Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – April 2014 INDEX S. No DESCRIPTION 1 INDEX MAP 2 EXECUTIVE SUMMARY 3 PROJECT BACKGROUND 4 CONTRACT DATA 5 SALIENT FEATURES OF THE PROJECT SUBMISSION OF RELEVANT MANUAL & DOCUMENTS BY 6 CONCESSIONAIRE P.No . 2 3-5 6 7-8 9 10 7 STATUS OF PERMITS 11 8 TECHNICAL MAN POWER- INDEPENDENT ENGINEER 12 9 TECHNICAL MAN POWER- CONCESSIONAIRE 13 10 TECHNICAL MAN POWER- SUB CONTRACTOR 14-16 11 PRE CONSTRUCTION ACTIVITIES 12 DETAILS OF CORRESPONDENCE FROM IE 13 STATUS OF PLANT & MACHINERY 21 14 STATUS OF DRAWING (Structures/Highways) 22 15 CONSTRUCTION PROGRAMME BY THE CONCESSIONAIRE, 23 17-18 19-20 S-CURVE 16 17 18 19 PROJECT WORK PROGRESS 24-25 DETAILS STATUS OF STRUCTURE 26-35 E EMERGENCY SERVICE 36 37-38 20 QUALITY ASSURANCE & QUALITY CONTROL SAFETY AND TRAFFIC MANEGEMENT 21 WEATHER REPORT 40 22 PHOTOGRAPHS 41 39 Page | 1 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – April 2014 Page | 2 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – April 2014 EXECUTIVE SUMMARY BACKGROUND: Ministry of Road Transport and Highways (MORT&H) has embarked on a staged up gradation programme of various National Highway. The widening is necessary to develop National Highway corridors where traffic intensity has increased significantly and there is requirement of augmentation of capacity for safe and efficient movement of traffic. MORT&H has authorized National Highway Authority of India (NHAI) to implement the development projects for six laning of Barwa Adda to Panagarh section of National Highway No.2 in the state Jharkhand and West Bengal by way of Public-Private Partnership (PPP) mode. The project corridor on NH-2, a part of Golden Quadrilateral is passing through plains of Gangetic region of landlocked states of Bihar & Jharkhand and connects the National Capital with Kolkata traversing almost 1465 km, passing through the states of west Bengal, Bihar, Jharkhand, Uttar Pradesh, Haryana & Delhi. Apart from cutting across several other NFs it traverses through major towns of Durgapur-Asansol, Dhanbad, Aurangabad, Varanasi, Allahabad, Kanpur, Agra, Faridabad, thereby catering to traffic with East West spectrum within the country. The project road of NH-2 starts from Barwa-Adda in Dhanbad district in the State of Jharkhand Km 398.240 and ends at Panagarh in Bardhaman district of West Bengal km 521.120. Total length of stretch is 122.88 km passes through Barwaadda, Ponrki, Bhitiya, Kaladih, Amarpur, Govindpur Bajar,Fakirdih,Phufwadih, Gopalganj, Nirsa, Belchahri in the district of Dhanbad in Jharkhand State and Salanpur, Niyamatpur, Asansol, Bogra Chatti, Palas danga, Raniganj More, Mangalpur, Andal More, Kada Road, Durgapur, Muchipara, Rajbandh Chati, Panagarh in the district of Bardhman in West Bengal. NHAI have awarded the task of Feasibility and Detailed engineering for improvement of this section of NH-2 to M/s ICT, India. NHAI has awarded the work of “Design, Build, Finance, Operate and Transfer of Km. 398.240 to Km.521.120 including a bypass of length 8.120 Km. and service road of length 149.310 at selected locations to M/s Barwa Adda Expressway Ltd. ( Mumbai). NHAI has awarded the Independent Consultancy for the project to M/s SA Infrastructure Consultants Pvt. Ltd. in association with Sugam Technocarts Pvt.Ltd. Page | 3 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – April 2014 Project Milestones Mile Scheduled Time Current Period Status 27th September 2014 ( 180th day from Appointed Date) One month Construction of all bridges shall have commenced. (Expended not less than 25% of the total capital cost set forth in Financial Package) 31st March 2015 (365th day from Appointed Date) - Construction of all Project Facilities shall have commenced. (Expended not less than 75% of the total capital cost set forth in Financial Package) 30th March 2016 (730th day from Appointed Date) - Description stone 1 2 3 4 Construction of Project Highway shall have commenced. (Expended not less than 10% of the total capital cost set forth in Financial Package) The scheduled six Laning Date 26th September 2016 (910th day from Appointed Date) completed - Page | 4 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – April 2014 CONDITION PRECEDENT S. N. Compliance Responsible Authority Execution date Current Status ROW Handing Over NHAI 28.03.2014 NHAI has handed over EROW of 535.74 Hac. 1 72.24 % 2 Permission of Environment Protection & Conservation of Site NHAI 3 Escrow Agreement BDU Nov 01, 2013 Executed 4 Substitution Agreement BDU Nov 01, 2013 Executed 5 Performance Security to Client Received. BDU 6 Delivery of Financial Model to Client BDU 7 Delivery of Warranties from All Consortium Member to client BDU 8 Delivery to the client a legal opinion from the legal counsel of the Concessionaire 10 11 State Support Agreement Approval from Railway Authorities in form of GAD for construction of ROB Submitted Nov 01, 2013 Executed Apr 23, 2013 Executed