Information Technology Services <Project ID> - <Project Title> Service Planning and Support Checklist Dec 2014 Doc ID Version: Status: Author: <ID> 3.0 FINAL Candice Walker/Laura Akl Title of Report Document Control Printed versions of this document or versions stored elsewhere are subject to change without notice and should be considered ‘uncontrolled’. Please contact the Author to ensure you have the latest version. Changes to the ‘controlled’ version will not be performed without prior consent from the author and agreed approver. Upon completion of such changes, the revised document will be delivered to all persons listed below. Document Author Name Role Contact Details Comment Editor Revision History Version Date 0.1 Initial Draft Authorisation Name Role Area Signature Date (or email approval to be attached) Document Distribution Name Role Area Date Referenced Documents Doc ID Doc Title Location Status: Final Version 2.0 Information Technology Services Author Version Document: ServicePlanningandSupportChecklistv3 Author: Candice Walker Save Date: 30/6/14 Page 2 of 15 Title of Report Table of Contents 1 Introduction .......................................................................................................................................................4 1.1 2 Service Strategy................................................................................................................................................5 2.1 3 4 5 Purpose .....................................................................................................................................................4 Service Definition ......................................................................................................................................5 Service Design ..................................................................................................................................................6 3.1 Design .......................................................................................................................................................6 3.2 Legal .........................................................................................................................................................7 3.3 Governance & Risk ...................................................................................................................................7 3.4 Finance & Procurement ............................................................................................................................8 Service Transition .............................................................................................................................................9 4.1 Release .....................................................................................................................................................9 4.2 Documentation & Training – Application (Support Teams) ....................................................................10 4.3 Testing & Capacity Analysis ...................................................................................................................11 4.4 Business Transition.................................................................................................................................12 Service Operations .........................................................................................................................................12 5.1 Support Model.........................................................................................................................................13 5.2 3rd Party Products/Vendor .....................................................................................................................14 5.3 Support Acceptance ...............................................................................................................................14 Status: Final Version 2.0 Information Technology Services Document: ServicePlanningandSupportChecklistv3 Author: Candice Walker Save Date: 30/6/14 Page 3 of 15 Title of Report 1 Introduction The Service Planning and Support Checklist is used to aid the overall transition of a service whether new or enhanced into a production environment. The objective of this checklist is to ensure that all the necessary tasks to be undertaken by ITS, Support Teams and Vendors/Suppliers are planned and coordinated for a smooth implementation. 1.1 Purpose The purpose of this document is to provide guidance to staff when planning to transition or handover a new or upgrade of an application or service. The checklist items posed are there to prompt the staff thinking when defining the scope and activities of the various strategies required for implementation and support. The checklist items are not exhaustive, nor do all of them apply to all service upgrades, enhancements or introductions. This document should be started at the Planning Phase to assist with completing operational handover and the Production Support Handover Document. Status: Final Version 2.0 Information Technology Services Document: ServicePlanningandSupportChecklistv3 Author: Candice Walker Save Date: 30/6/14 Page 4 of 15 Title of Report 2 Service Strategy The following section should be used to provide guidance during the Analysis Phase of the project lifecycle. 