Material change of use DEVELOPMENT ASSESSMENT CHECKLIST Applicant check Properly made Comments Yes No N/A Have fully completed IDAS forms (latest version) been submitted? Is the application accompanied by the correct fee? Is the application accompanied by the owner’s written consent or a declaration by the applicant that the owner has given written consent to the making of the application? Is all mandatory information provided as nominated on the IDAS form? Has an assessment of the development against the Townsville City Plan been submitted? Where compliance with the applicable acceptable outcome has not been achieved, has an alternative solution been identified which complies with the relevant performance outcome? Road works Yes No N/A Comments Yes No N/A Comments Indicate proposed and existing concrete paths and kerb ramps Location of utility services, including street trees, and all above and below ground assets Traffic management Must be presented in accordance with SC6.4.3.14 Traffic impact assessment guidelines Traffic reports/impact assessment External traffic requirements and on street parking and road furniture requirements Refer to DTMR requirements SC6.4.4.8 Standard Drawings, SC6.4.3.5 Car parking and public transport facilities guidelines Public transport requirement, e.g. bus bays, taxi ranks and loading bays Parking and access Yes No N/A Comments Required number of bays REVISION DATE >> 7 MAY 2014 Townsville City Plan Checklist SC6.4.2.4.1 Disabled bays, end of trip facilities, pedestrian movement Dimensions of bays and aisles Surface treatments and linemarking Use Turning Circles as per AS2890 Internal manoeuvrability Vehicle access requirements, dimensions of driveway location and Drainage Offsets Shade provision structures through shade trees and/or Stormwater drainage Yes No N/A Comments Report required (refer to SC6.7.4 Flooding hazard planning scheme policy Schedule 1 - Guidelines for preparation of flood studies and reports) The defined flood event levels Discharge point, drainage easement requirement CCTV of drains, building over or adjacent to drains Refer to SC6.4.2.2.6 Conduit assessment requirements and SC6.4.3.2 Building over or adjacent to services Stormwater quality management plan (including treatment modelling) Refer to SC6.4.3.8 Stormwater management plans for development Contours (existing and proposed) Water supply Yes No N/A Comments Non reticulated area Refer to SC6.4.3.11 On-site water supply Demonstrated adequacy of supply (main sizes and pressure) Refer to SC6.4.3.23 Water and sewer network modelling guidelines Existing connection points , meter connections/sub meters Sewerage reticulation Non sewered area Yes No N/A Comments Report Required for specific requirements SC6.4.3.10 On-site sewerage facilities for non-sewered properties Existing connection points REVISION DATE >> 7 MAY 2014 Townsville City Plan Checklist SC6.4.2.4.1 Refer to SC6.4.2.2.6 Conduit assessment requirements and SC6.4.3.2 Building over or adjacent to services CCTV of sewer, building over or adjacent to sewer Master planning Yes No N/A Comments Overall sewerage network Refer to SC6.4.3.23 Water and sewer network modelling guidelines Overall water network Refer to SC6.4.3.23 Water and sewer network modelling guidelines Overall stormwater network Overall road network Refer to hierarchy Bikeways/pathways network Refer to SC6.4.4.7 Bicycle, pedestrian and shared path design Public transport network Refer to SC6.4.3.5 Car parking and public transport facilities guidelines Park and open space network Refer to SC6.4.3.6 Landscape policy Landscape and open space Yes No N/A SC6.4.3.13 Townsville road Comments Surveyed existing levels and proposed finish levels Site analysis (opportunities and constraints) Identification of existing furniture, playground equipment and vegetation (including vegetation to be retained) Hard surface treatments, proposed surface finish Drainage and grading Fence and other structures Impact on existing assets, including any demolition required Planting details and establishment method Calculation of landscape (broken down into turfed, mulched and planted areas), recreation areas Irrigation requirements Revegetation requirement Refer to SC6.4.3.6 Landscape policy Open space requirement Other Yes No N/A Comments Conceptual soil erosion and sediment control plan Refer to SC6.4.3.8 Stormwater quality management plans for development Lighting requirements Refer to SC6.4.3.20 Public lighting and utility services REVISION DATE >> 7 MAY 2014 Townsville City Plan Checklist SC6.4.2.4.1 Steep slope stability >15% Geotechnical Report required refer to SC6.4.3.7 Steep land development design guidelines Acid sulphate soils <rl5.00 Report must be undertaken in accordance with the State Planning Policy, Guidelines for Sampling Analysis of Lowland Acid Sulfate Soils in Queensland, Acid Sulfate Soils Laboratory Methods Guidelines or AS 4969 Detailed survey plan provided If yes, attach minutes/notes Pre-lodgement meeting held? Referral agencies Yes No N/A Comments State department referrals (e.g. DTMR, DEHP) Other third party referrals REVISION DATE >> 7 MAY 2014 Townsville City Plan Checklist SC6.4.2.4.1 REVISION DATE >> 7 MAY 2014 Townsville City Plan Checklist SC6.4.2.4.1