Apr 30, 2013 Executed 20.02.2014 NHAI M/s S.A. Infrastructure Consultants Pvt Ltd in association with Sugam Technocrats Pvt. Ltd. NHAI Available for both the States. NHAI GADs for both the ROB’s have been approved. BDU Appointment of Independent Engineer 9 Oct 24, 2013 Page | 5 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – April 2014 PROJECT DETAILS: The Project Road is 122.88 KM Long consisting of 1-Bypass of Length 8.120 Km for Congested Area at Panagarh including structures as under:- A. HIGHWAYS:- (a) Total Length of Existing Carriage Way = 121.990 Km. (b) Total No. of lane = 2*3 lane (c) Total length of Service Road =149.310km (d) Width of Service Road =7m (c) Bypass Details:. Panagarh Bypass = 8.120km B. STRUCTURES:- (a) Major Bridges = 3Nos. (b) Minor Bridges = 21Nos. (11 New & 10 Widening) (c) Grade Separator = 12Nos. (d) ROBs = 2 Nos. (e) VUPs and PUPs = 20/11 Nos. (f) Box Culverts /Hume Pipe/Slab Culverts = (g) Over Pass/ Under Pass 2/2 Nos. = 203 Nos. Page | 6 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – April 2014 CONTRACT DATA CONCESSIONAIRE: Name of Project : Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Employer : National Highways Authority of India Concessionaire : Barwa Adda Expressway Limited, Plot No. C-22, G Block, Bandra Kurla Complex, Mumbai-400051 Project Developer : IL&FS Limited Construction Contractor : M/s Apco Infratech Pvt. Ltd. & Transportation Networks M/s Oriental Structural Engineers Pvt.Ltd. Date of Agreement : May 08, 2013 Development Period : From 8/05/2013 to 31/03/2014 Appointed Date : 01/04/2014 Project Cost/ Premium : Rs. 1665 Crore Premium of Rs. 42 Crore on appointed date and shall be increased by 5 % as compared to the immediately preceding year. Construction Period : 910 days. Scheduled Date of Project Completion : 26/09/2016 Concession Period : 20 Years Including 30 months of Construction Period. Performance Security : Rs. 107.19 Crore Page | 7 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – April 2014 INDEPENDENT CONSULTANT/ENGINEER: Engineer (Consultants) : M/s SA Infrastructure Consultants Pvt. Ltd in Association with Sugam Technocrats Pvt.Ltd. Head Office Address : C/o S.A. Infra Structure Consultants Pvt. Ltd.101102, CS-1 Gyandkhand-II, Indrapuram, Ghaziadad – (UP) 201014. Ph.No.: 0120-2607756, Email-info@sainfra.com Office Address : Plot No.16/14, Bengal Ambuja, City Center, Durgapur, Dist:- Burdwan (W B), Pin-713216 Email-tl_panagarh@sainfra.com Date of Agreement : 20.01.2014 Commencement date : 20.02.2014 Contract Period : 36 months Scope of Consultancy : Independent Engineer Page | 8 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – April 2014 SALIENT FEATURES OF THE PROJECT :THE PROJECT ROAD The Project road comprises off from 398.240 to Km.521.120 Km of existing road of NH-2. The Salient Features of the project are as under:S.No. Description Quantity 1 Length of Project 122.88 KM 2 (a) By Pass – Total Length – 8.120 Km (b) Existing Carriageway Length – 121.990 Km. 3 Width of carriageway 2*12.25=24.50M 4 Service Road 149.310 Km. 5 Width of service road 7M 6 ROB’s 2 Nos at Km 443+710 & Km 520+373 7 Grade Separator 12 Nos. at km.398+811,407+538,408+326,456+312,464+185,475+670, 476+050,496+609,501+996,504+287,506+200,515+983 8 Major Bridges - (3 No’s) MJB 3 Nos. at Km.464+674,517+095,518+829 Minor Bridges – (20 No’s) MNB 11 Nos. at Km. 405+330,409+876,415+120,429+973,437+047,450+140,4 61+652,464+903,468+620,497+840,509+953, Widening 9 Nos. at Km. 445+596,462+895,463+091,463+710,471+006,485+002,4 92+871,495+735,507+503 9 VUP 20 Nos. at Km. 403+440,411+374,413+886,421+400,428+208,433+563,447+7 71,451+153,460+036,467+115,469,750,473+340,479+109,486 +427,489+702,491+451,494+430,509+559,518+221,519+349 PUP 11 Nos. at Km. 398+495,399+230,407+400,409+088,417+953,424+400,476+4 30,504+555,510+700,512+920,514+900 10 Vehicular Under Passes 11 Pedestrian Underpasses 12 Box /HP/Slab Culverts 13 BUS Lay Byes 14 Truck Lay Byes 15 Toll Plaza 2 Nos. at Km. 438+500,507+000. 16 Truck Parking Places 2 Nos. at Km. 398+250 to Km 398+750 & Km 441+800 to Km 442+300. 203 Nos. LHS 20 Nos. RHS 20 Nos. LHS 10 Nos. RHS 04 Nos. Page | 9 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – April 2014 Submission of Relevant Manual & Documents by Concessionaire:- SI. No Description Remarks 1 QAP Received 2 Work Methodology Received 3 Work Schedule Received 4 EMP Not received 5 R & R Plan Not received 6 Material Report of Borrow areas Not received 7 Quarry location Not received 8 Safety Manual Not received Page | 10 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – April 2014 Status of Permits:SI . No 1 Descriptions Applied Date Permits for extraction of boulder from quarry from Additional District Magistrate (ADM) Mines 15.06.2012 2 Permit for installation of crusher from village Panchayat and State/Central Pollution Control Board 25.11.2013 3 License for explosives from the office of Explosive controller 