JAXA) visibility in Jan-Apr 2015 and propose test passes to JAXA to be included in ESA planning cycle 125 JAXA and ESA to check whether XML would be acceptable as the Service Request format This will be also checked with SMWG 126 JPL/ESA/JAXA to review the Service Request and provide feedback 127 JPL to update section 6.2 of MB based on the feedback on the Service Request 128 JAXA to update the presentation on PROCYON test (e.g. link budget, objectives and measurement type) and distribute it to the WG for comments Closed (2014/11/12). JPL/JAXA connectivity tested. JPL/ESA baseline solution found. To be implemented/tested Closed. (2014/11/12). If a candidate MB/BB is out for review, the WG will take the action to review it. Closed (2014/11/12). Draft MB will be thoroughly discussed at the next CCSDS (spring 2015) Closed Closed (2014/11/12). To be followed in the frame of ExoMars 2018 Closed (2014/11/12). Schedule distributed for Hayabusa-2. Concerning Procyon a tentative schedule has been distributed (covering 2015) Closed (2014/11/12). File distributed Closed (2014/11/12). 3 Hayabusa-2 passes scheduled. On-going (TBD in 2016-17) Closed (2014/11/12). Closed Closed (2014/11/12). Hayabusa-2 can be calculated from Procyon (+5dB, TBC) 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 MB: ESA to draft sections 5.3-5.4 JAXA to send actual Hayabusa-2 link budget (S/C EIRP) for December DDOR passes ESA to check feasibility of Procyon passes in 2015 JPL/ESA to check whether Ka-band catalogue would be available in 2016 WG to update X-band catalogue on SANA in 2015 JPL/JAXA to send ESA the Ka-band DDOR schedule for Hayabusa-2/PROCYON JAXA to send OEM of Hayabusa-2 and Procyon to ESA/JPL JPL to propose a draft service request for the Hayabusa-Procyon passes involving JAXA. Request is to be iterated and distributed after finalization JAXA to finalise distribute the Service Request for Hayabusa-Procyon accordingly WG chair to open the new MB Project and to add a Project for the BB revision JPL to check (and provide ESA/JAXA) latest Maven Orbital solution (in OEM) in 2014 for DDOR data evaluation ESA to check data servers implementation and report JPL-JAXA to send Hayabusa-2/PROCYON DDOR schedule (with related visibility) to ESA for proficiency passes support (X-band only) ESA to provide the model for MLG Tsys (provide Tsys measurements not possible) JPL to provide 107D as soon as available for inclusion in SANA registry (formatted in txt or excel) ESA to contact Nav WG and check status of the request to include sigmas in the observables and propose to join Nav meeting in Fall 2015 JPL/JAXA to communicate ESA the NASA test slots for Ka-band DDOR for early planning of a co-observation from CEB or MLG. JPL to provide results of Maven ESA TDM processed by JPL to ESA For InSight support JPL to check if both 2MHz and 8MHz recording per pass are feasible For InSight support JAXA to check if it is possible to support only 2MHz recording (not 8MHz) ESA to check and report on status of servers for data exchange ESA to give JAXA go-ahead for resuming data transfer tests ESA/JAXA to check upload/download Service request from SPS. JPL to check in case of problems JAXA to send Hayabusa DOY 2014_363 quasar data sampled at 2MHz to JPL/ESA plus S/C data at 50kHz (if not done yet). Closed. Closed Closed 30/06/2016 Closed Closed Closed Closed Closed Closed Closed 20/11/2015 Closed 20/11/2015 Closed Reverted to action 156. Closed Second half 2017. 15/12/2015 30/03/2016 30/03/2016 15/12/2015 20/11/2015 15/12/2015 15/01/2016 153 154 155 156 ESA to send JPL/JAXA meteo data for 2014_363 pass in TDM ESA to update SANA registry with new catalog format ESA to check internal consistency of the whole MB and send it to AD for Agency review JPL to contact Nav WG and propose the inclusion of DDOR sigma in the next revision of the TDM 15/01/2016 27/11/2015 27/11/2015 Closed