Reconfiguring a lot

advertisement
Reconfiguring a lot
DEVELOPMENT ASSESSMENT CHECKLIST
Applicant check
Properly made
Comments
Yes
No
N/A
Have fully completed the approved forms (latest
version) been submitted?
Is the application accompanied by the correct fee?
Is the application accompanied by the owner’s written
consent or a declaration by the applicant that the
owner has given written consent to the making of the
application?
Is all mandatory information provided as nominated
on the IDAS form?
Has an assessment of the development against the
Townsville City Plan been submitted?
Where compliance with the applicable acceptable
outcome has not been achieved, has an alternative
solution been identified which complies with the
relevant performance outcome?
Road works
Yes
No
N/A
Comments
Cross sections compliance, location of proposed and
existing concrete paths including kerb ramps.
Refer to SC6.4.4.8 Standard drawings
Intersection type and spacing
Refer to SC6.4.3.13 Townsville road
hierarchy and SC6.4.4.1 Geometric road
design
On street parking, turning movements
Turning circles for Service Vehicles in
accordance with AS 2890
Traffic management
Traffic reports/impact assessment
Yes
No
N/A
Comments
Must be presented in accordance with
SC6.4.3.14 Traffic impact assessment
guidelines
External traffic requirements and on street parking
and road furniture requirements
Noise amelioration
REVISION DATE >> 7 MAY 2014
Refer to SC6.4.3.15 Noise and vibration
assessment guidelines
Townsville City Plan Checklist SC6.4.2.4.2
Intersection treatment and
management requirements
local
area
Refer to SC6.4.4.1 Geometric road design,
MUTCD, Queensland and Austroads
Guidelines
traffic
Traffic signals
Stormwater drainage
Yes
No
N/A
Comments
Pre developed flood levels
Report required (refer to SC6.7.4 Flooding
hazard planning scheme policy Schedule
1 - Guidelines for preparation of flood
studies and reports)
Defined flood event levels
Requirements for detention/retention systems
Culverts/bridges (zero afflux for q50)
Drainage easement requirements
Contours (existing and proposed)
Stormwater management
Yes
No
N/A
Comments
Stormwater quality management plan (including
treatment modelling)
Refer to SC6.4.3.8 Stormwater quality
management plans for development
Treatment devices
Refer to SC6.4.3.9 Water sensitive urban
design guidelines
Water supply
Yes
No
N/A
Comments
Non reticulated area
Refer to SC6.4.3.11 On-site water supply
Demonstrated adequacy of supply (main sizes and
pressure)
Refer to SC6.4.3.23 Water and sewer
network modelling guidelines
High level supply requirement
Connection points
Sewerage reticulation
Yes
No
N/A
Comments
Report required for specific requirements
SC6.4.3.10 On-site sewerage facilities for
non-sewered properties
Non sewered area
Connection points
Required pump stations/rising mains
Master planning
Yes
No
N/A
Comments
Overall sewerage network
Refer to SC6.4.3.23 Water and sewer
network modelling guidelines
Overall water network
Refer to SC6.4.3.23 Water and sewer
network modelling guidelines
Overall stormwater network (including stormwater
REVISION DATE >> 7 MAY 2014
Townsville City Plan Checklist SC6.4.2.4.2
management)
Overall road network
Refer to
hierarchy
SC6.4.3.13
Townsville
road
Bikeways/pathways network
Refer to SC6.4.4.7 Bicycle, pedestrian and
shared path design
Public transport network
Park and open space network
Other
Yes
No
N/A
Comments
Conceptual soil erosion and sediment control plan
Refer
to
SC6.4.3.8
Stormwater
management plans for development
Lighting requirements
Refer to SC6.4.3.20 Public lighting and
utility services
Steep slope stability >15%
Geotechnical Report required refer to
SC6.4.3.7 Steep land development design
guidelines
Acid sulphate soils <rl5.00
Report must be undertaken in accordance
with SPP 2/02 Guideline – Acid Sulfate
Soils and Guidelines for Sampling Analysis
of Lowland Acid Sulfate Soils in
Queensland, Acid Sulfate Soils Laboratory
Methods Guidelines or AS 4969
Detail survey plan provided
If yes, attach minutes/notes
Pre-lodgement meeting held?
Referral agencies
Yes
No
N/A
Comments
State department referrals (e.g. DTMR, DEHP)
Other third party referrals
REVISION DATE >> 7 MAY 2014
Townsville City Plan Checklist SC6.4.2.4.2