Dickowita fishery harbour Details Location : Gampaha District, Wattala PS Land Area : 8.1 ha Basin Area : 11.7 ha Draft : -3.0m (Northern basin) / 4 ha : -5.0m (Southern basin) / 5ha : -6.0m (Harbour mouth) Width of the mouth : 50m Total breakwater length : 1170m Quay wall length : 240m (Northern basin) : 334m (Southern basin) Project Cost : Rs.8580.00Mn (€53Mn on Mixed credit Facility/ORET Main Objectives Maximization of fisheries sector contribution to the national economy. Increasing employment opportunities related to fisheries. Attract & encourage local and foreign investments in sector. Offer efficient service for the stakeholders. Minimize of post-harvest losses. Provide unloading and packing facilities to cater fish importing countries requirements (EU, Japan, U.S.A). Strategically located fish exporting harbour(close proximity to Airport and Colombo Port). Facilitate Negombo lagoon & Hamilton cannel located boats. As an alternative site for Mutwal fishery harbour. Main Facilities available Southern basin (for export oriented fishing vessels) Berthing for 20 – 30 Multi-day vessels at a time. 3 Offloading and packing units (350m² * 3) 2 bunkering piers, 3 finger piers. Administrative building with all the facilities. Office places for registered companies. Ice- plant (20 tons per day / storage capacity 40 tons). Waste management system. Oil spill protection equipments & fire fitting systems. Vehicle packing areas. Space for containers storage facilities. 24 hrs security. Northern basin (for local registered fishing vessels) Berthing for approx. 400 to 450 Multi-day/One-day vessels. Auction, Net mending facilities. Fuel dispensing units / storage capacity ……… 3 finger piers (45m each) Administrative building / Fuel office/ canteen. Ice- plant (20 tons per day / storage capacity 40 tons). Waste management system. Oil spill protection equipments & fire fitting systems. Vehicle packing areas. 24 hrs security. Providing safe and easy anchorage facility for 340 multi-day fishing vessels and 150 one day IBM boats. Berthing Facility Safe and easy anchorage facility for 340 multi-day fishing vessels and 150 one day IBM boats Ship sizes ( feet) Quantity 28’ to 32’ 85 34’ to 38’ 50 40’ to 45’ 150 50’ to 55’ 100 60’ to 65’ 40 75’ to 125’ 30 Total 465 Servicing Facility Boat Lifting, Cleaning & Minor repairs 100 ton Travel Lift Floating Dry Dock Mobile workshop facility from Cey – Nor Foundation ltd Boat Lifting, Cleaning & Major repairs (All the major repairs will be carried out at Cey – Nor boatyard at Mattakkuliya which is located near Dikkowita Fishery harbour to eliminate the contamination due to repairs) Slipway with Mechanically Operated Winch Defect Analysis through Paramarine Hull Repairing Engine Repairing Rudder Repairs Gel Coat Application Propeller Repairs Anchor Repairs etc. Fish Processing Facility 1020m2 Building with 3 Cold Rooms (Offloading) Internal dimensions excluding service area – 18L * 15W * 5H (m) * 3 units Design parameters doors closed per One Unit Outdoor conditions Indoor conditions Material Input Temperature 32ºC Relative Humidity 80% Temperature -5ºC Relative Humidity 90% - 95% 10,000Kg to be stored at -5ºC Doors open per One Unit Outdoor conditions Temperature 32ºC Relative Humidity 80% Indoor conditions Temperature +10ºC Relative Humidity 90% - 95% Material Input 3,000Kg fish (Tuna) at 0ºC every hour Personnel employed with cold room 20 persons