MONTHLY REPORT TO THE COMMUNITY MAY 2014 The Monthly Report to the Community summarises, for the information of the community and other interested stakeholders, all of the many activities of the Shire for the preceding month, ranging from policy development and implementation through to service delivery, the provision of infrastructure, and the Shire’s financial position. Given the scope of the Shire’s wide ranging activities, there is a great deal to report. Every effort is made to provide information in a readily understandable, easy-to-read form. Any resident, ratepayer or other stakeholder seeking further information should contact the relevant Shire manager or director, or in the first instance can contact: Todd Trimble Manager Communications Ph. 5950 1200 TABLE OF CONTENTS CEO’s Introduction Dr Michael Kennedy, OAM iii Corporate Performance Statement Geoff Emberson 1 Performance Executive Summary - Strategic Planning - Statutory Planning - Environment Protection and Community Safety - Economic Development - Director Sustainable Environment - Infrastructure Strategy - Infrastructure Maintenance - Infrastructure Project Management - Renewable Resources - Director Sustainable Infrastructure - Child, Youth and Family Care - Aged and Disability Services - Recreation and Leisure - Libraries, Arts and Culture - Social Planning and Community Development - Director Sustainable Communities - Corporate Planning and Projects - Communications - Team Support and Development - Governance and Corporate Support - Property & Valuation - Information Services - Finance - Director Sustainable Organisation Allan Cowley Alison Leighton 2 30 38 46 50 52 60 77 79 85 86 93 97 101 104 110 111 112 114 116 119 122 123 124 Capital Works Overview Craig Cinquegrana 125 Priority Works Overview Various 149 Priority Projects Overview Various 156 Asset Conversion Program Yasmin Woods 167 Financial Statements - Standard Statement of Financial Performance (Income Statement) - Net Cost Statement - Standard Statement of Cash Flows - Standard Statement of Financial Position (Balance Sheet) - Standard Statement of Capital Works - Corporate Performance Statement Geoff Emberson Key Financial Status Indicators - Borrowings Geoff Emberson Monthly Report May 2014 Angela Hughes Claire Smith Shane Murphy Stephen Chapple Nicola Belcher Barry Pankhurst Craig Cinquegrana Niall McDonagh Alex Atkins Robin Adams Jenny Van Riel Peter Gore Geoff Carson Jenny Macaffer Rob Macindoe Sophia Schyschow Todd Trimble John Rankine Tony Pinqiaro Yasmin Woods Mike Foreshew Geoff Emberson 173 174 175 179 180 182 183 Page i Monthly Report May 2014 Page ii CEO’s INTRODUCTION SHIRE WINS “TOWARDS SAFETY AWARD” ZERO The Mornington Peninsula Shire has been awarded the Towards Zero Safety Award for our Peninsula Safer Speeds Project. The Victorian Government’s inaugural awards recognised the State’s best road safety initiatives and this award highlights the Shire’s significant leadership and reporting through our road safety initiative, the Peninsula Safer Speeds Project. The project has implemented speed limit reductions for local rural and residential roads which have resulted in significant positive outcomes towards safety benefits that are projected to result in an 11% reduction in fatalities and a 6% reduction in serious injuries. The Peninsula Safer Speeds project is part of the Shire’s Peninsula DriveSafe strategy. Since the strategy’s adoption by Council in 2008 there has been a steady trend downwards in both fatalities and serious injuries on Mornington Peninsula Shire Roads. In 2013, the Shire recorded its lowest ever road toll across the Mornington Peninsula, a very positive outcome for our community. ‘PLAN MEBOURNE’ STRATEGY LAUNCH May saw the much awaited launch of the State Government’s PLAN MELBOURNE strategy to guide and plan for Melbourne’s growth to a projected population of 7.8 million people by 2051. Given that the community vision for the Peninsula is of being ‘near to, but not part of, Melbourne and its accelerating growth’, the Shire facilitated a series of very well attended PLAN PENINSULA workshops in 2013 to inform Council’s input to PLAN MELBOURNE, to reflect our community’s future expectations and aspirations. One of the key outcomes of PLAN MELBOURNE is confirmation of the State’s commitment to the Mornington Peninsula Planning Statement, which acknowledges that the Peninsula plays a range of complementary roles in tourism, recreation, agriculture and manufacturing, but that our community is clear that we are not ‘suburbia’, and don’t want to be. The Mornington Peninsula Planning Statement (MPPS) will strengthen Council’s position on a range of key planning issues including the appropriate level and location of population growth on the Peninsula, maintaining the current urban growth boundary, supporting the role and character of our townships, encouraging sustainable agriculture, providing for new recreational and tourism experiences, supporting conservation and biodiversity, managing environmental risks, and ensuring proper planning for the Port of Hastings and the associated major transport infrastructure. The drafting of the MPPS has now been completed with significant input from Council, and has been provided to State Government for finalization and approval. It is anticipated that Monthly Report May 2014 i the Planning Statement will become part of State policy, providing the highest level of autonomy in the planning system. Other elements of PLAN MELBOURNE that are of importance to the Mornington Peninsula include:• • • • Port of Hastings operation as a major container port with road and rail link to Dandenong achieved by 2025-2050 Frankston as the nearest “Metropolitan Activity Centre” and Hastings, Mornington and Rosebud to remain as “activity centres” and smaller centres to be reviewed in context of “neighborhood centres” Role for Metropolitan Planning Authority in reporting and implementing Plan Melbourne Subregional planning emphasis, with significant local government input. AGEING POPULATION ….NOT DOOM AND GLOOM A recent study published by the Monash Centre for Population and Urban Research has stated that, contrary to ‘conventional wisdom’, the ageing of the Australian population does not, and will not, impose unmanageable strains on society. It finds that Australia is coping well with its ageing population and should be able to keep doing so throughout the 21st century. Key points of the study include:• Labour force participation rates are rising for older people and could rise even higher with lower levels of aged based discrimination • Demographic ageing will be affordable with even a modest increase in economic growth • Medical research shows the physical and mental health of older people is improving, and rates of over 65s in residential care has fallen • Older people’s volunteer contribution plays a significant role particularly with child care, as grandparents participation in child care increases and with the major contribution over 65s are making to caring for people with disabilities A more detailed summary of the report is provided on page 94 of this report. BUSINESS CONTINUITY PLANNING Given the reliance that residents and businesses place on the availability of a range of Council services, it is essential that Council has plans in place to ensure uninterrupted service availability in the event of any significant business interruption at any of the Shire’s major business locations. The Shire’s Business Continuity Plan (BCP) has been developed to ensure an immediate, orderly and effective response to any incident that significantly disrupts Council operations. Getting back to business quickly is vital for our community that depend on critical services. The objectives of our BCP are to: • Ensure that maximum possible service levels are restored as quickly as possible • Ensure that the Council recovers from interruptions as quickly as possible Monthly Report May 2014 ii • • Minimise the effect on the public, staff and Council; and Minimise the likelihood and impact (risk) of interruptions. Developing a BCP involves an indepth business impact analysis undertaken by our management team. Operationally, a number of critical business functions have been identified and sub-plans developed for those important services. Our BCP was put to the test at a desktop scenario test in May. Feedback from Echelon Australia on the session has been very positive. A ‘live’ test of the BCP will be conducted towards the end of 2014. It is important that the community can be confident in our ability to immediately respond to any incident that significantly disrupts our operations, and get back to business quickly on critical services. STATE AND COMMONWEALTH BUDGETS As expected, May saw both State and Commonwealth budgets delivered with significantly ‘tightened’ funding to local government directly, and to a range of services that will impact on our local communities, reflecting tight economic conditions and severe budgetary constraints. It is difficult to assess the full year impact of tightened funding, as some impacts will be through reduced grant availability through the year, and there may be some (as yet unknown) off-setting gains. The Shire’s ongoing commitment to Driving Responsiveness, Innovation and Productivity (‘DRIP’) is the means by which Council seeks to improve service delivery while improving value for money, to offset the impact of reduced funding. HIGHER CONTRACTED MAINTENANCE STANDARDS REDUCE CALLOUTS Higher contracted maintenance standards as part of Council’s ‘SIMS2’ (Sustainable Infrastructure Maintenance Services) contracts have delivered significant reductions in after hours callouts. Comparing the busy November to March 2013-14 period with the prior season: • • • • • • For callouts related to building matters, they reduced from 491 to 443 – a 10% decrease For callouts related to cleansing matters, they reduced from 60 to 43 – a 28% decrease For callouts related to furniture & sign matters, they reduced from 11 to 3 – a 73% decrease For callouts related to road maintenance matters, they reduced from 198 to 187 – a 6% decrease For callouts related to parks and roadsides matters, they increased from 64 to 79 – a 10% increase. The increase in parks and roadsides callouts is directly related to a windstorm event late January 2014 resulting in callouts for fallen branches/trees Overall 830 callouts were received for 2012/13 and 760 for 2013/14. This is a 9% decrease from 2012/13. In reviewing data on all maintenance requested related to Foreshore Camping, and information from a campers satisfaction survey (conducted by the Shire’s Recreation & Leisure Team), the following results are also evidence of the success of new SIMS2 maintenance contracts: Monthly Report May 2014 3 • • Maintenance requests (during business hours and after hours) over the foreshore camping season (November to April) reduced from 718 to 602, a 16% decrease Camper satisfaction level in relation to maintenance services has improved from an average of 3.6 (out of 5) in 2012/13 to 4.2 in 2013/14. This is a 17% improvement. DRIVING RESPONSIVENESS, INNOVATION AND PRODUCTIVITY (DRIP) The Shire is committed to enhancing the responsiveness and value-for-money of all of its services, through a relentless focus on innovation and improving productivity. Some of this month’s highlights are summarised here: Energy Saver Studies The Shire is undertaking two projects to assist the community in identify ways of reducing energy use: • Aged and Disability Clients are involved in a study to identify the most efficient ways to support vulnerable members of our community to reduce energy bills and live in a more comfortable and safe environment. The project monitors energy use as well as providing support and retrofits to reduce energy consumption. • Mornington Peninsula sporting clubs are working with the Shire on a project “Save it for the Game” that aims to identify where clubs can save the most energy and assist in finding the best way to implement the recommendations. SMS Reminders The Shire has implemented an innovative approach in using SMS text messaging to send animal registration reminders to pet owners. Through this new business channel, we were able to stage the message delivery to occur at times when we are best positioned to process responses, and saved considerable resources associated with a traditional mail-out. The new method has also resulted in an increase of 1,200 pet registrations compared to last year. Community Emergency Risk Assessment The Shire, working closely with the Victorian State Emergency Service (SES) and other partner agencies, commenced work on a Community Emergency Risk Assessment (CERA) tool to help inform emergency management planning on the Mornington Peninsula. The CERA tool represents a significant shift within the emergency management and broader municipal management sectors towards a shared understanding of emergency hazards and the plans, actions and activities that are required to ensure the safety and resilience of Victorian communities. The CERA process provides all parties with a framework that can help channel complex social, economic, environmental and organisational factors into a relevant and practical planning format. In House Collaborative Training In support of working collegiately with a whole of Shire approach, various teams across the Shire have worked together to develop relevant and effective in house training programs for our large community care workforce. Areas of training include pet behaviour and interaction, road safety and best practice driving, and home fire safety which the CFA and Metropolitan Fire Brigade also participated in. The good will and vigour with which we can work together to achieve great outcomes for not only our team members but also the community is invaluable. Monthly Report May 2014 4 COMMUNITY ENGAGEMENT Active, direct engagement with local communities is an essential element of Council’s policy development and implementation, and service delivery and community support. Some of this month’s highlights are summarised here: Reconciliation Week Celebrations Reconciliation Week 2014 was celebrated with more than 100 people in attendance. Dean Stewart for Boon wurrung Foundation, the Djirri Djirri dance group the Mayor and Councillors joined in with the celebrations. Municipal Waste Management Strategy Review Community input continues into the Shire’s major review of our Waste Management Strategy. Two community engagement forums were held on the topic of “How can the Shire best provide for the disposal of its waste to landfill in the short to medium term?” The first forum was focused on understanding the context of the issue and sharing information on the options for future waste disposal. Information gaps identified at the first forum were then responded to at the second forum and the group voted on the option they supported. Wallaroo Reserve Community Project A community activation exercise was conducted as part of the Wallaroo Reserve Upgrade Project. Ideas from previous workshops were tested with over 80 community members and feedback was gathered to inform the implementation of those ideas. The exercise focused on solutions to negative activities occurring in the park, such as creating natural barriers to motorised vehicles and the creation of active, family friendly spaces such as revamping the old BMX tack, a new BBQ area, new play equipment and the installation of a basketball hoop. Monthly Report May 2014 5 Law Week Seniors Forum The Law Week Seniors Forum at Dromana Community Hall was attended by over 100 people. The Peninsula Advisory Committee for Elders (PACE), Mornington Peninsula Shire, Peninsula Community Legal Centre and Seniors Rights Victoria worked collaboratively to put together the forum which provided community members with information about law issues particular to seniors, a growing area of concern in Australia and around the world. Human Rights Arts & Film Festival The Shire in partnership with the Human Rights Arts and Film Festival (HRAFF) hosted a film on disability, Sons and Mothers at the Australian Centre for Moving Image (ACMI) in Federation Square. More than 160 people attended the screening and visited the Shire information table as well as attending a Q&A panel with the film’s director and a performer. Cultural Diversity Short Film Festival Opening Night The Mayor, Councillor Antonella Celi opened the Cultural Diversity Short Film Festival held on World Day for Cultural Diversity for Dialogue and Development and was a partnership between the Mornington Peninsula Human Rights Group and the New Hope Foundation. A selection of short films was showcased that highlighted the successes and challenges of the migrant experience. Neighbourhood House Expo The twelve Neighbourhood Houses held an Expo during Neighbourhood House Week at Peninsula Community Theatre. Free activities, displays, performances and information were provided for over 500 people that in attendance. The Expo showcased the diverse range of activities and learning experiences that are available at Neighbourhood and Community Houses across the Shire. National Volunteer Week The Peninsula has over 30,000 volunteers ranging across an enormous number of areas such as delivered meals, canteen assistants, bushland reserve volunteers, Red Cross, community drivers and sporting group committees. The Shire works closely with Volunteers Mornington Peninsula (VMP) to promote the development of volunteering across the Peninsula and this month celebrated volunteer contribution during National Volunteer Week; • The Shire hosted volunteers from the regional visitor information centres. The volunteers have accrued over 320 years of voluntary contribution in providing information to our visitors. Monthly Report May 2014 6 • The Frankston and Mornington Peninsula regions six Visitor Information Centres joined together to celebrate volunteering - the first ever combined event was attended by volunteers and their centre coordinators, the Frankston and Mornington Peninsula Shire Mayors, and directors and managers from both municipalities. • A series of ecological presentations for volunteers working in bushland reserves across the Shire were presented to say thank you for the incredible work that the volunteers undertake and to provide an opportunity to build their knowledge. • An afternoon at the briars including ECO House demonstrations and afternoon tea was held to acknowledge the dedicated delivered meals volunteers who deliver more than 1,300 meals to clients each week and travel more than 2,500 kms every week. Friends for Life The Shire commenced facilitating the Friends for Life Program at Somerville and Dromana Secondary Colleges. The program, backed by the World Health Organisation has been specifically developed by world-renowned child psychologist Prof. Paula Barrett for young people, to assist in fostering a variety of essential life skills and to empower young people and their families. Memorial Plantings A memorial planting at The Briars in conjunction with Peninsula Home Hospice was well attended by over 360 people, who planted indigenous trees in memory of their loved ones. This is the third year the event has been held and it continues to increase in popularity. FINANCIAL As is the usual practice for this time of the year we have commenced our year end review. This involves reconciliation of the remaining ‘unders and overs’ in different parts of the Shire organisation that have come about as a result of responding to priority needs and circumstances, offset by savings achieved through increased efficiency. Importantly, these movements, which have been reported throughout the year, will not impact our expected overall year-end result which remains unchanged. As part of this review, we have also started to identify projects which will be carried forward into the 2014/15 financial year. Dr Michael Kennedy OAM Chief Executive Officer Monthly Report May 2014 vii Corporate Performance Statement For the period ending May 2014 Forecast Month $'000 Income Rates Grants and Subsidies User Charges Grants Commission Interest Income Variance Month $'000 Forecast Y.T.D $'000 Actual Y.T.D. $'000 Variance Y.T.D $'000 Budget Y.E. $'000 Forecast Y.E. $'000 Variance Y.E. $'000 2 1,328 1,660 846 205 3 1,713 1,811 846 104 2 385 151 (0) (101) 132,096 11,552 24,877 3,383 1,383 132,132 11,693 24,894 3,383 1,378 37 140 18 0 (5) 131,708 11,712 27,198 6,466 1,700 132,296 12,481 27,603 6,610 1,568 588 769 405 144 (132) 4,041 4,477 436 173,290 173,480 189 178,783 180,557 1,774 1,728 5,749 3,117 2,147 478 0 8 1,782 6,044 3,729 1,052 544 0 1 (54) (296) (612) 1,095 (66) 0 7 15,270 60,778 32,391 17,812 4,667 0 1,301 15,231 61,739 32,933 16,961 4,730 0 1,518 39 (961) (542) 851 (63) 0 (217) 16,268 67,356 34,947 20,713 4,769 (500) 2,480 16,704 67,552 35,469 20,760 5,185 0 2,480 (436) (196) (522) (46) (416) (500) 0 13,228 13,153 74 132,220 133,112 (892) 146,033 148,150 (2,117) (8,676) 511 41,071 40,368 (702) 32,751 32,407 (343) 0 0 (44) 0 (140) (346) (2,398) 71 139 26 0 19 0 0 (44) 0 (399) (183) (2,450) 27 250 0 0 94 0 0 0 0 (259) 163 (52) (44) 111 (26) 0 75 11,865 (4,213) (471) (10,865) (3,239) (4,349) (28,306) 622 2,592 342 0 37 11,865 (4,224) (471) (10,865) (1,574) (2,773) (21,180) 531 2,850 (19) 0 94 (0) (11) 0 (0) 1,665 1,576 7,126 (90) 258 (362) 0 57 11,865 (4,886) (515) (11,335) (5,381) (5,395) (42,791) 1,450 2,651 1,354 0 311 11,865 (4,886) (515) (11,335) (4,938) (5,761) (47,354) 4,181 3,901 1,518 0 536 0 0 0 0 442 (366) (4,563) 2,731 1,250 164 0 225 (2,674) (2,705) (31) (35,984) (25,766) 10,219 (52,671) (52,788) (117) (11,381) 480 5,086 14,603 9,516 (19,920) (20,380) (460) 15 0 12 0 2,294 0 457 (1,837) 0 13,270 0 13,730 0 460 0 562 562 0 (6,088) (6,088) (0) Expenses Sustainable Environment Sustainable Infrastructure Sustainable Communities Sustainable Organisation The CEO's Office Efficiency Savings Interest Expense Funds available Actual Month $'000 (9,187) Capital and priority works and services New Borrowings Debt Servicing Principal Lease Payments Defined Benefits Superannuation Lia Priority Projects (Net) Priority Works (Net) Capital Expenditure Capital Grants Capital Contributions Special Charge Schemes Special Charge Schemes Transfers from reserves Operating Result (11,861) Non-operating Asset Sales Transfer to land acquisition reserve 3 0 Projects funded in previous years Result (11,858) Monthly Report May 2014 (11,366) 492 7,380 1 15,059 7,679 STRATEGIC PLANNING ACTIVITY CENTRE PLANNING Mornington Activity Centre Structure Plan The Mornington Activity Centre Structure Plan was adopted by Council in 2007 and is available on the Council website. The Planning Scheme includes key provisions of the Structure Plan, including mandatory height limits in different areas of the centre. A Streetscape Framework Plan was developed in 2009 and further streetscape improvements have occurred in the area, better linking the commercial centre to the foreshore. Update: The focus is now on further implementation of the Structure Plan. A major current implementation project relates to the improvement of the laneways that connect Main Street with the car parking areas at the rear of the Main Street shops. Refer to the Urban Design section of this report for further details. Rosebud Activity Centre Structure Plan The Rosebud Activity Centre Structure Plan and Urban Design Framework were adopted by Council at the Council meeting on 24 September 2012, and are available on the Council website. The Rosebud Structure Plan and UDF include the establishment of a new “heart” precinct, which extends from Wannaeue Place, through Ninth Avenue and across Point Nepean Road to a new civic space on the foreshore. The purpose of this element is to provide a clear destination point within the commercial centre, and improved connections between the centre and the adjoining foreshore reserve. Update: At its meeting on 12 March 2013, Council passed a number of resolutions relevant to the Rosebud Activity Centre Structure Plan and these matters are currently under investigation. Hastings Activity Centre Structure Plan The Hastings Activity Centre structure plan is intended to review and update plans for the Hastings Major Activity Centre in consultation with the community and stakeholders. Development of the structure plan is being coordinated with preparation of the Hastings South Coastal Management Plan. A Draft Hastings Town Centre Structure Plan has been completed with assistance from planning consultant firm Planisphere. Although there have been delays in the preparation of the Structure Plan, work on the Hastings Centre has already been undertaken through progressive implementation of the long term traffic management plan and the approval of Amendment C91 which has provided additional land for commercial development and associated development contributions to provide for improved public spaces. Update: On 26 May 2014 Council resolved to commence the public exhibition and consultation process for the draft Hastings Activity Centre Structure Plan. Monthly Report May 2014 2 HOUSING, NEIGHBOURHOOD CHARACTER AND SETTLEMENT PLANNING Housing Growth Requirements Program The Housing Growth Requirements Program was established by the Department of Planning and Community Development (now DTPLI) in the context of population growth rates which were significantly higher than those projected in the Melbourne 2030 strategy. The program was intended to consist of three main stages: • Assessment of the housing capacity of each metropolitan municipality. Consultants acting for DPCD (SGS Consultants) were appointed to complete a housing capacity assessment for each municipality in accordance with a standard methodology. This assessment was to include an analysis of previous housing development patterns, market trends and future opportunities and constraints. The methodology includes a category for townships and rural communities (separate from urban Melbourne) that covers the majority of the Peninsula. Preliminary Housing Development Data (2004 – 2008) was released in April 2011. • DPCD setting housing growth requirements for each metropolitan municipality based on the capacity assessment and demand trends. • Development of a framework to deliver on the requirements, including local housing strategies that facilitate housing development and diversity. Housing growth requirements were intended to be considered in the preparation of municipal housing strategies and any associated planning scheme amendments. It is understood that draft Housing Capacity Assessment Options were produced, which focused on ways to influence future housing supply and to test the influence of alternative planning frameworks and changes to infrastructure provision on future housing capacity and supply. However, this work has not been released. The new metropolitan planning strategy PLAN MELBOURNE, released on 19 May 2014, anticipates significant population growth and housing demand over the next 30 years. This strategy, and the current residential zones conversion project, both highlight the continuing need for significant work on future housing provision. Update: DTPLI provided a report on Housing Development Data to the Residential Zones Standing Advisory Committee in respect of Planning Scheme Amendment C179 – Residential Zones Conversion. However it did not contain the detailed targets and options that were originally envisaged under the Housing Growth Requirements Program. Review of the Low Density Residential Zone (LDRZ) DPCD previously provided a grant of $35,000 for work on housing related issues. This grant has been used to support a review of the Low Density Residential Zone (LDRZ) across the Shire. Update: Consultants have submitted a final draft which will be reviewed in conjunction with the preparation of the Local Housing and Sustainable Settlement Strategy (see below). Local Housing and Sustainable Settlement Strategy The Local Housing and Sustainable Settlement Strategy (LHSSS) was intended to follow on from the State government’s Housing Growth Requirements project (discussed above), and to provide a more detailed examination of housing issues, needs and trends at the local level. However, having regard to the delay in the release of Housing Capacity Assessments, it is considered appropriate to proceed with work at the local level as part of the background work required in the introduction of the new residential zones (see below). Monthly Report May 2014 3 The intention of the overall project is to include a coordinated review of housing with other key factors which affect the sustainability and livability of settlements, including access to employment, the availability of transport services, the availability of open space and recreation areas, the demand for community facilities etc. This is consistent with the approach being taken by the Green Building Council of Australia’s new (Green Star) rating guidelines on community level sustainability. The LHSSS will also need to address the key issues of housing availability, appropriate design and affordability. In practice it will also need to identify areas with greater and lesser capacity to absorb changes in housing stock, both in terms of infrastructure capacity and neighbourhood character. Refer to the Shire website for further details: http://www.mornpen.vic.gov.au/files/3fb4993f-56fb4959-9127-a1a500e01b08/Housing_Growth_Sustainability_Fact_File.pdf Update: The study brief is under review and preliminary data collection has been commenced. Neighbourhood Character Program The neighborhood character program involves a number of elements that are directed towards increasing the recognition of neighbourhood character and giving effect to the local area character policy within the planning scheme. The main elements include: • Pilot character studies, intended to test character study methodologies. A pilot study for the Beleura Hill Area in Mornington has commenced. • A general policy to complement Clause 54, 55 and 56 (Rescode provisions). A draft has been completed and will be considered as part of a future planning scheme amendment. • Gap analysis/cutting red tape – intended to identify areas under development pressure or where current provisions require revision. This is an ongoing process. • Local Planning Scheme amendments. Amendments for the Crib Point area (C163) have recently been completed and an amendment for the Mount Eliza Woodland Area (C162) is in progress – see the Amendment section of this report for details. • Investigation Areas – as part of the zone conversion process Council has identified a number of areas where there is an apparent case for use of the Neighbourhood Residential Zone and a higher level of control than provided under the statewide Rescode provisions. Initial work has commenced on a review of these investigation areas. • Coordination with the Local Housing and Settlement Strategy. In assessing future housing capacity, attention will be given to the ability of each area to absorb change without significant loss of character or the ability to achieve a preferred future character. • The preparation of Site Context and Design Response guidelines. The current planning scheme provisions emphasize the analysis and assessment of the existing context as an important factor in the design of new development which respects neighbourhood character. A weakness of the current system is the variability and limited depth of context analysis. The proposed guidelines aim to address this problem and will provide a more rigorous assessment framework (see item under Urban Design section of this report). Update: Tract Consultants have been appointed to complete the Beleura Hill Neighbourhood Character Study. The consultants have completed draft Design Guidelines. The draft Design Guidelines will be presented to Council on 23 June 2014 with a recommendation to commence a further public exhibition and consultation process. Monthly Report May 2014 4 Sorrento Township Planning Following the formation of the Sorrento Township Planning and Consultative Committee (STPCC), Council officers have provided support for community based planning activities, focused primarily on the development of a vision for the Sorrento township and an action plan to address a range of issues, including development and landscaping guidelines which reflect the historic seaside character of the town, traffic and parking management, and the future of the Morce Avenue area. The STPCC is also aware of the demographic and population distribution trends which will shape communities into the future and seeks, in the longer term, to develop policies which will produce a more balanced and sustainable community profile in Sorrento. Council has expressed support for the work undertaken to date on a draft streetscape concept plan (prepared by Hansen Partnership) and has recommended investigation of available implementation options, emphasising however that there is no commitment to funding capital works outside of the annual budget assessment process. Update: The construction of (Stage 1 of) Darling Plaza, one of the key elements of the streetscape concept plan, has recently been completed and the Sorrento Post Office building has recently been included in the Sorrento Historic Precinct Policy as a specific contributory building. Crib Point Township Plan Council, in conjunction with Hansen Partnership, Barraco Wright and NMBW Architects has prepared a township plan and design framework for the Crib Point Township, having particular regard to: • the increasing number of multi-unit applications in the Crib Point area, with the potential to have an adverse impact on the neighbourhood character of the township; • the cumulative loss of vegetation within the township; • the limited range of retail and other services within the town; • possible changes as a result of the Port of Hastings Strategy; • the possible location of the Otama submarine at Crib Point (Stony Point). Following completion of the draft Township Plan in December 2012, Council considered a complementary draft planning scheme amendment (C163), which proposes the introduction of three new Design and Development Overlays (two for residential areas and one for the commercial area) and a Vegetation Protection Overlay over the whole of the township residential area. While the VPO has been approved and the DDO provisions have been adopted and referred to the Minister for Planning for approval, the introduction of the Crib Point Township Plan as a reference document (C163 part 3) has been deferred pending further consultation with key port planning agencies, including the Port of Hastings Development Authority (PoHDA). Update: Discussions with PoHDA are continuing. Bittern Community Consultation Council has completed a community consultation project focused on the Bittern township, seeking community input on local issues and opportunities. Communication consultants, Collective Possibilities assisted in the project which included a number of focus group sessions, interviews (vox pops) at the Community Market and a consultation “summit” which was held at the Bittern Hall. The input received through this project will assist in the development of a number of projects in Bittern subject to further community consultation. Update: A report outlining the project and its outcomes was presented to the Council meeting on 26 May 2014. Monthly Report May 2014 5 GREEN WEDGE PLANNING Green Wedge Management Plan (GWMP) The Green Wedge Management Plan (GWMP) is intended to provide for the integrated land use planning and land management of the green wedge. The project is supported by a Community Reference Group and a Technical Reference Group of government agencies. The State government has also established a Peri-Urban planning unit which is responsible for green wedge management plans at state level. In June 2011, Council adopted an interim policy in relation to Dwellings in Rural Areas which is used to guide decision making by officers under delegation. Recent discussions with the Port Phillip and Western Port Catchment Management Authority regarding the current preparation of the Regional Catchment Strategy have also indicated significant opportunities for coordination with the Green Wedge Management Plan. In the context of the Minister’s zone reforms (see below), the consultation that has been undertaken through the Plan Peninsula process and the preparation of the Peninsula Planning Statement, it was considered appropriate for Council to adopt an interim Green Wedge Management Plan to reflect Council’s existing policy positions. Council adopted the Interim Green Wedge Management Plan in September 2012. Update: The interim Green Wedge Management Plan will be subject to community consultation and review following release by the Minister for Planning of the Mornington Peninsula Planning Statement, which is expected to occur by mid 2014. PORT AREA PLANNING The Mornington Peninsula Shire Council has consistently supported the further development of the Port of Hastings in principle. However, this support has been conditional on satisfactory resolution of the issues raised by the community, particularly ensuring that Hastings is further developed as an environmentally sustainable “green port”, and that the necessary transport infrastructure is provided ahead of demand to avoid adverse traffic and rail transport impacts on the Shire’s townships. The business case should also clearly identify the economic benefits to the Shire and the south east region. Further planning for port area development is ongoing, with the Port of Hastings Development Authority (PoHDA) established in January 2012 as a state owned enterprise, with Mr. Yehudi Blacher as the inaugural board chair and Mr. Michael Lean as the CEO of the Authority. The primary role of PoHDA is to advance planning for Hastings as a major container port, including more detailed environmental, social and economic investigations. The State government has also indicated that, due to congestion issues affecting the Port of Melbourne and growing freight demand, it will be necessary to bring forward development of the Port of Hastings by approx 10 years, with an estimated cost of approx $9.4 billion. In August, 2013 the State government released the Victorian Freight and Logistics Plan (Victoria – the Freight State), which emphasizes the importance of freight movement to Victoria’s economy. This plan confirms the projected growth of containerized imports and exports (quadrupling over the next forty years), and the critical role of the Port of Hastings in meeting this demand. The report also highlights the need for significant investment in road and rail infrastructure as part of an integrated freight and logistics system. Update: PoHDA are currently undertaking a range of social, economic and environmental background studies in preparation for development of the Strategy. Monthly Report May 2014 6 PoHDA has also recently announced the establishment of a community consultation program, referred to as “PORTicipate”, which has included the establishment of three groups representing the Community, Environment and Business. The Minister for Planning has approved a new Port Zone for use throughout Victoria and DTPLI is now considering where it should be applied. A report regarding the new Port Zone was considered by Council at the meeting on 24 February 2014 and a submission has been lodged with DTPLI advocating Council’s position. Peninsula Link (Frankston Bypass) Peninsula Link, a freeway standard road from the southern end of the East Link freeway which provides a bypass around central Frankston and connects to the existing Mornington Peninsula freeway north of Dromana, was opened in January 2013. The road extends through Baxter and the Moorooduc Plain, with major intersections at Bungower Road and Mornington Tyabb Road. A Community Advisory Group has been established to provide a forum for ongoing community input into the project. Representatives on the Community Advisory Group include Councillor Anne Shaw. Further information is available on the Peninsula Link website: http://www.peninsulalink.com.au/NewPage.aspx Update: Large scale vegetation offsets relating to the Peninsula Link project are being implemented on a 195 ha. portion of a private property at Boneo Park, West Rosebud, which forms part of the Tootgarook Wetlands, through a Trust for Nature covenant registered on the property title. Implementation of the vegetation offsets at Boneo Park is now into year two of a ten year plan, with associated extensive on ground works and monitoring. The owner of this land is also negotiating with other town planning permit holders to accommodate further vegetation offsets arising from approved development nearby. The Linking Melbourne Authority (LMA) is still to finalise the disposal of surplus land and prepare the required planning scheme amendment. Council has previously written to the LMA indicating its position in regard to surplus land i.e. the need to avoid the creation of additional substandard lots in the Green Wedge. Peninsula Link twin freeway service centres The Minister for Planning approved Mornington Peninsula Planning Scheme Amendment C195 to provide a site specific approval for Peninsula Link twin freeway service centres without public exhibition. Reports were made to Council about this matter on 24 February 2014 and 28 April 2014 and, in summary, Council resolved to request the Minister to “undo” this approval. Update: Awaiting the Minister’s response to Council’s requests for amendment of the Planning Scheme to “undo” Amendment C195. The applicant has submitted detailed plans for approval under the site specific provisions introduced by Amendment C195, and these have been included on the Shire’s website. Monthly Report May 2014 7 PLANNING SYSTEM Review of the Victorian Planning System The Minister for Planning has established an Advisory Committee to review the planning system in Victoria. The Committee report and the Government’s response can be viewed at: http://www.dpcd.vic.gov.au/ data/assets/word_doc/0014/105611/Govt-Response-toRecommendations-Accessible-Word-version.doc In summary, the report supports the preparation of a new Planning Act over the longer term and a review of the Victoria Planning Provisions in the short term, including the roles of the Municipal Strategic Statement and Local policies. The report proposes more emphasis on Local Government’s role in strategic planning. It also supports greater efficiency in the planning scheme amendment process, including the “streaming” of planning scheme amendments with a review of the number of decision points and earlier advice in the process from a Panel. The ability of Councils to refuse/abandon planning scheme amendments is not affected. The report also seeks to reduce permit triggers and to provide for more delegation and streaming of permit applications, with revised notice provisions. The use of Code based assessment for relatively simple proposals appears to be a high priority. Update: Implementation of the Committee’s recommendations has commenced with: • The introduction of the Planning and Environment Amendment (General) Act 2012 on 28 October 2013. • Ministerial Direction 15 - provides timeframes for (some) steps in the planning scheme amendment process. • Still outstanding: • Actions to reduce the backlog of cases and waiting time at VCAT. • A review of the adequacy of the current schedule of application fees. Code assessment process for straight forward, low impact permit applications. • (VicSmart) to be implemented through Planning Scheme amendments. Melbourne Metropolitan Planning Strategy – PLAN MELBOURNE In July 2012, the State government commenced the preparation of a new metropolitan planning strategy to manage Melbourne’s growth and change. Details are available on the dedicated website: http://www.planmelbourne.vic.gov.au/. The strategy is intended to “re-shape Melbourne” in response to the issues and pressures that arise from both an increasing population (growing from 4.5 million to more than 6 million over the next 30 years) and global economic competition. The draft Strategy, known as PLAN MELBOURNE, was released for public comment on 9 October 2013, with submissions closing on Friday 6 December 2013. The draft Strategy is based around ten key themes including people, housing, transport, environment, economy, communities, freight, infrastructure, regional areas and peri-urban areas. The strategy indicates an increased focus (both in terms of planning and investment) on key employment clusters, aiming to achieve a pattern of future development which is both more sustainable (reducing travel times – as expressed in the aim of a “20 minute city”) and more economically effective (supporting growth in areas which are already competitive, and promoting economies of scale and agglomeration). The strategy is also intended to contribute to the overall vision for the State, complementing and linking with regional growth plans. In addition to the release of the draft Strategy, the State government has announced the formation of the Metropolitan Planning Authority, enlarging and expanding the Growth Areas Authority which Monthly Report May 2014 8 has been responsible for planning and infrastructure coordination in Melbourne’s outer growth areas. The new MPA is intended to work with five sub-regional groups of Councils (with the Mornington Peninsula in the southern sub-region) to implement the new Metropolitan Strategy. Update: The Minister released the finalized PLAN MELBOURNE on 19 May 2014. Review of the State Planning Policy Framework The State Planning Policy Framework (SPPF) Review Advisory Committee (Advisory Committee) has been appointed by the Minister for Planning to review the SPPF. The Advisory Committee has been consulting about a revised format that integrates the SPPF with the Local Planning Policy Framework (LPPF), so that for each topic the State policy is immediately followed by any related regional policy and then any related local policy. This would replace the existing format, where the existing SPPF, containing all State policy, is followed by a separate LPPF (containing the Municipal Strategic Statement and all Local Policies). The aim is to put all policy regarding a particular issue or theme, whether State or local, in one location in the planning scheme rather than to require cross referencing between State and local sections. It is also intended to introduce additional policy mapping, although this aspect has not been fully developed at this stage. The revised policy section of the planning scheme will simply be referred to as the Planning Policy Framework (PPF). To date the Advisory Committee has mainly sought technical submissions (e.g. in relation to format rather than policy content) with a number of workshops and forums targeted at various stakeholders. Council has made an earlier submission on the matter and there has been officer participation at two