Works specification guidelines. The following works specification is

advertisement
Works specification guidelines.
The following works specification is based upon the supplied CAD Drawing
layout proposal and is briefly to include a major refurbishment of the
existing female and male staff toilets and the creation of a new ambulant
toilet and a new office will be created with corridor access.
The toilet refurbishments will briefly include all built in furniture, lined
walls, site formed anti-slip flooring and suspended ceilings with LED
lighting. However as these toilets are for staff/adults I suggest a more
mature colour scheme with a white and oak wood effect panelling
scheme.
Specification brief:
1.
All walls are to be 11mm OSB lined for a flat and secure substrate
for a Hygenic white wall cladding system (Altro-whiterock or
similar). All cladding is to be jointed with appropriate trims.
2.
Any new stud walling to have sound insulation.
3.
All new openings and wall removals to have appropriate structural
support where necessary.
4.
All PVC flooring (Altro, Marley etc) safety flooring to be site formed
and welded and finished with integrated trim to the wall cladding.
5.
All pottery-ware and brass-ware to be of quality manufacturer
(Ideal standard, Armitage shanks etc) as described in school
specification guidelines.
6.
Door specification to include view panels where necessary and
laminated finishes. Door furniture to include closers and finger/
kick-plates.
7.
All cubicles furniture and panelling to have reasonable protection
from ingress of water.
8.
All air-extraction to conform to multiple occupancy toilets
regulations.
9.
All lighting to be LED type to conform to new school energy
guidelines. Toilet lighting to be PIR operated.
10.
All works must comply with current building regulations and school
toilet design guidelines.
1) Female staff toilets.
Within the new female staff toilet area, a 4 toilet cubicle system will be
incorporated. These will be accompanied by 4 wash hand basins built into
furniture with additional mirrors. There will be PVC sheet wall lining.
The flooring will be an anti-slip type safety floor that is site formed,
whereby it rises slightly up the wall to aid in cleaning. All joints will be
welded together and sealed.
As follows are the works to be included within this quote:
1.
Site preparation- including creating temporary corridor protection.
2.
Strip out any existing electrics/plumbing fixtures and isolate and
make safe where necessary.
3.
Strip out existing fixtures and make good.
4.
Provision of radiator heating to toilet area.
5.
Install new dividing stud wall with sound insulation. Dry-line all
walls with new OSB 11mm and hygienic PVC wall lining (Altro
Whiterock or similar).
6.
Create and fit laminated door and frame to the new toilet areas.
7.
PVC lining to windows and walls where necessary.
8.
New copper pipework with appropriate safety features including
tmv’s, non-return valves etc, and waste pipework.
9.
600mm Suspended ceiling grid system to toilets. This will include
new PIR operated LED lighting.
10.
New electrics where necessary. This will include air extraction and 2
hand dryers.
11.
New paint/decoration where necessary.
12.
New flooring. This will include initial screed levelling system
followed by site-formed anti-slip safety floor (Safe-tred Dimensions
or similar) to the toilet area.
13.
New integrated pottery-ware (ideal standard or similar) to the toilet
area. The new toilets will be integrated into furniture or units. This
will include push button fascias, enclosed cisterns, isolation valves
etc. All built in equipment will include access panels.
14.
Creation of 4 hand wash basins (ideal standard or similar) within
built in furniture.
15.
miscellaneous works.
(note: no inclusion of decoration or flooring to existing corridor
area)
2) Ambulant toilet.
Adjacent to the new female staff toilet area, an ambulant toilet will be
incorporated. This will include a disability height toilet with appropriated
grab/support rails, wash hand basin, mirror and emergency pull cord
system. There will be PVC sheet wall lining.
The flooring will be an anti-slip type safety floor that is site formed,
whereby it rises slightly up the wall to aid in cleaning. All joints will be
welded together and sealed.
As follows are the works included in this quote:
1.
Site preparation- including creating temporary corridor protection.
2.