09.02.2013 4 5 6 7 NOC consent/Clearance required from village panchayat & State/Central Pollution Control Board/Dept. Vill Panchayat - 25.11.13 West Bengal Pollution Control Board - 20.12.13 Clearance required from village panchayat & State/Central Pollution Control Board Vill Panchayat - 25.11.13 West Bengal Pollution Control Board - 20.12.13 Permission required from village panchayat and ADM mines for Government & private land Vill Panchayat - 25.11.13 Permission from Forest Department and other applicable agencies Dhanbad (Jh) - 08.11.11 Burdwan (WB) - 23.09.13, 25.09.13, 30.09.13,30.09.13, 03.10.13 Page | 11 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – April 2014 List of Technical Man Power of I.E.:Technical Manpower- Independent Engineer Sl. No. 1. Name Designation Manoj Kumar Jaiswal (Dhanbad) Resident Engineer Date of Joining 19.02.2014 2. Saroj Kumar Singh (Durgapur) Resident Engineer 20.03.2014 3. Vijay Kumar Singh S.Q.M.E. 19.02.2014 4. Raj Kishore Rai Bridge Engineer 19.02.2014 5. Nityanand Kumar (Durgapur) Highway Design Engineer 19.02.2014 6. A N Dhodapaka (HQ) Sr. Bridge Engineer 06.03.2014 Page | 12 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – April 2014 List of Tech. Man Power of Concessionaire:Sl. No. Name Designation Remarks Concessionaire – Durgapur (Km. 398.240 to Km. 521.120) 1. Mr. V.P.KATTI PROJECT DIRECTOR 2. Mr. Anil Kumar Mishra Sr. Planning Engineer 3. Mr. Vimlesh Kumar Sr. Quantity Surveyor 4. Mr. Piyush Jain Assistant Planning 5. Mr. Kaushal Mehta Finance and Accounts 6. Mr. Abdesh Jha Administration 7. Mr. I. Nagaraju Q.A./Q.C. Head 8. Mr. Bipad Bhaanjan Ghosh Sr. Surveyor/CAD 9. Mr. Vikram Dutta L.A. Officer 10. Mr. S.P.Singh Utility Shifting (Electrical) 11. Mr. U C Srivastav Sr. Manager – O & M Tolling 12. Mr. Praveen Jindal Manager - Tolling Concessionaire – I Dhanbad (Km. 398.240 to Km. 441.565) 13. Mr. Sanjiban Dutta Section In-Charge 14. Mr. Naresh Chandra Sao Assistant Bridge Engineer 15. Mr. Umesh Sharma Assistant Material Engineer 16. Mr. Rajkumar Ghosh Lab Technician Concessionaire – II Asansol (Km. 398.465 to Km. 471.150) 17. Mr. Malay Dutta Section In-Charge 18. Mr. Pramod Kumar Pandey Assistant Highway Engineer 19. Mr. Himanshu Bushan Panda Bridge Engineer 20. Mr. Suresh R Assistant Bridge Engineer 21. Mr. Pravin Kumar Sharma Assistant Material Engineer 22. Mr. Somnath Chatterjee Lab Technician Concessionaire – III Durgapur (Km. 471.150 to Km. 521.120) 23. 24. 25. 26. Mr. Zulfequar Ahmed Mr. Rajesh Kumar Mr. Aman Sachdeva Mr. Jyoti Prakash Bridge Engineer Assistant Highway Engineer Assistant Bridge Engineer Lab Technician Page | 13 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – April 2014 List of Tech. Man Power of the Sub-Contractor :(APCO Infratech Limited) – Section I Sl. No. Name Sr. Project Manager Designation 1. Highway Mr. Satpal Singh Sr. General Manager 2. 3. 4. 5. Structure Mr. Umesh Chand Singh Mr. Sanjiv Kumar Mr. Kapil Kumar Mr. Bhanu Prakash Gupta AGM Sr. Material Jr. Engineer GET 6. Mr. B. Ramaseshaiah 7. Mr. Jai Prakesh Tiwari 8. Mr. Abhishek Pratap Singh Planning & Billing Dy. Project Manager Sr. Project Engineer DET 9. Mr. Krishan Chand Quality Control Engineers Document Controller 10. 11. Surveyor Jr. Engineer GET Mr. Natabar Patra Mr. Praveen Kumar Singh 12. Mr. Praveen K Srivastav 13. Mr. Sarya Pratap Kunwar 14. Mr. Uttam Kumar Verma 15. Mr. Ashish Kumar Mishra Mechanical Engineer Sr. Supervisor Sr. Supervisor Sr. Supervisor Asst. Supervisor 16. Mr. Mohd. Rashid 17. Mt. Umesh Biht 18. Mr. Rajat Singh Civil Supervisor Sr. Engineer Plant Mechanical Engineer GET 19. 20. 21. 22. 23. 24. 25. Mr. Bineshwar Singh Mr.Amit Mani Tripathi Mr. Dharmendra Singh Mr. Ranjeet Singh Mr. Shahrukh Khan Mr. Arun Kumar Upadhyay Mr. Digvijay Singh Remarks Supervisor Site Supervisor Civil Supervisor Highway Supervisor Supervisor Civil Supervisor Civil Supervisor (APCO Infratech Limited) – Section II Sl. No. Name Sr. Project Manager Designation 1. Highway Sr. Project Manager Mr. Sanjay Kumar Singh Remarks Page | 14 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – April 2014 2. Mr. R.P.Chowdhury 3. Mr. Sharad Kumar Mishra 4. Mr. Mukesh Kumar Singh Structure 5. Mr. Jagadish Srivastava 6. Mr. Arun Kumr 7. Mr. Yogesh Chandra 8. Mr. Rajendra Kumar Planning & Billing 9. Mr. Prasenjit Chakrabortty Quality Control Engineers 10. Mr. Suman Sanyal 11. Mr. Chandan Singh 12. Mr. Md. Shakil 13. Mr. Raj Kamal Tiwari Surveyor 14. Mr. Ashutosh Kumar Sing 15. Mr. Santosh Kumar Tripathi 16. Mr. Atul Kumar 17. Mr. Sandip Mishra Mechanical & Mining Engineer 18. Mr. Gautam Kumar Paul 19. Mr. P Bhaskar Reddy 20. Mr. Sayed Patauddin 21. Mr. Sk. Anisur Rehman 22. Mr. Sashi Kumar Gupta 23. Mr. Atul Singh 24. Mr. Jitendra Kumar Manager Dy. Manager Engineer Manager Asst. Engineer Jr. Engineer Asst. Engineer Engineer Manager Jr. Engineer Sr. Lab Technician Lab Technician Sr. Surveyor Sr. Surveyor Asst. Survyor Asst. Surveyor