Transmission Owner Contact Information for SCRs with TO Add-back kW Values for Summer 2015 Special Case Resource TO Add-back kW values allow for adjustments to a resource’s metered load for resource Demand Reduction in a TO’s Demand Response Program which coincide with a SCR Load Zone Peak Hour identified by the NYISO. Transmission Owners will report resource Demand Reductions that coincide with any SCR Load Zone Peak Hours in DRIS. Timeframe for Revising TO Add-back values: Changes to TO Add-back values may be made to an individual SCR during the Provisional ACL Verification import period (November 11, 2015 to January 14, 2016) Changes to TO Add-back values may be made to an individual SCR during the initial monthly enrollment period in the Capability Period How to Effectuate a Change to TO Add-back Values Changes to TO Add-back values may only be made by the applicable TO. Within the timeframes described above, RIPs may use the contact information below to request that the applicable TO correct the TO Add-back value reported to DRIS for any individual SCR. A change to the TO Add-back value for an individual SCR, when entered into DRIS by the applicable TO within the timeframes described above, will cause the SCR’s ACL to be recalculated in DRIS. Transmission Owner contact information: Con Edison Rob Greig Phone: (212) 460-3325 Email: greigr@coned.com NYPA Dan Smilowitz Phone: (914) 287-3118 Email: dan.smilowitz@nypa.gov Orange and Rockland Meridith Nierenberg Phone: (845) 577-3266 Email: NierenbergM@oru.com