workshops. Update: A report in response to the SPPF Review Advisory Committee’s draft PPF was presented at the Council meeting on 12 May 2014 and a submission has been lodged in accordance with the Council resolution. Zone Reform Program In July 2013 the Minister for Planning announced the approval of the new “reformed” residential, commercial and industrial zones. The new commercial and industrial zones were introduced on 15 July (via Amendment VC100), however Councils were given approx 12 months (until July 2014) to determine most appropriate use of the new residential zones. The new rural and Green Wedge Zones were released by the Minister on 15 August 2013 and came into effect on 6 September 2013. Further details are available at: http://www.dpcd.vic.gov.au/planning/theplanningsystem/improvingthe-system/new-zones-for-victoria/reformed-zones-for-victoria http://www.dpcd.vic.gov.au/planning/planningtoolkit/have-your-say-on-zones-reform In December 2013 the Minister appointed a Standing Advisory Committee to assist in the implementation of the new residential zones. A report on the process of residential zone conversion and a recommended response was reported to Council on 24 February 2014. Subsequently, Amendment C179, which proposes the conversion of the existing Residential 1 Zone into the two new zones (Neighborhood Residential Zone and General Residential Zone), has been prepared and exhibited. Council has determined to refer (21) submissions in relation to Amendment C179 to the Advisory Committee. Update: The Standing Advisory Committee conducted its hearing on 5 and 6 May 2014. Monthly Report May 2014 9 Currently awaiting the Standing Advisory Committee’s report and the Minister’s decision on Amendment C179. A further assessment of the implications of the new Commercial zones for the Mornington Peninsula is being prepared, in conjunction with work on the Mornington Peninsula Planning Statement. Review of Aboriginal Heritage Act The Government released an Issues and Options Paper for comment by 28 May 2012. On 28 May 2012, a report was presented to Council in relation to this Paper and a submission has been lodged. Update: Awaiting Government response. Planning Scheme Review Under the Planning and Environment Act, the Planning Scheme must be reviewed every four years unless an extension is granted by the Minister. Update: The Minister has granted a six month extension for the Planning Scheme Review – now due by 31 December 2014 and a report on this matter was made to the Council meeting on 26 May 2014. Council resolved to follow the new timetable for the review. PLANNING SCHEME AMENDMENTS REQUESTS FOR AMENDMENTS The Strategic Planning Team maintains a database recording suggestions and proposals for changes to the Planning Scheme that may be put forward by Councillors, officers or the community. A proposal is translated into a formal request for amendment of the Scheme when a first stage fee is paid by a proponent or when a decision is made to prepare an amendment for exhibition. At this time there are 12 formal requests by external proponents and 15 active Planning Scheme amendments. CURRENT PLANNING SCHEME AMENDMENTS Amendment C116 – General amendment Items include changes to Special Use Zone 1. Council agreed to support a request for exhibition subject to satisfactory consultation with the Port authority. Update: The Government has now responded to the Port Environs Advisory Committee and this matter can now be further progressed with the Port of Hastings Development Authority. A new report will be submitted to Council in due course. Amendment C121/C147 - Height Control Policy for all Business zones This amendment proposes interim and permanent Planning Scheme changes that would limit the height of development in town centres until such time as township specific planning controls are introduced e.g. following the preparation of Structure Plans. Update: This matter was deferred pending the introduction of the reformed commercial zones. The reformed zones are now in place and so it is now timely for the amendment to Monthly Report May 2014 10 be reviewed and progressed to the next stage with a view to exhibition later in 2014 following the release of the Peninsula Planning Statement. Amendment C126 Part 3 – Balnarring Civic Court Precinct This amendment proposes to rezone Council land in Balnarring. Consideration of this item has been delayed by the need to undertake additional strategic and design investigations. Further exhibition may be required. Update: To be reported to Council once further investigations are completed. Consultants have been appointed to provide a review of land use and development options and have completed a draft report. Amendment C130 – Local Planning Policy Framework This is a Section 20(4) amendment request which provides minor updates in the Local Planning Policy Framework and reformats the local policy section in accordance with the review of the State Planning Policy Framework which was introduced in September 2010. Update: In accordance with a Council resolution on 26 May 2014 this amendment request will be withdrawn in light of the new integrated State and local Planning Policy Framework proposal (see PLANNING SYSTEM section above). Amendment C133 - Green Wedge camping and caravan park local policy The amendment was exhibited in March 2010 and twenty four submissions were received. These submissions were referred to an Independent Panel that has now made its report. Update: The amendment has been adopted by Council and there are continuing discussions with DTPLI regarding submission for the Minister’s approval. Amendment C161 – Yaringa This amendment request proposes a rezoning to introduce a new Special Use Zone and is combined with a planning permit application to facilitate an inland marina, accommodation, conference centre, dry boat stack and factory development. The Minister for Planning previously authorized the preparation of an amendment; however the proposal was also subject to the need for a report under the Commonwealth Environment Protection and Biodiversity Conservation (EPBC) Act. Officers of the Commonwealth Department of the Environment conducted a detailed assessment of the proposed Yaringa Boat Harbour development site and the adjoining RAMSAR listed Western Port environs by boat and on foot in late September 2012. A draft Public Environment Report (prepared by the proponent) was subsequently exhibited for comment. A final Public Environment Report was placed on exhibition until mid June 2013. Following the exhibition period the Federal Minister has made his determination, giving conditional approval to the proposal. A report was presented to Council on 22 July 2013. In summary, Council resolved to refer the Yaringa proposal to the State Government for processing, with the Minister to act as the Planning Authority in this case, given the significant State issues that are involved. The Minister has subsequently declined this request. At its meeting on 24 March Council resolved to seek authorization by 28 March if possible, with a further report to be provided by 28 April 2014. Monthly Report May 2014 11 Update: A second authorization request has been lodged with the Minister for Planning in relation to Amendment C161 and an update report was provided to Council at the meeting on 28 April 2014. DTPLI has advised that it has extended the standard 10 day period for consideration of the authorisation request in order to provide more time to review the matter. Amendment C162 – Mount Eliza Woodland This amendment proposes new development and subdivision provisions to protect the character of the area, and is similar to a previous Amendment (C87) which was refused by a former Minister for Planning. The amendment has been exhibited and submissions have been received. After considering a report in May 2012 Council determined to refer submissions to an Independent Panel. The Panel hearing was conducted over three days beginning 27 August 2012. The Panel report was received in November 2012 and is available on the DPCD website. The amendment was reported to Council’s Development Assessments Committee for consideration on 20 May 2013 and subsequently presented to Council at a meeting on 11 June 2013. The amendment was adopted by Council and submitted to the Minister for approval on 21 June 2013. On 30 July 2013, the Minister responded directing Council to give notice of the adopted changes to C162 under Section 33(1) of the Act by direct written notice to the owners and occupiers within precinct 1, with a period of at least one month for submissions to be made directly to the Minister. The closing date for submissions on any changes in the adopted version of the amendment was 30 September 2013. Update: Currently awaiting the Minister’s decision. Amendment C174 - Mornington Peninsula Shire Heritage Review – Area 1 – Mount Eliza, Mornington and Mount Martha This amendment is intended to implement the findings of the first stage of a comprehensive review of heritage controls across the whole municipality, recognising the limitations of the original heritage studies produced in the 1980’s and changing community values and attitudes. At its meeting on 9 December 2013 Council adopted both the Mornington Peninsula Thematic History, which provides a comprehensive framework, identifying key heritage themes across the Shire, and the Stage 1 Heritage Review - Mount Eliza, Mornington and Mount Martha, which examines the heritage significance of particular places (usually buildings) and provides appropriate heritage citations i.e. a summary of the elements of heritage significance and recommendations for their conservation and management. The Heritage Review recommends the introduction of new heritage overlays as one of the key heritage conservation mechanisms. It is important to acknowledge that these recommendations have previously been subject to an extensive non-statutory consultation process, with direct consultation with affected land owners. In this context, at the meeting on 9 December 2013 Council resolved to seek authorisation to formally exhibit the planning scheme amendment, noting that this process will provide an opportunity for any opposing landowners to be further heard by an Independent Panel, which will report to Council before any final decision on the amendment is made. Update: Authorisation to exhibit the amendment has been received from the Minister and exhibition of Amendment C174 commenced in April 2014.The closing date for submissions is 2 June 2014. Amendment C176 – General amendment Monthly Report May 2014 12 Amendment C176 consists of six general items that deal with mapping errors and inconsistencies caused mainly by change of ownership or other changes on the land. The proposed changes are: • Rezone 300 Main Street, Mornington (Lot 1, PS 715119) from Public Park and Recreation Zone to Commercial 1 Zone; • Rezone 70 Mountain View Road, Mt Eliza (Lot 315, LP 12850, Vol 8651, Fol 953) from Residential 1 Zone to Commercial 1 Zone and including the land as a ‘convenience centre’ in Table 1 to Clause 21.07-3; • Rezone 7A Dellwood Court, 192A High Street (Lot 2, PS336086) and part of the High Street road reserve, Hastings from Public Park and Recreation Zone to Residential 1 Zone; • Rezone part 520 Arthurs Seat Road, Red Hill (Crown Allotment 2025 Parish of Kangerong, TP 949185E) from Public Conservation and Resource Zone to Green Wedge Zone and 520A Arthurs Seat Road, Red Hill (Reserve No. 1, Parish of Kangerong on PS 711847Y) from Green Wedge Zone to Public Park and Resource Zone; • Remove part of the Heritage Overlay from 2A Erlandsen Avenue, Sorrento (Lot 1, SP 25647); • Remove the Heritage Overlay from 2 Parklands Avenue, Somers (Lot 1, LP 39258); • Apply the Environmental Significance Overlay, Schedule 25 to part of 161 Boundary Road, Dromana (Reserve No. 1); Update: Authorisation to exhibit the amendment C176 has been received from the Minister. The exhibition is currently in progress and the closing date for submissions is 2 June 2014. Amendment C179 – Introduction of the New Residential Zones Refer to the commentary under “Zone Reform Program” above. Amendment C180 – RACV resort, Cape Schanck Council considered a report on this matter at its meeting on 23 September 2013. The RACV is seeking an amendment to the existing Incorporated document which applies to the Cape Schanck resort in order to enable Council to consider a substantial expansion of the resort facilities including a new conference facility. The proposed changes to the Incorporated document would also require notice to be given of the proposed development plan, and any changes relating to the provision of sewerage services, and consideration of these submissions prior to any decision. A request has been submitted to the Minister for Planning seeking a planning scheme amendment under Section 20(4) of the Act. Update: The Minister determined to give notice of the amendment request to adjoining landowners, and the notification process was undertaken by DTPLI. The exhibition period was completed on 2 May 2014. Awaiting the Minister’s decision. Amendment C184 – General amendment Amendment C184 consists of eight separate amendment requests. The proposed changes are as follows: • Rezone the front part of the land at 101, 103, 105, 107 & 111 Stuart Road, Tyabb from Special Use Zone, Schedule 3 to General Residential Zone, Schedule 1 and delete the Public Acquisition Overlay, Schedule 1 from 75, 79, 81, 83, 89, 91 & 95 Stuart Road, 1 & 2 Banksia Crescent & 2 Kathleen Crescent, Tyabb; • Rezone 57 Kunyung Road, Mt Eliza from Public Use Zone, Schedule 1 to Neighbourhood Residential Zone, Schedule 1, apply an Environmental Audit Overlay and introduce a new entry Monthly Report May 2014 13 • • • • • in the Schedule to Clause 52.03 Specific Sites and Exclusions and also an associated new entry in the Schedule to Clause 81.01 Incorporated Documents; Rezone part 219-257 Main Street, Mornington (Lot 1, TP821260) from Road Zone, Schedule 2 to Commercial 1 Zone; Delete the Design and Development Overlay, Schedule 7 from the land at 141 &173 Bungower Road, 61 Baldock Road and part 71 Baldock Road, Mornington. Apply a new Design and Development Overlay, Schedule 22 and Development Plan Overlay, Schedule 19; More accurately apply the Public Park and Resource Zone to the Western Port Marina, Hastings; Delete the Heritage Overlay, Schedule 152 from the land at 10-12 Hiskens Road, Sorrento (Lot 1, TP252157); and Rezone 89 Elizabeth Avenue (Reserve 1 on PS401415), 105 Elizabeth Avenue (Reserve 3 on PS 344605) and part 12 St Elmos Close (Reserve 2 on PS401415), Rosebud West from Residential 1 Zone to Public Conservation and Resource Zone. Update: Council resolved at a Council Meeting on 26 May 2014 to apply to the Minister for authorisation to prepare and exhibit Amendment C184 to the Mornington Peninsula Planning Scheme. COASTAL PROJECTS Victorian Coastal Strategy Review The draft Victorian Coastal Strategy 2013 (VCS) has been prepared under the Coastal Management Act by the Victorian Coastal Council (VCC) and was released for public comment at the Victorian Coastal Awards on 11 September 2013. The draft strategy highlights the following key points: - Building the capacity to adapt to coastal hazards Financing coastal infrastructure Managing population growth and its impact on the coast Better understanding the real value of natural assets on the coast A more integrated and holistic approach for planning and managing the marine environment Ensuring a balance between local community, regional and state-wide decision making authority, reflecting that previous settings may not be appropriate for the future Visit www.vcc.vic.gov.au for further details. Submissions in relation to the draft Strategy closed on 4 December 2013. Council considered a report on the draft VCS at its meeting in December 2013 and subsequently lodged a submission outlining a number of concerns with the draft VCS and the need for further consultation with local government and other stakeholders. Update: The Victorian Coastal Council submitted the Victorian Coastal Strategy to Minister Ryan Smith in April for approval pursuant to the Coastal Management Act 1995. Mt Eliza to Point Nepean Coastal Action Plan (CAP) The Coastal Action Plan was endorsed by the Minister for Environment and gazetted in December 2006. The Shire is working to implement the CAP by the progressive development and review of Coastal Management Plans. More recently the Central Coastal Board (CCB) prepared an internal CAP Review Report. Update: The Minister for the Environment has directed the Central Coastal Board (CCB) to prepare a new Regional Coastal Action Plan (CAP) for the Central Region. Monthly Report May 2014 14 At this stage it is uncertain where local plans, such as the Mt Eliza to Point Nepean CAP, will fit in the new system. Coastal Planning officers will continue to liaise with the CCB as the new CAP is being developed. Boating Coastal Action Plan The Central Coastal Board (CCB) is responsible for the preparation of the Boating Coastal Action Plan (BCAP) which aims to provide a vision for the future use and improvement of the boating network within the central region. It contains a series of guiding principles and specific policies to identify immediate priorities for upgrading and management of existing boating facilities and a planning framework for new facilities. The current BCAP was published in 2007 and reviewed in 2013. MPSC provided input into this review process. As noted above, the Minister for Environment and Climate Change has directed the CCB to prepare a new Regional Action Plan and it is proposed that boating issues will now be incorporated into this plan. Accordingly, the CCB have advised that the Boating CAP will not be further reviewed or continued as a separate document. As a transitional measure, the CCB has prepared a Recreational Boating Facilities Framework (RBFF), which is likely to be included in the Regional CAP at a future date. Update: In a recent submission to the CCB, MPSC has requested extensive consultation as part of developing the Regional CAP. Through this consultation, it is anticipated that MPSC will be able to provide comment on the information contained in the RBFF and how this information should be incorporated into the Regional CAP. Association of Bayside Municipalities Strategic Directions 2012-16 The Mornington Peninsula Shire (MPS) continues to be an active member of the Association of Bayside Municipalities (ABM). The ABM recently released proposed strategic directions for 201216 which include: • • • • • • Promoting integrated coastal planning including responses to climate change Enhancing the management of coastal assets and infrastructure Promoting the ecological health of marine areas and the coast Encouraging sustainable and equitable recreation and social uses Enhanced understanding of economic, social and environmental values and benefits Refining and improving our organizational approach These directions are intended to form the basis of a work plan for the ABM. Update: The Association of Bayside Municipalities was successful in receiving funding through the Victorian Adaptation and Sustainability Partnership program (VASP) administered through DEPI to develop an adaptation blueprint for Port Phillip Bay. Through this project, councils, state government and other key stakeholders will look at issues facing the Bay now and into the future, including climate change, population pressures and increased demands for recreation and leisure. This project aims to equip councillors, planners and other decision makers with the knowledge and skills to guide adaptive approaches into the future. Expressions of interest for the Project control group to oversee the project are currently being sought from Member Councils. Monthly Report May 2014 15 Coastal Climate Change Challenges The Shire’s coastal planners and staff from other units are involved in a number of initiatives in this area with a view to: • Improving the information available on the impacts of climate change on our communities, and; • Developing tools and guidelines to inform decision making and strategic planning along the coast. The key initiative at present is the Western Port Coastal Local Hazards Assessment (formerly Future Coasts). While broad level risk mapping and reports have been made available in recent times from the Federal Government’s “first pass” assessment, more detailed information at the State and local level is needed. Under the Future Coasts program, Western Port is one of four chosen study areas for a local coastal hazard assessment. The project scope affects four local Government areas and incorporates most of Western Port. Officers are currently participating on the Western Port Local Hazards Assessment steering committee and Technical Reference Group. Other partners include DSE, Melbourne Water, South East Councils Climate Change Alliance (SECCCA), the City of Casey, Bass Coast Shire and the Shire of Cardinia. The project consists of two main parts – part A being a general mapping of coastal hazard vulnerability around Western Port and part B being a more in depth assessment of the potential impact of climate change in locations that have been selected to represent a range of coastal conditions. Update: The consultants have finalized and submitted the Western Port Local Hazard Assessment to Melbourne Water and Department of Environment and Primary Industries. The report is currently undergoing independent peer review and it is anticipated that the Steering Committee will convene in June to consider the final report. Coastal Management Plans (CMP) – General Coastal Management Plans (CMPs) are prepared in accordance with the Coastal Management Act 1995 and set out the vision and land management requirements for specific foreshore areas. CMPs include a three year business plan identifying resources and/or possible sources of income to complete priority actions. Coastal Management Plan - Mornington The area to be covered by this plan extends from Caraar Creek to Linley Point. The Mornington CMP was adopted by Council on 24 September 2012. The final version was submitted to DSE for approval by the Minister for Environment and Climate Change under the Coastal Management Act on 22 November 2012. The Department of Environment and Primary Industries has provided comments on the Plan, requesting a number of adjustments. A duly adjusted copy has been provided to the Department to assist in its consideration and the approval of the Plan. Update: Awaiting clarification from DEPI of their requirements. Monthly Report May 2014 16 Mornington Harbour Precinct Plan In order to resolve the long term capacity and safety issues associated with the Mornington Harbour, Council has resolved to undertake the preparation of a Mornington Harbour Precinct Plan, with the formation of a Mornington Harbour Precinct Working Group to ensure broad community consultation. The working group has held a number of meetings to discuss issues and options, and has also included other stakeholders in the discussions. Update: The Working Group discussions will be reported to Council in the near future, enabling consideration of the options available, including the process of further consultation. Coastal Management Plan – Safety Beach Safety Beach is Council freehold land and therefore a Coastal Management Plan is not formally required to be submitted to the Minister to accord with the Coastal Management Act. However, a draft Master Plan was prepared in 1999 for the Safety Beach Foreshore and the community Foreshore Advisory Committee supports the development of a Coastal Management Plan. The Safety Beach Visioning Plan – Stage 1 Coastal Management Plan has been commenced with a comprehensive consultation phase with over 100 public opinion submissions received. The next stage of this project will be to develop an indicative plan and recommendations for the management of the Safety Beach Foreshore. Update: Work has commenced on Stage 2 – Plan Development of the Safety Beach Coastal Management Plan. The development of the plan will build on the extensive consultation work undertaken in the Stage 1 – Visioning Plan component of this project. As part of Stage 2, contact has been made with several schools and child care centres to elicit the views of parents and children, to broaden the base of consultation. Detailed traffic management advice has also been sought from traffic management and engineering agencies. Rye Recreational Boating Precinct Plan The Shire received funding for a Boating Precinct Plan for the Rye public boat launching facility through the State government’s Boating Safety and Facilities Program. The Plan, including a coastal processes study, was subsequently developed, and included an extensive consultation process. The Plan includes proposed improvements to both the boating precinct and to the wider Rye foreshore area. Following a formal exhibition period, and consideration of submissions, the Rye Recreational Boating Precinct Plan was considered by Council at its meeting of 25 November 2013 and subsequently adopted with the following resolution: • That Council adopts the Rye Recreational Boating Precinct Plan ‘in principle’ and subject to funding for its further development and implementation and to input from future consultations during the detailed design stage of the plan. • That Council pursues the implementation of the Rye Recreational Boating Precinct Plan with a long term investment strategy including seeking funding from State government, as appropriate, with any Council contribution being assessed as part of Council’s normal Capital Works Budget process and in the context of other Budget priorities. • That an indicative timeframe be brought back to Council early in 2014. Monthly Report May 2014 17 Update: Council has recently received advice of a successful grant application for design development of infrastructure associated with the Rye Boating Precinct. Pending the approval of budget proposals, the design development stage of this plan will be undertaken through the preparation of a Rye Recreational Boating Precinct Landscape Master Plan. Further consultation with key stakeholders and agencies will form an integral part of this process. An outline of the implementation timeframe will be reported to Council as soon as possible. Coastal Management Plan – Hastings South The Hastings South Coastal Management Plan, including a recreational boating precinct plan, has been prepared, in part utilising funds received from the Department of Transport. A community survey has also been undertaken to capture boating information on the Hastings foreshore. Update: The Hastings South Coastal Management Plan was on exhibition until Friday 30 May 2014. Further consultation will now be undertaken with the recently appointed Hastings Foreshore Advisory Group and Department of Environment and Primary Industries. A report on submissions and the final Hastings South Coastal Management Plan recommended for adoption will be presented to Council in August-September 2014. Major Coastal Works Projects Mt Eliza - Canadian Bay Car Park Landscape Master Plan Concept designs for the Canadian Bay car park have been completed. Consultation with the Foreshore Advisory Group is continuing. Update: Following consultation with Ward Councillors, it has been decided to develop a strategic overview of all coastal car parks, in consultation with the Infrastructure Strategy Unit, with a view to prioritising future works and funding. Mornington Football Disaster Memorial Park A draft landscape master plan has been prepared for the picnic/park area at the corner of the Esplanade and Schnapper Point Drive as well as the public spaces surrounding the old post office and court house buildings. On 15 March 2011 Council determined to undertake a consultation process to seek community input on the draft landscape master plan. The masterplan was considered and endorsed by Council at its meeting on 24 October 2011. The Infrastructure Unit and Strategic Planning have been working to implement the masterplan. Stage 1 works including upgrading the monument, lighting and vegetation works. Update: Stage 2 will focus on the main pathway from the monument to a look-out area over the harbour, the picnic area at the eastern end of the park and improvements to the side of the courthouse area. The detailed design and approvals process is near completion and works are expected to commence later this year. Mornington – Mills Beach Landscape Master Plan The community and in particular the Mornington Life Saving Club have requested improvements to this area, such as the provision of disabled access, improvement to the LSC forecourt area, reconsideration of the parking layout and safe access for emergency vehicles. A consultant was engaged to prepare a landscape masterplan for the area. Monthly Report May 2014 18 Update: The Mills Beach LMP was adopted by Council on 24 September 2012. Detailed design work is to be undertaken in conjunction with the Mornington Life Saving Club and the Foreshore Advisory Group. Mt Martha Life Saving Club/Yacht Club Area Due to a range of changes and proposals within the Mount Martha Coastal Activity Node, including a planning permit application by the Mt Martha Life Saving Club for the expansion of the Life Saving Club, proposed changes to the Yacht Club/Life Saving Club car park and the completion of the boardwalk from the pedestrian crossing to the YC/LSC car park, it was considered that the development of a precinct plan was appropriate to assist proper coordination of proposals. An interim Precinct Plan has been prepared and approval has been granted for reconstruction and extension of the Life Saving Club extension building in accordance with the interim Plan. Further consideration of proposals by the Yacht Club is being undertaken. Update: Coastal Planning recently provided the Mt Martha Yacht Club with further detailed documentation to assist with their planning permit application. Safety Beach - Bay Trail Construction of the trail is complete to a location across from Prescott Street (Safety Beach) and the footbridge over Sheepwash Creek has been completed. The coastal planners will continue to assist officers from the Infrastructure Strategy Team on planning for the development of the missing links of the Bay Trail. Update: In late February, the Shire’s Traffic Management team undertook the process of finalising the plans/alignment for the remaining section of Safety Beach Bay Trail prior to going out to tender. The alignment for the works was finalised in consultation with the Safety Beach Foreshore Advisory Group and with consideration of the Safety Beach Coastal Management Plan – Stage 1: Visioning Plan. Rosebud – Jetty Road Pier Precinct Landscape Masterplan A landscape masterplan is to be prepared for this area as a key action from the adopted Rosebud Coastal Management Plan adopted by Council last year. The plan will include the provision of a new playground, improved pedestrian movement and open space treatments. Update: Aspect Studios, the consultants engaged to develop the landscape master plan, have almost completed the draft master plan for Council’s consideration. A briefing has been held with Ward Councillors, and officers propose to present the draft to Council and to commence community consultation later this year. Portsea Foreshore – Restoration Works The Shire is working closely with DSE and Parks Victoria to address the erosion at Portsea beach. Works to date have included the stabilization of the Pier entrance area (which includes the installation of rock revetment) and the placement of large sand bags on the primary dune (eastern side of the Pier). Update: Coastal Planning and Infrastructure officers are working with DEPI to finalise plans for a concrete retaining wall between the pier and the western seawall which has been necessitated by the erosion of this site. Monthly Report May 2014 19 Council has considered a report on this matter and has resolved to provide funding to ensure the inclusion of a walkway along the top of the retaining wall as the most cost effective means of ensuring ongoing public access. The timing of these works is yet to be announced by DEPI who are the project managers. Sorrento Foreshore – DEPI Beach Renourishment Works Coastal Planning is working with DEPI on a beach renourishment project for Sorrento Foreshore. It is proposed to renourish a length of 400 metres of foreshore as part of the Victorian Government’s Protection of Port Phillip Bay Beaches and Foreshores Program (2011 – 2015). The project will result in approximately 6,000 cubic metres of sand being added to the western end of the beach to protect the foreshore from coastal erosion and provide improved public amenity. Update: A public information session in relation to the proposed works was held on 2 May 2014. Flinders Foreshore There are currently a number of community based proposals for the Flinders foreshore. Update: Biosis consultants have completed the Conservation Management Plan for the Flinders foreshore area in response to on site meetings with key community members and stakeholders. Shire Officers will continue work with community members to develop and assess proposals in accordance with Council’s Community Capital Partnerships policy and to undertake minor improvements. Mt Eliza and Mt Martha North Foreshore – Erosion and Works Storm surge wave activity has caused significant damage to land and infrastructure on Mt Eliza (Moondah) and Mt Martha North foreshores. Both beaches have suffered significant erosion to cliff faces and a number of bathing boxes have been damaged or destroyed. Coastal Planning, Statutory Building and Property Operations officers inspected the condition of bathing boxes at Mt Eliza and Mt Martha Foreshores. In all a total of 14 bathing box licensees were issued with orders to either re-stump or demolish their boxes. Update: Coastal Planning continues to work with DEPI and Property Operations to develop a response to the coastal erosion and Bathing Box issues. Foreshore Advisory Groups The Shire has established nine community-based Foreshore Advisory Groups to provide input to coastal planning for areas where the Shire itself is either the public land manager and/or the delegated Committee of Management. • Mt Eliza • Mornington • Mt Martha • Safety Beach • Rosebud • Rye • Sorrento • Portsea; and • Hastings Update: The recent Expression of Interest process for the appointment of members to the Foreshore Advisory Groups has now been completed. The applications were reported to Council at its meeting on 19 May 2014. All applicants have been advised of Council’s decision, with members appointed for a 12 month period. Monthly Report May 2014 20 NATURAL SYSTEMS PROJECTS Development of the Mornington Peninsula Biodiversity Conservation and Threat Mitigation Plan The first stage of this long term project, involving extensive Native Vegetation Mapping, has been completed. The Mornington Peninsula Fauna Atlas is the second stage and is now also complete. The Fauna Atlas project involved undertaking a field survey of native fauna on roadside reserves, targeted private land and Council controlled reserves. The project has resulted in the creation of over 70,000 fauna records across private and public land. The project has also established a data base for collection of information associated with native fauna road accidents. The Arthur Rylah Institute for Environmental Research (ARI) has been consulted extensively in development of the brief for the next stage of this project – the development of a Biodiversity Conservation Plan. ARI is a leading centre for applied ecological research in Victoria and provides the biodiversity research base for the Department of Environment and Primary Industries (DEPI). By working in partnership with this Institute it is intended to ensure that best practice methods and strategies are applied to the protection and enhancement of the Shire’s long term biodiversity. Update: The project brief for the Biodiversity Conservation Plan has been prepared and the project brief will be advertised no later than mid may 2014. A document that summarises the outcomes of the Shire biodiversity mapping project is in preparation for electronic and hard copy distribution to the community. The consultant will incorporate data from the current 2014 zoological survey of the Tootgarook wetland and further information regarding strategic shire biodiversity assets. Consultant work is expected to be completed by end June 2014. Tootgarook Wetland Management Plan 2013-2014 The Shire has engaged consultants (WBM/BMT) to investigate the feasibility of preparing a nomination for the Tootgarook Wetland as an internationally significant RAMSAR wetland. Consultants have also been engaged to facilitate the meetings of the Tootgarook Wetlands Stakeholder Working Group. Update: Melbourne Water, Arthur Rylah Institute (ARI) and the Shire have jointly prepared a draft Memo of Understanding for the development and implementation of a longer term monitoring program for the Tootgarook wetland. MW have awarded the contract for the development of a Tootgarook Wetland Ecological Monitoring program methodology to Jacobs P/L (formerly SKM) who are currently undertaking other projects for Melbourne Water. Two Tootgarook wetland fauna surveys are also now underway: • A Peninsula zoologist is undertaking a targeted survey of threatened vertebrate species on previously unsurveyed Council lands. A draft report has been received and reviewed. • Birdlife Australia has commenced a two year longitudinal significant bird survey at six sites in the wetland. The methodology of this study is consistent with an existing targeted bird survey underway at the adjacent Boneo Park property. Survey works continue, with the initial report due to the Shire in January 2015. Monthly Report May 2014 21 Results of both Shire fauna studies and the Boneo Park property study will help provide a baseline inventory informing the development of a Tootgarook wetland strategic plan and potentially supporting a RAMSAR listing application. Mornington Peninsula Shire Fauna Brochure This brochure is one of a series that provides “user friendly” information for landowners and community stakeholders helping to promote sustainable environmental management. The Shire Fauna brochure was launched in 2003 and has recently been updated and reprinted. Update: An electronic version of the brochure has been placed on the Shire website. Reforms to Victoria’s Native Vegetation Permitted Clearing Controls The Victorian Government is finalizing details of the changes to the regulatory framework governing the clearing of native vegetation in Victoria. These reforms are focussed on six key issues: • • • • • • Clarifying the objective of native vegetation permitted clearing Improving how biodiversity value is measured and defined Incorporating risk and proportionality in decision making Ensuring vegetation offsets provide appropriate compensation to the environment (a change from the principle of “net gain” to “no net loss”) Reviewing transitional arrangements from the present Native Vegetation Management Framework to the new controls, including revised offset crediting arrangements Developing modeled native vegetation mapping as a basis for the new native vegetation policy decision making. Update: The new Permitted Native Vegetation Clearing Controls were gazetted by Parliament in late December 2013 and changes made to all Victorian Planning Schemes. The new controls are framed in terms of ensuring No Net Loss of Native Vegetation, in contrast to the previous controls which required a net gain in the extent and quality of native vegetation. In addition, the new system relies more on modeling of vegetation significance, rather than requiring site by site assessment, at least in the initial stage of an application. However, the implementation of the new clearing controls remains incomplete, and, the Minister has sought comment from agencies and local government on changes to existing modeled mapping of habitat for threatened species. The timeframe to provide this information is very limited and an extension of the period for submissions has been sought. In addition the DEPI Bushbroker scheme that enabled planning permit holders to purchase vegetation offsets from third parties has recently been closed, reflecting government policy seeking to transfer vegetation trading to the private sector. Department of Environment and Primary Industry (DEPI Management) Review of Invasive Species in Victoria The Minister for Department of Environment and Primary Industries (DEPI) has announced that new Invasive Species Management legislation will be developed and a release of draft legislation is proposed for late 2014. The revised legislation will seek to integrate the management of marine and plant diseases (pathogens) with that of land based invasive species and more clearly articulate responsibilities for pest management on private and public land. Monthly Report May 2014 22 The draft bill was introduced to Victorian parliament in May 2013 and provides that local government will have the responsibility for control of regionally prohibited and controlled weeds and established pest animals on roadsides of Municipal roads as defined in the Road Management Act. The draft Act empowers the Minister to require Councils to prepare roadside weed and pest animal management plans. No indication has been given as to the availability of state government funds to assist Council in meeting implementation costs of such plans. Update: Awaiting update from the Minister for the Environment, including clarification of landowner responsibilities and associated provision of resources from the state to local government and the community. Mornington Peninsula and Western Port Biosphere Reserve Foundation Research Committee Council is represented on the Biosphere Research Committee that meets quarterly. The Research Committee is made up of representatives from Monash University, Chisholm TAFE, Cranbourne Botanic Gardens, one local government officer and a representative of the Biosphere Board. The focus of the Biosphere Research Committee continues to be: • Seeking Federal and state funds for continuation of a Recovery project for Southern Brown Bandicoot in the Western Port Catchment. • Development of a Strategic Plan and revised terms of reference for the Research Committee. • Development of a Recovery Plan for the Southern Brown Bandicoot (SBB) - The research committee is preparing for a public seminar on the SBB involving researchers, government officers and landholders. • Assistance with the implementation of Commonwealth Government NCCARF and Carbon Grants. A grant of $2.4 million (over 6 years) has been provided by the Federal government and is intended to support a number of project activities throughout Casey, Frankston, Cardinia, Bass Coast and Mornington Peninsula Shire Council Biosphere areas including:• Consolidating, at a regional scale, interim actions for habitat links, associated with a Regional Biodiversity Plan. • Immediate re-vegetation of Western Port Heathy Woodland (bandicoot) habitat. • Building capacity of private landholders to protect and extend habitat. • Enhancing key high conservation reserves. • Reviewing and addressing fire and invasive species control. • Establishing a Western Port Regional Biodiversity Action Plan. The Western Port Biosphere Research Committee has appointed a project implementation committee, including representatives from five local governments and state government. Project funding has been allocated for expenditure in the five Council areas and French Island. A number of Mornington Peninsula community groups have made applications for bushland rehabilitation projects on Council and Crown land in 2013/14. Further project funds will be made available in subsequent years. The Biosphere Growing Connections Project Manager has nominated the successful tenderers to the grant scheme across the five Biosphere Councils and French Island. Negotiations are underway with successful applicants to complete necessary documentation. Successful applicants to this funding project in the Mornington Peninsula Shire are:• Mornington Tourist Railway Inc for rail reserve works at Mornington-Moorooduc; and Monthly Report May 2014 23 • Habitat Restoration Fund (a not for profit group) for works at Woods Reserve Devilbend. Update: Grant project implementation is underway with a number of community grant recipients withdrawing from funded projects because of perceived shortfalls with the Commonwealth grant reporting process and the short term nature of each project and its reporting. Additional project funding has been directed to the Mornington Peninsula, including the Moorooduc Plain rehabilitation project being undertaken by the Mornington Tourist Railway Society. The UNESCO head office of the Man and Biosphere program is currently undertaking a 10 year survey of the outcomes and programs conducted by stakeholders in each Biosphere reserve. A response on behalf of the Shire has been substantially completed and will be submitted to the local Western Port Biosphere Reserve office in early June 2014. Devilbend Reserve The Devilbend Natural Features Reserve (NFR) covers an area of 1005 hectares. The reserve comprises 422 hectares of native vegetation, almost 250 hectares of water surface area associated with Devilbend and Bittern Reservoirs, 328 hectares of non-native vegetation predominantly in the form of cleared grazed land. Existing public reserve access is currently limited to a 5 hectare picnic area known as Devilbend Reservoir Park. The reserve also includes the largest inland water body on the Mornington Peninsula providing valuable habitat for water birds and shore birds as well as opportunities for recreation. The Devilbend Natural Features Reserve Management Plan 2010 was adopted by the Minister in May 2010. Subsequently, in 2011 Parks Victoria prepared the Devilbend Master Plan for the small component of the park known as Daangaen Point and other visitor nodes. The Shire noted a number of reserve interface issues including signage, equestrian trail linkages and support for the provision of reserve visitor parking within both Devilbend and Bittern reserve. Ongoing reserve management issues include unauthorised public entry to the reserve, continued dumping of hard waste on road reserves around the reserve perimeter and park fire management planning and associated on-ground works. Construction of the Graydens Road main entry to Devilbend Reserve has been delayed in association with construction of Peninsula Link. Parks Victoria has undertaken planning for Stage two implementation of the Park Master Plan: the Bittern reserve link. Update: Parks Victoria continues to implement the reserve Master Plan in terms of trail completion for development at the Devilbend and Bittern reservoir areas. Cemetery