2.1 Service Definition Required (Y/N) Service Definition Comment (include any links to existing documents and artifacts) 1. Complete and validate Service classification matrix with Service Owner 2. Define and document Architectural design requirements 3. Define platform/service monitoring requirements 4. Define operational, platform and KPI reporting needs Identify the proposed patterns of business activity (to assist in determining 5. capacity requirements) 6. Identify who manages the website presence and its content (if required). Define and agree on the (during business and after hour) Support Model, 7. include external support needs Status: Final Version 2.0 Information Technology Services Document: ServicePlanningandSupportChecklistv3 Author: Candice Walker Save Date: 30/6/14 Page 5 of 15 Title of Report 3 Service Design The following sections should be used to provide guidance during the Design and Build phases of the project lifecycle. 3.1 Design Required (Y/N) Design 1. Complete Technical Design Document 2. Define and agree on Service/maintenance windows 3. Confirm and agree on Backup and recovery arrangements 4. Identify any Service level targets outside of standard ITS SLTs 5. Define future direction and scalability of this service/application (eg: roadmap) for the life of the service Comment Define problem, service and incident types, groups and CTIs to go into Service Management Tool 7. Define infrastructure requirements Define any support/supplier access requirements to the test, development and 8. production environments 9. Define who will provide passwords, user ids access Define how the production platform will be accessed eg: via remote dialup, 10. dedicated link Identify the data classification of information/data being used, transferred and 11. stored 12. Define any specific development tools 6. Status: Final Version 2.0 Information Technology Services Document: ServicePlanningandSupportChecklistv3 Author: Candice Walker Save Date: 30/6/14 Page 6 of 15 Title of Report 3.2 Legal Legal 1 Verify all external contracts with the RMIT Legal department 2 Verify all contracts are available to the legal department Verify all key dates for contract reviews have been communicated to the legal department 3 3.3 Required (Y/N) Comment Required (Y/N) Comment Governance & Risk Governance & Risk 1 Update version of the University policy and/or procedure impacted by this new or enhanced service 2 Add ongoing operational risks to Risk Wizard/Daptiv Status: Final Version 2.0 Information Technology Services Document: ServicePlanningandSupportChecklistv3 Author: Candice Walker Save Date: 30/6/14 Page 7 of 15 Title of Report 3.4 Finance & Procurement Required (Y/N) Finance & Procurement 1 All invoices have been verified and approved against project budget. 2 Overall project financial status is available, highlighting all financial transactions for the project (including references to budget positions). 3 Cost of service identified for life of service, including licenses 4 All contracts and obligations that can result in financial transactions or have financial impact (eg. warranty periods) are transferred to the Service/Application Owner. 5 Procurement has been engaged to ensure that all licenses and purchases follow standard procurement processes Status: Final Version 2.0 Information Technology Services Comment Document: ServicePlanningandSupportChecklistv3 Author: Candice Walker Save Date: 30/6/14 Page 8 of 15 Title of Report 4 Service Transition The following sections should be used to provide guidance during the Testing and Implementation Phases of the project lifecycle. 4.1 Release Required (Y/N) Release 1. Identify ongoing training costs in budget 2. Identify and pay Support/Maintenance (duration dependant). 3. Identify and raise changes and releases into the production environment 4. Identify and communicate testing defect issues and workarounds to SMEs and Customers/Users 5. Finalise desktop design and rollout timeframe for the new build (ensure it is approved and communicated) 6. Organise desktops are ready for release 7. Organise MOE 8. Ensure all systems have been patched to a minimum of N-1 release before golive. If systems cannot be patched to N-1 release exemption must be sought. 9. Ensure staffing support model in place or advised Comment Ensure internal authorisation for Security Test Scripts (virus protection, 10. authentication, firewalls) has been sought. Plan a migration meeting with sign-off from the following people: ● Project Manager ● Service Management Reviewer - this person chairs the meeting / review 11. ● Project Owner ● Solution Architect ● Release / Deployment Manager Status: Final Version 2.0 Information Technology Services Document: ServicePlanningandSupportChecklistv3 Author: Candice Walker Save Date: 30/6/14 Page 9 of 15 Title of Report ● ● 4.2 Test Manager Service Owner (who will be accepting the handover of the technology) Documentation & Training – Application (Support Teams) Documentation & Training – Application (Support Teams) 1. Organise training of Support Teams (Functional and Technical) 2. Provide instructions to Support Teams on support requirements and procedures 3. Document technical design for Applications Architect for ongoing maintenance 4. Ensure Database Management team attends training for application specific database configuration 5. Update application/service in Service Management Tool 6. Complete Applications Manual as per Project Management methodology (ensure accessibility by Support teams) 7, Changes to support processes and procedures are implemented and communicated 8. Training sessions are scheduled to match ongoing requirements 9. Develop High level marketing material 10. Develop Quick reference guide 11. Develop Knowledge articles 12. Document FAQ for support teams 13. Document FAQ for customers Status: Final Version 2.0 Information Technology Services Required (Y/N) Comment Document: ServicePlanningandSupportChecklistv3 Author: Candice Walker Save Date: 30/6/14 Page 10 of 15 Title of Report 14. Develop User manuals 15. Develop raining artefacts for internal ITS Staff 16. Develop training artefacts for