Asst. Manager Engineer Sr. Engineer Asst. Engineer Data Entry Operator Supervisor Manager- Mining (Oriental Structural Engineers Pvt. Ltd.) – Section III Sl. No. Name Chief Project Manager 1. Mr. V. K. Chauhan Highway 2. Mr. N. K. Singh 3. Mr. Arjit Mittal 4. Mr. S. S Negi 5. Mr. Chandra Mani Kishore 6. Mr. Avimanyu Pal 7. Mr. Suresh Kushwah 8. Mr. U. K. Jha 9. Mr. K. K. Jha 10. Mr. Manoj Kumar 11. Mr. Vinod Kumar Sharma 12. Mr. Sanjay Kumar Bhrti 13. Mr. Jitendra Kumar Yadav 14. Mr. Shivajo Suryanvanshi Structure 15. Mr. Rajeev Naryal 16. Mr. Ramavatar Sharma 17. Mr. Ashok Kumar Singh 18. Mr. Chandan Rikhi 19. Mr. Pawan Kumar 20. Mr. Rajeev Kumar 21. Mr. Ugrasen Singh Designation Remarks Chief Project Manager Sr. Project Manager Sr. Manager Dy. Manager Dy. Engineer Dy. Manager Asst. Manager Jr. Officer Sr. Supervisor Supervisor Supervisor Sr. Supervisor Supervisor Sr. Supervisor Sr. Project Manager Dy. Project Manager Dy. Project Manager Engineer Engineer Foreman Asst. Manager Page | 15 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – April 2014 22. Mr. Durga Prasad Gautam 23. Mr. Amit Kumar Singh 24. Mr. Ramjee Singh Planning & Billing 25. Mr. Sumanta Chakraborty 26. Mr. Faishal Rizwan Siddqui 27. Mr. Brijesh Kumar Mishra Quality Control Engineers 28. Mr. Mukesh Kumar Singh 29. Mr. Ravish Kumar 30. Mr. Abhisit Singh Bhaduriya 31. Mr. Sunil Kumar Jha 31. Mr. Jay Prakash 33. Mr.Rajendra Prasad Singh Surveyor 34. Mr. Janmejay Rai 35. Mr. Vijay Kumar 36. Mr. Santosh Kumar Pradhan 37. Mr. Hardev Singh 38. Mr. Ravindra Tiwari 39. Mr. Bishwanath Mondal 40. Mr. Ashok Kumar Singh 41. Mr. Nandu Kumar 42. Mr. Kishore Kumar Mechanical & Mining Engineer 43. Mr. B.B. Singh 44. Mr. J. S. Virdhi Officer Asst. Officer Sr. Supervisor Jt. GM Sr. CAD Engineer Officer Asst. Engineer GET GET Lab Technician Lab Technician Lab Assistant Engineer Sr. Surveyor Surveyor Surveyor Surveyor Surveyor Asst. Surveyor Survey Helper Survey Helper Project Manager (P&M) Project Manager (Crusher) Page | 16 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – April 2014 PRE CONSTRUCTION ACTIVITIES:SUB HEAD STATUS OF LAND ACQUISITIONS:Description Jharkhand West Bengal Length 43.320km 79.560km 122.880 km Total land required 266.920 Ha 473.360 Ha 740.280 Ha Handed over 201.200 Ha 65.72 Ha 333.550 Ha 534.750 Ha 139.81 Ha 205.530 Ha To be handed over Total Remarks STATUS OF UTILITIES SHIFTING:S. N. Activity Unit 1 Tree Cutting Nos. 2 Electric Poles Nos 3 Electric Towers Nos 4 Water Pipe lines RM 5 Gas Pipe Lines (GEECL) RM 6 Petroleum Pipe line RM Balance Total Attended till this month 26018 2944 23074 7194 nil 7194 12 nil 12 82379 nil 82379 52100 nil 52100 837 nil 837 Remarks 88.7% balance Page | 17 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – April 2014 STATUS OF ENCUMBRANCES:SI. N. Descriptions Side Units (affected length) Total Attended Balance Remarks till this month 1. Pucca LHS M 971 Nil 971 RHS M 944 Nil 944 pucca LHS M 991 Nil 991 RHS M 1033 Nil 1033 LHS M 409 Nil 409 RHS M 381 Nil 381 LHS M 41 Nil 41 RHS M 43 Nil 43 Buildings 2. Semi Buildings 3. Kachha Buildings 4. Religious Structures Page | 18 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – April 2014 DETAILS OF CORRESPONDENCE FROM IE’s OFFICEDURGAPUR (APRIL , 2014) Correspondence with PD, NHAI PIU-Durgapur: Sl. No. Ref.No. Date Subject 1. SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/3708 03.04.2014 Submission of CV's of AHE 2 & AME 2 2. SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/45 10.04.2014 Submission of Insurance paper 3. SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/46 11.04.2014 Parliamentary election 2014 enforcement of model code of conduct 4. SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/47 12.04.2014 Submission of rent agreement and vehicle agreement 5. SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/69 25.04.2014 Election utility shifting estimates of DPSC/India power limited 6. SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/71 25.04.2014 Submission of weekly traffic census (05.04.2014-11.04.2014) 7. SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/72 25.04.2014 Submission of weekly traffic census (12.04.2014-20.04.2014) 8. SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/74 25.04.2014 Joining report 9. SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/77 25.04.2014 Zebra Crossing / Stop line marking in different places in Durgapur on NH-2. 10. SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/78 25.04.2014 Installation / Maintenance of Traffic Signals at 4 location on NH-2 under Durgapur SubDivision 11. SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/79 26.04.2014 Request to personally intervene to find out a probable solution reg. 12. SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/3759 25.04.2014 Submission of CV of Sub professional staff Mr. Tanu Behera. Page | 19 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – April 2014 Correspondence with Concessionaire: Sl. No. Ref.No. Date 1. SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/33 04.04.2014 Use of bottom ash and pond ash for NH work 2. SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/39 10.04.2014 Prevention of unauthorized median cut in NHAI 3. SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/40 10.04.2014 Realignment from 508.350 to 510.350 4. SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/41 10.04.2014 Allotment SAICPL 5. SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/42 10.04.2014 Repair of NH-2 from Air force station cut out to Paragarh ROB 6. SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/43 10.04.2014 Source approval for processment of NP4 RCC Hume pipe 7. SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/44 10.04.2014 Utility shifting of 1 mm dia water pipe line of Jharkhand DW&SD 8. SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/48 12.04.2014 Road maintenance, safety and traffic regulation 9. SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/49 12.04.2014 Source approval for processment of NP4 RCC Hume pipe 10. SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/50 12.04.2014 Source approval for steel reinforcement 11. SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/51 14.04.2014 Repair and maintenance of entrusted highway 12. SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/52 14.04.2014 Vehicle tracking system (GPS) ambulance, patrol vehicle and crane 14.04.2014 Source approval for cement 15.04.2004 Independent laboratory testing approval 13 14. SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/53 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/54 Subject of residential accommodation to for track 15. SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/55 15.04.2014 Maintenance of traffic signals at Subhas chak at Govindpur (408.000) 16. SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/56 16.04.2014 Permission for 11 KV underground double circuit electrical line to proposed 17. SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/59 16.04.2014 Repair of NH-2 from Air force station cut out to Paragarh ROB 19.04.2014 Repair of roads 21.04.2014 Road maintenance 25.04.2014 Ensuring repair of NH handed over to the concessionaire 25.04.2014 Site inspection on 29.04.2014 26.04.2041 Review of QAP 26.04.2014 Review of drawing and design 18. 19. 20. 21. 22. 23. SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/65 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/67 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/70 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/73 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/80 SAICPL-Sugam/Barwa-AddaPanagarh/IE/NH-2/2014/81 Page | 20 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – April 2014 STATUS OF PLANTS AND MACHINERY:The details of major plants and equipment deployed are mentioned below; A. PLANTS SI.No. Description of Items Unit Total Remarks 1. Crusher Plant Nos. 1 Installation in progress 2. WMM Plant Nos. 2 Installation in progress 3. Batching plant Nos 3 4. Hot mix Plant Nos. 2 1. mobilization in progress 2. installation in progress. 3. ready for calibration 1. mobilization in progress. 2. installation in progress B. MACHINERY 1. 2. 3. 4. 5. 6. 7. 8. 9. Dozer Excavator(1-1.2 cu.m bucket) Motar Grader (135-195HP) Vibr. Soil Compactor(8-10 t) Tendam Roller PTR Front Wheel Loader (3.0 cu.m) Tipper (10T/25T) Water tanker (10kl) Nos Nos Nos Nos Nos No Nos Nos No 2 5 4 4 2 1 2 10 1 10. 11. 12. 13. 14. JCB loader Hydra Crane (14 MT) Broomer Diesel Tanker DG (25-750KVA) Nos Nos No No Nos 2 3 1 1 5 C. SURVEY EQUIPMENTS 1. Total station Nos 5 2. Auto level Nos 4 Page | 21 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – April 2014 STATUS OF DESIGN AND DRAWING-HIGHWAY :Km 398+240 to 521+120 Sl. No. 1 2 3 4 Description & Design Scope Plan & Profile Drawings, TCS Structures and CD works Pavement Design Design & Drawings of ROB at Km 520+385 GAD for retained with widening of Box culvert Design of Box culvert 5 Reinforcement details of cast in situ Box culvert GAD & Reinforcement detail of box culvert Analysis and design of box culvert BAEL Letter No. for Submission Review by IE BAEL/PRJ/TEC/IEO/0002 dt. 22/02/14 SAICPL-Sugam/BarwaAdda-Panagarh/IE/NH2/2014/81 dt.26.04.2014 BAEL/PRJ/TEC/IEO/0003 dt. 22/02/14 SAICPL-Sugam/BarwaAdda-Panagarh/IE/NH2/2014/81 dt.26.04.2014 BAEL/PRJ/TEC/IEO/0012 dt. 04/03/14 SAICPL-Sugam/BarwaAdda-Panagarh/IE/NH2/2014/81 dt.26.04.2014 BAEL/PRJ/TEC/IEO/0011 dt. 04/03/14 SAICPL-Sugam/BarwaAdda-Panagarh/IE/NH2/2014/81 dt.26.04.2014 BAEL/PRJ/TEC/IEO/0014 dt. 12/03/14 BAEL/PRJ/TEC/IEO/0046-47 dt. 15/04/14 BAEL/PRJ/TEC/IEO/0053 dt. 22/04/14 BAEL/PRJ/TEC/IEO/0059 dt. 26/04/14 BAEL/PRJ/TEC/IEO/0060-61 dt. 26/04/14 Under review Under review Under review Under review Under review 6 GAD,Analysis and design of Minor Bridge 7 GAD Drawings for double