and Anglers Estate Hastings Review 2011/12 Consultants are presently undertaking a biodiversity survey of land in the vicinity of the Cemetery Estate (Long Island, Hastings) so as to inform a subsequent report to Council on the future status and management of the land, which is located adjacent to the ESSO refinery and abutting the Hastings Cemetery. Update: A final project report has been submitted by the consultant and is informing Council priorities for targeted predator (fox and rat) control programs to protect the EPBC Act, 1999 listed Southern Brown Bandicoot populations. The report will also inform a future report to Council on the designation of the land under the planning scheme and associated protection of the natural values in the light of existing and potential future land use. Monthly Report May 2014 24 Community Waterwatch Program The 2014 education program involves over 14 Peninsula schools and 10 community Landcare and Friends groups. The program was originally delivered by Melbourne Water, but, due to changing priorities within that organization, the Dolphin Research Institute (DRI) has been commissioned to continue with the delivery of the program. Update: DRI have commenced the 2013/14 Stage two Waterwatch program. Over ten Peninsula Shire Primary schools in both Western Port and Port Phillip Bay catchments are involved. DRI have engaged 12 school and community groups in the implementation of the 2014 program. The program has received very positive feedback from participating schools. The Balcombe Estuary Rehabilitation Group’s Balcombe Estuary Community Awareness day has been supported with the provision of funding assistance from the Shire Waterwatch budget. Watson Creek Catchment Joint Agency Catchment Project (Baxter/Somerville District) This is a long term project coordinated by the Western Port Biosphere Committee, which has focused on landowner engagement in the restoration of a much degraded creek line. The project vision is to significantly improve community understanding of the values of the catchment and the opportunities to protect these values while maintaining the economic outputs from the catchment area. The Biosphere Committee is currently overseeing the preparation of a Watson Creek Integrated Catchment Program Achievement Publication in association with Melbourne Water, the Shire and Watson Creek schools and LandCare group members. Update: A draft Project report, partially funded by the Shire, is currently in preparation with assistance from the Shire in GIS and project document editing. Project partners include the Port Phillip and Western Port Regional Catchment Authority, Western Port Biosphere, City of Frankston, Parks Victoria, Melbourne Water and Watson Creek Landcare group. The project report is nearing completion. A preliminary data gathering exercise is underway to collect information for inclusion in the publication to summarise the project achievements since inception. The project is being overseen by the Biosphere Committee Executive Officer. MPS COMMUNITY PARTNERSHIP GRANT PROGRAM Community Partnership projects 2011 – 2012 Work is progressing on the Friends of Tanti Creek Interpretational Signage Project. Update : A most recent draft of the project artwork was submitted for comment in late May 2014.The Strategic Planner Natural Systems and Shire Cultural Officer have met with the Tanti Creek Friends group to finalise the cultural heritage content in this public signage project and are currently awaiting feedback. HERITAGE PROJECTS Mornington Peninsula Thematic History The existing municipal heritage studies produced from the 1980’s onward (there are 4, one each for the 3 pre-amalgamation Shires plus a portion of Frankston City), each contain a “thematic environmental history”, which sets out the key heritage themes, and provides a reference point in Monthly Report May 2014 25 the assessment of heritage significance e.g. how important is a particular place in expressing one of the key heritage themes. In conjunction with the Shire Heritage Review (see below) the ‘thematic histories’ are being combined into a new Mornington Peninsula Thematic History. This is a necessary step in assessment of new heritage places and supporting any new heritage overlays that may be recommended by the Heritage Review. Update: The Mornington Peninsula Thematic History was considered by Council at its meeting on 9 December 2013 and was adopted, along with the Heritage Review – Area 1. Council also resolved to seek authorization to exhibit the associated planning scheme Amendment C174 (refer commentary on C174 for further details). Shire Heritage Review – Area 1 – Mt Eliza, Mornington, Mt Martha A review of the status of the Shire’s heritage studies and their implementation was completed in 2006. Given the significant resources required to undertake detailed heritage investigations, this report outlined a staged strategy to review and update heritage studies and recommendations for new heritage overlays. As the first stage of this process, an interim Thematic History for the Shire was prepared by consultant Graeme Butler & Associates (see above). Funds were allocated in the 2009-2010 budget to commence area based reviews of the previous heritage studies, with Stage 1 being a review of the Mt Martha, Mornington and Mt Eliza areas (Area 1). Context P/L were engaged to undertake the Stage 1 review, including community consultation workshops. The consultant’s recommendations were received in July 2012. The recommendations were considered by the project Steering Group and have completed a period of public exhibition. The Strategic Planner – Heritage & Urban Design inspected all properties and held discussions with many owners. Update: The Heritage Review Area 1 was considered and adopted by Council at its meeting on 9 December 2013. Council also resolved to seek authorization to exhibit the associated planning scheme Amendment C174 (refer commentary on C174 for further details). Shire Heritage Review – Area 2 – Dromana, Rosebud, Rye The planning for Stage 2 of the Shire Heritage Review, being a review of the Dromana to Rye areas (Area 2) has begun. The study area has been defined and the two major local heritage groups and the National Trust have been invited to join a new steering committee. These groups have nominated possible new heritage places for review. A photographic survey of places on the ‘heritage watch list’ within the area has been completed by Council staff. Update: A brief for the project is being prepared. This will be reviewed in light of the experience of the Heritage Review – Area 1. It is anticipated that Consultants will be appointed by mid 2014. Significant Tree Register Following a review of trees identified in the Shire’s heritage studies by Lorraine Huddle, Council’s heritage adviser, the Strategic Planning unit and Open Space & Roadsides unit have developed a project to use the Asset Management Database as a register of heritage trees on land managed by Council. Monthly Report May 2014 26 Once this project is established, a second stage, consisting of a register of heritage trees on private land is proposed, and public nominations for both lists will be invited. An outline of the proposed Register has been presented to Council’s Vegetation e-team. Initial consultation with some stakeholders - National Trust, Mornington & District Historical Society, has occurred. Update: Until now there has been no reliable mechanism for Councils to heritage list trees, other than the heritage overlay which is only intended for certain historically significant trees. Melbourne City Council recently adopted a planning scheme amendment to introduce a Significant Landscape Overlay in relation to a list of significant trees in the City. This development will be monitored to determine if this provides a mechanism that MPS could also adopt. Mornington Peninsula Heritage Strategy As part of its obligations under State government funding for Council’s Heritage Advisory Service, the Shire is required to prepare a Heritage Strategy. The Heritage Strategy will include actions that address the identification, protection, management and/or promotion of the municipality's heritage, and will be both a review of Council’s current operations in these areas, as well as setting out actions to improve aspects where there is scope to do so. The Heritage Strategy will be a "whole of Council" strategy developed through consultation across Council units that deal with heritage places and issues. It is proposed to link the Strategy to the Council Plan and for it to be reviewed every four years. Update: A draft of the Municipal Heritage Strategy has been received from the consultant. The document has undergone internal consultation and focused external consultation (heritage groups). It is expected to present this Strategy to Council in the near future with a view to public exhibition. Heritage Input to Projects Merricks to Red Hill Railway Reserve Conservation Management Plan A heritage report is required on this former railway alignment and the station grounds at Merricks and Red Hill as part of the development of a Master Plan. Update: The consultant (Biosis) has been engaged, and the project inception meeting held. A public advertisement calling for historical photos and documents has generated a large response. The consultant has completed preliminary site investigations and historic research. Rosebud Sound Shell Heritage Management Plan The Rosebud sound shell was entered onto the Victorian Heritage Register in 2012 as a significant example of modern design and the first structure in Australia to be designed with the use of a computer. The sound shell faces some management challenges due to its reinforced concrete construction and its vulnerability to inappropriate access, graffiti etc. There is an urgent need to find a visually sensitive way to prevent access to the roof of the soundshell by skate boarders etc. Update: A draft brief for a Heritage Management Plan for the Rosebud sound shell has been prepared and is under review prior to commencement of the project later this year. Monthly Report May 2014 27 SECTION 29A APPLICATIONS – REPORT AND CONSENT FOR DEMOLITION Section 29A of the Building Act requires Council to be notified of proposed demolitions. This in turn provides an opportunity to assess the heritage significance of the property and to either consent or, if appropriate, call a halt to proposed demolition pending the assessment under the Planning and Environment Act 1987. A request under Section 29A must be determined within 15 working days or there is deemed consent. An average of 30 requests per month has been received over the last 12 months. . In January 2014 – 23 demolition requests were received and 22 were completed. In February 2014 – 25 demolition requests were received and 30 were completed. In March 2014 – 36 demolition requests were received and 28 were completed. In April 2014 – 33 demolition requests were received and 31 were completed. In May 2014 – 27 demolition requests were received and 34 were completed. URBAN DESIGN PROJECTS Mornington Laneways Strategy and Empire Mall Council has engaged Hansen Partnership to prepare a strategy for the seven laneways identified along Main Street in Mornington, as well as a concept plan to upgrade Empire Mall. The Laneways Strategy seeks to address Safety, Amenity, Legibility, Access, and Activity in order to improve and enhance the laneways. A meeting / workshop to review the Laneways Analysis Report and Empire Mall Concept Plan was held on 6 February with the consultants and the project team including Briars Ward Councillors, Mornington Chamber of Commerce, Historical Society, and Council officers. Following this, a Visioning and Thematic Workshop was facilitated by the consultants with Ward Councilors, key stakeholders including Chamber of Commerce and Police, and Council officers, on 20 March. The findings of this visioning workshop were then presented to the Design Advisory Panel on 16 April 2014. Update: A Design Advisory Panel Workshop to review the draft Laneways Strategy was held on 16 April 2014. The consultants will now finalise the report based on DAP advice and review by the project team. Context Analysis and Design Response Guide The planning scheme requires developers to submit a Context Analysis & Design Response with their planning applications. Council’s Design Advisory Panel has for some time expressed concern over the quality of the Context Analysis & Design Response information provided by development applicants. This project involves preparation of a guide which clearly and concisely defines the purpose and required content of Context Analysis & Design Response documentation, as a guide for architects, designers and developers. Update: A draft for Context Analysis and Design Response guide has been prepared for consultation and is currently under review prior to being reported to Council. Hastings High Street Streetscape Framework Plan Council officers have commenced preparation of a project brief to engage consultants for the preparation of a streetscape framework plan for High Street, Hastings, to guide the implementation of streetscape improvements. Update: A Project Brief is currently being prepared to engage consultants for the High Street Streetscape Framework Plan, with a view to engaging consultants by late June 2014 Monthly Report May 2014 28 Design Advisory Panel The following planning applications / proposed developments were reviewed by the Shire’s Design Advisory Panel in May 2014: • 9 May 2014: Somerville Retirement Village A follow-up DAP Workshop for the Somerville Retirement Village was held in Melbourne to review the amended drawings. The revisions were based on a previous DAP Workshop held on site on 26 March 2014. The DAP Report has been provided to the attending Team Leader Statutory Planning for his consideration and further action. • 9 May 2014: Wellbeing Centre & Retirement Village, Racecourse Road, Mornington A DAP Workshop for a proposed Wellbeing Centre and Retirement Village was held in Melbourne with panel members and the applicant team. The DAP Report has been provided to the attending Team Leader Statutory Planning for his consideration and further action. STATUTORY PLANNING REFERRALS In January there were 16 referrals received and 10 responses provided. In February there were 11 referrals received and 13 responses provided. In March there were 12 referrals received and 10 responses provided. In April there were 10 referrals received and 8 responses provided. In May there were 18 referrals received and 21 responses provided. Financially, the positive year end variance results primarily from lower than anticipated expenditure on legal costs, heritage advice, printing and stationery, which have more than offset higher than anticipated expenditure on advertising, catering, parking and travel. Some significant accounts payable in May/June are likely to reduce the overall variance. $'000 Operating Surplus / (Deficit) Monthly Report May 2014 Forecast Actual Variance Forecast Month Month Month Y.T.D (204) (190) 14 (1,594) 29 Actual Variance Budget Forecast Variance Y.T.D. Y.T.D Y.E. Y.E. Y.E. (1,525) 69 (1,815) (1,745) 70 STATUTORY PLANNING Planning Applications Council received 227 planning applications this month - the highest number of planning applications received this financial year – and decided 197 planning applications. Of the applications decided, 76% were decided within the statutory timeframe, with a low percentage of applications decided outside the statutory timeframe. As at the end of this month, 676 planning applications remain in-hand, which continues a relatively stable number of in-hand applications over the past 12 months. Planning S72 Amendment Applications Council received 39 applications to amend a planning permit (under Section 72) and decided 37 applications. This is demonstrated by the graph below which shows that at the end of May, 86 applications remain in hand. This in-hand number has been stable for the past 7 months. Monthly Report May 2014 30 Planning Permit Amendments 160 140 136 128 120 100 83 82 80 60 80 78 80 86 86 71 68 52 64 58 62 39 37 40 26 21 14 20 21 22 24 27 17 19 24 20 25 18 23 29 27 20 20 7 0 Jun-13 Jul-13 Aug-13 Sep-13 Oct-13 Nov-13 Dec-13 Jan-14 Feb-14 Mar-14 Apr-14 May-14 Received Decided No. in han d at end of month Secondary Consent Applications Council received 40 applications to amend a planning permit and decided 52 applications. This is also demonstrated by the graph below which shows that the number of applications in hand per month has varied greatly since the start of this financial year (when officers began recording this data separately to the s72 applications). Monthly Report May 2014 31 Planning Areas Map Team North: Team North received 46 applications and decided 24 applications this month. The number received is third highest for the past 12 months and up from 29 planning applications received last month. Of the applications decided, 54% were decided ‘in time’, which is similar to last month’s performance. There are 134 planning applications in-hand in this team at the end of May 2014, which is 1 application less than this time last year. This reflects increased application activity in the area and fewer ‘older’ (in terms of statutory days) applications not decided within the team. Council’s Design Advisory Panel (DAP) met this month to consider a proposed development for a retirement village; the planning application is yet to be lodged. • Applications of interest: P14/0709: 16 Vale Street, Mornington (Craig Smith) The proposal is for 2 double storey and 2 single storey dwellings on a site with an area of 941 square metres. The dwellings are side by side pairs with the rear dwellings seeking access from the adjacent multi-dwelling development site. P14/0739: 25 Main Street, Mornington (Kym Umbers) The application is for a Beer café, on premises licence and outdoor seating (70 seats) on the corner of Queen Street at the premises formerly known as Gloria Jeans. P14/0863: 1132 Nepean Highway & 21 Bungower Road, Mornington (James Bryan) ‘Satellite’ building within the Bungower Road end car park with floor area of 551 square metres and children’s play area. Two restricted retail premises tenancies each with a floor area of 150 square metres and a convenience restaurant providing 100 indoor seats, 65 outdoor seats and operating 7.1 am to 11.00 pm. The on-site car parking provision will reduce from 840 spaces to 776 spaces. Weekday and weekend peaks measured in early December 2013 were 331 and 308 spaces respectively. P14/0899: 136 Bentons Road, Mt Martha (James Bryan) The proposal is a veterinary clinic using the existing building almost diagonally opposite Bentons Square shopping centre. An earlier version of the proposal (P13/1921) was refused by Council and an appeal to VCAT (Ref No. P795/2014) has been recently received. The key issue is compliance with non-residential uses in residential zones policy. As a repeat application - why is Monthly Report May 2014 32 the use appropriate now – what has changed? Other issues include parking layout, proximity to roundabout and residential amenity. • Amendments of interest: P12/1672: 40 Green Island Avenue, Mt Martha (Nick Jay) The proposed permit amendment is from 9 single storey dwellings to fourteen dwellings (two double storey and twelve single storey). The site area is 4048 square metres. • Update on VCAT appeals P13/0915: 3 Roy Court, Mount Eliza The Tribunal disallowed an appeal against Council’s refusal to grant a planning permit for 2 double storey, four-bedroom attached side by side dwellings and subdivision. The site has an area of 706.5 square metres. It has a street frontage of 12.9 metres with a wider rear boundary of 27.4 metres. Roy Court is located on the periphery of the Mount Eliza Commercial Centre. In relation to impact on the amenity of abutting properties, the Tribunal concluded that the development extends deeply into the site in a two storey form and proximate to the open space of the dwelling to the north and the residential properties to the rear. There is limited scope for planting on the review site to soften the interfaces because of the shallow area available and, potentially, because of the location of a drainage easement. • The impacts would be most significant for No. 2 Roy Court and No. 7 Viewpoint Avenue, both of which have open rear yards facing the review site. • Removal of vegetation along the rear of the review site will expose the proposed substantial form of the development to the backyards to the east. • The development would present significant bulk to the properties to the south notwithstanding there is an existing brick wall abutting Unit 2/4 Roy Court and taking into account the position of the existing dwelling on the review site. • The shadow diagrams indicate significant shadowing to the properties to the south including open space associated with No. 1/4 Roy Court. The decision is useful as it provides further guidance to the assessment of the key issues in the consideration of these increasingly common proposals. • Community Consultation Officers conducted a range of consultation meetings during the month, including: • • • 12 pre-application meetings, 2 meetings relating to VCAT proceedings; and 14 other meetings with parties as part of the normal application consultation process. Team East: Team East received 61 applications and decided 62 applications. Of those applications decided, 70% were decided ‘in time’ which exceeds the team’s target of 65%. The team currently has 158 planning applications in-hand, which is 8 applications higher than the team’s average of 150 planning applications in hand over the last 12 months. • Update on VCAT appeals P06/1112.06 269 Myers Road, Balnarring (Krystal Blizzard) This application sought to lodge an appeal to VCAT against Council’s refusal to extend the operating hours of the restaurant on the land (Veraison). The appeal was lodged 7 months outside the 60 day timeframe for appeals to be lodged at VCAT. Council did not consent to the application being made so far outside of the required time limit, and the matter was heard at a Practice Day hearing on 2 May 2014. The member refused to allow the application to be made out of time, noting that approval of such an application would have a significant impact on established Monthly Report May 2014 33 practices of the Tribunal. The member also emphasised the need for permit applicants to act diligently and in a timely way to protect their interests. • Community Consultation A pre-application Design Advisory Panel workshop was held for a large 2 and 3 storey residential development with basement car parks. At the meeting, the Panel was of the view that there should be greater diversity in the dwelling types, and that the proposal should be more responsive to the significant adjoining site, which is under common ownership with the subject site. A further meeting of the Panel is to be held to consider a revised proposal. Officers also conducted a range of consultation meetings during the month, including: • 2 meetings with residents (1 held onsite) regarding the Freeway Service Centres in Baxter. • Attendance at an accompanied site visit with a VCAT member following a recent hearing for a residential development in Somers. • 3 meetings specific to Martha Cove matters, held both on site and in Shire Offices. • 29 informal meetings with applicants and/or objectors as part of the usual assessment process. • 17 pre-application meetings. Team South: Team South received 42 applications and decided 26 applications. Of those applications decided, 65% were done within time, closely followed by 12% of applications decided between 61 and 80 statutory days. Over the past 12 months, Team South has averaged 51% of applications decided within time. The performance increase in May, while slightly lower than the equivalent result in April, is a reflection of stable staff numbers as well as a focus on processes and procedures to ensure timeliness of decision-making. • Applications of interest: P13/1671: 78 Leonard Street, Tootgarook, (Kym Umbers) P13/1689: 464 Melbourne Road, Blairgowrie (Katelyn Nash) P13/1623: 125-129 Hotham Road, Sorrento (Stephen Powell) Each of these planning applications seeks planning permission for the erection of Telecommunications Facilities comprising free-standing monopoles of 20m height (Leonard Street and Melbourne Road) and 25m height (Hotham Road). All of the applications have attracted objections (18 objections for Leonard Street, 7 objections for Melbourne Road and 6 objections for Hotham Road) and Planning Application Conferences have been held for the Leonard Street and Melbourne Road applications. In all applications, the applicant (Aurecon P/L) has prepared photomontages of the proposed towers from various vantage points. This assists in determining how the towers will visually sit within the respective landscapes, which in turn helps address some of the key concerns raised in the objections. The three proposed sites have been identified to cover the “gap” in Telstra’s coverage for the southern part of the Mornington Peninsula and, in particular, to provide a network that can deliver the Emergency Alert Message in the case of an emergency. Delegate approvals have been issued for the sites at Melbourne Road and Hotham Road, and a decision is expected on the Leonard Street site by mid June 2014. P14/0659: 2339 Point Nepean Road, Rye (Katelyn Nash) The application is for the alterations and additions to the existing buildings and the use for mixed medical, retail and accommodation. The additions will create a 3-storey building form with road abuttals to both Point Nepean Road and Campbells Lane at the rear. The ground floor and part of the first floor is proposed to accommodate 2 medical clinics and 1 retail shop (chemist), while the Monthly Report May 2014 34 remainder of the first floor and entire second floor levels will accommodate 3, 2-storey dwellings. A carparking variation is also proposed. A request for further information has been sent to the applicant to provide additional details on the operational components of the medical clinics and shop, a traffic engineer’s assessment of available off-site car parking, a waste management plan and various design aspects of the building. The proposed building form is significant in the Rye township due to the 3 storey form and has been referred to Council’s Urban Design Planner. The key issues (at this stage) to be considered are: - The building design aspects of 3-storey form, - The amenity for the occupants of the 3 dwellings, - Carparking availability on-site for dwelling occupants, and off-site for customers of the clinics and shop, and - The storage on-site, and collection, of waste from each separate use. Upon receipt of satisfactory response to the further information request, the application will be advertised. • Update on VCAT appeals P13/1470: 15 St Johns Wood Road, Blairgowrie (Stephen Powell) This application was for the subdivision of 4 existing dwellings into 4 separate lots. Council refused the application under delegation in December 2013, principally on the grounds that the proposed lots would be considerably smaller than the surrounding lot sizes and that the subdivision would lead to the entrenchment and intensification of the development density. The proposed lot sizes were to range from 511sqm to 178sqm, compared to the required planning scheme average lot size being 650sqm. The decision of the Tribunal was to affirm Council’s decision and order that no permit should issue. The Tribunal drew upon a number of recent VCAT cases within the southern parts of the Shire that reinforced the importance of maintaining a consistent neighbourhood character. It also confirmed the relevance of Council avoiding the entrenchment of historic building patterns that originated in the 1950’s and 1960’s where the typical building was a small fibro-cement holiday cottage. This historic building pattern is in direct contrast to the current expectations of dwellings intended for permanent living, comprising typically 4 bedrooms, multiple bathrooms, living areas and outdoor living/recreation areas. This is an important decision insofar that it adds further weight to Council’s desire to see such historic building pattern anomalies being brought into line with current planning scheme objectives and requirements. • Community Consultation Officers conducted a range of consultation meetings during the month, including: • 1 Planning Application Conference involving 10 people, • 13 informal meetings with applicants and/or objectors involving a total of 30 people, and • 2 pre application meetings involving a total of 2 people. Team Central: Team Central received 72 applications and decided 67 applications. Of those applications decided, 90% were done within time. The percentage of applications decided ‘in time’ is substantially above the team target (72%) and is the second highest percentage achieved by the team over the 12 months. The number of applications received and decided by the Team in May 2014 is both above the monthly average of 60 applications received and 57 applications decided for the past 12 months. These results have been achieved while managing the highest number of applications the team has in hand (180 applications) over the past 12 months. Monthly Report May 2014 35 • Applications of interest: P13/1801 – 278 Eastbourne Road, Rosebud (Lauren Lain) The application proposes the staged subdivision of the land into 18 lots. The existing building adjacent to Tea Tree Place is being retained on a large lot of 6695sqm. Council Officers have significant concerns with the access and visual bulk associated with the lots fronting Eastbourne Road; the applicant is currently seeking to address officers’ concerns via amended plans. • Update on VCAT appeals P13/0104 - 4 Byron Street, Blairgowrie (Nick Jay) The Tribunal upheld Council‘s permit conditions which required screening to the deck and upper level balcony and a reduction in the floor area of the upper level balcony and associated support beams. During the Tribunal proceedings, the legitimacy of council’s condition requiring screening to the ground floor deck was questioned as the deck did not trigger the need for a planning permit. Council maintained that the deck formed part of the planning application (as it was shown on the proposed plans) and as such required planning approval. Ultimately the Tribunal agreed and decided that Council’s approach was correct and the conditions were appropriate in order to protect the amenity and privacy of the nearest habitable rooms of the adjoining dwelling. • Community Consultation Officers conducted a range of consultation meetings during the month, including: • 1 meeting related to VCAT proceeding; • 1 Planning Application Conference; • 5 pre-application meetings; and • 11 other meetings with parties as part of the normal application process. Subdivision Applications: Fifteen planning permits were issued this month resulting in the creation of 81 net new lots across the Peninsula. Forty-three plans were certified and 39 Statements of Compliance were issued. Planning Support: The Planning Support team received a total of 3051 telephone calls in the month of May. Of these, 91% (target is 80%) of calls were answered within twenty seconds and 99% (target is 95%) of calls were answered within two minutes. The team also serviced approximately 962 counter enquiries this month. This month, the team experienced a high level of unexpected sick and carer’s leave. Of the 23 working days in May, the team experienced 32 working days of Sick and Carer’s Leave. Despite this level of absenteeism, the team were able to complete 91% (target is 80%) of all work within timeframes. During May, the Planning Support team held a series of expectations sessions that were aimed at seeking feedback from team members about the efficiencies and also any areas of improvement for the roles within the team. These sessions also included a review of the set timeframes for completing each task. This information has been further discussed with the leadership group and a set of findings and action plan will be discussed further with the team at an upcoming team meeting. The purpose of this exercise is to further streamline the way the team operates and remove any duplicate and non-value adding steps from the various functions within the team. General Business: On 28 May 2014 the Minister for Planning, Matthew Guy, announced that reforms would be made to the Bushfire Management Overlay and native vegetation requirements. The reforms include allowing private bushfire bunkers to be used as an alternative safety measure, allowing vegetation removal to achieve defendable space and allowing homes to be built on "infill" lots surrounded by other dwellings. While not part of the official media release, it has also been reported that the Country Fire Authority’s ability to 'veto' planning permits is also being reviewed. The exact form of the changes - and how it might impact on the Shire - is not yet known, but it is expected that the state wide amendment will be implemented shortly. Monthly Report May 2014 36 Financially, the unit has returned a monthly favourable variance of $7k. The unfavourable year to date variance is primarily due to lower planning application fees than forecast. $'000 Operating Surplus / (Deficit) Monthly Report May 2014 Forecast Actual Variance Forecast Month Month Y.T.D Month (557) (550) 7 (3,798) 37 Actual Variance Budget Forecast Variance Y.T.D. Y.T.D Y.E. Y.E. Y.E. (3,878) (80) (3,990) (3,892) 98 ENVIRONMENT PROTECTION AND COMMUNITY SAFETY FIRE PREVENTION AND EMERGENCY MANAGEMENT Fire Prevention Statistics for End of Fire Season 2013/2014 Indicator Number of Inspections Fire Prevention Notices Infringements Compulsory Clearances 2012/2013 Season 2013/2014 Season 3116 1605 115 17 4769 1760 147 45 % Change Increase of 53.0% Increase of 9.6% Increase of 28.7% Increase of 164.7% There has been a significant increase in all indicators relating to fire prevention efforts on private property for the 2013/2014 fire season in comparison to the previous season. This is primarily due to a drier and longer fire season with more significant grass growth in Spring and early Summer than we had the year before. The Shire saw a significant increase of property owners not complying with fire prevention notices, which is disappointing when we consider how important it is that all property owners, including those with vacant blocks, keep their properties in a fire ready condition over the fire season. As such, the Shire will be further strengthening its education initiatives in the lead up to next fire season with a particular focus on the Southern Peninsula. This will include: • • A pre fire season letter to residents in high risk locations in Blairgowrie, Portsea and Sorrento indicating that the fire season is nearly upon us. Accompanying the letter with a multi-agency bushfire flier which would promote messages around the following: • upcoming educational programs • how to report fire hazards to the Shire • promotional material of any nearby relevant agency doing fire prevention work. This initiative has the support of the Mornington Peninsula Municipal Fire Management Planning Committee and the Country Fire Authority (CFA). Telecommunications on the Mornington Peninsula The Shire continues its advocacy to the State and Federal Government concerning the $100m Commonwealth Government’s Mobile Coverage Program. The Victorian Government’s response reflects many of the comments made in the Mornington Peninsula Shire’s submission. Some of the key points reflected in our submission are listed below: • The Victorian Government has also consulted widely with regional communities and local governments on their specific issues and problems with mobile communications. The Government has received feedback from representatives of 27 rural and regional councils. Their comments reflect widespread concern at the impact of black spots on community safety, particularly bushfire risk, effectiveness of emergency alerts and coverage of transport links. The councils also raised issues of the economic and social impact of black spots on local communities, with the impact on tourism a consistent concern. • Improved mobile communication is required to better inform decision making in the event of an emergency and to support the Victorian Government’s principle of adopting a shared responsibility and shared obligation with communities and businesses to manage emergency events and disasters such as bushfires. • The Victorian Government does not support a single carrier solution that provides no service to a large portion of the population, particularly where public safety is a factor. For example, emergency alerts are half as effective if they can only reach the customers of one network. Monthly Report May 2014 38 • • Better estimates of transient and travelling population are required. Transient populations along the Victorian coastline have been analysed by the Department of Transport, Planning and Local Infrastructure and categorised as including: weekend populations, holidaymakers, daytrippers, festival attendees, seasonal workers, working populations, mobile skilled workers and construction crews (the link referring to Population and Settlement along the Victorian Coast is http://www.vcc.vic.gov.au/assets/media/files/Final_report_population_and_settlements_Aug_20 13.pdf). The methodology developed to calculate peak population estimates takes into account potential population should unoccupied dwellings and tourist accommodation be fully utilised. The critical drivers for improved mobile coverage ought to be better public safety and economic development through digital communications, meaning a focus on disaster prone area coverage, busy transport corridors and populated blackspots. The next ‘Network Coverage on the Mornington Peninsula’ meeting has been postponed from 27 May 2014 to 30 June 2014. The Parliamentary Secretary to the Minister for Communications, the Honourable Paul Fletcher MP, will be attending. The Minister has indicated he will be able to provide an update with respect to the implementation of the Commonwealth Government’s Mobile Phone Coverage Program at this meeting. Exercise Warringine Exercise Warringine was held on Friday 30 May 2014. The exercise was planned to practice the arrangements around a simulated hazardous materials (hazmat) event that has the potential to affect an environmentally sensitive area close to Westernport Bay. The Mornington Peninsula Shire hosted the exercise at the request of Victoria Police on behalf of the Port of Hastings Oil Spill Response and Port Emergency Committee of which the Shire is a member. This provided an opportunity for delegates to gain knowledge and/or clarity around current Victorian emergency management procedures and processes. It also involved a discussion exercise in response to an event that has the potential to impact upon the local community. Exercise Warringine objectives: • Enhance stakeholder knowledge with respect to emergency management arrangements within Victoria, in particular the command, control, coordination and relevant legislation, response and recovery plans. • Evaluate a multi-agency response to an emergency incident (hazmat) which also results in an environmental risk/impact to Westernport Bay. This is to include the integration of control and support agencies within the Emergency Management Team process and the documentation of appropriate structures to support the response at incident level. • Document the discussion with a view to identifying best practice, and/or barriers to inform the Mornington Peninsula Shire Municipal Emergency Management Plans (MEMP) and effective ways of knowledge transfer to partner agencies. A larger scale simulated exercise involving all emergency services and the Mornington Peninsula Shire is planned for 24 June 2014 and is known as ‘Exercise Moonah’. ENVIRONMENTAL HEALTH Food Safety Food Complaints This month the Shire received 12 complaints from the public in relation to food or the condition of a food business. These complaints have been or are currently under investigation. The complaints were primarily about dirty premises, poor food handling practices, food poisoning and gastrointestinal illness outbreaks. Food Recalls There were eight food recalls issued by Food Safety Australia and New Zealand or the Department of Human Services over the month which were followed up by the Environmental Health Team. Monthly Report May 2014 39 Five recalls were due to undeclared allergens, two recalls were due to microbial contamination and one recall was for the presence of prescription medication. Food Safety Assessments The Environmental Health Team has undertaken 155 assessments of fixed food business and 20 of temporary food businesses. The Team have also undertaken 30 new registrations/notifications and 124 Statements of Trade were processed through the online registering system known as Streatrader. Food Act Prosecution The proprietor of a bakery was fined $20k without conviction and ordered to pay Council costs of $7k. The proprietor pleaded guilty to 20 charges under the Food Act 1984 and Food Safety Standards, including the handling of food in an unsafe manner, at the Frankston Magistrate Court on 27 May 2014. Since January 2014, a food sampling program and food safety assessment of the premises identified ongoing non-compliance and food safety breaches. A number of food samples collected from the food business showed a high level of enteric bacteria, indicative of contamination through poor hygiene and post processing contamination. Subsequent inspections revealed the condition, along with handling procedures at the premises had deteriorated. Council Officers observed nests of live cockroaches in the premises, temperature abuse of foods, deteriorated equipment, broken hand wash facilities, lack of food safety knowledge and skills, food handlers not washing hands, inadequate cleaning and sanitising of food contact surfaces and the absence of adequate pest control and food safety program being implemented. In sentencing, the Magistrate was mindful that the proprietor had undertaken process and procedural changes to prevent recurrence of food safety breaches, had been cooperative with authorities and had entered a guilty plea early into the proceedings. However, in justifying a serious penalty, the Magistrate was of the opinion that the proprietor should have known better given his 25 years of experience in operating food business, that the length of time to comply with the Council’s requirements was concerning and overall that the community expect food for sale to be safe and suitable to eat. Merit Requests The Environmental Health Team received 39 complaints for the month. These complaints were in relation to smoky chimneys, asbestos, rubbish, odours and hoarding. All have been investigated by the Environmental Health Team. Mornington Beach Risk Assessment Update In July 2013 the Environment Protection Authority (EPA), through its Yarra and Bay Action Plan, granted the Shire $20k in funding to complete an environmental risk assessment for Mornington Beach, focusing on sources of high bacterial levels in the beach water. This assessment includes a water sampling program for stormwater drains within the Mornington commercial district. Phase three of the water sampling program is being completed by CAPIM (Centre for Aquatic Pollution Investigation and Management) at Melbourne University during May and June. The aim of the program is to find the source/s of the human E. Coli that was found in the Cook Street and Pearson Street stormwater drains in March and April (phase two). Water sampling has detected high E. Coli levels in the stormwater drains at three locations. The Shire’s Environmental Health Team is investigating the source of the E. Coli, assisted by South East Water and EPA. Monthly Report May 2014 40 COMMUNITY ANIMAL SHELTER Dogs The Community Animal Shelter had a total of 92 dogs come and visit in the month of May and it was pleasing to see that 80 of them were microchipped; this gives the pets a great chance of being reunited with their owners quickly. Only 24 dogs were registered prior to entry, which is disappointing, as Shire registration also speeds up the reuniting process. It is disappointing that animal owners are waiting to find out that failing to register an animal ($289) is far more expensive than animal registration ($36 for de-sexed or $167.50 for entire). Forty-seven of the dogs were reunited with their owners and 14 made their way to one of the following rescue groups: Australian Working Dog Rescue, Paw Prints, New Beginnings, Forever Friends, Magic Paws and The Australian Animal Protection Society. Only three dogs were required to be euthanised this month, which is an exceptional effort by the staff and volunteers who devote an incredible amount of energy into giving every animal a second chance where possible. Pictured from left to right Esther, Mandy and Sam Thanks to Mandy from New Beginnings Rescue Group who ‘rescued’ Tina, Cooper and Boo Boo from our Shelter. Meet Sophie (pictured left), another success story from our partnerships with rescue groups. Sophie came in to the Shelter after being found hiding in the bushes, pregnant and malnourished. Now Sophie is happily living in foster care with Magic Paws, having just given birth to 12 pups. Cats A total of 72 cats came to visit the Community Animal Shelter, but only 12 were microchipped. Twenty were de-sexed and four were registered prior to entry. Twelve of these cats were able to be reclaimed by their owners and a fantastic total of 28 were taken by the rescue groups. The rescue groups take the cats and arrange for them to be vaccinated, de-sexed and microchipped before placing them up for adoption to a permanent home. We would like to recognise the following groups for the month of May: Rescue-a-Cat, Peninsula Cat Rescue, Paw Prints, Australian Animal Protection Society and New Beginnings. Unfortunately 13 cats had to be euthanised under the Code of Practice. Monthly Report May 2014 41 Direct Adoptions The Community Animal Shelter Team (staff and volunteers) are continuing to do some fantastic proactive work towards direct adoptions from the Shelter. PetRescue (Australia’s most visited charity website) is our preferred choice for putting suitable animals up for adoption and we encourage you to take a look at the animals that are up for adoption. The website is http://www.petrescue.com.au/groups/10803 The response to the animals that have been placed on the website has been amazing, with enquiries coming from far and wide and at all times of the day and night. Livestock A surprise came along last week in the Community Animal Shelter livestock paddock where one goat was being kept after wandering the roads on the Mornington