customers 17. Handover the Support Contract from project to Service Owner to be executed 4.3 Testing & Capacity Analysis Required (Y/N) Testing & Capacity Analysis 1 Test scripts are received for handover from external organisation 2 Test Manager authorises the Test Plan/Scripts 3 Complete operational testing handover with Testing team, identifying critical scripts or key issues that require ongoing testing/monitoring 4 The relevant SOE testing documents are approved 5 UAT specifics are approved, scheduled and executed 6 Platform/service monitoring is configured, implemented and tested 7 System undergoes vulnerability scanning (vulnerabilities must be remediated or risk assessment accepted) 8 Data protection tests are completed 9 Agreed platform configuration management system are configured and tested (eg: SCCM, Puppet) 10 Complete performance testing 11 Complete functional testing Status: Final Version 2.0 Information Technology Services Comment Document: ServicePlanningandSupportChecklistv3 Author: Candice Walker Save Date: 30/6/14 Page 11 of 15 Title of Report 12 Test backup and restores 13 Complete Load testing 14 Complete User acceptance testing 15 Complete performance & volume testing 16 Complete network capacity analysis 17 Complete penetration testing 4.4 Business Transition Required (Y/N) Business Transition 1. The new/changed support processes are documented and communicated to the business 2. Business improvement metrics are run to capture any process SLA modifications 3. The training plan is developed, approved (including ongoing training/user guides) and executed with the business 4. The communications plan is updated to reflect potential issues with acceptance of business changes after project go-live Comment 5 Service Operations Status: Final Version 2.0 Information Technology Services Document: ServicePlanningandSupportChecklistv3 Author: Candice Walker Save Date: 30/6/14 Page 12 of 15 Title of Report The following section should be used to provide guidance during the Implementation Phase of the project lifecycle as part of Support Handover activities. 5.1 Support Model Required (Y/N) Support Model 1. Comment Support Model are resourced (During and after hours), Includes external support needs Implementation support needs are identified The following needs to be taken into account when planning an implementation: ● 3. Support Teams and specific people in those teams identified and added as stakeholders ● Support Teams include (but not limited to) = Service Support Centre + Desktop Support (CC), SLC Functional Support, Applications Team, Web, SAP Functional + Basis, Database Management, DLS (AD) and Service Management + Telecommunications + Data Centre + Security (ID) ● Access to systems and infrastructure arranged for those involved with implementation ● Other support resources identified Any interim support requirements to be provided by a development group (internal/external) are defined 4. Ongoing operational staffing costs and staffing overheads are added to operational budgets 5. The need for support team/s to interface with other teams or groups within the organisation are defined 6. Tools required for support are defined 7. Source Code stored using CVS are provided 8. Application Manual created or updated 2. Status: Final Version 2.0 Information Technology Services Document: ServicePlanningandSupportChecklistv3 Author: Candice Walker Save Date: 30/6/14 Page 13 of 15 Title of Report 9. 5.2 Subject Matter Expert List has been reviewed. 3rd Party Products/Vendor Required (Y/N) 3rd Party Products/Vendor 1. Define Role of 3rd party vendors (if appropriate) 2. Define 3rd party warranty arrangements 3. Establish Sub-contractor agreements with the 3rd party vendor (if required) 4. Create/Update Maintenance Agreements with 3rd Party Vendors 5. Create/Update Vendor Service Level Agreements 6. Setup Vendor certification of new/updated application configuration 5.3 Support Acceptance Required (Y/N) Support Acceptance 1. 2. 3. 4. Comment Comment Complete IT Service Desk – First-level service support handover document Complete Production Support handover document Complete and provide any further support documentation identified in the Document Delivery Matrix Provide environment structure and migration path to relevant Application Support Team Leader Status: Final Version 2.0 Information Technology Services Document: ServicePlanningandSupportChecklistv3 Author: Candice Walker Save Date: 30/6/14 Page 14 of 15 Title of Report 5. Provide agreed support documentation and source code 6. Relevant support personnel are trained, including 1st, 2nd and 3rd level support 7. Users are educated in using the service 8. Ensure tools to support service are implemented Coordinate Support Teams so they are in place and ready to provide support for Warranty (transition) period 10. Ensure Support Teams are in place and ready to provide ongoing support 11. Ensure operational processes are defined, developed, signed off and socialised 9. 5.4 Document Delivery Matrix The following section provides a table that allows you to populate additional documentation requirements that agreed upon in consultation with Support Teams throughout the Document Name Complete IT Service Desk – First-level service 1. support handover document Complete Production Support handover 2. document Technical Design Document 3. Support Team Requesting Service Support Centre All Support Teams Infrastructure Delivery Status: Final Version 2.0 Information Technology Services Template Location Start engagement To be completed Planning Phase Pre Implementation Planning Phase Pre Implementation Planning Phase Pre Implementation Document: ServicePlanningandSupportChecklistv3 Author: Candice Walker Save Date: 30/6/14 Page 15 of 15