cell pipe culvert BAEL/PRJ/TEC/IEO/0004to8&1 5-17,19 dt. 25 &28/02/14,1213/3/14 BAEL/PRJ/TEC/IEO/0032 dt. 29/03/14 Under review 8 GAD Drawings for Grade separator BAEL/PRJ/TEC/IEO/0045 dt. 15/04/14 Under review 9 Reinforcement Details for VUP BAEL/PRJ/TEC/IEO/0060 dt. 26/4/2014 Under review Under review Page | 22 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – April 2014 Concessionaire work progress:- S-Curve Page | 23 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – April 2014 PROJECT WORK PROGRESS:- Road Works Progress:Linear Progress (Road Works) Main Carriageway Activity Description Unit Total Length/Qty Completed % progress Main Carriageway Six lane C&G Km. Ha 122.88 306.53 1.77 4.47 Embankment Km. cum 122.88 1897473 - Sub-Grade Km. cum 122.88 1544213 - GSB/ CT sub base GSB CT sub-base Km. Cum cum 122.88 881086 291830 - WMM /CT Base WMM CT Base Km. Cum cum 122.88 192599 120889 - AG Layer Km. cum 42.93 187020 - DBM Km. cum Km. cum 122.88 250351 122.88 152516 - BC 1.44% 1.46% - Service Road Activity Description Unit Completed % progress Km. Ha Total Length/Qty 149.310 141.97 C&G 1.18 1.18 0.79% 0.83% Embankment Km. cum 149.310 655085 - Sub-Grade Km. 149.310 Page | 24 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – April 2014 cum 644416 CT Sub base Km. cum 149.310 290445 - CT Base Km. cum 149.310 73124 - AG Layer Km. cum Km. cum 149.310 103876 149.310 40192 - BC - Structure Work Progress:Type of structures Total Completed In progress 1 Not yet started 1 ROB 2 Major bridge 3 3 Minor bridge 20 20 Grade Separator 12 12 Over pass 2 2 Under pass 2 2 Vehicular underpass Pedestrian Underpass Box culverts 20 20 11 11 47 47 Slab culverts 67 67 Pipe culverts 88 Total 274 O 1 87 2 272 Page | 25 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – April 2014 DETAIL STATUS OF STRUCTURE :Sl No. Chainage No. as per Drawing 1 464+674 2 517+095 3 518+829 NYS. 4 398+811 NYS. 5 407+538 NYS. 6 408+326 NYS. 7 456+312 NYS. 8 464+185 NYS. 9 475+670 10 476+050 11 496+609 NYS. 12 501+996 NYS. 13 504+287 NYS. 14 506+200 NYS. 15 515+983 NYS. 16 405+330 NYS. New 3 Lane Bridge on LHS 17 409+876 NYS. New 3 Lane Bridge on LHS 18 415+120 NYS. New 3 Lane Bridge on LHS 19 429+973 NYS. New 3 Lane Bridge on LHS 20 437+047 NYS. New 3 Lane Bridge on LHS 21 450+140 NYS. New 3 Lane Bridge on LHS 22 461+652 NYS. New 3 Lane Bridge on LHS 23 464+903 NYS. New 3 Lane Bridge on RHS 24 468+620 NYS. New 3 Lane Bridge on LHS Name of Structure Status Remarks NYS. MAJOR BRIDGE Grade Separator MINOR BRIDGE (NEW) NYS. NYS. NYS. Page | 26 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – April 2014 25 497+840 NYS. New 3 Lane Bridge on LHS 26 509+953 NYS. New 3 Lane Bridge on LHS & Existing LHS Replaced by New 2 Lane Bridge 27 445+596 NYS. Widening on both Side 28 462+895 NYS. Widening on both Side 29 463+091 NYS. Widening on both Side 30 463+710 NYS. Widening on both Side 31 471+006 NYS. Widening on both Side 32 485+002 NYS. Widening on both Side NYS. Widening on both Side NYS. Widening on both Side NYS. Widening on both Side 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 MINOR BRIDGE (WIDENING) 492+871 495+735 507+503 520+373 ROB NYS. 443+710 NYS. 411+374 NYS. 413+886 NYS. 421+400 NYS. 428+208 NYS. 433+563 NYS. 447+771 460+036 467+115 469+750 473+340 479+109 486+427 489+702 GADs for both the ROBs have been approved NYS. 403+440 451+153 Work in progress (Test pile). VEHICULAR UNDERPASS NYS. NYS. NYS. NYS. Drawing not Submitted NYS. NYS. NYS. NYS. Page | 27 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – April 2014 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 NYS. 491+451 NYS. 494+430 NYS. 509+559 NYS. 518+221 NYS. 519+349 NYS. 398+495 NYS. 399+230 NYS. 407+400 NYS. 409+088 NYS. 417+953 424+400 PEDESTRIAN UNDERPASS NYS. 476+430 NYS. 504+555 NYS. 510+700 NYS. 512+920 NYS. 514+900 398+519 398+782 403+335 407+212 407+422 407+657 408+867 409+060 409+366 411+332 411+391 413+926 NYS. BOX CULVERT NYS. Reconstruction NYS. Reconstruction NYS. Reconstruction NYS. Reconstruction NYS. Reconstruction NYS. Left side widening Reconstruction NYS. Reconstruction NYS. Reconstruction NYS. Reconstruction NYS. Reconstruction NYS. Reconstruction NYS. Retained with widening but change to Reconstruction & Right side Page | 28 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – April 2014 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 415+216 417+933 421+327 421+497 424+467 427+882 428+025 443+615 443+931 444+047 448+029 450+883 451+334 456+131 456+175 456+355 461+940 467+300 470+025 475+615 486+816 489+549 489+860 494+593 496+719 496+749 502+182 502+372 NYS. Existing Retained (RHS) New slab (LHS) NYS. Reconstruction NYS. Reconstruction NYS. Reconstruction NYS. Reconstruction NYS. Reconstruction NYS. Reconstruction NYS. Reconstruction NYS. Reconstruction NYS. Reconstruction NYS. Retained with widening but change to Reconstruction NYS. Reconstruction NYS. Reconstruction NYS. Retained with