Material change of use

advertisement
Material change of use
DEVELOPMENT ASSESSMENT CHECKLIST
Applicant check
Properly made
Comments
Yes
No
N/A
Have fully completed IDAS forms (latest version)
been submitted?
Is the application accompanied by the correct fee?
Is the application accompanied by the owner’s written
consent or a declaration by the applicant that the
owner has given written consent to the making of the
application?
Is all mandatory information provided as nominated
on the IDAS form?
Has an assessment of the development against the
Townsville City Plan been submitted?
Where compliance with the applicable acceptable
outcome has not been achieved, has an alternative
solution been identified which complies with the
relevant performance outcome?
Road works
Yes
No
N/A
Comments
Yes
No
N/A
Comments
Indicate proposed and existing concrete paths and
kerb ramps
Location of utility services, including street trees, and
all above and below ground assets
Traffic management
Must be presented in accordance with
SC6.4.3.14 Traffic impact assessment
guidelines
Traffic reports/impact assessment
External traffic requirements and on street parking
and road furniture requirements
Refer to DTMR requirements SC6.4.4.8
Standard Drawings, SC6.4.3.5 Car parking
and public transport facilities guidelines
Public transport requirement, e.g. bus bays, taxi
ranks and loading bays
Parking and access
Yes
No
N/A
Comments
Required number of bays
REVISION DATE >> 7 MAY 2014
Townsville City Plan Checklist SC6.4.2.4.1
Disabled bays, end of trip facilities, pedestrian
movement
Dimensions of bays and aisles
Surface treatments and linemarking
Use Turning Circles as per AS2890
Internal manoeuvrability
Vehicle
access
requirements,
dimensions of driveway
location
and
Drainage
Offsets
Shade provision
structures
through
shade
trees
and/or
Stormwater drainage
Yes
No
N/A
Comments
Report required (refer to SC6.7.4 Flooding
hazard planning scheme policy Schedule
1 - Guidelines for preparation of flood
studies and reports)
The defined flood event levels
Discharge point, drainage easement requirement
CCTV of drains, building over or adjacent to drains
Refer to SC6.4.2.2.6 Conduit assessment
requirements and SC6.4.3.2 Building over
or adjacent to services
Stormwater quality management plan (including
treatment modelling)
Refer
to
SC6.4.3.8
Stormwater
management plans for development
Contours (existing and proposed)
Water supply
Yes
No
N/A
Comments
Non reticulated area
Refer to SC6.4.3.11 On-site water supply
Demonstrated adequacy of supply (main sizes and
pressure)
Refer to SC6.4.3.23 Water and sewer
network modelling guidelines
Existing connection points , meter connections/sub
meters
Sewerage reticulation
Non sewered area
Yes
No
N/A
Comments
Report Required for specific requirements
SC6.4.3.10 On-site sewerage facilities for
non-sewered properties
Existing connection points
REVISION DATE >> 7 MAY 2014
Townsville City Plan Checklist SC6.4.2.4.1
Refer to SC6.4.2.2.6 Conduit assessment
requirements and SC6.4.3.2 Building over
or adjacent to services
CCTV of sewer, building over or adjacent to sewer
Master planning
Yes
No
N/A
Comments
Overall sewerage network
Refer to SC6.4.3.23 Water and sewer
network modelling guidelines
Overall water network
Refer to SC6.4.3.23 Water and sewer
network modelling guidelines
Overall stormwater network
Overall road network
Refer to
hierarchy
Bikeways/pathways network
Refer to SC6.4.4.7 Bicycle, pedestrian and
shared path design
Public transport network
Refer to SC6.4.3.5 Car parking and public
transport facilities guidelines
Park and open space network
Refer to SC6.4.3.6 Landscape policy
Landscape and open space
Yes
No
N/A
SC6.4.3.13
Townsville
road
Comments
Surveyed existing levels and proposed finish levels
Site analysis (opportunities and constraints)
Identification of existing furniture, playground
equipment and vegetation (including vegetation to be
retained)
Hard surface treatments, proposed surface finish
Drainage and grading
Fence and other structures
Impact on existing assets, including any demolition
required
Planting details and establishment method
Calculation of landscape (broken down into turfed,
mulched and planted areas), recreation areas
Irrigation requirements
Revegetation requirement
Refer to SC6.4.3.6 Landscape policy
Open space requirement
Other
Yes
No
N/A
Comments
Conceptual soil erosion and sediment control plan
Refer to SC6.4.3.8 Stormwater quality
management plans for development
Lighting requirements
Refer to SC6.4.3.20 Public lighting and
utility services
REVISION DATE >> 7 MAY 2014
Townsville City Plan Checklist SC6.4.2.4.1
Steep slope stability >15%
Geotechnical Report required refer to
SC6.4.3.7 Steep land development design
guidelines
Acid sulphate soils <rl5.00
Report must be undertaken in accordance
with the State Planning Policy, Guidelines
for Sampling Analysis of Lowland Acid
Sulfate Soils in Queensland, Acid Sulfate
Soils Laboratory Methods Guidelines or
AS 4969
Detailed survey plan provided
If yes, attach minutes/notes
Pre-lodgement meeting held?
Referral agencies
Yes
No
N/A
Comments
State department referrals (e.g. DTMR, DEHP)
Other third party referrals
REVISION DATE >> 7 MAY 2014
Townsville City Plan Checklist SC6.4.2.4.1
REVISION DATE >> 7 MAY 2014
Townsville City Plan Checklist SC6.4.2.4.1
Download