Annex 1 AUDIT CHECKLIST (Essential elements to be included within the audit) 1) Designation letter (review conditions) Designated name Local Authority/group of Local Authorities Personnel operating under designation Scope of designation Review scope and class of instruments Conformity assessment tasks Types of instrument / sub categories of instrument 2) Essential Requirements Sub-contracting arrangements Testing by others Calibration by others Core criteria in the directives (annex V NAWI article 12 MID) Met at time of application Met on a continuing basis Independence and Insurance 3) Quality system Manual Procedures Plans Where a Notified Body is formed of a group of Local Authorities, are they operating to a common quality system? 4) Standards Local standards, working standards, test weights, EEC Directive weights Calibration, EEC verification of weights and other standards Standards maintained in-house, hired-in, other arrangements Range of standards available 5) Verification TAC and TC where appropriate Assessment of conformity to type Declaration of Conformity Certificate of 1st stage verification (if applicable) Verification tests Recording of the results (It is especially important that test sheets are correctly completed). 6) Application of the marks Manufacturer i.e. CE marking and Green Metrology Sticker Approved Body i.e. Notified Body Number Certificate of Conformity 7) Competence Evidence of staff training and knowledge Assessment of competence to undertake EC verification Annex 2 Audit Report Cover sheet (only one cover sheet is needed per audit) LA Notified Body audited Audit Officer LA Notified Body No. Telephone No. of auditor Date audited Supporting Audit Report e.g. ISO 9000 or UKAS (See auditing Protocol 3.3) Title Number Auditor’s signature/date Print name …………………………….. Date ……………………………………. Signature of auditor ……………………………………………… Signature of Authority representative Print name …………………………….. Signature of representative Date ……………………………………. ……………………………………………… Agreed to carry out corrective action: Print name ……………………………… Job title ………………………………… Signature of responsible officer (LANB) …………………………………………….. Auditor Satisfied corrective actions have been signed off and supplied with evidence corrective actions have been completed. Print name …………………………….. Signature of auditor Date ……………………………………. ……………………………………………… Detail of activities Please use the audit checklist when conducting the audit ensuring all points are covered e.g. quality manual, procedures, plans or other documents Item reference 1) Designation Letter Designated name Scope of designation 2) Essential Requirements Sub-contracting arrangements Core criteria in the Directives being met Independence and Insurance 3) Quality System Manual Procedures Notes NC’s Item reference Plan Groups of LANB all operate from same QS 4) Standards Local & Working Standards, test weights, EEC directive weights Calibration Maintenance of Standards Standards maintained in house, hired in other arrangement Range of standards available Notes N/C’s Item reference 5) Verification TAC & TC Assessment of Conformity to Type Declaration of Conformity Certificate of 1st stage verification Verification tests Recording of results 6) Application of Marks Manufacturer i.e. CE marking Green M sticker Approved body Number Certificate of Conformity Notes N/C’s Item reference 7) Competence Evidence of staff training and knowledge Assessment of competence undertaken Witness verification Opportunities for Improvement Notes N/C’s Details of non-conformities page of Item Reference from activity sheet Level of nonconformity Description of non-conformity Proposed corrective action Auditor Signature Date corrective action completed Annex 3 EXAMPLES OF MAJOR/MINOR NON-CONFORMITIES From paragraph 3.7 of the Auditing Protocol Area/Activity audited EC Verifications Description of non-conformity Major/Minor nonconformity Equipment has not been correctly verified Major Test result sheet not correctly completed Major Incorrect markings placed onto instrument Major No procedure to cover Appeals in relation to verification activities Minor Procedure exists but not addressed within QS for EC verification of NAWI/MID Minor Procedure exists however where refused submitter not made aware of right to appeal Minor No requirement within the procedure for the issue of C of C Major In procedure but no C of C’s have been issued against any of the EC verifications carried out Major Individual case of C of C not issued Major No training record in place for a member of staff performing EC verifications Major Training activity non-existent on all training files Major Training activity for member of staff not included on training record Minor Competence Staff unable to competently demonstrate verification testing Major Internal Audits No procedure or audit programme in place Major Procedure/programme in place, no audits conducted Major Not identified clearly Major Structure out of date or not accurate Major Individual Local Authorities within the group not working to a common QS Major Appeals Certificates of Conformity (C of C) Training Records Organisation Structure Joint Arrangements Opportunities for Improvement The aim of this is to allow the auditor scope to offer the authority, group suggestions for areas that might be improved upon. These will not go against the overall assessment, however allows the auditor to point out those areas that perhaps are not so serious to be awarded a major or minor nonconformity but are noteworthy to the auditing process.