widening but change to Reconstruction NYS. Retained with widening but change to Reconstruction NYS. Retained with widening but change to Reconstruction NYS. Retained with widening but change to Reconstruction NYS. Reconstruction NYS. Reconstruction NYS. Reconstruction NYS. Reconstruction NYS. Reconstruction NYS. Reconstruction NYS. Reconstruction NYS. Reconstruction NYS. Reconstruction NYS. Reconstruction NYS. Reconstruction Page | 29 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – April 2014 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 502+538 505+934 506+169 509+255 512+635 512+997 515+180 516+290 518+180 519+690 399+140 400+070 400+450 401+625 404+115 405+204 405+777 408+207 409+125 409+707 410+140 410+760 414+040 414+240 414+750 418+107 418+748 420+178 PIPE CULVERT NYS. Reconstruction NYS. Left side widening Reconstruction & Right side NYS. Left side widening Reconstruction & Right side NYS. Reconstruction NYS. Reconstruction NYS. Reconstruction NYS. New NYS. New NYS. New NYS. New NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Existing Retained (RHS) New Pipe (LHS) NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening Page | 30 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – April 2014 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 425+330 425+900 426+935 429+325 429+449 430+200 431+110 433+265 433+600 434+231 435+200 435+750 435+915 436+127 436+655 438+313 438+605 438+860 438+966 439+370 439+710 440+015 440+095 440+660 440+850 441+010 444+420 444+595 NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening Page | 31 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – April 2014 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 444+897 446+015 447+048 448+397 449+080 450+505 450+690 450+970 451+070 452+452 452+350 453+453 453+940 454+740 456+460 457+530 459+750 460+000 460+120 460+410 460+495 460+652 460+775 461+505 462+175 462+300 462+360 462+735 NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Existing Retained (RHS) New Pipe (LHS) NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening Page | 32 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – April 2014 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 463+015 463+345 463+530 467+040 473+415 473+980 476+446 477+500 478+570 478+611 478+990 479+325 485+790 486+075 511+920 406+115 406+475 409+525 411+755 412+325 412.616 412+836 413+356 413+555 415+830 416+283 416+985 420+790 SLAB CULVERT NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening Work in progress (LHS) Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening Page | 33 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – April 2014 221 222 223 224 225 422+485 422+645 423+026 423+592 423+986 NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening 226 432+316 NYS. Retained with widening 227 432+749 NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 432+989 439+900 441+850 442+567 442+745 444+675 446+410 446+655 449+421 449+821 452+685 453+580 455+705 457+130 457+260 465+060 465+087 465+525 465+765 468+375 469+220 Page | 34 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – April 2014 249 250 251 252 253 472+225 474+862 481+930 484+030 487+904 NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening 254 488+660 NYS. Retained with widening 255 489+128 NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening NYS. Retained with widening 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 491+970 493+834 495+445 497+040 497+367 499+890 500+278 501+260 501+562 502+863 503+456 505+226 505+700 506+723 507+738 512+383 438+500 NYS. Toll Plaza 507+000 NYS. NYS- Not Yet Started Page | 35 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – April 2014 EMERGENCY SERVICES:SI. N. Description Contact No 1 Control Room 8170006300 2 Highway Petrol (Jharkhand) 8229800282 3 Highway Ambulance(Jharkhand) 8229800281 4 Highway Crane(Jharkhand) 9525953313 5 Highway Pertol (West Bengal) 8170040455 6 Highway Ambulance(West Bengal) 8170040456 7 Highway Crane (West Bengal) - Page | 36 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – April 2014 Quality Assurance & Quality Control:Site Laboratory in Dhanbad camp, Asansol camp and Panagarh has been partial established. Sl. No. Description of material & source STATUS I CEMENT a Ultratech OPC 53 Grde- Rawan II REINFORCEMENT a. SAIL – Durgapur APPROVED b. Tata Tiscon – Bokaro APPROVED III HUME PIPES a. REVIEWED b. Hindustan Concrete pipe Industry – Ranchi Greenfield Industries – Makarampur c. Aggrawal Construction – Bolpur REVIEWED APPROVED. REVIEWED Page | 37 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – April 2014 Details of QC Tests conducted during the month (01st April 2014 to 30th April 2014) S. N. DESCR IPTION 1.0 Earth Work OGL/EG 1.1 Description of tests as per BIS/Agreem ent provisions Frequency of tests as per MoRTH/C.A. No. of tests conducted up to previous month No. of tests conducted this month pass Fail Total Pass