Peninsula. Staff doing their afternoon check discovered one goat had become three with the birth of very cute twins. The Mother and kids spent a few more days at the Shelter before being transported to Edgars Mission, a not for profit sanctuary for rescued farm animals. Check out further details on this link: https://www.facebook.com/edgarsmission/posts/10152800669680130 Pictured left: Jillian and Jacob looking very cute after arriving at Edgars Mission. National Volunteer Week (12–18 May 2014) The Community Animal Shelter Team would like to thank all the volunteers who give much of their valued time to help achieve the best outcome for the animals that come into the shelter’s care. Some of the animals arrive at the shelter looking exhausted, particularly if they have been roaming and they get some great attention whilst at the Community Animal Shelter. The animals that are in the shelter for more than a couple of days may need extra attention, exercise and care and this is made possible with the help of the volunteers at the shelter. SHIRE RANGERS The Shire Ranger Team dealt with approximately 1000 reactive cases over the past month. The following table provides a breakdown of the main case types received over the past 12 months with the associated increases in the main work types. Overall this is a higher workload than the same time last year. Monthly Report May 2014 42 Domestic Animals Act Senior members of the Shire Ranger Team attended Department of Environment and Primary Industry (DEPI) forums this month to discuss and work through the current amendment to the Domestic Animals Act. The amendments incorporate a number of changes which come directly from recommendations made by the coroner and focus on dog attacks, animal aggression and further legislation relating to restricted breed. In addition, there are changes which increase the reporting to the Secretaries DEPI of certain matters relating to animal aggression. Domestic Animal Businesses The Shire Ranger Team has completed the domestic animal business inspections this month. The intent of these inspections is to ensure compliance with the relevant codes of practice is achieved. All businesses inspected are complying with the code. Cases of interest Case One Two dog owners in Mount Eliza and Tuerong were summoned to appear in court in respect of ongoing concerns about their dogs wandering at large. Both dog owners were charged with multiple dog at large offences over several dates where they both pleaded guilty to all charges. The court found the charges proven and fined both dog owners $300, ordered them to pay $110.40 in statutory costs and placed them both on a good behavior bond for a period of 12 months. Case Two Shire Rangers attended a location in the Cemetery Estate, Hastings, in response to a burning off concern. After an initial visual assessment of the property and discussions with the elderly owner and his carer, it was apparent that there was some cause for concern regarding the state of the property (due to hoarding) and the occupant’s ability to clean up. Opposed to utilising enforcement mechanisms, the investigating Ranger sought assistance from the Shire’s Aged and Disability Services Team, which resulted in the matter being referred to an assessment officer that same day. Whilst the issue is not completely resolved, the Shire Ranger Team will continue to work with Aged and Disability Services Team with a view to reaching an amicable outcome for the property owner and the adjoining residents. STATUTORY BUILDING The Building Team attended two incidents on the Peninsula this month. One was a fire that destroyed a boatshed on Rosebud foreshore and the other a vehicle accident impacting on a dwelling at Dromana which claimed two lives. Monthly Report May 2014 43 Building Legislation Amendment Bill 2014 The Statutory Building Team is working through the 480 page Building Legislation Amendment Bill 2014 which had its second reading in parliament on 7 May 2014. The Bill contains the most significant reforms to the Building Control Scheme in Victoria since the introduction of the Building Act 1993. PLANNING COMPLIANCE Home Occupation The Planning Compliance Team has been called out to a higher than usual number of businesses operating from home (home occupation) over the month. The businesses have come to our attention through complaints received about the movement of vehicles and customers to and from the properties. Our investigations have resolved that some of these businesses are simply too big to fit within the allowance of a “home occupation” and need to be relocated to a business or industrial zoned area. Many of these businesses start out small in scale and most likely complied with the guidelines initially. However, due to increases in the number of employees or volume of movement at the premises, they are no longer able to comply with the guidelines. People thinking of running a business from home, or who are currently running a business from home, are encouraged to follow the link below to the fact file to see if they are complying or can comply with the guidelines. www.mornpen.vic.gov.au/Building_Planning/Planning/Planning_Fact_Files COMMUNITY ENGAGEMENT World No Tobacco Day Every year on 31 May the World Health Organisation and partners mark World No Tobacco Day, highlighting the health risks associated with tobacco use and advocating for effective policies to reduce tobacco consumption. Tobacco kills nearly six million people each year, of which more than 600,000 are non-smokers dying from breathing second-hand smoke. Through the Best Bites program and with the support of Peninsula Health, Rosebud Plaza Shopping Centre and Western Port Chamber of Commerce, the Shire’s Environmental Health Team arranged for food businesses with outdoor dining areas in Rosebud Plaza and Hastings to voluntarily make these areas smoke free for a day in the lead up to World No Tobacco Day. All Rosebud Plaza food businesses and six Hastings cafés and restaurants supported this initiative and went smoke free for a day. Display stands were also set up in the Hastings Library and Rosebud Plaza shopping centre from 26 – 31 May inclusive to celebrate World No Tobacco Day. Pictured Right: The World No Tobacco Day stand at the Rosebud Plaza Monthly Report May 2014 44 Financially, the favourable variance is due to greater than predicted income from infringements and greater than predicted recovery of penalties. This is reflected in the favourable year end forecast. $'000 Operating Surplus / (Deficit) Monthly Report May 2014 Forecast Actual Variance Forecast Month Month Y.T.D Month (771) (590) 181 (4,555) 45 Actual Variance Budget Forecast Variance Y.T.D. Y.T.D Y.E. Y.E. Y.E. (4,197) 358 (5,262) (5,072) 190 ECONOMIC DEVELOPMENT TOURISM Membership Membership renewal notices have been sent to 350+ members. Encouragingly we have received 11 new members plus 40 memberships renewed for the 2014-2015 financial year. Accommodation Bookings made during May are down by 35% when compared to the same time last year. When looking at Google analytics for the tourism website www.visitmorningtonpeninsula.org, page views for accommodation are only down by 13%. Website Page visits to events, packages and special offers have jumped significantly (for example 360%). This suggests that people are still coming to the site to view accommodation but are ‘shopping’ and buying elsewhere for the best package deals. Mornington Peninsula ‘Alley’ at Melbourne’s Good Food and Wine Show MPT coordinated a full ‘Alley’ of Mornington Peninsula food and wine enterprises in a bespoke regional area at the Melbourne Good Food and Wine Show held from 30 May until 1 June. The Show’s core theme was ‘regionality’ with a key focus on boutique producers. MPT team manned a regional tourism stand alongside: Peninsula Fudge, Bass and Flinders Distillery, Lindenderry at Red Hill, T’Gallant Winemakers, Horseback Winery Tours and Flinders Hotel. National Volunteer Week Celebration During National Volunteer Week (12-19 May), the Frankston and Mornington Peninsula regions six Visitor Information Centres joined together to celebrate the power of volunteering. The first ever combined event highlighted the amazing hard work of our volunteers and was a great opportunity to network with like-minded individuals. In total there were 64 volunteers with their centre coordinators present and a number of dignitaries. These included the Frankston and Mornington Peninsula Shire Mayors, Economic Development Managers, CEOs and Mornington Peninsula’s Director of Sustainable Environment. Biggest Morning Tea Mornington Peninsula Visitor Information Centre hosted a Biggest Morning Tea event on 21 May to help raise money for the Cancer Council. Over $200.00 was raised as the team of volunteers and staff (new and old) enjoyed the culinary delights. Training Familiarisations Eighteen Visitor Information Centre volunteers participated in a training familiarisation tour this month visiting several local member businesses including: Mock Orchards, Hummingbird EcoRetreat, The Long Table, Terre Restaurant and The Eco-Living Display Centre. Wine Food Farmgate Trail Map MPT launched the second edition of the Wine Food Farmgate Trail Map at the Melbourne Good Food and Wine Show. Sixty tourism businesses purchased advertising on the map and these sales funded new display materials to create the Mornington Peninsula ‘Alley’ at the Show. Winter Discovery 2014 MPT has created 39 special offers, packages and mini events with participating tourism businesses to inspire people to visit Mornington Peninsula over winter. Packages have been loaded onto the regional tourism website and included in a printed brochure (10,000 copies) to be distributed across the region to visitor information centres and local businesses, and into neighbouring regions and Melbourne’s Federation Square Visitor Information Centre. The full program, as well as the individual events, activities and accommodation packages can be downloaded from www.visitmorningtonpeninsula.org. The program will also feature in regular social media promotions. Monthly Report May 2014 46 International Media Marketplace A new element was introduced to the Australian Tourism Exchange (ATE) for 2014, the International Media Marketplace (IMM). The event was a program of one-on-one appointments, networking sessions and workshops that were designed to put Australian destinations and products in front of key media from across the globe. Traditionally the media were dispersed among ATE appointments along with the trade. This event allowed each of the appointments and discussions to be completely media focused. This format allowed Mornington Peninsula as a destination to pitch stories that were relevant to each of the journalists’ publications during our 1:1 appointments. Day one was a session of 22 one-on-one appointments. During this time we were able to highlight the key offerings of the region, as well as introduce the Wine Food Farmgate campaign as a key media proposition as part of Tourism Australia’s ‘Restaurant Australia’ promotion. Day two was an extremely informative workshop session which gathered speakers from the world of social media and online tourism marketing to present new trends in this ever changing marketing space. Conference Bureau Familiarisation Tour As an extension of the recent conference bid for the 2015 Australian Coastal Councils (ACC) Conference, the event organisers/convenors (Alan and Susan from ACC) were taken on a site inspection familiarisation across the region. The purpose of this visit was to determine whether the region’s venues and facilities had the capacity to host the conference in relation to the sessions and the overnight accommodation for delegates. The familiarisation tour consisted of site inspections for seven properties in the region, from Frankston through to the southern end of Mornington Peninsula. The day concluded with a Councillor reception in Mornington. A decision on the host destination for the conference will be made in early June. Dromana Visitor Information Centre [DVIC] The refurbishment of the DVIC is scheduled for late July/August and during works the Tourism Team will be co-located with the Rosebud Foreshore Camping Office. The foreshore office will undergo minor fit out works, which will expand the building’s versatility for business and community use. BUSINESS SUPPORT Peninsula Explorer Bus Economic Development Unit [EDU] has met with the owners of the Peninsula Explorer Bus to look at joint marketing opportunities. The two ‘open double decker’ buses arrived in Australia on 28 May and will be trialling in October for commencement of a November service. Western Port Chamber of Commerce and Industry [WCCI] EDU has been working closely with WCCI following the resignation of their President Lisa Dixon. An interim committee has been installed till the next Annual General Meeting. International Cool Climate Wine Show 550 entries this year is slightly down on last year, however the extremely poor local vintage of this year is the main reason for the decline. Four local producers were awarded Gold Medals, Elgee Park, Montalto, Jones Road and Capella, which is a great result when considering competitors were from NSW, South Australia, Tasmania and New Zealand. EVENTS EDU is working with the Mornington Racing Club and MP Kids Expo to host a 2 day and potentially 4 day festival for children. Any event will be in 2015 and early discussions are positive for the event to proceed. EDU will again sponsor the biggest basketball tournament in regional Victoria, the Southern Peninsula Basketball Tournament in November. Over 350 teams with their parents, friends and Monthly Report May 2014 47 family will descend on the peninsula’s basketball courts and provide a great family spectacle for everyone. The tournament sees many teams stay two nights at local accommodation, thereby providing a strong fillip to our local economy. BlueScope Steel EDU met with Bob Pullein, General Manager, and Peter Fitsioris, Manager Marine Logistics, to discuss plant operations. On a very positive note BlueScope have re hired 70 workers since the last round of retrenchments and overall production is running efficiently at 650,000 tonnes per annum. StreetLife The final training session for the ‘Business Skills Development and Mentoring’ program was held this month. The theme for the session was Marketing, with 35 businesses participating. The mentoring component of the program will continue until early June. Commercial Activities on Footpaths Monthly permits for Commercial activities are: Approved Permits 5 Licences with Liquor Permits Pending Expired 2 0 Digital Enterprise workshops These monthly workshop sessions will help small–medium size businesses improve their online presence, take full advantage of greater digital engagement and realize benefits enabled through participating fully in the digital economy. The May session covered the Benefits and Risks of Digital Marketing for 20 businesses. Women in Business The fifth Women In Business session of this business training program was held on 14 May with all 16 business operators participating. This program has been very successful to date with very positive feedback from all participants and from the program coordinators. Small Rural Landholder Network (SRLN) Two ‘Understanding your Soil’ workshop series have been delivered with the final workshop to be undertaken on Saturday 31 May. The attendance and feedback from participants has been positive, citing the interactive “hands on” delivery methods used to assist participants better understand their soil properties on their agricultural lands across the shire. An extensive soil coring program was undertaken to gather samples of various soil mapping sites to raise broad awareness of the diversity of land classes across the shire and to better understand: • General soil formation across the Peninsula • Physical properties of soils • Biological life in the soils • Microbial activity • Nutrient cycling • Soil chemistry • Texturing and analysis A learning resource will be developed from this activity series to enable other regions to deliver tailored workshops around localised soil themes. Monthly Report May 2014 48 Local Food Strategy The second Food Industry Advisory Body (F.I.A.B) meeting was held on 6 May. The FIAB members unanimously decided on the development of a Provenance program to promote Mornington Peninsula Produce. Actions associated with this process are currently being undertaken, including reviewing patent legalities, logo design, registration of a website domain and recruitment of 20 businesses to participate in the ‘pilot’ program. The next FIAB meeting is scheduled for 13 June. The recent launch of “Know Your Food Bowl’ project by the Victorian Food Alliance aims to raise awareness of the importance of peri-urban food production zones around metropolitan Melbourne. The Shire is one of the project’s case studies which will be promoted over the coming months, profiling the importance of its agricultural capacity, proximity and value to an adjoining urban centre. Agricultural Analysis The 2014 Agricultural Analysis draft report is being finalised after receiving internal feedback. The report provides a quantitative overview of key primary industries across the Shire and highlights significant values of production, land use trends and opportunities for action to provide focus for further agribusiness engagement across the shire. Planning support The Rural Business Officer continues to provide internal referral support to statutory planners regarding green wedge dwelling applications through the assessment of farm management plans. Some site visits have been necessary and further discussions with landholders to clarify additional information is routinely requested. Landholder business support The Rural Business Officer has received a number of requests from shire landholders to provide support to access relevant information regarding small business opportunities on their property. Soil maps, industry contacts and technical fact notes are provided to support awareness of pathways for individual action to follow up on issues and opportunities. MPS Careers and Jobs Expo The careers expo for 2014 has been rescheduled and will now be held in May 2015 (exact date TBC) at the Mornington Racing Club. The expo will now be run as a joint event with Frankston City Council and be known as the FMP Careers and Jobs Expo. The aim of this joint partnership is to combine multiple careers events within the region, to assist the needs of students and people returning to the workforce or looking for a career change, ultimately making it easier by attending one event. The venue itself is larger, making it ideal for exhibitors to promote career and training opportunities to attendees. New sponsorship and exhibitor opportunities are being sought over the coming weeks along with ways to promote the new event. Financially, the unfavourable variance of $114k is directly attributable to clerical errors in phasing of Tourism Salaries. This will correct itself by year end and will not impact on the unit’s result. $'000 Operating Surplus / (Deficit) Monthly Report May 2014 Forecast Actual Variance Forecast Month Month Y.T.D Month (103) (216) (114) (1,394) 49 Actual Variance Budget Forecast Variance Y.T.D. Y.T.D Y.E. Y.E. Y.E. (1,553) (160) (1,652) (1,643) 9 DIRECTOR - SUSTAINABLE ENVIRONMENT The Minister for Planning released the finalised Plan Melbourne on 19 May 2014. Plan Melbourne contains a range of initiatives which should bring benefits for the Mornington Peninsula, and include: • • • • • • • • Localised planning statement for the Mornington Peninsula Port of Hastings operation as major container port with road and rail link to Dandenong achieved by 2025 – 2050 Frankston the nearest “Metropolitan Activity Centre” and Hastings, Mornington and Rosebud to remain as “Activity Centres” and smaller centres to be reviewed in context of “Neighbourhood centres” No short or medium term removal of level crossings on the Mornington Peninsula although supported in principle over long term 20 minute neighbourhoods Management of main road system Role for Metropolitan Planning Authority in reporting and implementing Plan Melbourne Sub-regional planning emphasis For further information on Plan Melbourne, please visit: http://www.planmelbourne.vic.gov.au/Plan-Melbourne Council submitted its response to the State Planning Policy Framework (SPPF) Review Advisory Committee’s draft Policy Planning Framework (PPF). The Neighbourhood Character Program involves a number of elements that are directed towards increasing the recognition of character in giving effect to the local area character policy within the planning scheme. Tract Consultants have been appointed to complete the Beleura Hill Neighbourhood Character Study. Draft design guidelines will be presented to Council in June. Council has approved the appointment of members to the community based Foreshore Advisory Groups, to provide input to coastal planning. Members have been appointed for a 12 month period. A strategy is currently being developed for the seven laneways identified along Main Street in Mornington, as well as a concept plan to upgrade Empire Mall. Council received 227 planning applications this month, the highest number of planning applications received in a month this financial year, with 197 planning applications decided this month. Pleasingly, 76% of the planning applications were decided within the statutory period (our target is 65%). Council received 40 applications to amend a planning permit and decided 52 applications. The Planning Support team received 3,051 phone calls and serviced approximately 962 counter enquiries this month. Three planning applications have been received and processed for the erection of telecommunication facilities to cover the “gap” in Telstra’s coverage for the southern part of the Mornington Peninsula. Despite the significant increase in all indicators relating to fire prevention efforts on private property for the 2013/2014 season, the Shire saw a significant increase in property owners not complying with fire prevention notices, which is disappointing when we consider how important it is that all property owners keep their properties in a fire ready condition over the fire season. In the lead up to the 2014/2015 fire season Council will further strengthen its education initiatives with a particular focus on the Southern Peninsula. The Shire continues its advocacy concerning telecommunications and mobile coverage on the Mornington Peninsula. The Victorian government’s response to the Federal government’s $100M Monthly Report May 2014 50 Mobile Coverage Program reflects many of the comments made in the Mornington Peninsula Shire’s submission. A large-scale simulated exercise involving all emergency services and the Mornington Peninsula Shire is planned for 24 June 2014 and is known as ‘Exercise Moonah’. During National Volunteer Week (12-19 May) the Frankston and Mornington Peninsula region’s six visitor information centres joined together to celebrate the power of volunteering. 64 volunteers with their centre coordinators were presented with an Appreciation Certificate. Council greatly appreciates the amazing work of our volunteers. This year’s International Cool Climate Wine Show received 550 entries. Four local producers were awarded gold medals - Elgee Park, Montalto, Jones Road and Capella. Financially, the budget is tracking to forecast, with a minor unfavourable variation that is not expected to impact on year end. $'000 Operating Surplus / (Deficit) Monthly Report May 2014 Forecast Actual Variance Forecast Month Month Y.T.D Month (46) (50) (3) (412) 51 Actual Variance Budget Forecast Variance Y.T.D. Y.T.D Y.E. Y.E. Y.E. (424) (11) (458) (457) 2 INFRASTRUCTURE STRATEGY Infrastructure Planning and Policy Footpath Construction Strategy Special Charge Schemes – total length over 5.6km The recommendations in a report to Council to advance 10 footpath special charge scheme projects in Sorrento, McCrae, Rosebud, Dromana, Mount Martha and Mornington were adopted by Council on 28 April. Detailed work on these schemes has now begun with further reports to Council for the individual schemes expected in June and July 2014. Baden Powell Place Footpath Scheme, Mt Eliza – length 300m Construction of this footpath is complete with landscaping works, to replace the vegetation removed to accommodate the path, to be installed shortly. Fully Funded Path Works Lempriere Avenue Footpath, Mt Martha – length 50m Quotes are being sought for the construction of this short length of path with construction expected to begin during June. Construction of this path will provide safer access to existing paths connecting residents to the beaches and Mt Martha Village shops. Watts and Coolstore Roads Footpath, Hastings – length 550m The tender for these works has been awarded and construction is expected to begin in the second week of June 2014. Nepean Highway Shared Path, Mount Eliza – length 350m This path will complete a missing link in the shared path network in the vicinity of The Peninsula School, Mount Eliza. The relevant planning and environmental approvals are being sought with construction expected to be completed by the end of the current financial year. The Loop/Point Nepean Road Shared Path, Blairgowrie – 1.5km Contract documents are expected to be signed in the next few weeks, allowing works to commence by the end of this month. Works are anticipated to be completed by the end of the financial year. Traffic and Road Safety Disabled Access Improvement Works Works are continuing across the Peninsula to improve disabled access particularly around existing disabled parking bays. Construction works associated with disabled access improvements progressed in Hastings, Blairgowrie, Somerville and Flinders. Photo showing disabled access improvement in Flinders. Monthly Report May 2014 52 Hastings West Park Reserve Project Members of CoDesign undertook the second community design workshop with respect to the West Park Reserve development on Saturday 17th May in the Reserve. The workshop was a great success with approximately 80 members of the community, local business operators and contractors attending to discuss ideas for works in the Reserve. The scope of works for the projects is now being developed by CoDesign. Some photos from the workshop day: Monthly Report May 2014 53 Alfred St road closure -Streetscaping project Stage 1 of the Alfred St landscaping works has been awarded to A&V Creative Concrete P/l a Carrum Downs based contractor for the lump sum of $564,431. Work will commence in June. Peninsula SaferSpeeds A Council briefing was held on the 14th May on the final analysis report undertaken by ARRB Group and Monash University Accident Research Centre (MUARC) of the Peninsula SaferSpeeds trial project with the following outcomes highlighted; Community responses: - The overwhelming community support for the trial that grew even stronger after the trial ended. - Significant number of positive uninvited letters of support along with 2 petitions. Travel speeds: - Overall travel speeds reduced and these were greatest in the residential area. Road safety benefits: - Even small travel speed reductions translate to significant reduction in casualty crashes. Projected results are up to an 11% reduction in fatalities and a 6% reduction in serious injuries. Vehicle travel times: No statistical evidence of an increase in travel times as a result of lowering the speed. The next phase of Peninsula SaferSpeeds is now being developed with Mornington Park and surrounding residential areas to be considered for a holistic approach with a 40 Area speed limit in conjunction with a Place Making program. To ensure that the community views and ideas are understood a Community engagement event is planned at the Currawong Community hall on Saturday 14th June at 12:00pm – 2:00pm where the residents can meet the Briars ward Councillors and officers. A community survey is also being planned to provide a basis for an evaluation of this holistic approach. . Monthly Report May 2014 54 Peninsula RideSafe Bike lanes have been installed along Humphries road Mt Eliza in conjunction with Frankston City Council. Humphries road is identified in the bike strategy as a very popular road for on road cyclists and is very busy on the weekends with groups of cyclists riding from Melbourne and surrounds to tackle the climb. This Month the Shire’s Bike Ed Trailer has been at St Pauls Catholic Primary school allowing the students to use the bikes and equipment in their Bike Ed training sessions at the school Bike lanes have been installed along Charles Street Dromana to service the residential area allowing for walkers and riders to use alternative transport to the Shops. The road will also form part of an alternative cycling route through Dromana allowing cyclists to avoid the narrow and busy area passed the town centre along Point Nepean Road, route signage will be installed to guide cyclists using the alternative route. Peninsula DriveSafe The official Launch of the Arthurs Seat Challenge was held at Arthurs Restaurant on Wednesday the 21st. The event is the annual fundraiser for the Fit 2 Drive year 11 young driver programs that seeks to provide skills to young people to help them avoid road trauma as drivers and passengers. This year’s event will on Sunday the 9th of November. Local Area Traffic Management Local Area Traffic Management (LATM) projects have been designed and are planned to be constructed throughout June. Community consultation is scheduled to take place in the coming weeks prior to construction. The three LATM to be constructed in June include the following: Glen Shian Lane, Mount Eliza We are planning to install kerb outstands at three locations. As well as this a 0.8m – 1.0m lane will be installed to allow for cycling/walking down the length of Glen Shian Lane. Monthly Report May 2014 55 South Road, Rosebud In South Road we are planning to install a painted centre median strip between Parkmore Road and Lonsdale Street. As part of this project we will also provide car parking lanes in this area and also some concrete islands within the median strip to reinforce the median strip. Illaroo Street, Rosebud West In Illaroo Street we are planning to install two sets of Speed Cushions in the vicinity of the shops between Mawarra Avenue and Allambi Avenue. Charles Street, Dromana In Charles Street Speed Cushions have been installed to address the high travel speeds of Motorists in the section Between Pier Street and Solander Street. Traffic team members have received phone calls from the neighbouring residents thanking the Shire for slowing down the vehicles and letting the team know that the speed cushions are very quiet. Tourism signage upgrade The Briars Park Mt Martha Upgrades to the Nepean Highway signage and the park entrance signs have been completed to bring all the signage in to line with the Shire’s signage policy. This removes the clutter and makes the signage easy to understand and clear to read for all residents and visitors travelling along Nepean Highway and in to The Briars. Park Entrance sign Directional sign placed on the Nepean Highway TAC Community Road Safety Grants The TAC offers community groups in Victoria the opportunity to apply for road safety projects under their Community Road Safety grants Program. Three have been successfully obtained and works have been progressing with the three school involved. The following are the projects being worked on: Monthly Report May 2014 56 Student Safety and Accessibility to Bentons Junior College This project was to improve safety and access to Bentons Junior College through the provision of a footpath on the eastside of Sherlock Dve and the installation of additional disabled parking bays and kerb ramps in Longwood Dve. The footpath was recently completed and installation of street trees and reinstatement of the nature strip will commence shortly. It is also proposed to work further with the school as part of this project to look at encouraging more students to walk and that walking part way is ok. Maps have been developed showing where students live so that we can target those who live within walking distance and find suitable drop off location that allow students to walk part way for those who live further away. Park and Stride Program to improve Student Safety and Accessibility to Boneo Primary School This project aims to increase safety and access around Boneo Primary School and to provide greater ability for students to walk for part of their journey to school through the installation of a path around the Boneo Recreation Reserve, installation of picnic tables to create meeting points for parents and children. Meetings have been held with the school and the Boneo Reserve Committee of Management to finalise locations for the path and tables to ensure all users can benefit from them. Works on the path will commence shortly. Following installation of the path, the new parking and walking arrangements will be promoted with the school and school parents. Student Safety – McLaurin Drive Footpath and Drop Off Area This project was to provide a safe continuous accessible path of travel for students and school community members to/from vehicles parked remotely in McLaurin Drive Tyabb. Tyabb Primary School has very limited parking on their grounds or in front of the school and therefore many parents used the unsealed shoulder to park and the students walked to school even though there was no footpath. Monthly Report May 2014 57 The footpath and shoulder sealing has been completed and reports from the school indicates that the area is continuing to be used and the parents are very happy with the upgrades. Asset Management Safer Local Roads – Pavement Performance Measurement Work is continuing within the Asset Management unit to progress Safer Local Roads contract Pavement Condition Index (PCI) improvements. Preparation of a detailed PCI Quality Plan is ongoing in order to provide documented direction in ensuring consistency in future PCI methodologies and calculations. Included in the document will be an improvement plan and guidelines to address potential future emerging issues. Analysis of road pavement condition assessments is about to commence from digital images taken during the last pavement assessment in 2012. The photographs below show typical images available from the digital methods now in use. The defect measurement outcomes derived from this method will be compared to those achieved from manual site inspections conducted at the same time. At the completion of the assessment an agreed adjustment will be made to Target PCI’s to be achieved in 2014-2015 to ensure consistency in outcomes despite the change of assessment method. Monthly Report May 2014 58 Financially, the year to date variance is favourable primarily due to capital recovery and the phasing of the program. In addition some minor corrections are to be made to salaries due to backfill of vacant positions in the team. Overall the team is on target to meet forecast at year end. $'000 Operating Surplus / (Deficit) Monthly Report May 2014 Forecast Actual Variance Forecast Month Month Y.T.D Month (156) (204) (48) (2,070) 59 Actual Variance Budget Forecast Variance Y.T.D. Y.T.D Y.E. Y.E. Y.E. (2,041) 29 (2,279) (2,273) 6 INFRASTRUCTURE MAINTENANCE COMMUNITY ENGAGEMENT For the month of May while there was numerous informal engagements onsite with the community (typically 1:1’s which occur whilst delivering customer service as part of managing Objective and MERIT), formally the Infrastructure Maintenance Team and the service providers were involved in the following specific formal engagement with the community: • The Natural Systems Team met with the Mornington Peninsula Youth Enterprises Nursery (MPYEN) to share ideas and practices and to understand what we have in common, particularly in terms of Nursery operations. (see later item) • This month the Shire Nursery has given several thousand indigenous trees away to residents who have experienced possum damage to their existing trees (see later item and photographs). The give-away will continue into winter until stocks run out. • During the months of May (and June) the Natural Systems Team are hosting a series of ecological presentations for volunteers working in bushland reserves across the Shire in an effort to say thanks for all the incredible work that they undertake protecting the biodiversity values within their patch as well as giving them an opportunity to skill up in their knowledge. • The Nursery Coordinator assisted with a memorial planting at The Briars in conjunction with Peninsula Home Hospice on the 18th May. The day was hugely successful, with over 360 people attending to plant indigenous trees in memory of their loved ones. This is the third year the event has been held, becoming more popular and well attended each time. CLEANSING & DRAINAGE CLEANING. Building Waste & Recycling Services A new initiative rolled out under SIMS2 is the provision of waste & recycling services for users groups at Shire buildings, including sporting pavilions. Prior to SIMS2 user groups / clubs were typically responsible for management of their waste. Provision of this service under SIMS2 allows for a consistent approach for Shire buildings. However, contaminated cardboard bins (in particular) have been a recent hot topic. Following a productive meeting with key people from Recreation & Leisure, Asset Management, the Mornington Peninsula Regional Waste Management Group Education Officer and Service Provider, plans are in place to educate the tenants of these sites in the sustainable use of the various litter receptacles that have been provided to them. A positive outcome here will be well received by all. Linked to this is the introduction of bin cages at certain sites to discourage inappropriate use and contamination. Monthly Report May 2014 60 Bin Cage – Balnarring Hall PARKS & ROADSIDES, BUILDINGS AND FURNITURE & SIGNS Mornington Cemetery Expansion The Parks and Roadsides team have been striving to deliver the Cemetery Expansion project in order to achieve a good grass strike prior to winter. The project consisted of the removal of remnant vegetation on the eastern border of the Cemetery and grounds preparation for seeding of the finished surface. A 15 metre buffer of vegetation has been retained along Nepean Highway and Inga Parade. Due to the intended future use of the area as a cemetery, particular attention had to be paid to the removal of all root matter and debris from surface layers. Following vegetation removal, shaping and seeding, the roadways and drainage including a small wetland feature were constructed. Projections indicate that the soon to be opened area will extend the life of the Cemetery by 20 – 25 years. Monthly Report May 2014 61 The existing treed SE corner of the Cemetery has been cleared for the expansion. Monthly Report May 2014 62 Tree Banding for Possum Control The Parks and Roadsides Tree Maintenance team have been installing possum bands in bushland and urban areas to prevent possum access and save large native trees. The two locations represented by the attached photos are Earimil Creek Bushland Reserve and Moorooduc Quarry Bushland Reserve. Both these reserves are on the residential fringes of Mount Eliza. Many of the trees in the reserves are under environmental stress due to overgrazing by possums. There are two types of bands being used, clear perspex bands and metal bands. In areas where part of the bushland management may include Fire Management burns the metal bands are used. Otherwise the clear bands are preferred because they are less visually obtrusive. The key to the success of Possum Banding is the ability to isolate impacted tree canopies from the possums by strategically locating bands on impacted and neighbouring trees denying possum access to tree canopies. In addition, pruning is required to remove smaller subordinate vegetation under trees and/or pruning to separate canopies of trees to prevent access. Possum Band to Bushland Reserves Monthly Report May 2014 63 Toilet Floor Refurbishments Floor refurbishments as part of the Public Toilet Strategy have commenced at 17 public toilet blocks to improve the amenity and serviceability of the toilets. Floors have been coated with a durable epoxy non-slip finish with works being carried out in a manner that minimises inconvenience for patrons. This includes the erection of signs in advance of toilet block closure advising of the pending closure and advising of the closest alternative facility. Monthly Report May 2014 64 NATURAL SYSTEMS TEAM Fire Management Planning During May the Natural Systems Team continued to develop plans for fire management. The draft Municipal Roadsides Fire Management Plan was taken to the Municipal Emergency Management Planning Committee and endorsed by that committee. The Roadsides Fire Plan has now received considerable agency consultation and support. In coming months the plan will be reported to Council for formal adoption. In addition, fire management plans for individual bushland reserves have now been fully revised with input from the Country Fire Authority (CFA) at regional and brigade level. It is important to continue to review fire plans as local conditions change in regard to development, road access, and neighbour involvement, and fire science continues to develop. In June the Natural Systems Team will participate in further review of the Victorian Fire Risk Register for the Mornington Peninsula. Ecological Presentations to Volunteers During the months of May (and June) the Natural Systems Team are hosting a series of ecological presentations for volunteers working in bushland reserves across the Shire in an effort to say thanks for all the incredible work that they undertake protecting the biodiversity values within their patch as well as giving them an opportunity to skill up in their knowledge. In May Ed McNabb, a wildlife ecologist with a special interest in nocturnal fauna, briefed the volunteers on how to survey at night for owls. The owl the group was particularly interested in the State Endangered Powerful Owl which was identified by call in the Main Ridge Equestrian Grounds. We also had Robert Bender sharing the success stories of the bat box program he has been running for 20 years at the Organ Pipes National Park. In late May, botanist and geologist Leon Costermans provided a guided bus trip across the Peninsula looking at how the geology relates to soils and vegetation. All of the presentations have been well attended and there are more to come in the month of June. The Briars Late in May The Briars hosted a well attended, two day heritage skills workshop, organised by Heritage Victoria and the National Trust, on dealing with damp and an introduction to mortars and repointing. Many of The Briars’ heritage buildings are hand-made (soft) brick with lime mortar and have significant issues with damp and salt damage, therefore workshop was of particular interest for the Team. Monthly Report May 2014 65 Memorial Planting and other Works at The Briars The Nursery Coordinator assisted with a memorial planting at The Briars in conjunction with Peninsula Home Hospice on the 18th May. The day was hugely successful, with over 360 people attending to plant indigenous trees in memory of their loved ones. This is the third year the event has been held, becoming more popular and well attended each time. This month has again illustrated the importance of The Briars as a place of outdoor environmental education and engaging with the community. Numerous school groups, bush kinder, vocational training groups, Briars trainees and university students were engaged in activities around the Wildlife Sanctuary, broad acres and Heritage gardens. The use of The Briars as a resource for learning and engagement continues to grow in importance. Stocklys Creek also continues to improve, in partnership with Melbourne Water, with this month over 2000 seedlings being planted along its banks. This will aid the stabilisation of the creek bank and improve biodiversity outcomes. Balcombe Grammar and Osborne Primary both were involved in plantings just last week. Rabbit control works are continuing as we progress towards total elimination of the pest within the boundary of the Wildlife Sanctuary. External exclusion fencing is almost complete, working together with Mt. Martha Rotary and The Briars outdoor volunteers, and once this is complete no rabbits will be able to get into the Sanctuary from the outside. Now that the 1080 bait programs have been completed, action within the Sanctuary is focusing on warren destruction. It is hoped the elimination of all the rabbits within the Sanctuary by can be achieved by October this year, but there will need to be constant pressure on the population to make this occur. Warden Training In May all Natural Systems Team members working at The Briars undertook Warden refresher training so as to be able to manage an emergency should it occur. While the Team already has an emergency management plan for The Briars, the training will be used by team members to review the emergency management plan and to make any required changes / enhancements to emergency management at The Briars. Nursery Outreach The Natural Systems Team met with the Mornington Peninsula Youth Enterprises Nursery (MPYEN) to share ideas and practices and to understand what we have in common. Considerable training to young people is provided both at The Briars and at MPYEN through the two organisations. Ideas on the development of programs were discussed and communication channels opened for future combined works such as on seed collection and propagation of indigenous species. Plant Distribution This month the Shire Nursery has given several thousand indigenous trees away to residents who have experienced possum damage to their existing trees (see earlier item and photographs). The giveaway will continue into winter until stocks run out. The Nursery supplied 108 native plants for the Citizenship Ceremony held at Peninsula Community Theatre on the 14th May. Training on the Job Franklin Scholar students have been working in the garden adjacent to the Nursery. This large area was planted out by Conservation Land Management trainees several years ago and is now in need of some weed control, maintenance and re-planting. The Franklin Scholar students have planned the different aspects of undertaking the works, including safety requirements, weed treatments and plant selection. They will complete the implementation in coming weeks, resulting in the inclusion of some rarer grassy woodland herbs and small shrubs that can then be propagated by the Nursery team in the future. Monthly Report May 2014 66 SAFER LOCAL ROADS (SLR) DRAINAGE Panorama Drive, Mount Martha After investigating a sink hole at the rear of property number 87, it exposed a separated storm water drainage