Lehigh County Conservation District Chapter 102 Applicant’s Pre-Application Meeting Form Informal Meeting Information *Meeting Minutes shall be submitted to our office within 5 days after the informal meeting** Meeting Date: ____________________ Meeting Time: _______________ Informal or Formal:______________ Project Name: ______________________________________________________________________________ Permit Type: Individual, General, Major, Minor, Renewal or Unknown_________________________________ Multiple Program Permits Involved?: ___ Yes ___ No (i.e. Air permit) (If yes, Contact - Colleen Stutzman at DEP – 570-826-2511) Applicant’s Name:___________________________________________________________________________ Applicant’s Company:________________________________________________________________________ Mailing Address: ____________________________________________________________________________ City, State, Zip: _____________________________________________________________________________ Phone:__________________ Fax:__________________ Email:_______________________________________ Consultant’s Name: _________________________________________________________________________ Consultant’s Company: _______________________________________________________________________ Mailing Address:____________________________________________________________________________ City, State, Zip:______________________________________________________________________________ Phone:__________________ Fax:__________________ Email:_______________________________________ Project Information NPDES Acreage:__________________________________ Limits of Disturbance:________________________ Municipality:____________________________________________ Points of Interest:____________________ Receiving Surface Water:_____________________________________________________________________ Chapter 93 Classification:_____________________________________________________________________ LVPC Act 167 Ordinance: _____________________________________________ Date of Ordinance:________________ Impaired: ____Yes ____No Cause:____________________________________ Existing Wetlands: ____Yes ____No ____EV Potential Contaminants: ____Yes ____No Contaminant:______________________________ Riparian Buffers: ____Yes ____No PNDI Hits:___________________________________________________ Cleared: ____Yes ____No Other Permits Required (Ch. 105, 106, Air Quality, etc.): ____________________________________________________ Formal Meeting Plan Information: Please bring 3 copies of the NOI, worksheets & infiltration testing results to the meeting. Be prepared to discuss the following information at the time of the formal pre-application meeting. Please provide the following information at the formal meeting or additional information may be required prior to submission. E&S Plans ABACT BMPs included with design (special protection watersheds) New E&S manual dated March 2012 used Project located in a Karst area Sediment Basin was checked for high water table and test location shown Conversion of sediment basin to a permanent PCSM BMP – 1’ separation Drainage area greater than 5 ac – Is the basin lined? Does the basin have a liner with baffles Sediment basin sized with Maximum Drainage area during construction Emergency Spillway based on using 2 cfs/acre or 25 year storm elevation(24”) Principal Spillway designed to convey peak flow for 10 yr/24hr storm Emergency Spillway discharge capacity using 100 year storm (12”) Last Revised 11/6/2014 Provided __Yes __No __Yes __No __Yes __No __Yes __No __Yes __No __Yes __No __Yes __No __Yes __No __Yes __No __Yes __No __Yes __No __N/A __N/A __N/A __N/A __N/A __N/A __N/A __N/A __N/A __N/A __N/A PCSM Plan Drawings Existing Conditions or Special Features identified Soil Types – (Hydraulic Soil Group) Proposed Features Test Pit Locations BMPS Locations per Page 6 of NOI Protected Area(s)/Credit Area(s) Location NPDES Boundary Limits of Disturbance Boundary Legend Project located in Floodplain or Floodway Critical Stages on Plan Existing and Proposed Easements Offsite Discharge Analysis or Easement required PCSM Plan Detail Sheet Permanent BMP Details Construction Sequence for each BMP Operations and Maintenance Procedures for each BMP Non-Structural Credit Area(s) (Checklist Notes from Ch. 8) Responsible Party Note Permanent Stabilization Schedule PCSM Narrative NOI Worksheets 1-5 & 10 for each POI NOI Worksheets 1-5, 12-13 for each POI Discussion of how Curve Numbers were selected for pre/post conditions Provide all Worksheets for each POI/Discharge location Provide Worksheet 4 Post Development Runoff calculation for each BMP Rainfall Data using latest NOAA/Atlas 14 Figures Loading Ratios – Using Bed Bottom Contour - Sizing Criteria for each BMP Design infiltration Rates – Discuss safety/reduction factors/geometric mean Infiltration Volume Calculations for each BMP Infiltration Draw Down Period for 2 year storm for each BMP Infiltration/Geotechnical Report included Maximum Ponding Depth for each BMP is met Complete the following chart pertaining to each infiltration BMP BMP A BMP Bottom Elevation* B Elevation of Infiltration Test C Elevation Difference (B-A) __Yes __Yes __Yes __Yes __Yes __Yes __Yes __Yes __Yes __Yes __Yes __Yes __Yes __No __No __No __No __No __No __No __No __No __No __No __No __No __N/A __N/A __N/A __N/A __N/A __N/A __N/A __N/A __N/A __N/A __N/A __N/A __N/A __Yes __Yes __Yes __Yes __Yes __Yes __No __No __No __No __No __No __N/A __N/A __N/A __N/A __N/A __N/A __Yes __Yes __Yes __Yes __Yes __Yes __Yes __Yes __Yes __Yes __Yes __Yes __No __No __No __No __No __No __No __No __No __No __No __No __N/A __N/A __N/A __N/A __N/A __N/A __N/A __N/A __N/A __N/A __N/A __N/A D Elevation of Limiting Zone** E Elevation Difference (A-D) *Note: A Rain Garden bottom elevation would be at the bottom of the 18” of planting soil. (C) Maintain minimum 1’. (E) Maintain minimum of 2’. **Please list the elevation of limiting zone or the elevation of the test pit to verify no limiting zones exist within 2 feet of bed bottom. Pre & Post Drainage Plans Points of Interests – Provide NOI pages 4&5 for each POI Drainage Boundary – Provide areas for each Water Quality and Volume BMP Post Drainage Map – Provide breakout of cover types to support worksheet 12 Last Revised 11/6/2014 __Yes __No __N/A __Yes __No __N/A __Yes __No __N/A