Fail Total no. of tests conducted up to this month Total Pass Fail Total As required - - - 26 26 26 26 As required - - - 74 74 74 74 As required - - - 26 26 26 26 1.4 Grain size analysis MDD & OMC Atterberg limit FSI As required - - - 26 26 26 26 1.5 CBR As required - - - - - - - 1.6 Field density of original ground Grain size analysis MDD & OMC Atterberg limit FSI 1st test per 1000m2 2nd test per 3000m3 2nd test per 3000m3 2nd test per 3000m3 2nd test per 3000m3 1st test per 3000m3 As required - - - 22 22 22 22 - - - 16 16 16 16 - - - 17 17 17 17 - - - 22 22 22 22 - - - - - - - 1st test per 250m3 - - - 4 4 4 4 L 1.2 1.3 1.7 1.8 1.9 1.10 Borrow area used for embank ment and sub grade 1.11 CBR 1.12 Deleterious Content Test NMC 1.13 Page | 38 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – April 2014 Safety and traffic management: Status of PPE on site :Usage :- Personal protective equipment (PPE) to reduce employee exposure to hazards when engineering and administrative controls are not feasible or effective in reducing these exposures to acceptable levels. Employers are required to determine if PPE should be used to protect their workers. a. Be appropriate for the risks involved and the conditions at the place of exposure. b. Take account of ergonomic requirements, the state of health of the person who wears it and the duration of its use; c. Be capable of fitting the wearer correctly. d. Be, so far as is reasonably practicable, effective to prevent or adequately control risks involved without increasing the overall risks. PPE availability on site :a. b. c. These 750 mm one piece composite Rubber traffic cones (CRC) come complete with D2 reflective sleeve which fully conforms to BS EN 13422:2004. These road cones are manufactured from recycled material. Reflective tapes. Head Protection, Hand Protection, Safety Footwear, Yellow High Visibility Clothing. Functionality :a. Rubber Traffic Cones : Its function is on the crossing of roadways, maintenance of freeways, dangerous zone and road sites and so on. b. Reflective tapes :- One of the most important attributes of road safety is line visibility. The importance of this function to resist the wear the tear cause by regular traffic and changing climate conditions. These reflective road tapes suitable for both longitudinal and transverse installation in locations that experience substantial traffic activity. c. Head Protection, Hand Protection, Safety Footwear, Yellow High Visibility Clothing. : These PPE are function in such manner, that the labour on site should be visible from long distance due to the reflective material and protect them from any uncertain hazard happen on site. Maintenance of Existing Highways:The Maintenance of existing highway has to be taken up immediately by concessionaire for repairing of pot holes and rutting. Specially at Panagarh town portion and existing toll plaza location & Check post location should be taken up in priority basis. Page | 39 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – April 2014 WEATHER REPORT:- 01-Apr-14 Section -I Dhanbad Temperature Rain Fall 0C Max Min (mm) 39.0 27.0 Nil 02-Apr-14 38.0 28.0 Nil 39.2 29.9 Nil 39.0 22.0 Nil 03-Apr-14 40.0 27.0 Nil 39.0 29.0 Nil 40.0 23.0 Nil 04-Apr-14 41.0 28.0 Nil 40.0 29.9 Nil 39.0 24.0 Nil 05-Apr-14 39.0 28.0 Nil 41.0 31.0 Nil 39.0 19.0 Nil 06-Apr-14 40.0 29.0 Nil 39.5 30.4 Nil 40.0 20.0 Nil 07-Apr-14 38.0 28.0 Nil 42.0 33.0 Nil 41.0 22.0 Nil 08-Apr-14 41.0 29.0 Nil 40.0 32.7 Nil 41.0 24.0 Nil 09-Apr-14 39.0 28.0 Nil 38.5 30.3 Nil 38.0 25.0 Nil 10-Apr-14 40.0 28.0 Nil 39.5 30.1 Nil 39.0 23.0 Nil 11-Apr-14 41.0 29.0 Nil 40.0 31.5 Nil 38.0 22.0 Nil 12-Apr-14 43.0 31.0 Nil 39.0 31.0 Nil 39.0 22.0 Nil 13-Apr-14 42.0 29.0 Nil 41.0 31.0 Nil 40.0 22.0 Nil 14-Apr-14 44.0 30.0 Nil 41.0 33.5 Nil 40.0 22.0 Nil 15-Apr-14 46.0 32.0 Nil 41.2 33.0 Nil 40.0 24.0 Nil 16-Apr-14 43.0 31.0 Nil 42.0 32.0 Nil 41.0 25.0 Nil 17-Apr-14 41.0 29.0 Nil 43.0 33.5 Nil 41.0 24.0 Nil 18-Apr-14 45.0 32.0 Nil 42.0 32.5 Nil 39.0 25.0 Nil 19-Apr-14 42.0 29.0 Nil 41.8 34.0 Nil 39.0 27.0 Nil 20-Apr-14 44.0 32.0 Nil 40.5 33.2 Nil 39.0 26.0 Nil 21-Apr-14 41.0 30.0 Nil 42.0 33.0 Nil 40.0 24.0 Nil 22-Apr-14 43.0 31.0 Nil 43.0 32.0 Nil 40.0 25.0 Nil 23-Apr-14 44.0 32.0 Nil 42.6 31.0 Nil 41.0 24.0 Nil 24-Apr-14 42.0 29.0 Nil 42.4 30.3 Nil 41.0 24.0 Nil 25-Apr-14 43.0 30.0 Nil 42.0 29.0 Nil 42.0 25.0 Nil 26-Apr-14 45.0 31.0 Nil 43.0 31.5 Nil 42.0 25.0 Nil 27-Apr-14 48.0 32.0 Nil 40.0 28.2 Nil 43.0 25.0 Nil 28-Apr-14 44.0 31.0 Nil 43.3 33.0 Nil 43.0 26.0 Nil 29-Apr-14 45.0 31.0 Nil 43.0 31.5 Nil 44.0 27.0 Nil 30-Apr-14 44.0 30.0 Nil 40.0 30.2 Nil 43.0 26.0 Nil DATE Section -II Asansol Temperature Rain Fall 0C Max Min (mm) 39.0 28.6 Nil Section – III Durgapur Temperature Rain Fall 0C Max Min (mm) 37.0 22.0 Nil Page | 40 Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – April 2014 Site Photographs:Widening of pipe culvert at km. 473.415 C& G at km 519.350. Page | 41