line. Repairs have been completed. Monthly Report May 2014 67 Perrot Court, Hastings After viewing the CCTV footage as part of the reseal program, the footage identified a separated storm water drainage line at Perrot Court, Hastings. The appropriate repairs where undertaken before asphalt reinstatement. The road resurfacing sealing works were then completed. Monthly Report May 2014 68 FORESHORE FACILITIES Hawkers Beach, Mount Martha A section of the old bluestone retaining wall collapsed at Hawkers Beach, requiring the section to be replaced with a new timber structure. The works where extremely labour intensive due to the old concrete footings. The area was stabilised on completion with geo matting, and the planting of indigenous tube stock. Monthly Report May 2014 69 Hawkers Beach, Mount Martha (Cont’d) Monthly Report May 2014 70 North Beach, Mount Martha The lower and upper section of the stair case opposite Alice Street was recently dismantled and new timber stairs constructed. Monthly Report May 2014 71 LATM PROGRAM Charles Street, Dromana 6 new speed cushions (humps) have been installed at 77 & 95 Charles Street, between Pier and Slander Streets. Monthly Report May 2014 72 Barkly Street & Tanti Avenue Mornington Reinstated the concrete spike down kerb, removed and relayed existing pavers. Monthly Report May 2014 73 Monthly Report May 2014 74 ACCELERATED WORKS PROGRAM (AWP) Shands Road, Main Ridge/Red Hill South All tree removal in preparation for road construction is now complete between Red Hill Shoreham Road and Mornington Flinders Road. Weather permitting, drainage and earthworks will now commence. Monthly Report May 2014 75 After Hours Services: Many hours of assistance to the community and emergency service agencies after hours, often throughout the night, are undertaken. Over the past 12 months the average number of after-hours callouts per week was 34 compared to 39 for the previous 12 months. In reviewing in more detail the call out data for the period November to March 2013/14 (5 months covering the summer busy period for the Shire), and comparing it with the same period 12 months ago (2012/13) the following can be concluded for the 5 months: • • • • • • Overall 830 call outs were received for 12/13 and 760 for 13/14. This is a 9% decrease from 12/13 For callouts related to building matters, they reduced from 491 to 443 – a 10% decrease For callouts related to cleansing matters, they reduced from 60 to 43 – a 28% decrease For callouts related to furniture & signs matters, they reduced from 11 to 3 – a 73% decrease For callouts related to parks & roadsides matters, they increased from 64 to 79 – a 10% increase. The increase in parks & roadsides callouts is directly related to a windstorm event late January 2014 resulting in call outs for fallen branches / trees. For callouts related to road maintenance matters, they reduced from 198 to 187 – a 6% decrease. These reductions in the number of call outs are of significance. In April 2013 with the rollout of new 10 year maintenance contracts under SIMS2, a range of new initiatives and service enhancements came into operation. It is considered these improvements in service standards delivered by Council for maintenance of its built and natural assets are the primary driver of reduced call outs after hours. In reviewing data on all maintenance requests related to Foreshore Camping, and information from a campers satisfaction survey (conducted by the Shire’s Recreation & Leisure Team), the following results are also evidence of the success of new SIMS2 maintenance contracts: • • Maintenance requests (during business hours and after hours) over the foreshore camping season (November to April) reduced from 718 to 602, a 16% decrease Camper satisfaction level in relation to maintenance services has improved from an average of 3.6 (out of 5) in 12/13 to 4.2 in 13/14. This is a 17% improvement. Financially, the YTD unfavourable is primarily due to variables in the timing of delivery of maintenance activities (and therefore expenditure) procured outside the contract lump sums. An example of this is the supply and placement of crushed rock on unsealed roads which is rolling out now in ready for upcoming winter. In addition, the team have recently received additional funding from the Victorian Government towards infrastructure damage caused by extreme storms. The income has offset expenditure incurred from these events. While these variables in timing of expenditure create an unfavourable YTD, there are no expected YE unfavourable expected. $'000 Operating Surplus / (Deficit) Monthly Report May 2014 Forecast Actual Variance Forecast Month Month Y.T.D Month (3,531) (3,474) 57 (37,548) 76 Actual Variance Budget Forecast Variance Y.T.D. Y.T.D Y.E. Y.E. Y.E. (37,661) (113) (40,707) (40,731) (24) INFRASTRUCTURE PROJECT MANAGEMENT SUBDIVISIONS 12 – 18A Walter Street, Safety Beach This is a 28 lot residential subdivision and pavement preparation and concrete works are progressing. SEWERING THE SOUTHERN PENINSULA South East Water are in the progress of delivering the Southern Peninsula ECO Project, providing 16,200 lots in Tootgarook, Rye, Blairgowrie, St Andrews Beach, Sorrento and Portsea with sewer connection points. The project will cost $357M and will involve the installation of 230km of pipe. The project will be accelerated from the 16 year program to be delivered in 30 months and is being tendered as four separate packages. Package A – Portsea, Sorrento & St Andrews Beach The contract has been awarded to Zinfra to install 80km of pipe. Works are scheduled for completion in June 2015. Works in Portsea have been completed and it is expected that property owners will be able to connect from 1 July 2014. Works in Sorrento are progressing in the Westmore Avenue area, progressing toward Hughes Road. Package B – Rye & Tootgarook The contract has been awarded to Interflow to install 98km of pipe. Works are scheduled for completion in June 2015. Works are nearing completion in Tootgarook and are progressing in the Weeroona Street area of Rye. Package C – Blairgowrie The contract is planned for commencement June 2015 and completion April 2016. Transfer System The contract has been awarded to Fulton Hogan to install the transfer main linking Portsea to the Boneo treatment plant along with associated pump stations. Works are progressing on the Hughes Road/ Melbourne Road pump station in Sorrento and works are planned to commence on the French Street Reserve pump station in July. Directional drilling is progressing for the transfer pipe in Browns Road, Boneo. CCTV COMMUNITY ENGAGEMENT The Unit has been working closely with the Environment Protection and Community Safety Unit to support it in the development of a CCTV Policy. There has been good public support for this and the draft is due to go back to Council next month for adoption. MELBOURNE WATER METROPOLITAN REGION FLOOD STRATEGY ENGAGEMENT WORKSHOP The Shire accepted the Melbourne Water invitation to participate in this workshop and was well represented across engineering and building disciplines. The Shire’s relationship with Melbourne Monthly Report May 2014 77 Water in the collaborative flood mapping and drainage strategy development was quite distinct and of great interest to the participants. DRIVING RESPONSIVENESS, INNOVATION & PRODUCTIVITY The Shire’s use of the State Government’s Construction Supplier Register (CSR) to assist delivery of its capital works program continues to yield great competitive results and this was recognised recently when the Shire featured on the front page of the CSR Newsletter. Financially, the team have largely achieved the program budget in May, with capital and priority works (salary cost) recoveries remaining on target. Subdivision external professional is reported as over, due to additional specialist skills employed. This over expenditure has been offset with income from drainage points of discharge which should exceed the budgeted year end forecast. The year end position remains on target. $'000 Operating Surplus / (Deficit) Monthly Report May 2014 Forecast Actual Variance Forecast Month Month Y.T.D Month (207) (172) 35 (1,186) 78 Actual Variance Budget Forecast Variance Y.T.D. Y.T.D Y.E. Y.E. Y.E. (1,162) 24 (1,258) (1,265) (7) RENEWABLE RESOURCES During May the team continued to undertake a significant amount of work in relation to the review of the Shire’s Municipal Waste Management Strategy including hosting two community engagement forums – Let’s Talk Waste on the 13th and 29th May 2014. COMMUNITY ENGAGEMENT A review of the Municipal Waste Management Strategy is presently underway. Key activities during the month included: • Maintaining the online engagement forum, visited by over 1,000 residents • Running two community engagement forums, attended by approximately 90 residents from across the Peninsula to inform the decision: How can the Shire best provide for the disposal of its waste to landfill in the short to medium term? ECO LIVING DISPLAY CENTRE Workshops On Saturday 10th May eighteen people attended a workshop on ‘Backyard composting and worm farming’. The presenter, Michelle Wattus, showed participants how to successful maintain a variety of worm farms and compost bins. ‘Little helpers’ at the composting workshop – Sat 10th May Tours During May, staff and volunteers ran a number of organised tours. These were: Holy Trinity Primary School (65 children); Peninsula Visitor Information Centre volunteers (20 adults); and Shire Meals on Wheels volunteers (40 adults). Monthly Report May 2014 79 Community Meeting and Regular Groups The Eco Centre Carers Group use the Centre on a weekly basis. The group, comprising of parents, their disabled adult children and carers, use the Centre for a range of activities including gardening, cooking, singing and dancing. The Collaborative Garden Group, a group of disabled clients from Konnections and Kankama, have met at the Centre twice over May and participated in gardening and cooking. Volunteer Training On the 21st May, the Eco Living Display Centre volunteers attended a training session to learn about the new technologies installed at the Centre over the last few months. Daniel Merrony, from Energy Makeovers, trained the volunteers in the use of the new energy monitor. ‘Are You Ready? Victorian Adaptation and Sustainability Partnership Project The Mornington Peninsula Shire, in conjunction with Kingston and Bayside City Councils, have been successful in receiving a $200,000 grant from the Department of Environment and Primary Industries (DEPI) through their Victorian Adaptation and Sustainability Partnership to develop a climate change adaption website and community engagement program. The project will assist residents to plan for the impacts of climate change through developing a thorough understanding of their climate change risks and through the development of individualised Action Plans. This month the following steps were achieved: DEPI Funding Agreement signed, Project Plan finalised, Letters of Agreements signed with partner Councils, Tender documents finalised, Tenders advertised on 10th May and eleven submissions received on 27th May. Tenders will be short listed by 5th June. South East Councils Climate Change Alliance Mornington Peninsula Shire is working with SECCCA to deliver a range of innovate projects including the Energy Saver Study and the Save it for the Game, sporting clubs project. Both projects are progressing exceptionally well and have identified some key issues for the Shire to address. Energy Savers Study The Study looks at identifying the most efficient ways to support vulnerable members of our community reduce their energy bills and live in a more comfortable and safe environment. The project seeks participation from current Aged and Disability Clients and monitors energy use and well and providing support and retrofits to reduce consumption. The project is being implemented in partnership between the Renewable Resources Team and the Aged and Disability Team. The partnership means that both teams are able to contribute to the implementation of the project and improve the energy saving opportunities along with the health and wellbeing for the participants. For information on the social and wellbeing benefits to clients, please see the Aged and Disability Teams section in this Monthly report. The Mornington Peninsula Shire has had a great response to our invitation to be a part of the study with all 56 places filling quickly. The Shire has employed an Energy Liaison Officer, Michelle Wright, who has been working closely with each client to make sure the project will work for them. There have been some significant findings in these early stages, including understanding the energy needs of the clients. Energy bills range quite a lot depending on the circumstances, but some simple solutions are proving to be practical in many homes. Draught sealing is a low cost, simple solution that will improve the efficiency of older homes. Monthly Report May 2014 80 Save it for the Game Six Mornington Peninsula sporting clubs have signed up the project that aims to identify where clubs can save the most energy and assist the clubs in finding the best way to implement the recommendations. As the audits are conducted across the member councils’ clubs, there are some clear opportunities for our clubs to make significant reductions on their energy bills: • Installing simple timers on appliances so they are not running when not in use • Consolidate refrigerated goods into one fridge. The project has found many fridges running all year round, keeping some long life milk cool! • Upgrade inefficient lighting in clubs rooms • Using sensors to switch the lights off when no-one is around. A formal workshop with the clubs will conducted in August to present the audit results and recognise the club champions for their involvement so far. ENERGY MANAGEMENT Energy and Greenhouse Management and Improvement Plan Since the adoptions of the Plan in March 2013, Shire officers have been identifying and implementing a range of energy efficiency projects across the Shire buildings. Projects that have seen significant savings include LED lighting upgrades, implementing timers for hot water systems and appliance and draught exclusion. The Shire is well on track to achieve its target of 5% emissions reduction in the first 12 months. WATER MANAGEMENT The Shire was successful in receiving a further four projects funded through the Melbourne Water Living Rivers Program. Officers are currently developing the project plans, but all will contribute to improvements in waterway and bay health in both Port Phillip Bay and Western Port. The January to March quarter saw a rise in water consumption across the Shire. Detailed investigations have been conducted and identified some major leaks and inefficiencies that have been resolved. CLIMATE CHANGE Climate Change Policy Council has been addressing climate change for over a decade and the Shire has been recognised for its embedded approach whereby climate change responsibilities are reflected both ‘vertically’ from Our Vision, to the Shire Strategic Plan, to Business Plans, to Position Descriptions and PDRs, and ‘horizontally’ (in a joined-up way) across the entire organisation. The Shire is presently developing a climate change policy to express Council’s ongoing commitment to addressing Climate Change implications and impacts in a succinct statement. The Policy will capture and confirm the effectiveness and appropriateness of Council’s approach and set a course for future action. Further to the workshop held with Councillors in April, officers prepared for a second workshop scheduled for early June to further develop the direction of the Shire’s Climate Change Policy. The objective of the workshop will be: • To articulate the overall Vision for the Policy What is it that we want things to look like; what the Policy is working towards Monthly Report May 2014 81 • To consider elements of the Policy To provide comment on, or add to, different elements of the proposed Policy drafted from previous consultation data • To clarify next steps To clarify the steps required to complete a draft of the proposed policy and develop an implementation action plan WASTE MANAGEMENT Municipal Waste Management Strategy Review The Mornington Peninsula Shire‘s Municipal Waste Management Strategy reflects the Shire’s commitment to providing the community with sustainable and cost effective waste management and recycling services. A major review of the Strategy is presently underway: Let’s talk waste Key activities during the month include: • Management of the online engagement forum. During the month approximately 1,400 residents visited the online space and approximately 110 additional surveys have been completed. • The Traffic Impact Assessment and Visual Impact Assessment of the proposed options for the Rye landfill were completed during the month; • An external organisation also commenced a random survey of 300 residents to help inform the Strategy review. The process will ensure that we have responses from across our demographics and geographic locations; and • The Shire hosted two Community Engagement Forums to help inform the decision How can the Shire best provide for the disposal of its waste to landfill in the short to medium term? The first forum was focused on understanding the context of the issue and sharing information on the options for future waste disposal. Information gaps identified at the first forum were responded to at the second forum and then the group had to vote on which option they supported. 1. The forums were held on Tuesday 13th of May and Thursday 29th of May and were attended by approximately 90 residents from across the Mornington Peninsula community, State Government and the waste industry. 2. A report on the first Forum is available at: yoursay.mornpen.vic.gov.au 3. One piece of feedback from the first forum was that there were not enough young people present. The Shire responded to this feedback by recruiting a group of people aged under 40 for the final forum to ensure the views of this segment of the community were captured in the process 4. The report from the second Forum is presently being produced and the outcomes from this component of the engagement processes will be shared in the next monthly report. Monthly Report May 2014 82 Photos from the Let’s Talk Waste Community Forums No-Charge Green Waste Weekend A no-charge green waste weekend was held on the 17th and 18th May 2014. In the past the nocharge green waste weekends have been well utilised by residents. The latest weekend was no different. Approximately 4,680 cubic metres of domestic green waste was disposed at waste disposal centres across the peninsula (a decrease of 500 cubic metres from the same time last year) with around 3,400 residents using this opportunity to clean up their properties. After the initial rush at 8.00am traffic moved well through the sites and no significant delays were experienced. Traffic management was in place at all three waste disposal facilities. All the green waste collected over the weekend will now be chipped and processed into a final mulch product. The mulch should be ready in a few weeks time for residents to purchase at the sites. Monthly Report May 2014 83 Free Disposal of Televisions Dispose of your old television or computer at the Shire’s Resource Recovery Centres (tips) for free. The Federal government introduced a National Television and Computer Product Stewardship Scheme which passes the responsibility of recycling back to the manufacturers when television and computer equipment has reached the end of its life. The Shire is pleased to confirm that the scheme is still operating at the Shire’s waste disposal facilities at Rye, Mornington and Tyabb. Residents and small businesses are able to drop off televisions, computer equipment and computer monitors for free. To discourage large businesses and corporations from exploiting this service a limit of 15 items per drop applies. In operation since late 2012 the Shire has received to date 25,147 televisions which have been recovered and recycled. Financially, overall the Unit is tracking in line with the forecasted position, which is consistent with the midyear budget review However during May the Waste disposal tipping expenditure is over forecast, which is offset from improved tipping fee income. $'000 Operating Surplus / (Deficit) Monthly Report May 2014 Forecast Actual Variance Forecast Month Month Y.T.D Month (1,450) (1,262) 188 (11,247) 84 Actual Variance Budget Forecast Variance Y.T.D. Y.T.D Y.E. Y.E. Y.E. (11,079) 168 (13,514) (14,072) (558) DIRECTOR – SUSTAINABLE INFRASTRUCTURE As reported in last month the Peninsula SaferSpeeds project was recognised as one the State’s best road safety initiatives at the inaugural Towards Zero Road Safety Awards. Council has now also received the final reports from ARRB Group and Monash University Accident Research Centre (MUARC) on the results of the trial. As detailed in the Infrastructure Strategy Units part of the this report the final analysis of the project showed significant community support for the trial and the success of the project in reducing travel speeds on the trial roads with the greatest success occurring in the residential areas where speed limits were reduced to 40 kph. Successfully reducing travel speeds results in a significant reduction in casualty crashes and it is projected these reduced speeds will result in a 11% reduction in fatalities and a 6% reduction in serious injuries. It is also interesting to note that reducing speed limits and achieving the reduction in vehicle travel speeds does not result in a significant reduction in travel time. While this seems counterintuitive it actually illustrates that there are many factors outside speed limits that dictate the time it takes to undertake any journey. Traffic volumes, weather conditions and road conditions are all examples of factors that impact on travel times. Mornington Park and the surrounding residential areas will be the next location where the SaferSpeeds approach will be undertaken with the introduction of 40kph speed zone. To ensure that the community views and ideas are understood there will be a Community engagement event held along with a community survey. In relation to the installation of CCTV cameras in Hastings this project is now progressing with the installation of the required electrical wiring and cameras having now reached near completion. Regrettably this project continues to be plagued by a range of delays caused by United Energy. Recent changes in requirements by United Energy have necessitated some re-work to be undertaken by the Shire’s contractor. At this stage commissioning of the system is still on track for June although finalisation of all documentation by VicPol is still to be agreed. On a brighter note the exhibition of a draft CCTV policy by Council appears to have attracted good public support and this matter will shortly be reported to Council for final approval of the policy. On a different matter entirely the second ‘no-charge’ green waste weekend was held this month and once again was utilised by a large number of residents to dispose of approximately 4,680 cubic metres of domestic green waste. Around 3,400 residents used this opportunity to clean up their properties and operations at the three sites were successful conducted with no significant delays experienced on the day. Financially, there is a small favourable variance to report in May, which is due a number of minor variations. Overall the forecast year end remains on target. $'000 Operating Surplus / (Deficit) Monthly Report May 2014 Forecast Actual Variance Forecast Month Month Y.T.D Month (60) (60) 0 (489) 85 Actual Variance Budget Forecast Variance Y.T.D. Y.T.D Y.E. Y.E. Y.E. (482) 6 (551) (540) 11 CHILD, YOUTH AND FAMILY CARE EARLY YEARS • Planning for the annual Referral Pathways event is well progressed. This is a partnership event with Frankston City Council and this year Medicare Local will also join the partnership. The event provides valued support to the broader Early Years sector around the importance of early identification of possible developmental delays in children and the process of referring to a range of specialist and support services. • Families Week in may was celebrated by inviting local early years service providers to engage children and young people up to the age of 12 in a drawing and/or writing exercise to capture their voice on four key areas of interest. The topics were: • My favourite thing about living on the Mornington Peninsula is... • I feel healthy when... • I feel safe when... • I feel happy when... • Some of the pictures and words provided by local children will be used as artwork for the Municipal Early Years Plan and State of Mornington Peninsula Children’s report which are currently under development. • It has been highlighted that the current funding for fifteen hours of kindergarten is not secure after the end of the 2014 calendar year as the State and federal governments have not yet reached agreement over the ongoing federal contribution of five hours of funding to top up the State’s ten hours. Council has been briefed and advocacy letters have been sent on behalf of the Mayor and Council to the key State and federal MPs. Early analysis of the federal budget indicates that funding will be continued for the 2015 calendar year. A decision on securing the funding as ongoing will not be made until July 20144 at the earliest following the conclusion of the Federal enquiries into the National Reforms to the early years that are currently underway. • The Early Years strategic review project continues to progress well with a third meeting of the sectoral advisory group scheduled for 20 May. YOUTH SERVICES April School Holiday Program This month saw the conclusion of the April/Easter School Holiday Program. Both Drop-In Centres were open each day from 10am to 5pm, providing a number of activities, food and a safe place for young people to catch up with friends. The Shed 11 Youth Centre also provided breakfast each day to young people that attended the Drop In Centre. This was offered as many of the young people had expressed that they did not have breakfast each day. Poor diet and nutrition (including not eating breakfast) has been identified as an area of concern by the Communities That Care data. The final excursion for the Program was a trip to ‘Sidetracked’ Centre in Oakleigh. This was a successful activity, with many of the young people that attended expressing that they would love to attend this activity again on a future School Holiday Program. The young people participated in: laser tag, mini golf, bowling and the go karts activity. Due to the popularity of this activity, and the responses of young people, there are plans to run this activity in the July School Holiday Program. Monthly Report May 2014 86 Rebound: June saw the beginning of the Rebound program kick off. We had three impressive workshops that young people could choose from- Juggling/circus skills, DJ mixing and hip hop dancing workshop. The young people all said they all learnt new skills and were able to showcase their talents to an audience. Some parents came and had a dinner with the young people at the end. The program was heavily supported by the Balnarring Village common volunteers who turned up on the night to support and engage with their local young people which was positive to see. The young people engaged well with the volunteers. Monthly Report May 2014 87 Friends for Life: This month Youth Service’s began facilitating the Friends for Life Program at both Somerville and Dromana Secondary Colleges, with year 7 students. The Friends for life program has been specifically developed by world-renowned child psychologist Prof. Paula Barrett for young people between 12 to 15 years old, to assist with: • Increasing social and emotional skills and resilience • Decreasing and preventing worry and emotional distress for young people • Teaching cognitive behavioural strategies that correspond to several areas of social and emotional learning • Implementing preventative strategies and increases protective factors around anxiety and depression The Friends for Life program also assists young people too: • Develop life skills to effectively cope with challenging situations • Normalise states of emotional distress • Build life-long emotional resilience • Build life-supporting social networks and positive role models • Promote self-confidence and empathy • Reduce bullying and teach constructive peer relationship skills • Develop friendship skills • Empower young people and their families The Friends for Life program is backed by the World Health Organisation and Youth Services staff attending a 2 day training course on how to facilitate the program. This program fits in perfectly with CTC priorities around assisting young people with depressive symptoms and helping to develop a range of protective factors. Bright Sparks: The Bright Sparks program is a personal development program that aims at helping grade 6 students in transitioning period into high school. Over the past month The Mornington Shire Youth Services Team has facilitated the program at Mt Eliza Primary School which has finished it’s 1st 2nd and 3rd sessions and also Boneo Primary School which has finished all 4 sessions. Throughout the program workers reiterate to the students the importance of community engagement and why it is important to be involved in our communities. These discussions are supported by CTC (Communities That Care) data regarding Low Community Attachment. Session 3 is based around a healthy lifestyle which includes healthy eating, exercise and healthy relationships. The discussions around healthy relationships and what is, and what is not acceptable are an important topic of discussion. Workers discuss with the students the importance of a healthy relationship. This supports CTC data regarding Family Conflict which is a risk factor across the Mornington Peninsula. L2P: L2P has had a successful month, with 3 young people having gained their Probationary Licences. This is fantastic for these young people to gain more educational and career/employment opportunities. Many young people on entering the program, state that apart from more independence, education and employment opportunities are the most mentioned reasons for gaining their licence. Without the help of many generous volunteers mentoring these young people, the program would not be what it is today. It helps provide young people with a connection to their community and to another generation of people within the community. Monthly Report May 2014 88 Shed 11 This month the Hanging with Dad program commenced from Shed 11 as a partnership between Good Shepherd Youth and Family Services and the Youth Services team. Hanging with Dad is a four week program for fathers and sons that aims to strengthen relationships and provide personal development opportunities. The program is structured informally with a meal and activities in the youth centre followed by discussions around various topics. The most recent session was based around anger management and brain development. This program works to address CTC evidence around family conflict and intergenerational activity. Community Linkages: Youth Services in partnership with the Brotherhood of St Laurence launched their new youth support program at Willam Wurrain on the 14th of May with Indigenous artist Yaya. Yaya, the young people and staff sat around and yarned and learnt some of the symbolism and skills involved with forms of contemporary Indigenous art. It was amazing to see the young people welcomed to their ‘Gathering Place’ and made to feel like it was their cultural home. The young people produced some really effective art and while they were busy getting creative Yaya shared some of her stories as a member of the Stolen Generation. The next session will involve Emu egg carving with Baluk Arts artists. Peninsula Pride Over the last month Peninsula Pride has been based at the Rosebud YLounge, hosting our weekly QSA (Queer Straight Alliance) drop in groups every Tuesday afternoon. One noteworthy thing that occurred over the last month is the celebration of International Day Against Homophobia (IDAHO Day). In recognition of this worldwide celebration Peninsula Pride held a ‘Working Together with Pride’ workshop facilitated by special guest Joel from Safe Schools Coalition Victoria at headspace Peninsula. This workshop had representatives from 5 different schools across the Frankston Mornington Peninsula region including Somerville Secondary College. Additionally the Mornington Peninsula Shire Council showed support by raising rainbow flags on the weekend of IDAHO day. Monthly Report May 2014 89 Adopt-a-Hotspot: During Term 2 Primary and Secondary school students from the Hastings area have been completing workshops as part of the ‘Adopt-a-Hotspot’ program. This program looks at reducing the incidents of graffiti in the Westernport Catchment. A number of schools are currently involved, with students from St Mary’s Primary School, Wallaroo Primary School and Westernport Secondary College already completing Workshops with Artist Brett Cardwell. Year 8 students from Westernport Secondary College have also participated in the Education Workshops that form an important component of the Program. Many of the students that participated commented that they were not aware of some of the consequences of graffiti, for themselves, their friends and the wider community. These education workshops were run by the Mornington Peninsula Shire’s Youth Services Team and Youth Resource Officers from Hastings Police. In the coming weeks the Hastings VCAL group will design a Mural for their site with artist Brett Cardwell and Westernport Secondary College students will continue to complete both the Education and Mural Design Workshops. Councillor Garnock has continued to work on his adopted site in Hastings, working closely with business owners and the Westernport Chamber of Commerce. YOUTH STRATEGIC OUTCOMES Communities That Care (CTC) A total of 54 people responded to the CTC Local Area Information Sessions expressing an interest in getting involved in Local Area Groups. The CTC team in responding to this level of interest commenced the re-establishment of Local Area Groups. The “Rosebud to Portsea” and “Hastings / Crib Point / Bittern / Cerberus” groups have now convened and “Mornington Communities”, “Mount Eliza”, “Two Bays and Somerville / Tyabb / Baxter” are re-commencing in June. The CTC team is now in the process of finalising the draft of a new CTC training program for the new recruits. COMMUNITY LIASION The twelve Neighbourhood Houses held an Expo during Neighbourhood House Week at Peninsula Community Theatre. Free activities, displays, performances and information were provided all day for approximately 500 people that attended. The Expo showcased the diverse range of activities and learning experiences that are available at Neighbourhood/Community Houses across the Shire. CHILD & FAMILY HEALTH SERVICES The new branding - Child & Family Health Services - incorporating Immunisation Services, Universal and Enhanced Maternal & Child Health programs was officially launched at a joint Child Youth & Family Care workshop. Team members from Youth, Education & Care, and Child & Family Health came together to celebrate National Families Week - May 15th to 21st. The workshop was an opportunity to explore synergies in service provision and to plan future joint learning and development opportunities. Child & Family Health have met with representatives from Peninsula Health Social Work department to develop improved referral pathways for families in the antenatal and postnatal periods. In a new initiative the Enhanced team will start to engage with vulnerable families antenatally. The team have also connected with the Koori Maternity services worker. Although Maternal & Child Health services rates very highly on customer satisfaction surveys and the team complete over 18,000 consultations per annum it is still rare for parents to give unsolicited feedback to the team. A parent completed this on line feedback earlier this month. Monthly Report May 2014 90 “Child maternal health care nurses – fantastic asset to the shire. Please pass my comments onto the respective manager. Over the past 15 months I have been attending Waterfall Gully child health care facility with my 2 children for there (sic) scheduled health checks. The warm welcome, support, knowledge and assistance has been outstanding. So much thanks to Lara, Carmel, Zoe and Rosemary. EDUCATION & CARE SERVICES Playgroup Playgroup and Youth Services worked together to ensure the smooth transition of the Nourish and Nurture supported playgroup from Pelican Park to Wallaroo Community House. Work is continuing on exploring the supported playgroups move to a brokerage model in 2015. Meetings have taken place with our current stakeholders to ensure a smooth process for all involved. The meetings have also included exploring the use of “Small Talk” within all future playgroups. More information on the small talk model is currently being gathered with the plan to assimilate this into all our early education and care services. Our playgroup development team attended the “Laying the Foundations” conference by Playgroup Victoria which provided excellent networking opportunities and collaboration with other municipalities and services delivery options including successful playgroup models for fathers across the state. Family Day Care Family Day Care provides so many fantastic opportunities to extend on children’s learning and here is a great example of this from our Educator Francine’s home. We were having morning-tea together when Stella (4yrs) pondered, “I wonder how they make cheese out of milk?” She was eating Babybel cheese at the time. Harry (3yrs) declared he had seen cheese being made on T.V. So later in the week, after a trip to the library where a very helpful librarian helped me find a great book, “From Farm To You; Cheese” by Carol Jones, we read together how the milk from cows is used for cheese. “Maybe we could make some” suggested Stella eagerly and luckily on the last page was a recipe for cottage cheese! We all became very excited and made a plan to make it the following week. There was a trip to the shops to buy junket and a litre of milk and then we set about following the recipe. It took time but eventually each child had some cottage cheese to take home. We also tried some for afternoon tea mixed with honey on toast. Darcy (4yrs) didn't really like it although Harry and Keira's parents said Monthly Report May 2014 91 they enjoyed theirs and Stella's mum thought she might try the recipe out at home. A recipe book came with the junket and after reading it together the children were eager to make the ice-cream. So this then became our next activity; it was very cold but yummy! As an Educator I enjoyed these activities as much as the children and it reminded me why I like being a Family Day Care Educator; you just never know where a child's interest will lead you and what journey it will entail! Today Stella asked how candles are made and straight away my brain began ticking over.... Financially, the monthly variation relates primarily to grants paid prior to that forecast, as well as additional costs incurred in the Outside School Hours Program. The impact of these factors will see by year end some negative variation from revised budget forecast more in line with original adopted budget. $'000 Operating Surplus / (Deficit) Monthly Report May 2014 Forecast Actual Variance Forecast Month Month Y.T.D Month (90) (107) (16) (4,447) 92 Actual Variance Budget Forecast Variance Y.T.D. Y.T.D Y.E. Y.E. Y.E. (4,573) (126) (5,137) (5,062) 75 AGED & DISABILITY SERVICES Law Week Seniors Forum On Wednesday 14 May 2014 over 100 Mornington Peninsula residents attended a Law Week Seniors Forum at Dromana Community Hall. Peninsula Advisory Committee for Elders (PACE) ,Mornington Peninsula Shire, Peninsula Community Legal Centre and Seniors Rights Victoria worked collaboratively to put together a Law Week forum which provided community members with information about elder law issues; a growing area of concern in Australia and around the world. One of the key recommendations of the Shire’s recently adopted Positive Ageing Strategy, Mornington Peninsula, A Community For All Ages, is for PACE and the Shire to conduct regular community information forums where residents can learn about age related issues from local service providers. This forum linked with Law Week, which is a festival held annually in May each year and aims to make learning about the law easier. The Law Week Seniors Forum addressed two vital aspects of elder law that can help to ensure residents are protected in their later years: • Assets for Care; money, ageing and family, and • Lifetime Planning; Wills and Powers of Attorney. Residents in attendance provided great feedback about the forum, but did complain that they now had to go away and do some homework. PACE Law Week Forum – a collaboration between MPS, PACE, Seniors Rights Victoria and Peninsula Legal Community Centre. From left: Saskia Rijfkogel and Saskia W eerheim, Peninsula Community Legal Centre, Gary Ferguson and Carol Stuart, Seniors Rights Victoria, Cr Antonella Celi, Mayor MPS, and Jeanette Lane, PACE Forums Committee Monthly Report May 2014 93 Ageing Population….Not Doom and Gloom The ageing of the Australian population does not, and will not, impose unmanageable strains on society, according to a new study. The report finds Australia is coping well with its ageing population and should be able to keep on doing so throughout the 21st century. Written by Swinburne University of Technology Adjunct Associate Professor Katharine Betts, the study reveals the average age of Australians increased from 28.9 in 1978 to 37.3 in 2013. Despite this, the proportion aged 15 and over and in the labour force grew from 61.7% in February 1978 to 64.2% in January 2014. Despite the increase in the average age, the number of people aged 15 plus who were not in the labour force, for every 10 who were, fell from 6.2 in February 1978 to 5.6 in January 2014. If present rates of labour force participation continue, the proportion of the total population in the labour force will fall from its current, unprecedented, level of 53% to about 44% in 2061. In 1966, the proportion was lower (42%) and still the nation prospered. There is scope for age specific labour force participation rates to rise; in 2012 the Netherlands, Switzerland, Norway and Canada all had older populations than Australia together with higher labour force participation rates. A comparison of data from 31 economically developed countries in 2012 shows no association between their age structure and rates of labourforce participation, so a range of futures is possible. Baby boomers do not form a unique bulge in the population python. There are more baby boomers (born between 1946 and 1961) than there are people born between 1930 and 1945, but the 16 year cohorts younger than the baby boomers (Generation X, Generation Y, and Generation Z) are larger. Fears that a dwindling proportion of taxpaying workers will be unable to support a growing proportion of age pensioners are unfounded. Even with no further growth in labour force participation rates, the proportion of workers will not fall as low as it was in the 1960s. Moreover, only 39% of all taxes are based on paid labour. The remaining 61% are unlikely to be affected by demographic ageing. The cost of the age pension has been growing faster than GDP but this is not due to demographic ageing. It is due to successive government changes in the size of the pension and in access to it. Today, a couple aged 65 and over can have an annual income of up to $72,000 plus $1.1 million in assets (apart from the family home) and still be eligible for a part pension. Data on 31 OECD countries in 2011 show no association between the proportion of a country’s population aged 65 and over and the percentage of money on health care. America has one of the younger populations in the OECD but spends 18% of its health care; Japan has the oldest population in the OECD but spends only 9% on healthcare. Can mass immigration cure ageing? Mass immigration leads to a temporary marginal decrease in the average age. It does, however, add large numbers of extra people: as many as an extra 21 million by 2061 or an extra 44 million by 2101 (taking the total to 70 million). This total would include an extra 10 million older people (18 million instead of eight million). “Demographic ageing results from family planning and better health. The only way to avoid it over the long term is to have large families and die young,” Adjunct Associate Professor Betts says. “Attempts to make Australia younger by making it bigger are no more rational than a middle aged person trying to look younger by gaining 40 kilos.” The report is published by the Monash Centre for Population and Urban Research. Monthly Report May 2014 94 In House Collaborative Training…. In the spirit of working collegiately with a whole of council approach, the Aged & Disability Services team has worked with “specialists” in their fields from other teams across Council to develop relevant and effective in house training programs for our large community care workforce. The good will and vigour with which we can work together to achieve great outcomes for not only our team members but also the community is invaluable. Pets Aged & Disability Services team members have worked with the Environment Protection and Community Safety (EPACS) unit to develop and deliver a more flexibly responsive service to clients which may include their pets. With over 60% of households having a pet, Australians have the highest rate of pet ownership in the western world. Working with the specialists in their field we have received support and advice to assist us in updating our policies and procedures to enhance service delivery outcomes for clients. From a risk management strategy we encourage clients to “contain” their pets whilst we are delivering services such as home care to keep both the pet and the community care worker safe. When delivering services which align to active service principles (maximising independence and wellness) we seek to encourage safely incorporating a client’s pet into service delivery such as respite care or socialisation. The EPACS team, primarily Shire Rangers have provided information and training to all assessing officers and community care workers in our unit on pet behaviours and how to identify risks in regard to assessment and service delivery in the home. Where we have identified some concerns with a client’s pet we seek further input from Shire Rangers to develop an appropriate response plan to deliver the best outcomes for the client while maintaining a