Appendix E Completed Mitigation Projects Completed Mitigation Projects Alachua County Fire Rescue Headquarters and Stations Project Description A wind retrofit project to reenforce window and door openings at the Fire Rescue Headquarters building and 3 fire stations. Project enhances protection of public safety equipment in these buildings. Fire stations and Headquarters are listed critical facilities. Project Costs Total Costs: $ 48,525 Federal Share: $ 36,772 Local Share: $ 11,753 Funding Source: HMGP Project Timeline Completed July 2008. Alachua County Sheriff Admin Building and CCC/EOC Building Project Description A wind retrofit project to add shutters to window and door openings at the ASO Administration building and upgrade the existing system on the CCC/EOC building. Project enhances protection of public safety equipment in these buildings. ASO Admin building and the CC/EOC are listed critical facility. Project Costs Total Costs: $ 125,640 Federal Share: $ 94,230 County Share: $ 31,410 Funding Source: PDM Grant Project Timeline Completed September 2011. City of Alachua Project Description Lincoln Gardens Drainage Project. Enhancement of storm water management system to address flooding and erosion. Installation of roadway curb and guttering, additional storm water inlets, and right-of-way stabilization [grading and installation of sod]. Project Costs Total Costs: $ 351,070 Federal Share: $ 263,300 City Share: $ 87,770 Project Timeline Phase 1 Planning and Design: October 2006 – July 2008 Phase 2 Construction: August 2009 – April 2010 Funding Source: HMGP Project Description Mulberry Landing Drainage Improvements. Installation of drainage pipe and inlet structures to address historic flooding. Project Costs Total Costs: $ 51,850 Federal Share: $ 38,888 Local Share: $ 12,962 Project Timeline Phase 1 Planning and Design: October 2006 – August 2008 Phase 2 Construction: August 2009 – April 2010 Funding Source: HMGP Project Description Wastewater Treatment Plant Access Road Drainage Improvements. Installation of drainage pipe and regarding of roadside swales to enhance water conveyance. The City of Alachua Wastewater Treatment Plan is a listed critical facility. Project Costs Total Costs: $ 48,852 Federal Share: $ 36,718 Local Share: $ 12,134 Project Timeline Phase 1 Planning and Design: April 2007 – November 2008 Phase 2 – Construction: August 2009 – May 2010 Funding Source: HMGP City of Archer Project Description Storm water Management System Enhancement. Expansion of an existing storm water retention basin. Project Costs Total Costs: $ 54,713 Funding Source: CDBG Project Timeline Project completed August 2011