Reconfiguring a lot DEVELOPMENT ASSESSMENT CHECKLIST Applicant check Properly made Comments Yes No N/A Have fully completed the approved forms (latest version) been submitted? Is the application accompanied by the correct fee? Is the application accompanied by the owner’s written consent or a declaration by the applicant that the owner has given written consent to the making of the application? Is all mandatory information provided as nominated on the IDAS form? Has an assessment of the development against the Townsville City Plan been submitted? Where compliance with the applicable acceptable outcome has not been achieved, has an alternative solution been identified which complies with the relevant performance outcome? Road works Yes No N/A Comments Cross sections compliance, location of proposed and existing concrete paths including kerb ramps. Refer to SC6.4.4.8 Standard drawings Intersection type and spacing Refer to SC6.4.3.13 Townsville road hierarchy and SC6.4.4.1 Geometric road design On street parking, turning movements Turning circles for Service Vehicles in accordance with AS 2890 Traffic management Traffic reports/impact assessment Yes No N/A Comments Must be presented in accordance with SC6.4.3.14 Traffic impact assessment guidelines External traffic requirements and on street parking and road furniture requirements Noise amelioration REVISION DATE >> 7 MAY 2014 Refer to SC6.4.3.15 Noise and vibration assessment guidelines Townsville City Plan Checklist SC6.4.2.4.2 Intersection treatment and management requirements local area Refer to SC6.4.4.1 Geometric road design, MUTCD, Queensland and Austroads Guidelines traffic Traffic signals Stormwater drainage Yes No N/A Comments Pre developed flood levels Report required (refer to SC6.7.4 Flooding hazard planning scheme policy Schedule 1 - Guidelines for preparation of flood studies and reports) Defined flood event levels Requirements for detention/retention systems Culverts/bridges (zero afflux for q50) Drainage easement requirements Contours (existing and proposed) Stormwater management Yes No N/A Comments Stormwater quality management plan (including treatment modelling) Refer to SC6.4.3.8 Stormwater quality management plans for development Treatment devices Refer to SC6.4.3.9 Water sensitive urban design guidelines Water supply Yes No N/A Comments Non reticulated area Refer to SC6.4.3.11 On-site water supply Demonstrated adequacy of supply (main sizes and pressure) Refer to SC6.4.3.23 Water and sewer network modelling guidelines High level supply requirement Connection points Sewerage reticulation Yes No N/A Comments Report required for specific requirements SC6.4.3.10 On-site sewerage facilities for non-sewered properties Non sewered area Connection points Required pump stations/rising mains Master planning Yes No N/A Comments Overall sewerage network Refer to SC6.4.3.23 Water and sewer network modelling guidelines Overall water network Refer to SC6.4.3.23 Water and sewer network modelling guidelines Overall stormwater network (including stormwater REVISION DATE >> 7 MAY 2014 Townsville City Plan Checklist SC6.4.2.4.2 management) Overall road network Refer to hierarchy SC6.4.3.13 Townsville road Bikeways/pathways network Refer to SC6.4.4.7 Bicycle, pedestrian and shared path design Public transport network Park and open space network Other Yes No N/A Comments Conceptual soil erosion and sediment control plan Refer to SC6.4.3.8 Stormwater management plans for development Lighting requirements Refer to SC6.4.3.20 Public lighting and utility services Steep slope stability >15% Geotechnical Report required refer to SC6.4.3.7 Steep land development design guidelines Acid sulphate soils <rl5.00 Report must be undertaken in accordance with SPP 2/02 Guideline – Acid Sulfate Soils and Guidelines for Sampling Analysis of Lowland Acid Sulfate Soils in Queensland, Acid Sulfate Soils Laboratory Methods Guidelines or AS 4969 Detail survey plan provided If yes, attach minutes/notes Pre-lodgement meeting held? Referral agencies Yes No N/A Comments State department referrals (e.g. DTMR, DEHP) Other third party referrals REVISION DATE >> 7 MAY 2014 Townsville City Plan Checklist SC6.4.2.4.2