Strip out any existing electrics/plumbing fixtures and isolate where
necessary.
3.
Strip out existing fixtures and make good.
4.
Provision of radiator heating to toilet area.
5.
Install new dividing stud wall with sound insulation. Dry-line all
walls with new OSB 11mm and hygienic PVC wall lining (Altro
Whiterock or similar).
6.
Create and fit oak laminated door and frame to the new toilet areas.
7.
New copper pipework with appropriate safety features including
tmv’s, non-return valves etc, and waste pipework.
8.
600mm Suspended ceiling grid system to toilets. This will include
new LED lighting.
9.
New electrics where necessary. This will include air extraction and
hand dryer.
10.
New paint/decoration where necessary.
11.
New flooring. This will include initial screed levelling system
followed by site-formed anti-slip safety floor (Safetred dimensions
or similar) to the toilet area.
12.
New pottery-ware (ideal standard or similar) to the toilet area.
13.
Wash hand basin (ideal standard or similar).
14.
Emergency call/alert system.
15.
miscellaneous works.
(note: no inclusion of decoration or flooring to existing corridor
area)
3) Male staff toilets.
Within the new male staff toilet area, a 3 toilet cubicle system will be
incorporated. These will be accompanied by 2 wash hand basins built into
furniture with additional mirrors. There will be a PVC sheet wall lining.
The flooring will be an anti-slip type safety floor that is site formed,
whereby it rises slightly up the wall to aid in cleaning. All joints will be
welded together and sealed.
As follows are the works included in these quotes:
1.
Site preparation- including creating temporary corridor protection.
2.
Strip out any existing electrics/plumbing fixtures and isolate where
necessary.
3.
Strip out existing fixtures and make good.
4.
Provision of radiator heating to toilet area.
5.
Install new dividing stud wall with sound insulation. Dry-line all
walls with new OSB 11mm and hygienic PVC wall lining (Altro
Whiterock or similar).
6.
Create and fit oak laminated door and frame to the new toilet areas.
7.
PVC lining to windows and walls where necessary.
8.
New copper pipework with appropriate safety features including
tmv’s, non-return valves etc, and waste pipework.
9.
600mm Suspended ceiling grid system to toilets. This will include
new LED lighting.
10.
New electrics where necessary. This will include air extraction and
hand dryer.
11.
New paint/decoration where necessary.
12.
New flooring. This will include initial screed levelling system
followed by site-formed anti-slip safety floor (safetred dimensions
or similar) to the toilet area.
13.
New integrated pottery-ware (ideal standard or similar) to the toilet
area. The new toilets will be integrated into furniture or units. This
will include push button fascias, enclosed cisterns, isolation valves
etc. All built in equipment will include access panels.
14.
Creation of 2 hand wash basins (ideal standard or similar) within
built in furniture.
15.
miscellaneous works.
(note: no inclusion of decoration or flooring to existing corridor
area)
4) Office creation.
This office would be created by stripping out all existing fittings from the
existing male staff toilets and making good. An extending dividing wall
would be created to create a new office area with new corridor access.
The adjacent office doorway would be blocked up and made good and
relocated on the main corridor wall.
This area would then undertake a full refurbishment including the
following works:
1.
Strip out existing fixtures and fittings and isolate pipework and
make good.
2.
Install new radiators.
3.
Create new openings within corridor wall, with any support, as
necessary.
4.
Dry-line walls.
5.
Plaster skim to all walls.
6.
Grid system ceiling with new lighting.
7.
Provision of 3 compartment trunking and new electrical sockets
(provide blanks for voice and data).
8.
Carpet flooring, including screed levelling.
9.
New oak laminated fire doors with twin view panels and door
furniture.
10.
New decorations.
11.
UPVC Line to windows.
12.
Miscellaneous works.
Further notes:
General layouts as per drawing layout descriptions.
No provision to be included for any fire/emergency works, voice/data
works.
No provision to be included for the initial source supply of hot and cold
water.