safe work environment for our team members. Road Safety Awareness As the majority of our team members deliver community services in residents’ homes we have also engaged the specialist skills of the Shire’s Road Safety team to develop an awareness raising program for all assessing officers and community care workers. The training provides up to date information and statistical evidence on best practice when driving. The importance of reiterating road safety to our team members is imperative as they spend a considerable time “on the road”. Home Fire Safety Last year Aged & Disability Services team members worked with our Emergency Management colleagues to develop a training program on Bushfire Awareness. We utilised the skills in our Communications team to film the training for future use. Aged & Disability Services is a large team of approximately 250 members so logistically it can be difficult to have all team members attend arranged sessions. By having the DVD available we can ensure all team members have received this training and we can provide the information to new employees on commencement. This year we have continued on the theme of fire safety and with assistance again from Emergency Management, collaborated with the Country Fire Authority and the Metropolitan Fire Brigade to deliver a training program on Home Fire Safety, so that Aged & Disability Services team members can better support our 5,000 clients to prepare and respond to home fire safety issues including correct smoke alarm placement and maintenance, home fire safety plans, regular checking and servicing of appliances and heaters, etc. National Volunteers Week National Volunteer Week celebrated 25 years of volunteering in Australia this year. Mornington Peninsula Shire Delivered Meals has 150 dedicated volunteers who deliver more than 1,300 meals to clients each week and travel more than 2,500 kms every week. This year to celebrate the fantastic and valued contribution these volunteers make to the community, the Shire arranged a special thank you event for our amazing Delivered Meals volunteers who enjoyed an afternoon at The Briar’s including demonstrations at the ECO house followed by Devonshire tea at Joesphine’s Restaurant. Volunteers were also presented with a 2014 National Volunteers Week Lapel pin. Monthly Report May 2014 95 During the afternoon tea at Josephine’s restaurant, one of our volunteers was asked by a lady sitting at another table “what group are we?”, the volunteer replied “we are Delivered Meals Volunteers”. The lady then stated that she had always wanted to deliver meals but was unfortunately not able to, and she thought the volunteers did a spectacular job. The lady and her group left the restaurant and shortly after the owner came and told us that “someone” had offered to buy all the volunteers in the room a drink. The owner indicated that it was the lady who had just left and that she wished to remain anonymous. The volunteers were delighted to accept and were amazed at the show of generosity; a fitting gesture for National Volunteers Week. What we did in May… As usual, team members of Aged & Disability Services were kept busy with plenty of demand for support from our ageing population. The following services were delivered to support 5,000 older people and people with a disability to stay living at home safely, actively and independently: • 1,439 hours of “living at home” assessment • 12,832 hours of home/personal/respite care • 5,654 delivered meals • 538 hours of home maintenance/modifications • 750 hours of activity program • 888 Dial A Bus passenger trips Financially, the month to date unfavourable variance was impacted by only part of anticipated HACC growth funding received during May, with the remainder to be received in June. It is anticipated that the growth funding will cover the majority of the increased demand, leaving a slight unfavourable variance at year end. $'000 Operating Surplus / (Deficit) Monthly Report May 2014 Forecast Actual Variance Forecast Month Month Y.T.D Month (601) (819) (218) (4,856) 96 Actual Variance Budget Forecast Variance Y.T.D. Y.T.D Y.E. Y.E. Y.E. (5,131) (275) (5,131) (5,146) (15) RECREATION AND LEISURE SPORT & LEISURE Operation Pelican Park Recreation Centre WET Swimming Program The importance of swimming lessons and the education/skills program provided by the Shire are highlighted in recently received correspondence for Pelican Park: “At a recent family holiday, Bethany went camping along a river site shortly after participating in an intensive swimming program at Pelican Park, with instructor Noeleen. Whilst swimming in the river out of her depth, Bethany fell off her noodle, went under, came to the surface, grabbed her noodle, turned on her back and kicked to the river edge.” An elated Grandma said that there was no way that Bethany would have been able to do that prior to those swimming lessons. Bethany is now partaking in regular lessons at Pelican Park Recreation Centre.” Crib Point Pool Season in Review Overall attendance for 2013/2014 season was 8,522 visitations. The facility saw an increase in casual entry and member attendances this season of approximately 39.5% (5,154 compared to the 2012/2013 season of 4,456). Ten Schools from the Western Port District conducted swimming carnivals at Crib Point Pool this season which included schools from Rosebud through to Balnarring and north to Somerville. Primary Schools from across the Westernport District returned to Crib Point Pool for their annual Triathlon Event conducted in November 2013, with over 300 students attending. Another 367 students took part in the District Swimming Carnival held in February 2014. Three schools (St Josephs, St Mary’s & Balnarring Primary Schools) this season choose to hold after school hours training sessions at the pool to prepare their students for the event, compared to only 1 school last season. There were 112 students that attended training for the event this season, which doubled the previous 12/13 season attendance. The Annual Mornington Peninsula Shire WET Novice Carnival was held again in March 2014 at the Crib Point Pool with 60 students, from 20 schools across the Peninsula, competing in the event. RECREATION COMMUNITY PARTNERSHIPS Operations Community Halls What’s happening in the Community Halls this month? The Community Halls were busy this month with private functions, workshops, public meetings, personal training and fundraisers. Minor halls recorded 73% occupancy, secondary halls 68% occupancy and township halls recorded over 85% occupancy rates. The occupancy rates indicate all facilities are well utilised by the local community. Hall enquiries continue to increase through word of mouth from satisfied hirers, guests at hall events and the information provided on the Mornington Peninsula Shire website. Monthly Report May 2014 97 Regular user groups New regular bookings have commenced at Baxter, Mornington Park Pavilion, & Mount Martha House Community Centre this month. New bookings include personal training for over 55’s, yoga & birthing classes. Hall improvements • Dromana Community Hall had a ceiling mounted projector and pull down screen installed this month. An Av trolley was also purchased to assist with DVD and Computer presentations. • Dromana Old Shire Office – Room 8 had the pull down projector screen replaced. • 4 trestle table trolleys have been ordered for Currawong, Boneo, Blairgowrie and Baxter Community Hall. The trolleys will assist hirers to wheel the tables and be stored safely. Foreshore Camping The month of May has seen the Foreshore Camping team begin preparation for next season. The following key actions took place: • • • • • • Staff-end of season review Renewal and balloted waiting list applications reviewed and processed SIMS Building review SIMS Parks and Open Space review SIMS Roads review SIMS Cleansing review. The above reviews will provide information for the upcoming Camping Liaison Committee 2014/15 planning meetings. Using the information from the reviews, the Foreshore team can plan and develop appropriate capital works programing and operational improvements. RECREATION PLANNING Operations Playground Strategy Implementation Program A range of improvement works have been completed this month: The new ‘Gyro’ basket swing installed at Mechanics Institute Reserve, Balnarring is being very well utilised, with reserve neighbours reporting families and children spending between 30 minutes and an hour on the swing. This is significant given many pieces of play equipment only occupy children for a matter of minutes. A new seating and a picnic table has also been installed. New play equipment has been ordered for D.R. Morell Reserve, Mornington to replace 24 year old equipment, and will be installed in June. New pieces of equipment include a flying saucer spinner and basket swing. A ‘concord’ and a ‘tornado swing’ have been ordered for Shoreham Hall Reserve in Shoreham. A timber ‘basket swing’ will be a welcome addition to the playground at Rotary Park Reserve, Mount Eliza. The existing play structure has good play value and the Shire’s Parks and Roadsides and Mount Eliza Rotary Club are involved in further works at the reserve. An information sign has been erected at Jones Road Reserve in Somerville to seek local input from residents and suggestions for new play equipment at the reserve. Community consultation will take place in the first week of June where preference of equipment will be discussed. It is hoped that installation will take place this financial year. Monthly Report May 2014 98 Balnarring Skate Park The Skate Park was officially opened by Mayor Antonella Celli on Saturday 24th May. A skate and BMX competition took place on the day with the event attracting over 100 people from the local area and other parts of Melbourne. Community consultation is currently underway to seek feedback about proposed lighting. To date the response has been overwhelmingly in favour of lighting running on a timer system. Additional seating and upgrading the adjoining BBQ area are planned in the draft Civic Court Reserve Master Plan. Long Term Master Plans The draft plan for Balnarring Civic Court Reserve remains on hold pending the completion of the broader Precinct Study by the Shire Strategic Planning team. Final changes are being made to the draft plans for Citation and Ferrero Reserves in preparation for presentation to Council and public exhibition. The draft plan for Olympic Park Reserve has been prepared and will be presented to stakeholders for initial review in June. The community consultation period closes at the end of May for the development of the Red Hill and Merricks reserve master plans. One to one stakeholder discussions were held on 20th May for the Merricks Recreation Reserve plan. Preliminary plans will be prepared in June. Flinders Park Implementation of this master plan has commenced with the Flinders Community Association undertaking two highly successful tree and shrub planting days as a ‘community capital’ initiative. Mount Martha Parade Grounds Master plan implementation John Patrick Landscape Architects have been engaged to prepare detailed design drawings for Mount Martha Parade Grounds. John Patrick has experience in working with historical landscapes. The drawings are to include tennis court, picnic, BBQ and Skate Park. Police Point Shire Park Recreation and Conservation Plan implementation Works are now well underway for the demolition and replacement of attendant cottages fences. Most steel sheds will also be removed as part of this work and woody weeds currently covering fences. Works are expected to be completed by the end of June. A brief for an overarching Cultural Heritage Management Plan has been drafted and will be sent for quotations, with the work commencing in June. Consultants are continuing to assist with the design of the proposed picnic and play space, interpretation and ’Calling Ground’ fence, and preparation of a Heritage Impact Statement for a heritage permit to cover these works. A concept design is being developed for Cottage 6 and will be reviewed by the working groups in June. COMMUNITY & SPECIAL EVENTS Operations There were 26 events and six weddings held on the Peninsula during May with an estimated 7,450 event participants. There were two Shire funded events – the Taste of Sorrento and the Art Red Hill event. The numbers of Mother’s Day Classic events on the Peninsula are growing, with a total of three walk/runs held on Sunday 11 May 2014 to raise awareness and much needed funds for breast cancer research. A record 1,837 participants walked from Dromana Pier to McCrae Lighthouse, Monthly Report May 2014 99 raising over $30,000. First time events at Coolart Homestead & Wetlands attracted 500 participants and Flinders attracted 326 walkers in total. All the event organisers reported that they were overwhelmed with the overall participation and support for these events this year, and expect the numbers to grow in the future. The Hastings Foreshore was selected for the Mornington Peninsula component of the state-wide RSPCA Million Paws Walk on May 18 and saw over 500 residents and visitors participate with their much loved pets. The 2km Walk, which is the Mornington Animal Shelter’s biggest annual fundraiser, is not only an opportunity to have a good walk with like-minded dog owners and their animals, it also helps raise awareness of the Animal Shelter’s work and is a day of family fun. Highlights of the day include vet advice, stalls, a BBQ, dog washes, refreshments and prizes. Funds raised through walk registrations, merchandise sales and online fundraising are donated to the RSPCA for use with its animal programs, adoptions, veterinary services and awareness campaigns. Financially, the year to date variance is unfavourable for the unit. This is mainly attributable to lower income than forecast for Community Halls and Pelican Park. $'000 Operating Surplus / (Deficit) Monthly Report May 2014 Forecast Actual Variance Forecast Month Month Y.T.D Month (647) (823) (176) (4,437) 100 Actual Variance Budget Forecast Variance Y.T.D. Y.T.D Y.E. Y.E. Y.E. (4,769) (332) (5,031) (4,979) 52 LIBRARIES, ARTS AND CULTURE Library Services Community Engagement and Programs • Swap your Fines for Food – Our Library encouraged our members with overdue library items to return them during our library fines amnesty from 14 April to 17 May 2014. Library members had their overdue fines waived in exchange for donated nonperishable food items. During the four week period Our Library members donated 5,368 food items which were passed on to the following organisations: Library member Diane Keeler with Shire Mayor Antonella Celi, and Tayla and Angela at Rosebud Library. - Western Port Community Centre - Mornington Community Information and Support Centre Inc. - The Southern Peninsula Food for All Inc. Over 1500 overdue items identified prior to the Amnesty were returned to Our Library. • Our Library was pleased to take part in the State Library of Victoria’s High Road to Reading program this May. This initiative brings authors to public libraries across Victoria for readings, talks and workshops. The program is funded by the State Library of Victoria and delivered in partnership with Public Libraries Victoria Network and supported by a grant from Copyright Agency Limited: - Andrew Rule is one of Australia’s most successful crime writers and has written and co-written many books, including Underbelly true crime series and the Chopper series. Rosebud Library hosted guest speaker Andrew Rule on 1 May, with 38 enthusiastic audience members. - John Safran, award-winning documentary maker and radio broadcaster, visited Mornington Library for an ‘in conversation’ style presentation which was greatly received by the 59 attendees. Geoff Carson, Manager Libraries Arts and Culture interviewed John about his first book Murder in Mississippi, a true-crime story about the murder of white supremacist Richard Barrett with whom John had previously crossed paths while filming John Safran’s Race Relations. - Children’s Book Council of Australia award winner Scot Gardner held a ‘Write like a Wildthing’ workshop at the Hastings Library. Scot’s workshop was aimed at strengthening students’ understanding and use of authentic detail in their writing, with 25 enthusiastic year 9 students from Western Port Secondary were highly engaged in Scot’s workshop, all participating in writing and discussion. Monthly Report May 2014 101 • Education Week 18-24 May - Our Library hosted four free events as part of Education Week. Grades 4 and 5 children from local schools were invited to attend sessions at the Mornington, Rosebud, Hastings and Somerville Libraries. Over 160 children were entertained and mesmerised by Professor Bunsen performing intriguing science tricks. • National Simultaneous Storytime 21 May – Our Library once again took part in the National Simultaneous Storytime. This year’s title was Andrew Joyner’s Too many elephants in this house. Over 90 children and 63 adults attended across our Hastings, Mornington, Rosebud and Somerville libraries. • Mornington Library 10th Birthday – Our Library team and library visitors, along with the Mayor Cr Celi celebrated the 10th anniversary of the opening of the Mornington Library on 29 May. Everyone was entertained by Comedian Monica Dullard (aka Moira the Cruise Ship Librarian). Cultural Planning • Mornington Library Foyer Exhibition Space hosted the BERG (Balcombe Estuary Reserves Group) exhibition of photos, sculptures and original artwork by local artist Annie Dowd. Annie was commissioned as part of an Arts Stream grant given to BERG to produce a brochure of the 52 birds in the Estuary. • The Shire’s Artsblog promoted 38 peninsula arts and cultural events held during the month. Since linking to Facebook and Lindedin in April subscriptions have increased by 180 • The Mornington Winter Jazz Festival was launched on 29 May at The Social Hotel in Mornington. Local History • The Local History Coordinator visited the Hastings-Western Port and the Mornington & District Historical Societies to assist with cataloguing, training and management issues. • Preparation for the Postcards - Stories from the Mornington Peninsula travelling exhibition, have been finalised. The exhibition is due to commence in June at the Nepean Historical Society. • A scoping document for the Local History website continues to be developed and designer has been engaged to produce the Local History Trail brochure. Monthly Report May 2014 102 a • The Digitisation Program continues with the following works: - Scanning of a historical diary and photograhs from the Coolart Homestead. - Nepean Historical Society- 462 photos scanned, cassette tape conversions, 856 negatives scanned, and over 100o objects photographed. - Selection and provision of over 200 images for the Postcards exhibition audio visual display for the Historical Societies - Provided Parks Victoria with scanned files of the Point Nepean and Quarantine Station. Mornington Peninsula Regional Gallery Exhibitions • Most excitingly, as three exhibitions concluded during the month two fabulous new ones commenced. The 2014 National Works on Paper exhibition and Paul Kelly and the Portraits were officially opened on 24 May. Cr Shaw gave the official welcome and Roger Gilchrist (Tallis Foundation) and Karen Vickery (National Portrait Gallery) officially opened the aforementioned exhibitions. A very large crowd comprising many artists and Gallery supporters was in attendance. Nine works were selected from the 2014 NWOP by the judges and acquired for the Gallery’s Permanent Collection. The major acquisitive award went to Jess Johnson for her work Mysteria Mystica Maxima. The other acquired works were by Catherine Cassidy, Andrew Hazewinkel, Louise Jennison, Nongirrnga Marawili, Viv Miller, Jennifer Mills, John Nixon and Lisa Waup. The support of the Mornington Peninsula Shire, Beleura House Garden (Tallis Foundation), Ursula Hoff Institute and the Friends of the MPRG was integral to the success of the Gallery’s very important biennial acquisitive exhibition. STATISTICS AND REPORTING KPI Library membership Library Loans Home Library Service Loans Library Visits Library Enquiries Library Events Library Event Attendance Gallery Attendance This month 78,581 121,916 971 52,251 4,882 103 2,667 3,200 Last Month 82,493 121,194 1,099 50,241 4,494 75 1,760 2,850 2013 76,551 129,234 1,233 61,717 4,452 81 1,306 3,201 Financially, at the end of May the unit has an unfavourable year to date variance of $126k. This is primarily due to phasing of salaries and is expected to resolve in June. There remains a favourable year end forecast of $33k to the adopted budget. $'000 Operating Surplus / (Deficit) Monthly Report May 2014 Forecast Actual Variance Forecast Month Month Y.T.D Month (440) (657) (217) (4,628) 103 Actual Variance Budget Forecast Variance Y.T.D. Y.T.D Y.E. Y.E. Y.E. (4,754) (126) (5,288) (5,255) 33 SOCIAL PLANNING AND COMMUNITY DEVELOPMENT ABORIGINAL CULTURE, SUPPORT AND DEVELOPMENT Reconciliation Week 2014 was celebrated with more than 100 people at Council meeting on 26 May at the Hastings Hub. Dean Stewart for Boon wurrung Foundation, the Djirri Djirri dance group and Councillors Lynn Bowden, David Garnock, Hugh Fraser, Anne Shaw and Mayor Antonella Celi were some of the participants that joined in with the celebrations. Shire Nominated For Hart Award! The HART (HELPING ACHIEVE RECONCILIATION TOGETHER) Awards are a partnership between Victorian Local Governance Association and Reconciliation Victoria and they aim to recognise the great and varied work happening in local governments and community organisations to contribute to local reconciliation outcomes. The Shire’s has been shortlisted for the first-ever Community HART Awards with winner announced on Thursday 5 June In its inaugural year, 24 nominations were received with 5 local governments and 5 community organisations shortlisted. Willum Warrain in Action Since the opening in March, Willum Warrain (Aboriginal gathering place), has been planning the implementation of a number of programs in line with the Koolin Balit strategy and Department of Health funding. Willum Warrain has also been hosting successful ukulele workshops with members (we might get to see and hear the first ever Aboriginal Ukulele band!) and they also held a special event for reconciliation on the 30 May. Monthly Report May 2014 104 ACCESS AND EQUITY Promoting Human Rights through Film Human Rights Arts & Film Festival (HRAFF) The Shire is a partner with the Human Rights Arts and Film Festival (HRAFF) and this year hosted the film, Sons and Mothers on Saturday 17th May at 3 the Australian Centre for Moving Image (ACMI) in Federation Square. Aileen Burgess, a local Peninsula resident, introduced the film and talked about her own experience of living with a son who has a disability. More than 160 people attended the film and the Shire information table was well visited. After the film a Q&A panel with the film director and one of the performers ensued. The Shire is hoping to screen the film in a local venue in the next 6 months so keep a look out on our website and face book page. Celebrating World Day of Cultural Diversity To celebrate cultural diversity the Mornington Peninsula Shire in partnership with Mornington Peninsula Human Rights Group and New Hope Foundation hosted a short film festival commencing on World Day of Cultural Diversity for Dialogue and Development with a selection of diverse Australian films. World Day for Cultural Diversity for Dialogue and Development, Wednesday May 21, is held annually to help deepen people’s understanding of what cultural diversity and harmony means. The festival screened a selection of Colorfest films showcasing the success, challenges and nuances of migrant communities in Australia and the world. Culture is important because it is the foundation on which communities are built and friendships are forged. According to the Australian Bureau of Statistics Census 2011, 18.1% of our resident population are born overseas. 5.9% of this group is from a non-English speaking background, with the dominant non-English speaking population groups from Italy, Greece, Germany, the Netherlands, Croatia, France, Spain, and China. You may also be aware; the Peninsula also has the second-fastest growing Aboriginal & Torres Strait islander population in Victoria. In supporting cultural diversity, the Shire has made a commitment of support towards cultural diversity with the endorsement of a “Cultural Diversity Statement of Commitment” in March 2013. The Cultural Diversity Statement of Commitment comprises of: a) Support for the Australian Human Rights Commission (AHRC) ‘Racism. It Stops with Me’ Campaign (130 participating orgs and growing), and b) Support for the Refugee Council of Australia’s ‘Refugee Welcome Zones’ initiative (85 local govt. supports and growing). Council recognises that local government has an important role to play towards the development and support of harmony and inclusion of ‘all cultures’ within our community. Monthly Report May 2014 105 COMMUNITY DEVELOPMENT Volunteer Opportunities The Volunteering Mornington Peninsula online Volunteer Opportunities Directory was launched in conjunction with National Volunteering Week. The new searchable directory is the culmination of the VMP Online Volunteering Resource update project. People seeking a volunteer role can find information about what is involved in being a volunteer, their rights and responsibilities and how to find a volunteer role. The Volunteer Opportunities Directory will make it easier for potential volunteers to search for organisations that have volunteering opportunities by the type of volunteering role they are interested in, the type of service or activity the organisation delivers and the location of the volunteer role. Volunteer Involving Organisations providing services and activities on the Mornington Peninsula can find information about how to register for inclusion in the Volunteer Opportunities Directory online and managers or co-ordinators of volunteering programs can access information about the MP Managers of Volunteers Network and professional development resources. Visit www.volmornpen.com.au to find out more about volunteering. Wallaroo Reserve Community Project On Saturday 17th May, The Wallaroo Reserve Upgrade Project conducted a community activation exercise. Community design workshops conducted in April involved young people and residents from West Park in Hastings. The workshops explored solutions to concerns on the negative activities occurring in the park, such as creating natural barriers to motorised vehicles and the creation of active, family friendly spaces such as revamping the old BMX tack, a new BBQ area, new play equipment and the installation of a basketball hoop. The purpose of the activation day was to test these ideas with the community and gather feedback on positioning and layout. A BBQ lunch was provided and approximately 80 community members participated in the event. The next phase of the project will be in June, when concept drawings will be finalised with the West Park Residents Group and the Shire Infrastructure team, so planning for community working bees can begin. DISABILITY & SOCIAL INCLUSION Accessible Mobility Path Planning for Somerville Mornington Peninsula Shire is planning a forum in Somerville to look at and identify accessible paths of travel, accessible parking and accessible toilets for users of mobility devices in the town. The forum is the first process in developing a mobility map for Somerville. A ‘mobility map’ has already been developed for Rosebud, and the Shire has published a ‘Practical Guide to your Mobility Scooter’ and a ‘Scooter Information Booklet’. These are available from Shire Offices or the Shire website at: www.mornpen.vic.gov.au/scooters. Shire Access Officer Xiaoli Ma with Gordon Trott encourages Somerville locals to attend the Somerville Accessible Pathways Forum, June 4 at the Somerville Mechanics Hall. Monthly Report May 2014 106 HEALTH AND WELLBEING Food Security Presentation to the MAV Healthy Eating Forum The Shire was invited by the Municipal Association Victoria (MAV) to present its work addressing food security including Connecting Local People to Local Food on the Mornington Peninsula. The shire is keen to progress the dietary wellbeing of residence on the peninsula and this includes encouraging residents to eat healthy, local, fresh and affordable produce. To date there have been a number of initiative supported and developed by the Shire including the development of the local produce farmgate map, the running of the food sensitive planning workshop by Kirsten Larsen, supporting the enhancement of the second bite program and development of the fresh food resources, such as a easy read booklet and nutritional food posters. The latest addition to this work will include a fresh food round table forum, inviting local producers to meet with local food business in the pursuit of coming the Peninsula produce as local as possible, not only supporting the local food economy, but also reducing food miles. This event is scheduled for the 15th of July from 2-4.30pm at the Peninsula Community Theatre. Say ‘NO’ to Family Violence Family Violence is an issue which impacts upon people in everyday life. Whether you know someone personal who have been affected, have been a victim yourself or perhaps even a perpetrator, family violence is a matter which concerns everyone. In line with its Health and Wellbeing Plan (Health, Hope and Happiness II), the Shire is committed to raising awareness and working towards reducing the incidence of family violence. Family violence can happen to anyone at any time, and sadly the statistics are too high - with 1658 family violence incidents recorded on the Mornington Peninsula with police in attendance during 2012-13 The Mornington Peninsula Shire Mayor Cr Antonella Celi, joined local community members who appear in the ‘Say No to Family Violence’ video to raise awareness of family violence. The Shire has produced a short video; a range of posters and a roadside banner have been produced to help raise awareness of family violence in the community. Mornington Peninsula Shire worked with film maker, Sian Darling, Peninsula Advisory Committee for Elders (PACE) and Peninsula Health to develop the awareness campaign. The video is being shown at local cinemas, and posters with images from the video are available to download from the Shire’s website and will be provided to local community groups to display. The roadside banner is currently located on Nepean Highway, Mount Martha. To view the short film or to download a poster, visit www.mornpen.vic.gov.au/family_violence The short film also screened at Human Rights Arts and Film Festival in Melbourne Thursday 8 May. www.hraff.org Monthly Report May 2014 107 Helpful contacts If you are in immediate danger contact the Police on: 000. Women’s Domestic Violence Crisis Service: 1800 015 188 Talk it over Men’s Line Australia: 1300 78 99 78 Kids Helpline: 1800 55 1800 Peninsula Family Violence Program: 5971 9454 (business hours) For free professional support and information 24/7, the ‘Ask Someone’ website is www.asksomeone.org.au . The ‘Ask Someone’ app is available for free for iPhone and iPad, Android and BlackBerry – links from Ask Someone website. *http://www.vichealth.vic.gov.au/Programs-and-Projects/Freedom-from-violence/Preventingviolence-framework.aspx HOUSING RIGHTS AND ISSUES Coordinated Response to Homelessness on the Rosebud Foreshore Work with Shire Rangers and Emergency Housing Providers is paying dividends with much improved cooperation in responding to up to 30 incidents of homelessness on Rosebud foreshore since Christmas. This has considerable benefits to vulnerable families and individuals, assists the operations of Crisis Housing Services and is very good for Council Officers and Councils reputation in being responsive to homelessness! SOCIAL PLANNING Responsible Gambling Awareness Week: The Changing Face Of Gambling Responsible Gambling Awareness Week 2014 (RGAW) was held from May 26 – June 1 and the theme was ‘the changing face of gambling’. RGAW is an initiative of the Victorian Responsible Gambling Foundation in partnership with the Victorian Government, local councils, Gambler’s Help services, industry and community groups The initiative seeks to raise awareness about responsible gambling practices and encourages individuals to seek help to learn how to minimise gambling-related harm. RGAW 2014 focused on the changing environment of gambling and the prevalent increase in the many new forms and ways to gamble, exposing our community to gambling-related harm. RGAW aims to build awareness of gambling behaviours and positively build resilience in the community by informing them about gambling, emerging trends and technology. Gambler’s Help – Southern set up a static display at our local Libraries in Hastings, Mornington and Rosebud and also at Frankston library in collaboration with the Shire’s Responsible Gaming Committee, which includes Council representatives, gaming operators and community agencies, Useful contacts Gamblers Help. Phone: 95755353 or 1800 858 858 http://www.gamblinghelponline.org.au/ Gamblers Help – Southern: http://gamblershelpsouthern.org.au/ Responsible Gambling Guide http://www.rgaw.com.au/images/rgg.pdf Monthly Report May 2014 108 WHAT’S ON • Wednesday, 4 June, 2014, 11 am – 2:30 pm, Somerville Mechanics Hall, 66 station St, Somerville Accessible Pathways Forum • Thursday 5 June 6,30pm Law of the Jungle film screening SPAC, Rosebud Secondary College • Saturday June 14th 12 to 2 pm Safer Speeds Program community consultation Currawong Community Centre, Mornington Park • Art About project on Saturdays: June 21 & 28, July 5, August 2, 16 & 30, September 27, November 15 & 29. For details on SP&CD events and activities see the Shire’s website www.mornpen.vic.gov.au under events or call Kerri-Ann or Leisa on 5950 1685. Monthly Report May 2014 109 DIRECTOR – SUSTAINABLE COMMUNITIES May has been a very busy month with much to celebrate including Reconciliation Week and National Volunteers Week. At the Community Council meeting in Hastings, the Mayor read out a Statement acknowledging the extremely valuable work done by volunteers across the Mornington Peninsula. It is believed these number in excess of 30,000 and range across an enormous number of areas including, delivered meals, canteen assistants, bushland reserve volunteers, red cross, community drivers, sporting group committees to name but a few. The Shire works closely with Volunteers Mornington Peninsula (VMP) Committee to promote the development of volunteering across the Peninsula and part of this focus includes the changing patterns of volunteers, recognising the traditional ‘roster based’ volunteering does not suit many people who are only available for part of the year or are working longer with limited free time availability. The Communities that Care (CTC) program provides a major evidence based framework from which a strategic focus can be applied to supporting young people in our community. Area based Local Advisory Groups (LAGS) consider data that identifies protective behaviours and risk factors and develop local strategies to deal with these. The Shire’s Youth Services team also use this data to construct programs and services to optimise effective outcomes and a number of examples are outlined in the preceding report. The Balnarring Skate Park was officially opened by the Mayor in late May with over 100 enthusiastic people on hand to witness the opening and participate in a BMX competition. On a recent visit to the site I spoke with a young person enjoying the facility and asked him what he thought…..he indicated he had been a regular participant in the consultation process leading up to final design and thought it was, “ace”! Additional seating and improved lighting for the area are now being considered as the daylight hours reduce. As we approach the end of the financial year, many of our peak summer services are reviewed including Foreshore Camping. It is extremely pleasing to get much positive feedback and continue to see an increase in the number of bed nights which this year approached 98,000. The contribution of a Camper Advisory Group goes a long way towards helping us communicate with the campers and identify issues at an early stage so they can be addressed before they become a problem. Camping fees are set to maintain affordability and to keep facilities in order. Any surplus funds are redirected into improvements for the following year and this enables ongoing benefit for visitors and locals alike without any impost on ratepayers. Finally, I draw your attention to the details of some of the Master Planning projects that are being undertaken by our Recreation and Leisure team. These provide for effective and timetabled improvements with recent works commencing at Police Point, Mount Martha and Flinders Park. Financially, the month to date unfavourable variation of $24k is largely due to phasing of employee costs not taking into consideration the three pay periods in May. This is not expected to impact on year end. $'000 Operating Surplus / (Deficit) Monthly Report May 2014 Forecast Actual Variance Forecast Month Month Y.T.D Month (136) (160) (24) (1,147) 110 Actual Variance Budget Forecast Variance Y.T.D. Y.T.D Y.E. Y.E. Y.E. (1,317) (170) (1,289) (1,271) 18 CORPORATE PLANNING AND PROJECTS Local Government Performance Reporting Framework (LGPRF) Local Government Victoria (LGV) is working closely with councils to deliver a new performance reporting framework for local government. The framework will become mandatory for implementation by councils as part of the 2014-15 planning and reporting cycle. CP&P and Finance staff attended further LGV information sessions on the now mandatory regulations during May. Ongoing discussions with the units involved in the LGPRF have continued with the recent release of a revised (version 4) workbook by LGV. These discussions have ensured the organisation is in a strong position to report against the framework as of the 1 July 2014 mandatory timeframe. An analysis of 2013-2014 end-of year data will be undertaken. Customer Responsiveness Ongoing monitoring of merit and correspondence continues. Our team has continued to provide input and advice to further align our corporate systems with Council and community expectations. We have also fully participated in the more detailed, shire-wide customer service charter and workflow initiatives. Demographics – review of ‘small areas’ CP&P have worked across the teams to revise and update the geographical ‘small areas’ for the Shire’s demographic data. The review now results in Mornington being designated as a distinct ‘small area’, with Tuerong and Moorooduc sharing demographic commonalities and subsequently grouped together. This small area change allows improved research methodology to assist with strategic decisions making. Shire Grant Model The team is coordinating the review and establishment of a future grant model that responds to the requirements of the draft Local Government Amendment (Governance & Conduct) Bill 2014, specifically the administrative arrangements of the current Councillor Discretionary Fund. The review also presents an opportunity to revisit the current Community Grant and Community Partnership Programs to determine a model that best delivers grants to our community. An internal officer workshop and presentation to executive took place in May. Based on early feedback, further refinement will take place prior to consideration by Council. Policy Support The team has assisted in the early background work to assist officers framing the draft Smoking Policy and Public Arts Policy. Community Engagement The team is coordinating the Community Engagement module as part of the Shire’s Learning & Development program. To complement this session and to showcase best practice engagement (including social media) to our teams in an informal setting, our team is organising two ‘lunch time tool box’ sessions for interested staff. These lunchtime showcase sessions will be presented by Keith Greaves (Chit Chat) and are planned for August/September. Financially, the budget is on track for the month. There are some small salary variations due to extended annual leave taken during the year. $'000 Operating Surplus / (Deficit) Monthly Report May 2014 Forecast Actual Variance Forecast Month Month Y.T.D Month (63) (63) 0 (572) 111 Actual Variance Budget Forecast Variance Y.T.D. Y.T.D Y.E. Y.E. Y.E. (522) 50 (606) (628) (22) COMMUNICATIONS The State Government’s Plan Melbourne initiative was released during May, and was welcomed by the Mayor Cr Antonella Celi, as “Good news for the Peninsula”. “The new Plan Melbourne is very positive for the Mornington Peninsula”, Cr Celi said. “We worked closely with our local communities in informing the government about our future aspirations, and all that hard work has been worthwhile. “There is a firm commitment to the introduction of the Mornington Peninsula Planning Statement that recognises the distinct role and importance of the Peninsula to the whole of Melbourne. “Council has approved the draft Planning Statement, which expresses our community’s vision of the Peninsula being ‘near to, but not part of, Melbourne and its accelerating growth’, as reflected by community input during Council’s Plan Peninsula consultation program. “The Peninsula plays a range of complementary roles in tourism, recreation, agriculture and manufacturing, but our community is clear that we are not ‘suburbia’, and don’t want to be. “Council’s input into Plan Melbourne reflected what the community told us.” The Communications team is currently preparing information to disseminate information about Plan Melbourne and what it means to the Peninsula. There will be an article in the July edition of Peninsula Wide as well as information on the Shire’s website. Other activities of the Communications team for the month included: Peninsula-Wide May issue was issued, and preparation for the July issue is underway. Media and News A number of media releases and web news items were issued throughout May, including: • Road works and closures • Peninsula Link Freeway Service Stations • Waste Strategy Review • The changing face of gambling • Mornington Library Birthday • Heritage Awards nominations • Retirement of Red Hill Ward Councillor, Frank Martin • Briars Ward Community Expo • Accessible path planning Somerville • World Environment Day • Balnarring Skate Park Opening • Volunteering Week • Reconciliation Week • New look business website • Art program workshop • Cultural Diversity Film Festival • Say NO to family violence • Stories from the Mornington Peninsula (postcards) • Neighbourhood House Week • Cerberus Ward Meeting Media Release • Author Tour Rosebud Media Release Monthly Report May 2014 112 Communications Support In May the team provided communications assistance to: • Library Services: Literacy Village project • Traffic & Roads: place making project • Recreation: Mornington Civic project • Rangers: illegal dumping project, boat ramp project, rec vehicle project • Wellbeing: tobacco day project, food security booklet, community gardens booklet • Rates: rates information project • Corporate events guidelines • Environment protection: CCTV policy • Events: Aus Day project, Signage blades project • Renewable resources: waste contracts project Photography and Video • Youth Film Event – Cr Bev Colomb • Mayoral Headshots – Cr Antonella Celi • Arts Talk II Forum • Family Violence Roadside Sign – Cr Antonella Celi • Somerville Mobility Map • Waste Strategy Review – Cr Antonella Celi • Mornington CCTV – Cr Bev Colomb • Smoke Free Charter Rosebud and Hastings – Cr Antonella Celi, Cr David Garnock • Bill Hansen Photo • Sorrento Senior Citizens Funding – Cr Tim Rodgers, Cr Hugh Fraser • New Roundabout Canterbury Jetty & Melbourne Road – Cr Tim Rodgers, Cr Hugh Fraser • Mornington Library 10th Birthday Celebration Graphic Design and Images Design projects and support throughout May included • Annual Report preparation • Rates/Budget documents • World Day for Cultural Diversity posters • A number of promotional banners for the web External Website External website stats for May 2014 - Visits: 54,823 and Page Views: 209,178. Mobile is 26% of visits and tablet 15%.Top content was Home, Search, Current Vacancies, Lost Pets, Contact Us, Markets, Advertised Planning Applications, Planning and Events. Thinking of Volunteering? The new Volunteering Mornington Peninsula online Volunteer Opportunities Directory now makes it easier to find volunteering opportunities. You can use the Directory to search for an organisation seeking volunteers by the type of service or activity, the location, and the type of volunteering role you are interested. Financially, the favourable variance is a result of the phasing of invoices for Peninsula Wide and is not expected to significantly impact on the year end forecast. $'000 Operating Surplus / (Deficit) Monthly Report May 2014 Forecast Actual Variance Forecast Month Month Y.T.D Month (166) (98) 68 (1,006) 113 Actual Variance Budget Forecast Variance Y.T.D. Y.T.D Y.E. Y.E. Y.E. (955) 50 (1,153) (1,148) 4 TEAM SUPPORT AND DEVELOPMENT Traineeships There are 18 trainees acquiring skills in the workplace. Four secondary school students also undertook a week long work experience this month. Of interest was the variety of the experience requested. The Shire was able to provide meaningful work for these students in Information Technology, Building, Recreation and Maternal & Child Health. It’s a great example of the breadth of work undertaken in local government and the variety of career choices available to those who choose a career in local government. As a result of reading an article in ‘Peninsula Wide’ relating to the Briars Traineeship program, a community member rang Team Support and Development to discuss the possibility of commencing a career in conservation or land management. Whilst it was pointed out that the Briars Traineeships are geared to Year 10 students participating in the school based VCAL education initiative for their final two years of secondary school, the advice provided focused the community member to think about study given that she was currently seeking to move out of the retail industry. She was also was directed to possible tertiary institutions that may be able to assist in terms of career and study options. Additionally, the community member was encouraged to register on the Shire’s ‘e-recruit’ website as a job candidate, nominating the careers that best matched her current skills and experience. She was extremely appreciative of the advice provided which she said gave her a plan to work towards. It was evident from her tone of voice nearing the conclusion of the conversation that she felt more confident to pursue her career aspirations. Corporate Learning and Development