Major Projects Newsletter
VOLUME
Project Update
No. 06 – March 2012
CONTENT 1
20 BED ACCOMMODATION
UNITS – BROWN 18
Project Manager: Rik Jones 8946 7737
Construction: Sunbuild Pty Ltd
Major Projects has completed the
construction of a 20 room health
workers accommodation building at
Casuarina Campus.
TRADES TRAINING FACILTY
Building will be managed by
International House staff and leased to
the Northern Territory Government for
nursing accommodation.
Project Manager: Rik Jones 8946 7737
Design Consultant: Mode Designs Pty
Ltd
Initial design was done in house and
Mode Designs Pty Ltd won the
contract for construction
documentation. Building was
constructed by Sunbuild Pty Ltd.
20 BED ACCOM
1
TRADES TRAINING
1
CLM BUILDING
2
PALMERSTON LAND
2
HR COUNTER
2
OTHER WORKS
2
CDU is planning the construction
/upgrade of trade training facilities at
Casuarina Campus. Contract for
construction documentation services has
been awarded to Mode Designs Pty Ltd.
Detailed design work is continuing.
MAJOR PROJECTS – HOPE YOU HAVE A SAFE AND ENJOYABLE EASTER BREAK
1
Major Projects Newsletter
CLM BUILDING
Project Manager: Rik Jones 8946 7737
Construction: NT LINK
A demountable is now located in the Pink Precinct
for Conservation Land Management Group. It will
accommodate 30 students and 5 staff.
PALMERSTON LAND DEVELOPMENT
Project Manager: Ken Suter 8946 6309
Construction: CIC-LDC
HR COUNTER
Project Manager: Ranjith Dias 8946 6259
Construction: Pattermore Constructions Pty
Ltd
Construction of a Counter for HR has been
completed. Pattemore Construction worked after
hours and on week-ends to minimize disruption to
staff.
OTHER PROJECTS
ORANGE 11 LEVEL 1 REFURBISHMENT – Rik
Jones 8946 7737
A new space has being created to incorporate
Architecture, Design and the Building Drafting
team in the area vacated by Fashion.
CASUARINA FIRE MAINS – Tom Lacey 8946
6114
ORANGE 2 LEVELS 2, 3, & 4 – Rik Jones 8946
7737
ORANGE 1 LEVEL 2 – Ken Suter 8946 63609
RED 6 Refurbishment and Fit-out – Ranjith Dias
8946 6529
Sales of allotments in stages 1, 2 & 3 have
progressed well and stage 4 is to open shortly.
Road works and infrastructure are continuing and it
is anticipated that house construction will
commence July 2013.
Please contact the Project Managers should
you require further information or visit: http://www.cdu.edu.au/fas/majorcapworks.html
MAJOR PROJECTS – HOPE YOU HAVE A SAFE AND ENJOYABLE EASTER BREAK