A great variety of programs were provided to team members during May, ranging from corporate compliance (workplace behaviour) to internal systems (CIS). The “Influencing Skills” program is designed to assist staff in their day to day work with the community, enabling them to provide advice in a positive and ‘influential’ way. The program was well regarded by participants, with 88% of participants agreeing that they will receive support from their manager to implement their learning and 98% of participants agreeing that the facilitator exhibited a thorough understanding of the topic. A sample of comments: “Thank you for a very valuable 2 days of learning. The ideas and concepts were delivered in a way that was clear, relevant and I feel I can implement in the workplace right away. I enjoyed the videos to show the different styles” ”The course was well presented. I felt like I got a lot out of the material and there was plenty of useful techniques that could be implemented in the workplace” Another important training program for people managers was the “Managing the Generations in the Workplace” session, designed to assist in the management of the different ‘types’ of people in the workplace. The first “How to Train Others” program commenced. This program is aimed at those required to train small groups in their roles, to enable them to understand different learning styles and ways of delivering content. Participants were able to present on a topic and receive feedback on their “mini training session”. All participants chose subject matter they can use back in the workplace. The current focus is on reviewing programs and consulting with people managers on the content of the 2015 Corporate Learning and Development Program. Monthly Report May 2014 114 Financially, the year to date unfavourable variance is made up mostly of job advertising ($79K) and paid parental leave ($52K). This is offset in part by favourable variances in salaries ($35K) and staff training ($51K). $'000 Operating Surplus / (Deficit) Monthly Report May 2014 Forecast Actual Variance Forecast Month Month Y.T.D Month (124) (239) (115) (1,690) 115 Actual Variance Budget Forecast Variance Y.T.D. Y.T.D Y.E. Y.E. Y.E. (1,828) (138) (1,542) (1,888) (346) GOVERNANCE AND CORPORATE SUPPORT GOVERNANCE Governance has recently provided training to staff who regularly prepare reports for Council meetings in the use of Objective Committees. This product is used by Governance to prepare and compile the agendas for Council and Committee meetings. Training was provided to 42 team members during the month with further training sessions scheduled for June and October. VCAT Hearing – Dangerous Dog Declaration During May, members of the Shire Ranger Team and Governance Team attended a VCAT hearing for the appeal of a dangerous dog declaration following a serious dog attack in the Shire some months earlier. The dangerous dog declaration had previously been the subject of an internal review by the Shire’s Local Law Permit and Domestic Animals Act Review Panel. The Review Panel provides a right of appeal against an Authorised Officer’s decision in relation to Local Law permit applications and decisions made under the Domestic Animals Act. Following consideration of the matter, the Review Panel upheld the Authorised Officer’s original decision. The dog owner subsequently appealed to VCAT for a review of the decision. Local Government Amendment (Governance and Conduct) Bill As reported last month, the Local Government Amendment (Governance and Conduct) Bill 2014 was introduced into the Victorian Parliament on 2 April. The Bill proposes changes to the Local Government Act 1989 to promote good conduct by elected councillors and to support effective governance by councils. It is expected that further debate on the Bill will occur during June. Red Hill Ward By-Election Following the recent resignation of Cr Frank Martin, a by-election for the Red Hill Ward will be held to fill the extraordinary vacancy. The date for the by-election is fixed by the Minister and must be held on a Saturday not later than 100 days after the date of resignation. It is anticipated that Election Day will be scheduled in mid-late August. The new Councillor to be elected will hold office until the next General election to be held in October 2016. Cultural Diversity Short Film Festival Opening Night The Mayor, Cr Antonella Celi opened the Cultural Diversity Short Film Festival on Wednesday 21 May 2014. The event was held on World Day for Cultural Diversity for Dialogue for Development and was a partnership between the Mornington Peninsula Human Rights Group and the New Hope Foundation. A selection of short films were showcased that highlighted the successes and challenges of the migrant experience. Afternoon Tea for Thomas Lopes from Lospalos Chair of the Friends of Lospalos Committee, Nepean Ward Councillor Tim Rodgers held an afternoon tea at the Municipal offices, Rosebud to celebrate visiting Lospalos resident Thomas Lopes. Thomas is in Australia studying English and Health promotion until June 2014. Thomas is involved with Many Hands International, a not-for-profit organisation that works with disadvantaged communities to empower through a cultural assets approach to community development. Anzac Commemorative Naming Project As reported in March, the Office of Geographic Names is conducting an Anzac Commemorative Naming Project in partnership with naming authorities, primarily Councils, to mark the 100 year anniversary of the Anzac forces landing at Gallipoli. The community can become involved and take part in the project by researching appropriate names which may be used in a new name or renaming of a road, reserve or other feature. The historical information obtained will then be recorded online in VICNAMES – Victoria’s register of geographic names. Eight local primary schools expressed an interest to participate in the project and research appropriate names for possible use as road or feature naming. Appropriate names could include Monthly Report May 2014 116 individual Anzacs who were born or lived within the Shire or other significant items of military history. A total of nine commemorative names have been submitted by four primary schools for consideration. All names submitted comply with the Office of Geographic Names’ guidelines and will be retained for possible use for official naming purposes. Freedom of Information Requests Requests in progress at start of the month New requests during the month Withdrawn requests Non valid requests Requests resolved Requests in progress at end of the month 7 9 1 1 2 14 Customer Service The 20 second telephone call answering performance for May in the first response (switchboard) was 81%, which was above the target of 80%. This indicator means that callers who phone the Shire’s main telephone number receive a personal greeting in less than 20 seconds. The total for all of customer service, which includes transfers to customer service operators from the “switchboard”, was 78.7 % which was below the target of 80%. It should be noted that the second indicator measures the transfer from the “switchboard” to the customer service officer who manages the enquiry from the caller. The two minute performance was 97.6%, which was above the target (target 95%), and the customer call abandon rate was excellent at 1.1%, which is significantly better than the target of 3.0%. Abandoned calls, sometimes called lost calls, are callers that hang up before answer. These are expressed as a percentage of total calls offered, and generally range in many large volume call centres up to 4%. The number of calls during May was 22,232 compared to the April call rate of 21,505, an increase of 727. Statutory Planning Administration Telephones The call answering performance for within 20 seconds was 92.8% (target 80%) and the two minute performance was 99.3% (target 95%). The customer abandon rate was 0.6% (target 7%). These results are similar to last month and meet all targets. Calls regarding current applications are directed to the particular planner handling the application and are therefore not included in this report. Environment Protection and Community Safety Unit Telephones The call answering performance for the 20 second and the two minute performance targets (target 95%) were met. The customer abandon rate was excellent at 1.9% (target 7%). Extended Hours Call Service Calls during the Shire’s extended telephone hours (before and after normal operating hours) were 25 calls per day and 549 for the month, this is 106 less than April. The customer abandon rate during the extended hours was 3.5%, above the target of 3.0%. Of those extended hours callers, over 90% were able to be resolved immediately by Customer Service Officers. Most calls were of a routine nature and dealt with by Customer Service staff by the raising of Service Requests or the provision of general information. After Hours Contact Service This is the call service to the Shire’s external service provider for calls received after 6pm and before 8am. There were 306 calls for the month, a decrease of 143 on April. Service Requests Monthly Report May 2014 117 Service requests raised during May numbered 7,012 compared with 6,595 in April. This is an increase of 417 on April and an increase of 130 when compared to last May. The number of overdue requests at the end of May numbered 369, a decrease of 178 when compared with April and a decrease of 116 when compared to May of last year. Community Engagement Activities A Citizenship Ceremony was held at the Peninsula Community Theatre on 14 May where 105 local residents became Australian citizens. A local township Council meeting was held at the Hastings Community Hub on 26 May with many local residents and representatives from community groups in attendance. Prior to the formal meeting, an Aboriginal traditional welcome, smoking ceremony, didge and dancers and art display were provided to celebrate Reconciliation Week. An update on the progress of the Bittern Township Plan and Crib Point Township Plan was also provided to the community. Financially, the year to date variance is favourable by $80k, which is due to photo copier and equipment hire not being expensed in accordance with the budget phasing. Animal Registrations income has increased by $75k over the year end forecast, due to an increase in registrations recorded. This additional income has offset additional casual salaries in Customer Service which have been required in recent months to meet service deliverables. $'000 Operating Surplus / (Deficit) Monthly Report May 2014 Forecast Actual Variance Forecast Month Month Y.T.D Month (430) (427) 2 (4,615) 118 Actual Variance Budget Forecast Variance Y.T.D. Y.T.D Y.E. Y.E. Y.E. (4,534) 80 (5,132) (5,084) 48 PROPERTY AND VALUATIONS PROPERTY Proposed Sale – 130 Wilsons Road, Mornington Jacobs & Lowe-Bennetts have been appointed as agents for the sale of the abovementioned property which will be auctioned on the 27th June, 2014. The funds generated from the sale will be put towards the cost of the redevelopment of premises at Civic Reserve, the new home for the Club. Expression of Interest – 4 Hotham Road, Sorrento The advertising period for expression of interest submissions closes on the 12th June 2014. CRE Brokers, real estate agents acting on Council’s behalf in the marketing of the premises, have advised that there has been significant interest in this unique site. Submissions received will be considered by Council in August 2014. 4 Hotham Road, Sorrento Hastings and Westernport Historical Society A request has been received from the Society to construct a new shed at their premises at 7-9 Marine Parade, Hastings. Consent has been granted subject to the Society obtaining appropriate building approval. Arthurs Seat Binoculars A licence was recently issued to Mrs Davidson for the coin-operated binoculars at Arthurs Seat. Monthly Report May 2014 119 VALUATIONS General Valuation 2014 Task Description Due Date Progress to Date Stage 1 Statistical Analysis of 2012 Revaluation & all sales since 01/01/2012 28/02/2013 Approved by VGV 12 February 2013 Stage 2 Residential & Rural Preliminary Valuations 31/10/2013 83% completed Stage 3A Specialised Valuations 31/08/2013 Not applicable Stage 3B Commercial, Industrial Valuations 31/01/2014 Lodged with VGV Stage 4 Final Residential & Rural Valuations 31/03/2014 Final submission sent to VGV for certification Stage 5 Valuation Return 30/04/2014 Completed and will be reported to Council on 30/06/2014 Supplementary Valuations The Valuation Officers completed 6 supplementary valuations during May 2014. Committal of supplementary valuations ceased for 2013/2014 rating year 30 March 2014. Now that Stage 5 of the Revaluation has been completed, staff will work full-time on clearing the outstanding supplementary valuations. Mornington Peninsula Shire Valuation Objections 06/07 2006 Reval 07/08 2006 Reval 08/09 2008 Reval 09/10 2008 Reval 10/11 2010 Reval 11/12 2010 Reval 12/13 2012 Reval 13/14 2012 Reval Formal Objections 74 24 75 36 43 10 159 53 Disallowed, withdrawn & invalid 43 6 53 11 18 6 64 16 Completed – changes recommended to VGV 31 18 22 24 20 3 95 35 0 0 0 0 0 0 0 2 2008 (2006 level Reval) 2009 (2008 level Reval) 2010 (2008 level Reval) 2011 (2010 level Reval) 2012 (2010 level Reval) 2013 (2012 level Reval) 2014 (2012 level Reval) Formal Objections 37 152 17 50 13 187 48 Disallowed, withdrawn & invalid 27 106 7 38 7 118 1 Completed – changes recommended to VGV 10 46 10 12 6 69 2 0 0 0 0 0 0 45 Incomplete as at 30/04/2014 State Revenue Office Objections – Land Tax Incomplete as at 30/07/2013 Shire Appeals There are no VCAT applications at this time. Monthly Report May 2014 120 Financially, the team is reporting an unfavourable year to date result of $104k which is mainly due to the payment of the Fire Services levy for Council properties being earlier than expected ($278k). Favourable outcomes include Property Operations Maintenance (+50k fav), and Valuations Fees and Charges (+65k fav). The year end result is on target. $'000 Operating Surplus / (Deficit) Monthly Report May 2014 Forecast Actual Variance Forecast Month Month Y.T.D Month 436 400 (36) 4,247 121 Actual Variance Budget Forecast Variance Y.T.D. Y.T.D Y.E. Y.E. Y.E. 4,143 (104) 4,925 4,898 (27) INFORMATION SERVICES May has been a particularly productive month for the Information Services Unit with key highlights described below. Information Technology • Upgraded CI (Property and Rating) to the latest release that addresses some bugs identified but also some refinements to functionality and system performance; • Completed the rollout of Windows 7 to all candidate PC’s. Some have not been upgraded as they are due to be replaced and will be preinstalled with Windows 7. • Completed refurbishment of IS area in Rosebud resulting in a more efficient office layout and a better working environment. • Testing of Trapeze software has commenced. Trapeze allows electronic stamping and approval of plans, permits, etc. It will reduce the need to manually stamp a hardcopy document saving time and printing resources (paper, toner, etc.). • Developed detailed project plan for the implementation of TimeTarget (Rostering) and established a test/training environment ready for on-site implementation. • Ordered the upgrade of reliable high speed network links (Mornington Depot, Rosebud Visitor Information centre and Rosebud Foreshore) to replace existing microwave links. GIS • Initial maps and consultation with Community Planner regarding the mobility map for Somerville. • Data extraction for drainage project mailouts for Drainage consultant • Land Under Roads (LUR). The values of two new roads have been added to the Shire’s Property and Rating system to update valuation information. • Plotting of additional maps for the Tootgarook Wetland project. • Design of maps of major evacuation routes for Emergency Services Records Management • Commencement of new staff member, Amy Packer, as a Records Officer in Rosebud and Mornington; • Team Leader – Records Management has been appointed as Chief Fire Warden for Rosebud as well as being appointed to the Shires’ Emergency Management Team. Financially, the variance for month and year to date is favourable primarily due to the timing of payments in IT operations. The unit is expected to meet the year end favourable forecast to the adopted budget. $'000 Operating Surplus / (Deficit) Monthly Report May 2014 Forecast Actual Variance Forecast Month Month Y.T.D Month (232) (187) 44 (2,121) 122 Actual Variance Budget Forecast Variance Y.T.D. Y.T.D Y.E. Y.E. Y.E. (2,028) 92 (2,672) (2,548) 124 FINANCE Revenue Management The focus this month has primarily been on the normal activities of the team, i.e. the collection of outstanding annual rates and sundry debtors. We have endeavoured to contact as many ratepayers as possible by telephone, encouraging payment arrangements prior to issuing complaints (legal action). Although this is a time consuming process the results have been very positive. As a number of our ratepayers are non-residents, our focus has been on investigating recently purchased properties with unpaid rates, to ensure accurate information is obtained from Solicitors/ Conveyancers acting on behalf of vendors and purchasers at the time of settlement. Direct debit payments finished this month and are proving a reliable payment method. This completes the fourth year that direct debit has been available as a rate payment method with 2,750 rate payers using this option. We sent flyers out this month with the fourth instalment notices offering registration for electronic delivery of rate notices for the 2014-2015 year. Currently we have had 860 register. Rate modelling was completed this month for budget purposes and preparation commenced for the printing of rate notices for the next financial year. Accounting Services The proposed 2014/15 budget was on exhibition until 21 May. Council will, following consideration of budget submissions adopt (with or without amendment) the 2014/15 budget at the Council meeting scheduled for 30 June 2014. Preparation for the 2013/14 year-end financial statements and audit has continued during May. Financially, the favourable $425k YTD variance is primarily due to timing of employee overheads which will balance out at year end. $'000 Operating Surplus / (Deficit) Monthly Report May 2014 Forecast Actual Variance Forecast Month Month Y.T.D Month (564) 442 1,005 (1,682) 123 Actual Variance Budget Forecast Variance Y.T.D. Y.T.D Y.E. Y.E. Y.E. (1,257) 425 (2,369) (2,466) (98) DIRECTOR – SUSTAINABLE ORGANISATION 14/15 Budget Preparations for the 14/15 Budget continued to be a key focus this month with team members working towards finalisation of the budget document for Council’s formal consideration on 30th June 2014. This work has included final processing and analysis of the revaluation results and a review of the financial implications of the recent State and Federal Government budget announcements. A comprehensive summary of these issues will be provided to Council in the coming weeks. The formal public exhibition period for the draft 14/15 budget document concluded on the 24th May with 18 formal submissions received for consideration. The Section 223 Budget Hearing has been scheduled for 4pm on Thursday 12th June at the Rosebud Council Chamber where submitters will have the opportunity to speak to their submissions. This Section 223 process is a statutory obligation under the Local Government Act. It follows Council’s pre-budget community engagement initiative which resulted in 48 submissions from individuals, community and sporting groups being considered as part of the development of the draft 14/15 budget. Customer Service We have continued to surpass key customer service targets this month whilst at the same time accommodating increases in telephone calls and service requests. 81% of telephone calls were answered within 20 seconds (above the target of 80%) and our abandoned call rate was only 1.1% of the total calls received (positively exceeding our target of 3%). For a more comprehensive discussion of these results, including in the area of Service Requests, please refer to the commentary included within our Governance and Corporate Support section. Information Services It is worth noting two key initiatives that have progressed this month within the Information Services Unit that are likely to result in productivity improvements to business processes across the organisation. The first is the introduction and testing of ‘Trapeze’ software. This software allows electronic stamping and approval of plans and permits. It will significantly reduce the need to manually stamp a hardcopy document, saving time and printing resources (paper, toner, etc.) in a range of processes. The first focus area for this software will be our Statutory Planning Unit. Further reporting on the outcomes of the initial testing phase will be provided in subsequent months. The second is the upgrade of network links to remote Shire sites (Mornington Works Depot, Dromana Visitor Information Centre and Rosebud Foreshore). The network connection to these sites, currently achieved via microwave, will be upgraded to reliable high speed network links specific to each site. This will enable business processes at these sites reliant on corporate network information to occur more reliably and efficiently. This is expected to ultimately increase productivity and reduce ‘down time’ due to connectivity issues. Financially, there is a small favourable variance for the month due to reduced expenditure in the salaries area. $'000 Operating Surplus / (Deficit) Monthly Report May 2014 Forecast Actual Variance Forecast Month Month Y.T.D Month (46) (30) 15 (505) 124 Actual Variance Budget Forecast Variance Y.T.D. Y.T.D Y.E. Y.E. Y.E. (466) 39 (528) (527) 1 CAPITAL WORKS OVERVIEW 7444 – Alfred Street, Hastings – Streetscape Works A contract has been awarded to A & V Creative Concrete Pty Ltd for streetscape works for Alfred Street, Hastings. The works will incorporate exposed aggregate concrete paving, to match existing treatment on High Street, this will create continuity with the surrounding public space in Hastings while forming a contrasting effect with the paved fingers. The paved fingers will be finished in 3 varying shades, arranged to resemble the ephemeral tidal movements of Western Port, with planting to provide for an enclosed green space. Public lighting will also be provided, allowing for continual illumination throughout the public space. Image: Proposed new Streetscape Works within Alfred Street Works are anticipated to be completed by late August 2014. D418 – Millbank Drive Drainage Upgrade, Mount Eliza Drainage works are now nearing completion for the drainage upgrade works to alleviate current flooding issues associated with eighteen properties located within Millbank Drive and Bellbird Road, Mount Eliza. The works will provide for the upgrade of the existing drainage system, by duplicating the current pipe network and providing a surcharge path through the Council Reserve located within Millbank Drive to Kackeraboite Creek. Drainage works are being undertaken by Civilmech Pty Ltd. The proposed drainage improvements include the following: • Installation of a new, high flow pipe network including pipes and pits • Upgrade of existing pipes • Replacement of road pavement • Concrete kerb & channel • Re-grading of driveways • Rock outfall, and • Other associated works The drainage works are being funded from the Shire’s Local Integrated Drainage Strategy. S603 – Shanns Avenue, Mount Martha – Special Charge Scheme Civil works are now nearing completion with asphalting works being undertaken the construction of Shanns Avenue special charge scheme. Works are to improve access, safety, residential amenity and to reduce the impacts of storm water runoff and maintenance costs. The works involve the construction of Shanns Avenue and Jeannine Court, for a total length of 500 metres. A contract has been awarded to Maw Civil Pty Ltd. Monthly Report May 2014 125 The objective of the works is to improve access, safety, residential amenity and to reduce the impacts of storm water runoff and maintenance costs. The Shire has been successful in establishing a Special Charge Scheme agreement with the residents of Shanns Avenue and Jeannie Court, Mt Martha. The proposed new road reconstruction includes the following key elements: • 5.5m wide road for both Shanns Avenue & Jeannine Court • Three Raised Platforms with 50km/hr speed limit throughout the whole length • Kerb and Channel on both sides • Concrete footpath (Exposed Aggregates type), and • Drainage networks improvements Photo of asphalting works undertaken Monthly Report May 2014 126 7665 Road Reconstruction Works, Shands Road, Main Ridge Tree removal has been undertaken with drainage works now commencing for the construction for the reconstruction of Shands Road, from Mornington-Flinders Road to Shoreham Road, Main Ridge. The project is currently being assessed for net gain offsets for vegetation removal with Department of Environment and Primary Industries. There has been extensive community consultation through the development of this project. These works are being funded by the Federal Government through the National Black Spot Program through VicRoads and under the Safer Local Roads contract with Downer Edi. Photo of trees being removed 7677 Melbourne Road & Canterbury Jetty Road, Roundabout Construction Civil works for the new roundabout at the intersection of Melbourne Road and Canterbury Jetty Road, Blairgowrie is now completed, with landscaping works now to be undertaken. The works are to improve intersection functionality and safety for road users. Civil works are being undertaken Maw Civil. Over a 5-year period there have been 12 reported crashes over a 3.2 km section of Melbourne Road from Dundas Street to Canterbury-Jetty Road. Construction of the roundabout will significantly improve traffic flow, improve road safety reducing the likelihood of vehicle collisions and improve the overall functionality of the intersection for through traffic of the industrial precinct. The intersection upgrade works are being funded by the Federal Government through the National Black Spot Program. D426 - Wetlands and Shared User Path Construction, Nepean Highway, Dromana A contract has been awarded to Maw Civil Pty Ltd for the construction of wetland and shared path. The wetlands (south side of the Nepean Highway) are a by-product of its low level position and inadequate drainage. The Shire aims to improve pedestrian access by constructing a surface that allows for easier pedestrian and cyclist movement. Monthly Report May 2014 127 Image of newly constructed path and wetland D416 - Mount Eliza Village Flood Mitigation Project The Shire is currently working towards reducing flooding to the Mount Eliza shopping precinct as part of its Local Integrated Drainage Strategy (LIDS). In the past the precinct has been subject to serious flooding during severe wet weather. This means drainage infrastructure must be improved to reduce the likelihood of future flooding to businesses and surrounding homes. Works will be undertaken in stages to reduce any disruption to shops and local traffic. It is envisaged that road closures and driveway access restrictions will be kept to a minimum and that a safe environment will be maintained for community members and contractors at all times. The Shire is committed to keeping the community informed at all times throughout the project and will be seeking input from residents and business owners to minimize any disruptions. A contact has been award to Jaydo Construction Pty Ltd for $1.289M to construct the works. Image of area to be protected by the mitigation works Monthly Report May 2014 128 S603 – McLeod Road Group, Road and Drainage Construction, Mount Martha A contract has been awarded to Maw Civil Pty Ltd for the road construction of McLeod Road, Hall Street, Stiles Street, Hender Street, Barrow Street and Spencer Street, Mount Martha The objective of the works is to improve access, safety, residential amenity and to reduce the impacts of storm water runoff and maintenance costs. The Shire has been successful in establishing a Special Charge Scheme agreement with the residents of McLeod Road Group, Mount Martha. The contract works involve the construction of McLeod Road, Hall Street, Stiles Street, Hender Street, Barrow Street and Spencer Street, for a total length of 2 kilometres. The proposed new road reconstruction includes the following key elements: • 5.5m wide road (back of kerb to back of kerb) for all roads • At least five Raised Platforms with 50km/hr speed limit throughout the whole length • Slow points with narrowing of road pavement • Threshold treatments at road intersections • Kerb and Channel on both sides • Drainage networks improvements and • Water sensitive urban design for stormwater discharge into Sunshine Creek McLeod Road Group property owners together with Council will pay for the cost of these works under the provisions of McLeod Road Group Special Charge Scheme. Council will contribute 34% of the cost of works and property owners the other 66%.Council resolved to declare the special charge at its meeting on 10th October 2011. There has been extensive community consultation through the development of the McLeod Road Group Special Charge Scheme, including posting of notices under the relevant statutory processes. 7708 – Shands Road and Main Creek Road, Roundabout, Main Ridge Tenders are currently being called for the construction of roundabout at the intersection of Shands Road and Main Creek Road, Main Ridge. The project is being funded via VicRoads through the National Blackspot program. The upgrade will provide for improved safety to motorists and pedestrians, and will include the following key components: • Central island construction • Kerb and channel returns • Splitter Islands with pedestrian refuges • Pavement widening • Drainage improvements • Removal of trees • Relocation of existing bus stop, and • Other associated works Works are currently in the Preliminary stage with the aim of having works scheduled for September to December 2014. Monthly Report May 2014 129 Image of proposed roundabout 7401 - Building Program – Major Building Works Mornington Civic Reserve Redevelopment Project David Collings Leisure Centre is being expanded to provide new and improved recreation and leisure programs at Civic Reserve. Mornington Tennis Club will relocate to their new clubrooms and outdoor courts. Mornington Youth Club will be accommodated in a new purpose built gymnastics hall. An expanded table tennis facility has been designed for Mornington Peninsula Table Tennis Association. The existing entry foyer will be reconfigured to include an expanded program room, kiosk, administration offices, amenities, crèche and small gym room. Services infrastructure to the building is being upgraded and a new car park constructed. The building works will effectively double the size of David Collings Leisure Centre and consists of the following components: Tennis • Clubrooms including social room, tournament office, kitchen, storage, change rooms and amenities. • 12 outdoor tennis courts (Conipur Pro-Clay surfacing) with lighting Gymnastics • Gymnastics hall including multi-purpose room, office, coach’s room, store and change room and amenities. Table Tennis • Options for up to six international competition size table tennis courts (Core works consist of two courts with capacity to expand to six courts by agreement with Mornington Peninsula Table Tennis Association). Program Rooms and Entry Foyer • Group fitness room, administration office, reception desk and kiosk, crèche, gym room (45 square metres), store and new and refurbished amenities. Supporting Infrastructure • Upgraded electricity supply, new gas supply, recycled water supply and car park (175 spaces) and associated landscaping. Significant progress has been made with the project construction works since works commenced on July 2013 with the project now more than 60 percent complete. The current focus of building works is completion of external cladding, internal partition walls and hydraulic, electrical and mechanical services. Tennis court playing surfaces and car park pavements are being finalised. Monthly Report May 2014 130 Tennis facilities at Civic Reserve Car park construction at Civic Reserve Bentons Square Community Centre Preschool Additions A contract was awarded to building contractor Mackie for additions to the preschool at Bentons Square Community Centre, Mornington East. The building additions include a playroom with capacity for 33 preschool children, toilets, kitchen, office, store-room and entry foyer. Playground facilities will be expanded and modernised in conjunction with the building works. This development will significantly increase places available for preschool students in Mornington. The project costing $1 million has attracted a State Government grant of $600,000. Works have commenced on site with demolition and concrete slab preparation works underway. It is anticipated building works will be completed in September 2014. Image – Preschool Additions Mount Martha Life Saving Club Clubrooms A contract ($1.74 million) has been awarded to Lloyd Group for the construction of new clubrooms for Mount Martha Life Saving Club. The existing club-rooms will be demolished to make room for the facility, which will be double the size. Included in the new facility are three training rooms, a larger first aid communications room, an office which state and district officers can work from, as well as space to store emergency equipment, some of which is currently stored off site due to lack of space. Public toilets will be included within the new clubrooms. Project funding is being provided over two financial years by the Victorian Government ($900,000), Mount Martha Life Saving Club ($400,000) and the Shire ($250,000 plus cost of new public toilets). The builder has established on site and commenced demolition activities. Monthly Report May 2014 131 Image: Mount Martha Life Saving Club Clubrooms Streetscape Improvement Works Package (Mount Eliza, Portsea, and Sorrento) The Shire’s capital works program includes funding for implementation of a number of minor streetscape improvement projects throughout the municipality consistent with adopted streetscape master plans. The streetscape works will improve the sense of place, amenity and pedestrian safety in various villages through the provision of quality landscaping and urban infrastructure. A contract has been awarded for works at the following locations: 1. Mount Eliza Village (south side of Mount Eliza Way service road, from Old Mornington Road roundabout to Davies Avenue) a. Reconstruction and widening of the footpath and kerb and channel in front of service road shops; b. Landscaping of the median strip between Mount Eliza Way and service road; c. Re-alignment of the pedestrian crossings on the service road entrance off Old Mornington Road roundabout; d. Rationalisation of confusing traffic islands at car park entrance off Old Mornington Road roundabout. 2. Portsea Village (north side of Point Nepean Road service road, from Newton Reserve to Portsea Hotel) a. Reconstruction of the existing footpath and kerb and channel in front of Newton Reserve and commercial premises; b. Enhanced pedestrian linkages to the entrance of Portsea Pier access road; c. Provision of a small pedestrian plaza on Newton Reserve outside Portsea Pier Café including provision of quality street furniture (seating, lighting, rubbish bins, bicycle hoops and drinking fountain); d. Quality landscape planting on Newton Reserve with native coastal trees, shrubs and grasses and protection of existing Drooping Sheoaks; 3. Ocean Beach Road, Sorrento (completion of Darling Square works outside Manyung Gallery) Monthly Report May 2014 132 a. Exposed aggregate paving, provision of curved seat facing location of future street sculpture, planting and street tree consistent with landscape theme delivered on northern side of Darling Square; 4. Ocean Beach Road, Sorrento (entrance from Old Melbourne Road roundabout) a. Installation of a raised pedestrian crossing platform, including associated timber bollards and landscape planting, consistent with pedestrian crossing recently installed at Darling Square. Baxter Preschool, Baxter Williams Kaye Hofer Architects has been engaged to provide the detailed design and specification for the refurbishment and additions to Baxter Preschool. A number of meetings have been held with the project steering committee to develop the design to cater for increased enrolments and changing regulatory requirements. The works include additional classroom, staff offices/meeting room, toilets, disabled toilet and a new enlarged entry foyer. The proposed works will significantly increase places available for preschool students in Baxter. Project costing of $1.2 million has attracted a State Government grant of $300,000. Council awarded a contract to Mackie for all construction activities at its 16 September 2013 meeting. The preschool will operate and remain on site during the staged construction work with new services in 2014 housed in a temporary portable building onsite for the first two terms. Construction works commenced November 2013 Photo of window frames and plastering in new playroom Elsie Dorrington Netball Pavilion, Mornington – Pavilion Strategy MSM Architects has been engaged to provide the detailed design and specification for the refurbishment and additions to Elsie Dorrington Netball Pavilion. The design includes time keepers/office, unisex change and toilet facilities, umpires change room, store rooms, bin store, internal disabled toilet, external public toilets, first aid room, disabled access, new kitchen and social areas. The proposed works will significantly assist the Mornington Netball Association in providing adequate facilities to cater for their existing seven playing courts. $1.2 million has been budgeted for this project. Monthly Report May 2014 133 Tenders for the building works close 13th November 2013. Construction works commenced 20th January 2014 and is anticipated to be completed in August 2014. Photo of undercover viewing area Citation Reserve, Mount Martha – Pavilion Strategy This project will involve the demolition/relocation of the existing pavilion with a new facility to cater for both senior and junior football. The design will include unisex change and toilet facilities, umpires change room, store rooms, bin store, internal disabled toilet, external public toilets, first aid room, disabled access, new kitchen and social areas. Provision will also be made for new energy efficient lighting, heating, ventilation and cooling systems, insulation, water saving fixtures and water tanks for capture of roof water for toilet flushing. Architectural firm Mantric Architecture has been appointed to develop the detailed design and documentation. A meeting has been held 20th November 2013 with Council’s Design Advisory Panel (DAP) to review the concept and overall master plan for Citation Reserve. The advice from the DAP has influenced the design and location of the concept plan. A further meeting with the DAP was held on the 11th April 2014. The schematic design has been completed and detailed design has commenced. Image of schematic design elevations Monthly Report May 2014 134 Martha Cove Fish Passage The Shire has completed a series of ponds on Brokil Creek to link the Martha Cove waterway development with the upper reaches of Brokil Creek. These works enable native fish to migrate upstream as part of their annual breeding cycle. Funding for this project was provided by the Martha Cove developer. Image: Fish Passage works at Martha Cove development site F023 CCTV Hasting The contract for the installation of CCTV cameras in the Hastings Commercial Centre was awarded to Omnivision Pty Ltd. The installation works are now completed and awaiting powering up by United Energy. The cameras to will then be tested before commissioning Coles Carpark Monthly Report May 2014 Corner Salmon and High St With control box on ground 135 Mothers Beach Toilet The design for the new Mothers Beach Toilet is underway. The Architects are Baade Harbour Australia Pty Ltd. The design is based on 6 unisex family units designed to the Disability Code requirements and will also have external showers and 1 ambulant toilet Monthly Report May 2014 136 CAPITAL WORKS Financially, there have been no changes to capital in the May report The following list is comprised from April’s report, where the program has been revised by $67k (unfavourably). Please note projects are shown net of income (cost to Council). Projects with additional income: • 17031 - Provision of Library Books/Materials – (nil) Premiers Reading Challenge funding received towards books for pre-schoolers ($21k). • 17263 - Implementation of Recreations Master Plan – (nil), Contribution from Recreation Reserve development, Bunguyan Reserve Tyabb +$155k. • 17665 – B/Spot Shands Rd Mornington Flinders Rd Shoreham – +$125k, contribution from residents received towards road/drainage works/additional to Vic Road blackspot funding . • 17622 – R2R 3 Hodgins Road Frankston Flinders Rd – (nil), project reallocation from R2R 3 Bungower Road/Tyabb Tooradin Road +$528k. (project to be finalised December 2014) • 17549 – Bicycle Strategy (nil), Contribution from Recreation Reserve development, Bicycle Strategy works +$40k. • 17584 – Activity Centre Structure Plan (nil), Developer contribution received towards streetscape works +$27k. Projects with additional costs: • 17038 - Traffic Management Treatments - Somerville Pedestrian Strategy Implementation ($50k): Additional cost associated with Shire contribution/construction of intersections lights. • 17362 – Footpath Strategy Implementation – SCS Old Mornington Rd Stage 2 William Road ($70k): Additional cost to complete works, shire contribution. • 17403 – Municipal Building Improvements – Rosebud Central Shopping Lights ($55k): Risk management issue, to make safe lighting fixtures at shopping centre. • 17618 – R2R Racecourse Rd ($47k) Additional Shire contribution towards completion of works. • 17673 – Sporting Facilities Lighting Program – Fruit Growers Reserve ($50k) Increase cost of lighting due to higher specifications of engineered works. • 17606 – Tyabb/Tooradin Road – ($53k) additional funding to address urgent traffic management issues including bridge works. • 17558 Kerb and Channel – Rehabilitation: Emergency Repairs ($54k), additional cost of repairs from service requests. Monthly Report May 2014 137 Savings have been achieved in the following projects (which offset other items): • 17401 Building Renovations – Major Building, Toilet Strategy Implementation $30k, offset funding towards Mornington Transit Centre (works included toilet works). • 17644 B/Spot Melbourne Rd and Hughes - $75k, Shire contribution no longer required, project complete. • 17707 B/Spot Boes Rd/Graydens Road - $150k, Shire contribution re-prioritised to other capital projects/project funding to be reviewed 2014-15. • 17552 B/Spot Program Council Contribution - $35k, Offset savings towards urgent works. (Rosebud lighting works) • 17708 B/Spot Shands/Mains Creek Roundabout, $50k Shire contributions reviewed and decreased. • 17710 B/Spot Sandy Road Fingal, $50k Shire contributions reviewed and decreased. • 17665 Somerville Needs Strategy $50k, funding reallocated to Somerville pedestrian signals. Forecast Actual Variance Forecast Actual Variance Budget Forecast Variance Month Month Month Y.T.D Y.T.D. Y.T.D Y.E. Y.E. Y.E. $'000 $'000 $'000 $'000 $'000 $'000 $'000 $'000 $'000 Capital Works Area Internal Expenses Land Buildings Infrastructure - Roads Infrastructure - Drainage Infrastructure - Other Plant Information Technology Artworks Library Bookstock 0 0 931 965 219 234 1 0 0 11 0 1 1,113 730 284 156 22 7 0 118 0 (1) (182) 235 (65) 78 (21) (7) 0 (107) 0 532 7,970 12,536 2,897 2,706 392 3 15 1,007 1 497 8,596 6,607 2,576 1,538 146 63 0 1,036 (1) 35 (626) 5,929 321 1,168 246 (60) 15 (28) 0 50 14,167 18,570 3,989 4,018 406 0 20 1,320 0 532 16,310 20,275 4,032 4,173 410 3 20 1,341 0 (482) (2,143) (1,704) (43) (155) (3) (3) 0 (21) 2,398 2,450 (52) 28,306 21,181 7,125 42,791 47,354 (4,563) Total Capital Works Monthly Report May 2014 138 Capital Works Third Quarter Program No Program Description Activity Activity/ Description Forecast Proposed Annual Forecast Net Change Comment Fav(Unfav) Funded within program 17028 Replacement of Office Furniture Z100 Office Furniture: Annual Provision 30,000 25,000 17028 Replacement of Office Furniture Z117 HACC Oven Equipment 19,129 24,129 17050 Rehab - Walkways/bike paths/footpat E540 Horse Trail Upgrade for Maintenance 0 10,000 (10,000) Additional cost 17050 Rehab - Walkways/bike paths/footpat E579 Eramosa Rd (Graf Rd - Pembrooke Drive 70,266 77,321 (7,055) Additional cost 17050 Rehab - Walkways/bike paths/footpat E580 Milne Rd ( Martin Rd - Governor Rd) 120,000 100,000 20,000 Offset urgent works 17050 Rehab - Walkways/bike paths/footpat E582 Mornington Tyabb Rd (Yuilles Rd) 162,234 157,000 5,234 Offset urgent works 17050 Rehab - Walkways/bike paths/footpat E523 Balcombe Creek Boardwalk 300,000 246,000 17050 Rehab - Walkways/bike paths/footpat E542 Footpath Replacement for Risk Management 150,000 220,000 (70,000) Reinstatment of original budget, due to the urgent nature of works 17053 Drainage Rehabilitation E101 Emergency Repairs From Maint Program 340,000 439,528 (99,528) Additional cost to complete outstanding works 17053 Drainage Rehabilitation E102 Drainage Rehab Enhancement 140,000 100,000 40,000 Offset within program 17053 Drainage Rehabilitation E103 Intersection Drainage and Soak Pit 90,000 30,000 60,000 Offset within program 17053 Drainage Rehabilitation E107 Pit Lid Replacement 50,000 20,000 17054 Drainage Upgrades D028 Investigation & Design Development 100,000 94,000 17054 Drainage Upgrades D055 TBD: Drainage Upgrade 160,000 180,000 17054 Drainage Upgrades D064 Installation of Soak Pits 100,000 64,000 17054 Drainage Upgrades D085 Minor Works Shirewide Upgrades 40,000 62,000 17401 Building Renovations - Major Build K023 Mount Martha House 6,641 14,000 17401 Building Renovations - Major Build K048 Program Design Cost 60,080 57,680 17401 Building Renovations - Major Build K066 Sorrento Pre School (Income) 0 (19,629) Monthly Report May 2014 139 5,000 Offset urgent works (5,000) Urgent works HACC oven 54,000 Offset urgent works, Rehab Walkways/bike paths/footpath 30,000 Offset within program 6,000 Offset within program (20,000) Additional cost to complete outstanding works 36,000 Additional cost to complete outstanding works (22,000) Offset within program (7,359) Additional cost to complete outstanding works 2,400 Offset final stage of Sorrento Strategy Boardwalk 17368 Sorrento Boardwalk Strategy 19,629 Contributions received Program No Program Description Activity Activity/ Description Forecast Proposed Annual Forecast 17401 Building Renovations - Major Build K066 Sorrento Pre School 200,000 219,629 (19,629) Additional works 17401 Building Renovations - Major Build K084 Sports Pavilion Strategy Implementation 264,000 247,843 16,157 Offset funding 17401 Building Renovations - Major Build K094 Office Pound Rd Hasting 2,561 3,850 17401 Building Renovations - Major Build K096 Mt Martha Tennis Pavilion 20,582 45,000 17401 Building Renovations - Major Build K102 Hastings Municipal Office - Refurbishment 200,000 197,223 17401 Building Renovations - Major Build K105 Minor Urgent Works 100,000 93,435 17554 Skate & BMX Strategy S500 Balnarring Skate Park, Balnarring 267,000 403,400 17554 Skate & BMX Strategy S501 Mt Martha Skate Park 254,000 117,600 17593 Integrated Flood Management and Dra D401 The Eyrie McCrae 238,000 257,000 17593 Integrated Flood Management and Dra D412 Dromana Catchment 22,000 25,200 17593 Integrated Flood Management and Dra D416 Ballar Catchment 1,047,800 1,008,100 17593 Integrated Flood Management and Dra D419 McCrae Catchment 40,000 52,000 17593 Integrated Flood Management and Dra D421 Flood Mitigation Unsealed Rds 6,000 6,500 17593 Integrated Flood Management and Dra D427 Dorio Regraded Drain Baxter (Income) 0 (73,472) 17593 Integrated Flood Management and Dra D427 Dorio Regraded Drain Baxter 0 73,472 17362 Footpath Strategy - Impl H366 Wooralla Dr (Tower Rd to Emil Madse 275,265 223,320 4,875,558 4,801,129 Total Projects deferred Monthly Report May 2014 149 Net Change Comment Fav(Unfav) (1,289) Additional cost to complete outstanding works (24,418) Mt Martha Tennis Pavillion offset from Sports Pavillion Strategy 2,777 Offset 6,565 Offset (136,400) Additional cost to complete outstanding works 136,400 Design stage still being completed due to heritage advice, transfer funding to Balnarring Skate Park, for additional scope of works increase (19,000) Additional cost to complete outstanding works (3,200) Additional cost to complete outstanding works 39,700 Program offset, funding offset toward program over expenditure (12,000) Design stage (500) Additional cost to complete outstanding works 73,472 Offset funding from LMA Linking Melbourne Authority (Pen Link Linking works) (73,472) Offset funding from LMA Linking Melbourne Authority (Pen Link Linking works) 51,945 Delayed project due to planning issues 74,429 Program No Program Description Activity Activity/ Description Forecast Proposed Annual Forecast 17701 Active Sports Strategy - Impl 7701 Active Sports Strategy - Implementation 100,000 50,000 100,000 50,000 90,000 70,000 90,000 70,000 9,500 59,500 (50,000) Additional cost to complete outstanding works (Somerville intersection) (13,000) Additional cost of Emergency Repairs Total Net Change Comment Fav(Unfav) 50,000 Velodrome Study deferred for current year (and next), offset toward over expenditures 50,000 Projects funding priority works 17699 Unmade Carpark Construction Strateg 7699 Unmade Carpark Construction Strategy Total 20,000 Offset funding towards 56833 Rye Pocket Park (prioirty works) 20,000 Projects with additional expenditure 17038 Traffic Mgt Treatments C129 Somerville Pedestrian Strategy Implementation 17065 Rehab-Foreshore Fac/Boat Ramps/Jett E980 Emergency Struct Repair Boat Ramp 50,000 63,000 17272 Hall Improvements Asset Replacement J506 Hall Building Works (Various) 30,000 32,692 (2,692) Additional cost to complete outstanding works (offset from T032) 17362 Footpath Strategy - Impl H335 SCS Walkers Rd/ Millbank Dr to Humphries 30,000 33,400 17362 Footpath Strategy - Impl H347 Pt Nepean Rd Wattle Pl to Bartels 101,300 109,000 17362 Footpath Strategy - Impl H350 SCS Old Mton Rd Stage 2 -William Rd 202,000 272,000 17362 Footpath Strategy - Impl H353 Jetty Rd (Pt Nepean Rd Keogh St) 264,132 269,000 17368 Sorrento Strategy - Boardwalk 7368 Sorrento Strategy - Boardwalk 9,920 12,320 17400 BBQ Upgrade Program O031 Quarry Reserve (No 1) 13,000 16,239 17403 Municipal Building Imp J026 Rosebud Central Shopping Ctre Light 0 55,000 (3,400) Refund to residents (7,700) Additional cost to complete outstanding works (70,000) Additional cost to complete outstanding works (4,868) Additional cost to complete outstanding works (2,400) Additional cost to complete outstanding works (3,239) Additional cost to complete outstanding works (55,000) Urgent works to make safe 17606 B/Spot Tyabb Tooradin Rd Bungower 7606 B/Spot Tyabb Tooradin Rd Bungower 0 53,000 Monthly Report May 2014 141 (53,000) Urgent works to make safe/bridge works Forecast Proposed Annual Forecast R2R Racecourse Rd M/ton Tyabb Rd 0 46,884 7658 Gateway Park Development 0 9,180 Morington Transit Precinct 7666 Mornington Transit Precinct 346,000 376,000 17673 Sporting Facilities Lighting Program L201 Fruit Growers Reserve 40,000 90,000 17558 Kerb and Channel - Rehabilitation M516 Kerb and Channel Replacement 200,000 316,000 17665 B/Spot Shands- Mton Flind Shoreham 7665 B/Spot Shands- Mton Flind Shoreham (Income) 0 (105,392) 17665 B/Spot Shands- Mton Flind Shoreham 7665 B/Spot Shands- Mton Flind Shoreham 551,600 781,992 4,834,320 2,268,423 Program No Program Description Activity Activity/ Description 17618 R2R Racecourse Rd M/ton Tyabb 7618 17658 Gateway Park Development 17666 Total Net Change Comment Fav(Unfav) (46,884) Project finalisation. (9,180) Additional cost/offset Mornington Structure Plan (30,000) Additional works, including public toilet facility, funded from toilet strategy (50,000) Additional lighting/increased lighting (116,000) Funding revised due to urgent works 105,392 Contribution towards works/associated at Tucks Rd/Shands Rd (230,392) Additional external and Shire contribution towards project works (642,363) Projects with additional income 17031 Provision of Library Books/Material L919 Premier's Reading Challenge (Income) 0 (20,752) 17031 Provision of Library Books/Material L919 Premier's Reading Challenge 0 20,752 17038 Traffic Mgt Treatments C142 Tyabb Primary School (Income) 0 (25,000) 17038 Traffic Mgt Treatments C142 Tyabb Primary School 0 50,000 17263 Implementation of Recreation Master T030 Bunguyan Reserve (Income) 0 (126,635) 126,635 Funding received from developer 17263 Implementation of Recreation Master T030 Bunguyan Reserve 120,000 246,635 (126,635) Funding received from developer Monthly Report May 2014 142 20,752 Premiers Reading Challenge: to fund the developemnt of reading skills amongst the young. (20,752) Premiers Reading Challenge: to fund the developemnt of reading skills amongst the young. 25,000 Contribution received (50,000) Contribution received/Council blackspt funding. Forecast Proposed Annual Forecast Mt Martha Junior Football Lights (Income) 0 (13,500) 13,500 Contribution Department of Transport and Local Infrastructure T039 Mt Martha Junior Football Lights 0 13,500 (13,500) Contribution Department of Transport and Local Infrastructure Implementation of Recreation Master T040 South M/ton Junior Football Club (Income) 0 (15,700) 15,700 Contribution Department of Transport and Local Infrastructure 17263 Implementation of Recreation Master T040 South M/ton Junior Football Club 0 15,700 17362 Footpath Strategy - Impl H350 SCS Old Mton Rd Stage 2 -William Rd (Income) (61,200) (81,200) (15,700) Contribution Department of Transport and Local Infrastructure 20,000 Contributions Special Charge Scheme. 17362 Footpath Strategy - Impl H357 SCS Victoria St-Marine Pd/Seaview A ((Income) 0 (14,023) 14,023 Contributions Special Charge Scheme. 17549 Bicycle Strategy 7549 Bicycle Strategy (Income) 0 (40,000) 17549 Bicycle Strategy 7549 Bicycle Strategy 298,777 338,777 17559 Drainage - Soak Pit Refurbishment 7559 Drainage Rehabilitation Program (Income) 0 (1,818) 17584 Activity Centre Structure Plan - Im 7584 Activity Centre Structure Plan - Improvements (Income) 0 (27,000) 27,000 Developer Contribution 17584 Activity Centre Structure Plan - Im 7584 Activity Centre Structure Plan - Implemenation 726,000 753,000 (27,000) Developer Contribution 17622 R2R 3 Hodgins Road Frankston Flinde 7622 R2R 3 Hodgins Road Frankston Flinders (Income) 0 (528,895) 528,895 R2R 3 allocation of funding 17622 R2R 3 Hodgins Road Frankston Flinde 7622 R2R 3 Hodgins Road Frankston Flinders 0 528,895 (528,895) R2R 3 allocation of funding 17690 Sorrento Early Leaning Facility 7690 Sorrento Early Learning Facility (Income) 0 (10,000) 17690 Sorrento Early Leaning Facility 7690 Sorrento Early Learning Facility 267,000 277,000 17695 RTR - Bungower Rd / Tyabb-Tooradin 7695 RTR - Bungower Rd / Tyabb-Tooradin (Income) (1,000,000) (210,427) 10,000 Contribution Department of Early Childhood (10,000) Contribution Department of Early Childhood (789,573) Reallocation of funding 17695 RTR - Bungower Rd / Tyabb-Tooradin 7695 RTR - Bungower Rd / Tyabb-Tooradin 1,000,000 210,427 1,350,577 1,339,736 0 4,730 Program No Program Description Activity Activity/ Description 17263 Implementation of Recreation Master T039 17263 Implementation of Recreation Master 17263 Total Net Change Comment Fav(Unfav) 40,000 Developer Contribution (40,000) Developer Contribution 1,818 Contribution towards works 789,573 Reallocation of funding 10,841 Projects with offsets from Operations 17010 Plant & Equipment Replacement Monthly Report May 2014 Y522 Trailer 143 (4,730) Funded operations budget Program No Program Description Activity Activity/ Forecast Description 17010 Plant & Equipment Replacement Y550 Proposed Annual Forecast Cat and Dog Cages Total Net Change Comment Fav(Unfav) 0 3,600 (3,600) Funded operations budget 0 8,330 (8,330) 98,900 83,000 938,000 908,000 5,000 6,340 Projects with savings 17263 Implementation of Recreation Master T032 Sports Lighting Graham Reserve SRV 17401 Building Renovations - Major Building K085 Toilet Strategy Implementation 17066 Signage - safety warning on Reserves 7066 Signage - safety warning on Reserves 17483 Signage Directional 7483 Signage Directional 25,000 23,660 17552 Blackspot Program (Council contributions) 7552 B/Spot Program Council Contribution 75,000 40,000 35,000 Offset Rosebud Lighting (Muncipal 17558 Kerb and Channel - Rehabilitation M514 Emergency repairs from service requirements 100,000 38,000 62,000 Offset footpath rehab program/urgent after asset reviews. 17593 Integrated Flood Management and D424 Southern Peninsula Catchment 150,000 155,000 (5,000) Additional cost to complete outstanding 149,000 133,000 works 16,000 Project finalisation, transfer of funding 75,000 0 Drainage 15,900 Offset toward lighting projects17673 30,000 Offset funding towards 17666 (1,340) Offset funding from 17483 Signage 1,340 Offset towards signage 17066 Signage 17641 B/Spot Elizabeth St & Herring St 7641 BSpot Elizabeth Street Herring St 17644 B/Spot Melb Rd and Hughes Rd 7644 BSpot Melbourne Rd and Hughes Road 17655 Somerville Needs Strategy 7655 Somerville Needs Strategy - Implementation 189,000 139,000 17696 Hastings Activity Centre Structure 7696 Mornington Structure Plan Traffic Management 100,000 90,820 17707 BSpot Boes/Graydens Roundabout 7707 BSpot Boes/Graydens Roundabout 250,000 100,000 17708 BSpot Shands/Main Creek Roundabout 7708 BSpot Shands/Main Creek Roundabout 930,000 880,000 50,000 Project re-prioritised 17710 BSpot Sandy Road Fingal 7710 BSpot Sandy Road Fingal 415,000 365,000 50,000 Project re-prioritised 17711 BSpot Point Leo Road Red Hill 7711 BSpot Point Leo Road Red Hill 135,000 110,000 25,000 Offset funding towards 17665 3,634,900 3,071,820 563,080 14,885,355 11,609,438 67,657 Total Grand Total Changes Monthly Report May 2014 144 75,000 Reallocation of funding/project 50,000 Offset towards additional cost of Somerville traffic lights works 9,180 Offset toward bottom line 150,000 Shire funding re -prioritised Capital Works Forecast Y.T.D Program 17010. Plant & Equipment Replacement 17012. Acquisition (splays, easements & sm 17016. Oval Rehab - Drainage & Sprinklers 17028. Replacement of Office Furniture 17030. Corporate IT System 17031. Provision of Library Books/Material 17032. Acquisitions - M'ton Pen Reg Galler 17038. Traffic Mgt Treatments 17042. Unsealed Rds - Intersection Safety 17050. Rehab - Walkways/bike paths/footpat 17053. Drainage Rehabilitation 17054. Drainage Upgrades 17062. Signage - Traffic/Parking Areas 17063. Signage - General 17065. Rehab-Foreshore Fac/Boat Ramps/Jett 17066. Signage - safety warning on Res & F 17067. Signage - Local Laws on Reserves 17082. Sale of Roads 17187. Fruitgrowers Reserve Machinery Shed 17260. Playground developments 17263. Implementation of Recreation Master 17272. Hall Improvements Asset Replacement 17273. Reserve Improvements/ Asset Replace 17313. Equestrian Strategy Implementation 17362. Footpath Strategy - Impl 17363. Photocopier Replacement 17368. Sorrento Strategy - Boardwalk 17371. Portsea Strategy - Impl Stage 1 17400. BBQ Upgrade Program 17401. Building Renovations - Major Build Monthly Report May 2014 364,138 50,000 145,381 49,813 2,882 1,007,306 15,000 337,188 22,500 1,422,429 709,518 396,980 11,250 15,000 60,496 4,806 11,250 0 0 365,976 779,284 35,446 75,292 1,000 2,358,604 37,530 11,972 300,000 37,129 5,633,267 145 Actual Y.T.D. Variance Y.T.D Budget Y.E. Forecast Y.E. 124,135 240,003 376,300 383,130 2,092 47,908 50,000 50,000 13,970 131,411 147,000 147,000 45,082 4,731 30,000 49,129 2,882 0 0 2,882 1,035,518 (28,212) 1,320,000 1,340,752 0 15,000 20,000 20,000 688,604 (351,416) 329,300 759,300 7,373 15,127 30,000 30,000 1,074,952 347,477 1,410,000 1,317,821 647,073 62,445 700,000 669,528 356,612 40,368 400,000 400,000 16,292 (5,042) 15,000 15,000 6,641 8,359 20,000 20,000 62,984 (2,488) 50,000 63,000 7,173 (2,367) 5,000 6,340 11,287 (37) 15,000 15,000 11,876 (11,876) 0 0 368 (368) 0 0 218,478 147,498 447,000 457,000 192,460 586,824 1,322,100 1,150,835 32,692 2,754 50,000 32,692 0 75,292 90,000 90,000 0 1,000 100,000 1,000 846,005 1,512,599 2,770,982 2,844,605 9,980 27,550 50,040 50,040 12,223 (251) 0 12,320 43,265 256,735 400,000 400,000 48,739 (11,610) 40,000 43,239 7,068,348 (1,435,081) 11,935,000 12,268,098 Variance Y.E. (6,830) 0 0 (19,129) (2,882) (20,752) 0 (430,000) 0 92,179 30,472 0 0 0 (13,000) (1,340) 0 0 0 (10,000) 171,265 17,308 0 99,000 (73,623) 0 (12,320) 0 (3,239) (333,098) Forecast Y.T.D Program 17402. Recreation Building Imp 17403. Municipal Building Imp 17444. Hastings Com Area Parking & TMT Imp 17464. Plant & Equip Replace't Rec Facil 17465. LT - Coastal Mgt/Master Plan Impl 17473. St Mitchell Circuit, M'ton Railway 17482. Safer Local Roads Program 17483. Signage Directional 17486. Southern Peninsula Aquatic Recreati 17489. Rye Traffic Man Strategy Implementa 17490. Police Point Park Improvements 17496. LATM Shire Wide 17504. Signage Township Corporate 17522. Enterprise Content Management Syste 17549. Bicycle Strategy 17552. Blackspot Program (Council contribu 17554. Skate & BMX Strategy 17555. Gateway Park, Mornington 17556. Soccer Strategy - Implementation 17558. Kerb and Channel - Rehabilitation 17559. Drainage - Soak Pit Refurbishment 17584. Activity Centre Structure Plan - Im 17586. Bus Shelter Rehabilitation 17593. Integrated Flood Management and Dra 17594. Dromana Visitors Centre - Major Upg 17606. B/Spot Tyabb Tooradin Rd Bungower 17618. R2R Racecourse Rd M/ton Tyabb 17622. R2R 3 Hodgins Road Frankston Flinde 17626. Foreshore Camping Areas - Amenity B 17629. Safety Beach CC - Path to Lift Acce 17630. Peninsula DriveSafe 17641. B/Spot Elizabeth St & Herring St Monthly Report May 2014 130,000 58,994 220,000 32,829 0 65,697 0 22,692 152,125 37,500 7,275 0 37,500 120,000 213,940 31,664 377,298 0 57,125 323,976 100,000 516,950 9,998 1,690,693 0 8,830 7,810 88,114 196,875 19,875 50,000 107,158 146 Actual Y.T.D. 2,866 52,344 80,092 29,778 0 81,920 0 14,071 168,659 3,486 170 600 30,124 59,980 31,947 51,877 470,359 3,220 0 352,831 85,156 343,645 22,176 1,487,587 1,840 680 46,884 6,801 255,291 2,333 28,534 102,214 Variance Y.T.D 127,134 6,650 139,908 3,051 0 (16,223) 0 8,621 (16,534) 34,014 7,105 (600) 7,376 60,020 181,993 (20,213) (93,061) (3,220) 57,125 (28,855) 14,844 173,305 (12,178) 203,106 (1,840) 8,150 (39,074) 81,313 (58,416) 17,543 21,466 4,945 Budget Y.E. 130,000 50,000 220,000 30,000 80,000 65,697 4,000,000 25,000 188,500 50,000 9,700 0 50,000 120,000 315,000 500,000 521,000 0 109,500 300,000 100,000 726,000 20,000 2,788,800 0 0 0 0 262,500 26,500 50,000 149,000 Forecast Y.E. 130,000 105,000 220,000 34,072 80,000 81,920 4,000,000 23,660 188,500 50,000 9,700 0 50,000 120,000 338,777 40,000 521,000 0 209,500 354,000 100,000 753,000 22,200 2,862,272 0 53,000 46,884 528,895 262,500 26,500 50,000 133,000 Variance Y.E. 0 (55,000) 0 (4,072) 0 (16,223) 0 1,340 0 0 0 0 0 0 (23,777) 460,000 0 0 (100,000) (54,000) 0 (27,000) (2,200) (73,472) 0 (53,000) (46,884) (528,895) 0 0 0 16,000 Forecast Y.T.D Program 17644. B/Spot Melb Rd and Hughes Rd 17655. Somerville Needs Strategy 17657. Former M'ton Sec.College Classrooms 17658. Gateway Park Development 17659. Urban Rd Contibutory Scheme Strateg 17660. Pavillion Strategy Implementation 17664. B/Spot MelbRd Dundas-Canterbury RD 17665. B/Spot Shands- Mton Flind Shoreham 17666. Morington Transit Precinct 17667. Sorrento Seawall 17668. Mount Martha Park Viewing Tower 17671. Sorrento Policemans Point Strategy 17672. Neighbourhood Activity Centre Struc 17673. Sporting Facilities Lighting Progra 17674. Ticketing System Foreshore B/Ramp 17675. Tennis Strategy 17676. Netball Strategy 17677. BSpot Melb Rd (Canterbury Jetty Rd) 17678. BSpot Browns Rd/Boneo Rd-Flders Rd 17679. BSpot Marine Pd/Western Port/Skinne 17681. Safety Beach - Buckley's Rest 17682. Taxi Rank Safety Program 17683. Tootgarook Wetlands Bird Hide 17684. Bay Trail Path 17685. Disabled Parking 17686. SCS - Project Dromana Shire Road 17689. Land Acq - 23 Ninth Ave, Rosebud 17690. Sorrento Early Leaning Facility 17692. Bentons Square Preschool Additions 17695. RTR - Bungower Rd / Tyabb-Tooradin 17696. Hastings Activity Centre Structure 17697. Rosebud Activity Centre Structure P Monthly Report May 2014 56,250 212,158 75,000 1,530 1,474,900 32,175 220,000 681,880 408,642 154,700 73,000 18,750 150,000 64,992 41,700 25,000 60,000 832,545 306,500 605,500 20,000 0 18,000 63,000 69,375 75,000 21,933 313,148 455,475 635,058 85,130 80,000 147 Actual Y.T.D. 345 12,391 34,968 9,180 935,360 38,117 211,124 16,714 375,715 18,312 36,969 0 33,401 187,582 32,498 8,050 82,158 334,372 258,699 76,143 170 436 0 14,938 74,974 0 21,999 264,617 69,116 210,427 11,114 1,440 Variance Y.T.D 55,905 199,767 40,032 (7,650) 539,540 (5,942) 8,876 665,166 32,927 136,388 36,031 18,750 116,599 (122,590) 9,202 16,950 (22,158) 498,173 47,801 529,357 19,830 (436) 18,000 48,063 (5,599) 75,000 (66) 48,531 386,359 424,631 74,016 78,560 Budget Y.E. 75,000 189,000 100,000 0 2,401,900 42,900 220,000 551,600 346,000 154,700 73,000 25,000 200,000 100,000 41,700 100,000 119,000 832,545 306,500 655,500 20,000 0 18,000 92,000 92,500 100,000 0 267,000 581,900 1,000,000 100,000 100,000 Forecast Y.E. 0 139,000 100,000 9,180 2,301,900 42,900 220,000 781,992 376,000 154,700 73,000 25,000 200,000 212,335 41,700 100,000 119,000 832,545 306,500 655,500 20,000 0 18,000 92,000 92,500 100,000 21,933 277,000 581,900 210,427 90,820 100,000 Variance Y.E. 75,000 50,000 0 (9,180) 100,000 0 0 (230,392) (30,000) 0 0 0 0 (112,335) 0 0 0 0 0 0 0 0 0 0 0 0 (21,933) (10,000) 0 789,573 9,180 0 Forecast Y.T.D Program 17699. Unmade Carpark Construction Strateg 17701. Active Sports Strategy - Impl 17702. MP Regional Gallery Climate Control 17704. Land Acq. - 65 Skinner Street 17705. Alfreed Street Roundabout 17706. Alfreed Street Streetscape Works 17707. BSpot Boes/Graydens Roundabout 17708. BSpot Shands/Main Creek Roundabout 17709. BSpot Jetty/McDowell Signals 17710. BSpot Sandy Road Fingal 17711. BSpot Point Leo Road Red Hill 17712. West Park Open Space 17714. Mt Martha Life Saving Club 17715. Mens Shed Somerville 17716. Mens Shed Mornington 17717. Rosebud Library - Air Conditioning 77,431 8,330 400,000 460,000 92,304 185,000 216,660 146,608 62,476 60,808 18,326 0 300,000 0 0 0 Actual Y.T.D. 8,705 0 440,992 460,858 170 8,784 96,810 77,005 26,979 6,900 95,962 23,102 16,775 2,775 0 138,826 28,305,639 21,180,542 Monthly Report May 2014 148 Variance Y.T.D 68,726 8,330 (40,992) (858) 92,134 176,217 119,850 69,603 35,497 53,908 (77,636) (23,102) 283,225 (2,775) 0 (138,826) Budget Y.E. 90,000 100,000 400,000 0 100,000 185,000 0 0 0 0 0 0 0 0 0 0 Forecast Y.E. Variance Y.E. 70,000 20,000 50,000 50,000 400,000 0 460,000 (460,000) 100,000 0 185,000 0 100,000 (100,000) 880,000 (880,000) 375,000 (375,000) 365,000 (365,000) 110,000 (110,000) 80,000 (80,000) 1,700,000 (1,700,000) 90,000 (90,000) 60,000 (60,000) 0 0 7,125,097 42,790,664 47,353,923 (4,563,259) PRIORITY WORKS OVERVIEW Financially, there have been no changes to Priority Works in the May report The following list is comprised from April’s report, where the program has been revised by $67k (favourably), and reported. Major variations include: Projects with additional expenditure: • 56044 – Dredging of Boatramps ($20k) Additional works at Safety Beach (urgent works) • 56107 – Building Renovations- William Warrain Centre ($13.5k) Urgent air condition works required. • 56167 – Special Charge Scheme Design ($40k), additional cost of investigations • 58322 - Rye Pocket Park ($20k), works to create pocket park/parking area. Projects with savings (used to offset other items) • 56146 Infrastructure Upgrades – Landfills Rye Landfill $30k: project works funded 2014-15 • 56275 Long Term Coastal Management Master Plans $20k: Offset funding 56044 V907 Foreshore dredging Safety Beach works. • 58306 Long Point Reserve – Connection to Sewerage $18k, Offset towards 56170 T521 Balnarring Recreation Reserve, additional cost to complete Projects with additional funding The following have received additional income from grants, and have no net cost to the Shire. • 58308 Briars Feral Exclusion Fence (nil), funding received from the RE Ross Trust fund. • 56123 Sustainable Energy Fund Initiative (nil), funding transferred from reserves to fund sustainable initiatives (as per Council resolution) • 56067 Coastal Reserves Biodiversity (nil), funding received from Westernport Ramsar. • 56228 Corporate Water Conservation Program (nil), funding received from Melbourne Water for land management and water quality projects. Monthly Report May 2014 149 Priority Works Third Quarter Program No Activity/ Program Description Activity Description Posting Account Forecast Proposed Annual Forecast Net Change Comment Fav(Unfav) Funded within program 56012 56012 56108 56108 56112 56112 56171 56171 56228 Building Demolition. Building Demolition. Street Furniture. Street Furniture. Risk Mgt Initiatives former Landfill Risk Mgt Initiatives former Landfill IT Systems Upgrades and Development IT Systems Upgrades and Development Corporate Water Conservation Program K909 K919 L750 L751 L807 L821 Y107 Y108 W102 TBD: Building Demolition Fuel Tanks 782 Esplanade /Mton Street Furniture Refurbishment New Furniture/Bike Rack Install TBD (Risk Mitigation) Landfill Gas Monitoring Microwve Link Upgrade: Mornington/S Project Pro Implementation Monitoring and Research 01 K909 2282 01 K919 2282 01 L750 2282 01 L751 2282 01 L807 2282 01 L821 2282 01 Y107 2282 01 Y108 2282 01 W102 2282 36,728 85,000 22,500 50,000 35,800 44,563 35,000 15,000 10,000 38,200 83,528 23,185 49,315 39,541 40,822 34,125 15,875 20,000 (1,472) 1,472 (685) 685 (3,741) 3,741 875 (875) (10,000) 56228 Corporate Water Conservation Program W107 Integrated Catchment Management 01 W107 2104 0 40,000 (40,000) Funded within program/cost of salary 56228 Corporate Water Conservation Program W107 Integrated Catchment Management 01 W107 2282 145,000 105,000 40,000 Funded within program (offset contract expenditure) 56228 Corporate Water Conservation Program W112 L/Rivers Sub-surface WSUD Trial 01 W112 2282 80,000 70,000 10,000 Funded within program (offset to W10 Monitoring and Research) 56275 Long Term Coastal Management Master Z075 Coastal Infrastructure Minor Works 01 Z075 2282 9,850 13,206 (3,356) Funded from within program (offset Z078 Strategic Plans) 56275 Long Term Coastal Management Master Z078 Strategic Plans (Coastal/Landscape/ 01 Z078 2282 205,000 201,644 774,441 774,441 Total Funding offset within program Funding offset within program Offsetting within program Offsetting within program Offsetting within program Offsetting within program Offset within program Offset within program Funded within program (offset W107 L/Rivers Sub-surface WSUD Tiral) 3,356 Funded from within program (offset to Z075 Strategic Plans) 0 Projects with additional expenditure 56006 Rehab - Foreshore Facilities. V000 Emergency Fac Rehab 01 V000 2282 55,779 70,500 (14,721) Additional cost of repairs to infrastructure prior to holiday season (risk managment) 56013 56044 Street Lighting Improvements. Dredging of Boatramp at Hastings V503 V907 Street Lighting Imp Urgent Request TBD Boatramps Dredging 01 V503 2282 01 V907 2282 65,000 30,000 69,898 50,000 (4,898) (20,000) Urgent works at Mothers Beach, not yet complete 56067 56067 Coastal Reserves Biodiversity Conservation. Coastal Reserves Biodiversity Conservation. X057 X099 Warrangine Creek Veg Quality Improv Frankston Spider Orchid Monitoring 01 X057 2282 01 X099 2282 0 0 4,750 8,000 56107 Building Renovations Misc. K535 Willum Warrain Centre 01 K535 2282 0 13,500 (13,500) Replacement of air-condition units 56109 Minor Traffic Improvements. 6109 Minor Traffic Improvements 01 6109 2282 50,000 66,000 (16,000) Offset from Council Contribution Blackspot program 17641 Elizabeth St Herring St Hastings Monthly Report May 2014 150 (4,750) Finalisation of works (8,000) Finalisation of works Priority Works Third Quarter Program Activity/ 56167 Special Charge Schemes Design. H032 TBD Special Charge Scheme Design 01 H032 2282 40,000 80,000 58320 Portsea F/shore West Beach Closure 8320 Portsea F/shore West Beach Closure 01 8320 2282 68,000 75,500 (7,500) Additional works funded mid year, now complete. Funding required 58322 Rye Pocket Garden 8322 Rye Pocket Garden 01 8322 2282 0 20,000 (20,000) Creation of pocket park and additional parking facility, funded from capital (17699 Unmade roads/carparks) 308,779 458,148 Description Total Forecast Net Change Comment Fav(Unfav) Activity No Posting Account Proposed Annual Forecast Program Description (40,000) Special charge scheme investigations (149,369) Projects with savings 56146 56146 56170 Infrastructure Upgrades - Landfills Infrastructure Upgrades - Landfills Open Space Strategy - Implmentation L614 L615 T521 Rye Waste Disposal Centre - Hard St Improved Signage & Traffic Flow Balnarring Recreation Reserve 01 L614 2282 01 L615 2282 01 T521 2282 30,000 45,000 10,000 0 40,000 21,009 56228 Corporate Water Conservation Progra W106 Water Sensitive Urban Design 01 W106 2282 50,000 45,000 56275 Long Term Coastal Management Master Z079 Open Space (Signage/Roadside/Vegeta 01 Z079 2282 50,000 30,000 20,000 Offset 56044 V907 Foreshore Dredging Safety Beach Project 56275 Long Term Coastal Management Master Z082 Coastal Infrastructure Renewal 01 Z082 2282 25,000 10,279 14,721 Offset funding towards Emergency Fac Rehab Programme 58306 Long Point Reserve - Connection to 8306 Long Point Reserve - Connection to 01 8306 2282 60,000 42,000 18,000 Offset 56170 T521 Balanarring Rec Reserve 56149 Signage - Bushland/Roadside Reserve X548 To be determined 01 X548 2282 20,000 15,500 56067 Coastal Reserves Biodiversity Cons. X098 Briars Heritage Gardens 01 X098 2282 Total 0 4,500 290,000 208,288 30,000 Offset towards bottom line 5,000 Offset towards bottom line (11,009) Offset from 8306 Long Point Reserve (Investigations) 5,000 Offset provided/scope of works revised 4,500 Offset towards over expenditure signage (4,500) Addiitional cost to complete 81,712 Projects with additional income 56123 Sustainable Energy Funds Initiative 6123 Sustainable Energy Funds Initiative 01 6123 1974 0 (225,000) 225,000 Funding from Sustainable Energy Fund (funded operational budget Renewable Resources 2014-15) 56123 Sustainable Energy Funds Initiative 6123 Sustainable Energy Funds Initiative 01 6123 2282 0 225,000 (225,000) Funding from Sustainable Energy Fund (funded operational budget Renewable Resources 2014-15) 56228 Corporate Water Conservation Progra W104 Living Rivers Projects (Melb Water) 01 W104 1201 0 (65,000) 65,000 Melbourne Water Funding Received 56228 Corporate Water Conservation Progra W104 Living Rivers Projects (Melb Water) 01 W104 2282 4,000 69,000 (65,000) Melbourne Water Funding Received 58308 The Briars Fera Exlcusion Fence 8308 The Briars Feral Exclusion Fence 01 8308 1311 0 (20,000) Monthly Report May 2014 151 20,000 Funding from Ross Trust towards feral animal contol Priority Works Third Quarter Program Activity/ 58308 The Briars Fera Exlcusion Fence 8308 The Briars Feral Exclusion Fence 01 8308 2282 0 20,000 (20,000) Funding from Ross Trust towards feral animal contol 56067 Coastal Reserves Biodiversity Conservation. (Income) X072 Kackeraboite Creek Restoration Proj 01 X072 1201 0 (8,805) 56067 Coastal Reserves Biodiversity Conservatio X072 Kackeraboite Creek Restoration Proj 01 X072 2282 0 8,805 56067 Coastal Reserves Biodiversity X096 Conservation. (Income) Coastal Reserves Biodiversity Conservatio X096 Arthurs Seat Urban Fringe Wed 01 X096 1201 0 (36,364) 8,805 Melboune Water Kackeraboite Ck (Restorations Project No5 Corridores of Green) (8,805) Melboune Water Kackeraboite Ck (Restorations Project No5 Corridores of Green) 36,364 Melbourne Water Project funding Arthurs Seat Urban Fringe Wed 01 X096 2282 0 36,364 (36,364) Melbourne Water Project funding Coastal Reserves Biodiversity Conservation. (Income) Coastal Reserves Biodiversity Conservation. (Income) Coastal Reserves Biodiversity Conservation. (Income) X100 Vic Roads Esplanade Landslip Reveg 01 X100 1311 0 (10,249) X100 Vic Roads Esplanade Landslip Reveg 01 X100 1555 0 10,249 X102 Tanti Creek Restoration Project C/G 01 X102 1201 0 (9,477) 56067 Coastal Reserves Biodiversity Conservation. (Income) X102 Tanti Creek Restoration Project C/G 01 X102 1311 0 (6,700) 10,249 Vic/DSE funding Esplande Landslip Revegetation Works (10,249) Vic/DSE funding Esplande Landslip Revegetation Works 9,477 Melbourne Water Grant (Tanti Creek Restoration Works, (Coridors of Green Program) 6,700 Australian Unity Property Limited (Contribution to Tanti Creek Restoration Project Melbourne Water Corriodors of Green Grant) 56067 56067 Coastal Reserves Biodiversity Conservatio X102 Coastal Reserves Biodiversity X103 Conservation. (Income) Tanti Creek Restoration Project C/G Protecting Ecological Westernport 01 X102 2282 01 X103 1201 0 0 16,177 (45,000) 56067 Coastal Reserves Biodiversity Conservatio X103 Protecting Ecological Westernport 01 X103 2282 0 45,000 4,000 4,000 0 1,377,220 1,444,877 (67,657) 56067 56067 56067 56067 Description Total Grand Total Changes Monthly Report May 2014 152 Forecast Net Change Comment Fav(Unfav) Activity No Posting Account Proposed Annual Forecast Program Description (16,177) Works 45,000 Additional funding (Protecting the Ecological Values of the Westerport Ramsar Site) (45,000) Additional funding (Protecting the Ecological Values of the Westerport Ramsar Site) Priority Works Forecast Y.T.D Program 56001. Installation of New Fire Plugs. 56001. Installation of New Fire Plugs. (Inc) 56002. Resurfacing of Cricket Pitches. 56002. Resurfacing of Cricket Pitches. (Inc) 56003. Developer Wks - Drainage Upgrades. 56003. Developer Wks - Drainage Upgrades. (Inc) 56004. Upgrade Disabled Fac - Rds Res & Ca 56004. Upgrade Disabled Fac - Rds Res & Ca (Inc) 56006. Rehab - Foreshore Facilities. 56006. Rehab - Foreshore Facilities. (Inc) 56007. N/Ball Crt Resurf (Sport Club Fund) 56007. N/Ball Crt Resurf (Sport Club Fund) (Inc) 56009. Conservation Works-MPRG. 56009. Conservation Works-MPRG. (Inc) 56012. Building Demolition. 56012. Building Demolition. (Inc) 56013. Street Lighting Improvements. 56013. Street Lighting Improvements. (Inc) 56015. Half Cost Fencing 56015. Half Cost Fencing (Inc) 56030. Implement Dog free & leash areas 56030. Implement Dog free & leash areas (Inc) 56036. Office Renovations (3 Offices). 56036. Office Renovations (3 Offices). (Inc) 56039. Disabled Facilities Council Buildin 56039. Disabled Facilities Council Buildin (Inc) 56044. Dredging of Boatramp at Hastings 56044. Dredging of Boatramp at Hastings (Inc) Monthly Report May 2014 50,000 50,000 15,000 15,000 40,000 40,000 30,000 30,000 67,525 67,525 25,000 25,000 20,000 20,000 97,008 97,008 60,396 60,396 20,000 20,000 20,000 20,000 30,000 30,000 344,500 344,500 8,330 8,330 153 Actual Y.T.D. 32,108 32,108 13,750 13,750 50,044 50,044 36,671 36,671 71,546 71,546 29,778 29,778 11,665 11,665 102,764 102,764 70,059 69,898 12,535 12,535 10,887 10,887 27,801 27,801 113,513 113,513 13,903 13,903 Variance Y.T.D 17,892 17,892 1,250 1,250 (10,044) (10,044) (6,671) (6,671) (4,021) (4,021) (4,778) (4,778) 8,335 8,335 (5,756) (5,756) (9,663) (9,502) 7,465 7,465 9,114 9,114 2,199 2,199 230,987 230,987 (5,573) (5,573) Budget Y.E. 50,000 50,000 15,000 15,000 40,000 40,000 50,000 50,000 50,000 50,000 50,000 50,000 25,000 25,000 30,000 30,000 65,000 65,000 20,000 20,000 25,000 25,000 30,000 30,000 374,500 374,500 50,000 50,000 Forecast Y.E. 50,000 50,000 15,000 15,000 40,000 40,000 47,800 47,800 70,500 70,500 50,000 50,000 25,000 25,000 121,728 121,728 69,898 69,898 20,000 20,000 25,000 25,000 30,000 30,000 345,500 345,500 50,000 50,000 Variance Y.E. 0 0 0 0 0 0 2,200 2,200 (20,500) (20,500) 0 0 0 0 (91,728) (91,728) (4,898) (4,898) 0 0 0 0 0 0 29,000 29,000 0 0 Priority Works Forecast Y.T.D Program 56001. Installation of New Fire Plugs. 56001. Installation of New Fire Plugs. (Inc) 56064. Minor Streetscape Works- Commer Cnt 56064. Minor Streetscape Works- Commer Cnt (Inc) 56065. Sewerage Connection- Council Buildi 56065. Sewerage Connection- Council Buildi (Inc) 56067. Coastal Reserves Biodiversity Cons. 56067. Coastal Reserves Biodiversity Cons. (Inc) 56105. Tree Removal Program 56105. Tree Removal Program (Inc) 56107. Building Renovations Misc. 56107. Building Renovations Misc. (Inc) 56108. Street Furniture. 56108. Street Furniture. (Inc) 56109. Minor Traffic Improvements. 56109. Minor Traffic Improvements. (Inc) 56112. Risk Mgt Initiatives former Landfil 56112. Risk Mgt Initiatives former Landfil (Inc) 56123. Sustainable Energy Funds Initiative 56123. Sustainable Energy Funds Initiative (Inc) 56146. Infrastructure Upgrades - Landfills 56146. Infrastructure Upgrades - Landfills (Inc) 56147. Infrastructure Invest/Studies/Analy 56147. Infrastructure Invest/Studies/Analy (Inc) 56149. Signage - Bushland/Roadside Reserve 56149. Signage - Bushland/Roadside Reserve (Inc) 56151. Main Roads - Improvement Works 56151. Main Roads - Improvement Works (Inc) Monthly Report May 2014 50,000 50,000 91,667 91,667 5,000 5,000 58,432 52,374 45,828 45,828 75,250 75,250 64,578 64,578 60,996 60,996 361,151 361,151 37,484 0 86,664 86,664 36,500 36,500 2,582 2,582 30,000 30,000 154 Actual Y.T.D. 32,108 32,108 93,817 93,817 0 0 163,740 34,245 45,833 45,833 67,106 67,106 28,694 28,694 65,676 65,676 180,083 180,083 94,170 170 1,660 1,660 45,839 45,839 2,530 2,530 5,986 5,986 Variance Y.T.D 17,892 17,892 (2,150) (2,150) 5,000 5,000 (105,308) 18,129 (5) (5) 8,144 8,144 35,884 35,884 (4,680) (4,680) 181,068 181,068 (56,686) (170) 85,004 85,004 (9,339) (9,339) 52 52 24,014 24,014 Budget Y.E. 50,000 50,000 100,000 100,000 20,000 20,000 60,500 60,500 50,000 50,000 78,000 78,000 70,000 70,000 50,000 50,000 458,563 458,563 0 0 125,000 125,000 50,000 50,000 20,000 20,000 30,000 30,000 Forecast Y.E. 50,000 50,000 100,000 100,000 0 0 184,096 77,750 50,000 50,000 91,500 91,500 72,500 72,500 66,000 66,000 358,563 358,563 225,000 0 90,000 90,000 50,000 50,000 15,500 15,500 30,000 30,000 Variance Y.E. 0 0 0 0 20,000 20,000 (123,596) (17,250) 0 0 (13,500) (13,500) (2,500) (2,500) (16,000) (16,000) 100,000 100,000 (225,000) 0 35,000 35,000 0 0 4,500 4,500 0 0 Priority Works Forecast Y.T.D Program 56001. Installation of New Fire Plugs. 56001. Installation of New Fire Plugs. (Inc) 56152. Parks & Reserves (Passive) Rehab Pr 56152. Parks & Reserves (Passive) Rehab Pr (Inc) 56167. Special Charge Schemes Design. 56167. Special Charge Schemes Design. (Inc) 56170. Open Space Strategy - Implmentation 56170. Open Space Strategy - Implmentation (Inc) 56171. IT Systems Upgrades and Development 56171. IT Systems Upgrades and Development (Inc) 56172. Asbestos Removal Program. 56172. Asbestos Removal Program. (Inc) 56226. Landfill Cell Capping Provision 56226. Landfill Cell Capping Provision (Inc) Monthly Report May 2014 50,000 50,000 59,600 59,600 63,328 63,328 106,500 106,500 476,830 476,830 0 0 200,000 200,000 155 Actual Y.T.D. 32,108 32,108 48,255 48,255 95,959 95,959 69,602 69,602 202,106 202,106 100,000 100,000 200,000 200,000 Variance Y.T.D 17,892 17,892 11,345 11,345 (32,631) (32,631) 36,898 36,898 274,724 274,724 (100,000) (100,000) 0 0 Budget Y.E. 50,000 50,000 59,600 59,600 30,000 30,000 113,100 113,100 424,500 424,500 100,000 100,000 200,000 200,000 Forecast Y.E. 50,000 50,000 59,600 59,600 90,000 90,000 124,109 124,109 521,500 521,500 100,000 100,000 200,000 200,000 Variance Y.E. 0 0 0 0 (60,000) (60,000) (11,009) (11,009) (97,000) (97,000) 0 0 0 0 PRIORITY PROJECTS OVERVIEW Financially, there have been no changes to Priority Projects in the May report Reported in April, the net cost of priority projects increased by $17k. Overall the program has received additional funding of $122k (project related) which has been matched with additional expenditure (mostly salaries) in project outlays. Other changes are of a minor nature. Major variations include: Projects with additional cost: • 8811 WOL Universal Access Planning - $20k: additional cost of contract expenditure. • 8955 WOL Tourism Advertising - $9k: additional cost of contract expenditure. Projects with additional funding: • 8803 WOL Freeza - $24k: funding received 2013-14. • 8877 WOL Smalltalk Program - $16k: Additional annual funding received. • 8878 WOL Willum Warrain - $34k: Additional annual funding received Monthly Report May 2014 156 Activity Activity Description Posting Account Forecast Proposed Net Change Comment Fav/(Unfav) Projects with offsets 8619 Triple Housing Policy 01 8619 2103. Triple Housing Policy - Salaries & Wages - Priority Project 10,000 15,000 8619 Triple Housing Policy 01 8619 2281. Triple Housing Policy - Contracts - Priority Projects 17,705 12,705 5,000 8811 WOL Universal Access Planning & Cha 01 8811 2103. WOL Universal Access Planning & Cha - Salaries & Wages - Priority Project 3,000 20,000 (17,000) 8811 WOL Universal Access Planning & Cha 01 8811 2281. WOL Universal Access Planning & Cha - Contracts - Priority Projects 43,713 23,713 20,000 8914 Place Planning 01 8914 2103. Place Planning - Salaries & Wages - Priority Project 0 58,000 (58,000) 8914 Place Planning 01 8914 2281. Place Planning - Contracts - Priority Projects 60,000 2,000 58,000 8957 WOL Tourism Directional Signage App 01 8957 2281. WOL Tourism Directional Signage App - Contracts - Priority Projects 23,000 27,400 (4,400) 157,418 158,818 (1,400) Projects with additional funding 8762 Police Point Houses (Income) 01 8762 1312. Police Point Houses - Contributions Priority Projects 8762 Police Point Houses 01 8762 2103. Police Point Houses - Salaries & Wages - Priority Project 8803 WOL FREEZA (D&A Free Entertainment) (Income) 01 8803 1202. WOL FREEZA (D&A Free Entertainment) - Grants & Subsidies Priority Project 8803 WOL FREEZA (D&A Free Entertainment) 01 8803 2281. WOL FREEZA (D&A Free Entertainment) - Contracts - Priority Projects 8877 WOL Smalltalk Program (Income) 8877 0 (4,200) 18,000 22,200 0 (24,000) 38,645 62,645 01 8877 1202. WOL Smalltalk Program - Grants & Subsidies Priority Project 0 (16,720) WOL Smalltalk Program 01 8877 2103. WOL Smalltalk Program - Salaries & Wages - Priority Project 0 16,720 8878 WOL Willum Warrain (Income) 01 8878 1202. WOL Willum Warrain - Grants & Subsidies Priority Project 0 (29,490) 8878 WOL Willum Warrain (Income) 01 8878 1312. WOL Willum Warrain - Contributions Priority Projects 8878 WOL Willum Warrain 01 8878 2103. WOL Willum Warrain - Salaries & Wages - Priority Project 8899 WOL Schoolies Week Project (Income) 01 8899 1202. WOL Schoolies Week Project - Grants & Subsidies Priority Project 8899 WOL Schoolies Week Project 01 8899 2281. WOL Schoolies Week Project - Contracts - Priority Projects 8918 Community Playgroup Initiative 01 8918 2103. Community Playgroup Initiative - Salaries & Wages - Priority Project 8918 Community Playgroup Initiative 01 8918 2281. Community Playgroup Initiative - Contracts - Priority Projects 8921 ANZAC Commemorative Naming Project (Income) 8921 0 (5,000) 10,000 44,490 0 -11400 6296 7863 0 20,000 28,700 8,700 01 8921 1202. ANZAC Commemorative Naming Project - Grants & Subsidies Priority Project 0 (1,000) ANZAC Commemorative Naming Project 01 8921 2281. ANZAC Commemorative Naming Project - Contracts - Priority Projects 0 3,000 8951 WOL Tourism Public Relations (Income) 01 8951 1556. WOL Tourism Public Relations - External Revenue Priority Projects (12,000) (7,000) 8951 WOL Tourism Public Relations 01 8951 2281. WOL Tourism Public Relations - Contracts - Priority Projects 100,000 95,000 8963 WOL Streetlife (Income) 01 8963 1202. WOL Streetlife - Grants & Subsidies Priority Project 0 (8,500) 8963 WOL Streetlife 01 8963 2281. WOL Streetlife - Contracts - Priority Projects 0 8,500 8964 WOL Smoking Bans Childrens Playground (Income) 01 8964 1202. WOL Smoking Bans Childrens Playgrou - Grants & Subsidies Priority Project 0 (5,500) Monthly Report May 2014 157 (5,000) 4,200 Offset within program Offset within program Offset within program Offset within program Offset within program Offset within program additional expenditure Additional funding Additional funding/expenditure 24,000 Additional funding (24,000) Additional funding/expenditure 16,720 Additional funding (16,720) Additional funding/expenditure 29,490 Additional funding 5,000 Additional funding (34,490) Additional funding/expenditure 11400 Additional funding/expenditure committed previous financial period -1567 additional funding (20,000) Additional funding 20,000 Additional funding/expenditure 1,000 Additional funding (3,000) Additional funding/expenditure (5,000) Additional funding 5,000 Additional funding/expenditure 8,500 Additional funding (8,500) Additional funding/expenditure 5,500 Additional funding (4,200) 0 5,500 -59376 223030 -65000 228381 01 8950 1556. WOL Tourism Brochure Development - External Revenue Priority Projects (50,000) (59,000) WOL Tourism Advertising (Income) WOL Tourism Advertising 01 8955 1556. WOL Tourism Advertising - External Revenue Priority Projects 01 8955 2281. WOL Tourism Advertising - Contracts - Priority Projects -103100 276718 -100500 286000 WOL Tourism Exhibitions & TS (Income) 01 8952 1556. WOL Tourism Exhibitions & TS - External Revenue Priority Projects (6,000) (10,000) -2600 reduced funding/minor -9282 additional expenditure 4,000 additional expenditure 470,913 461,689 9,224 (177,900) (178,800) 900 150,000 164,959 (14,959) (27,900) (13,841) (14,059) 65,000 58,500 6,500 8964 WOL Smoking Bans Childrens Playground 01 8964 2281. WOL Smoking Bans Childrens Playgrou - Contracts - Priority Projects 8956 8956 WOL MPT Industry (Income) WOL MPT Industry 01 8956 1556. WOL MPT Industry - External Revenue Priority Projects 01 8956 2281. WOL MPT Industry - Contracts - Priority Projects 8950 WOL Tourism Brochure Development (Income) 8955 8955 8952 Projects with additional cost 8959 WOL Destination Mornington Peninsula (Income) 01 8959 1556. WOL Destination Mornington Peninsul - External Revenue Priority Projects 8959 01 8959 2281. WOL Destination Mornington Peninsul - Contracts - Priority Projects WOL Destination Mornington Peninsula Total (5,500) Additional funding/expenditure 5624 additional income -5351 additional income/expenditure 9,000 additional funding received/works completed previous period additional income additional funding/expenditure Projects with saving 6502 Community Partnerships 01 6502 2281. Community Partnerships - Contracts - Priority Projects 8954 WOL Tourism Design & Artwork (Income) 01 8954 1556. WOL Tourism Design & Artwork - External Revenue Priority Projects -75932 -81000 8954 WOL Tourism Design & Artwork 01 8954 2281. WOL Tourism Design & Artwork - Contracts - Priority Projects 100900 88900 Total Grand Total Monthly Report May 2014 158 Projects with saving 5068 additional income/for works completed in previous financial year 12000 reducation of forecast expenditure/project completion 89,968 66,400 23,568 718,299 686,907 17,333 Priority Projects Forecast Y.T.D Program 1520. IT Operations (Inc) 3350. Project Management (Inc) 4980. M'ton P'sula Shire Nursery (Inc) 6459. Hastings Promotional Fund 6581. Events (Inc) 6615. Tobacco Education 6679. Rosebud Promotional Fund 6680. Mt Eliza Promotional Fund 6736. Careers Expo 6931. Contract Document Review 8641. Road Safety Program Shire Wide (Inc) 8642. Sorrento Promotional Fund SCS (Inc) 8654. Early Home Learning P'ship (PRC) 8707. Opt-in Green Waste Kerbside Collect 8755. Mornington S/Centre Promotional Sch (Inc) 8762. Police Point Houses 8777. Arts & Culture Strat Project (Inc) 8803. WOL FREEZA (D&A Free Entertainment) 8807. Electoral Review 8829. Local Landcare Facilitators Initiat 8830. WOL Community Safety Fund 8841. Rye Recreational Boating Precinct P 8847. Peninsula Planning Statement (Inc) 8874. WOL Backyard Blitz (DPCD) 8875. WOL Postcards from the Mton Peninsu 8877. WOL Smalltalk Program 8878. WOL Willum Warrain Monthly Report May 2014 0 0 0 0 0 25,962 11,100 5,500 58,500 163,097 0 0 22,171 0 0 0 0 7,500 7,712 0 26,250 22,500 0 62,268 20,056 8,000 18,526 159 Actual Y.T.D. (7,800) (10,637) (59) 64,739 (51,317) 0 19,800 0 62,926 143,446 (2,750) (8,863) 14,122 79,115 (77,931) 39,025 (53,376) 580 0 19,636 1,000 30,913 (1,950) 71,233 24,299 0 21,860 Variance Y.T.D 7,800 10,637 59 (64,739) 51,317 25,962 (8,700) 5,500 (4,426) 19,651 2,750 8,863 8,049 (79,115) 77,931 (39,025) 53,376 6,920 7,712 (19,636) 25,250 (8,413) 1,950 (8,965) (4,243) 8,000 (3,334) Budget Y.E. 0 0 0 0 0 51,924 22,200 11,000 65,000 178,000 0 0 30,000 0 0 0 0 10,000 15,425 0 35,000 30,000 0 83,025 20,056 8,100 20,000 Forecast Y.E. 0 0 0 0 0 51,924 22,200 11,000 58,500 178,000 0 0 27,000 0 0 0 0 10,000 15,424 0 35,000 30,000 0 83,025 20,056 8,100 20,000 Variance Y.E. 0 0 0 0 0 0 0 0 6,500 0 0 0 3,000 0 0 0 0 0 1 0 0 0 0 0 0 0 0 Forecast Y.T.D Program 8880. WOL Fire Information Message Traile 8885. Archibald Prize Exhibition 8887. WOL PEN-Step 8888. WOL SPARCS 8889. Fire Services Property Levy-Imp 8899. WOL Schoolies Week Project (Inc) 8921. ANZAC Commemorative Naming Project 8950. WOL Tourism Brochure Development 8951. WOL Tourism Public Relations 8952. WOL Tourism Exhibitions & TS 8954. WOL Tourism Design & Artwork 8955. WOL Tourism Advertising 8956. WOL MPT Industry (Inc) 8957. WOL Tourism Directional Signage App 8959. WOL Destination Mornington Peninsul (Inc) 8960. Low Income Energy Efficiency Prgm 8961. WOL Adopt A Hot Spot - Hastings 8962. WOL Walk To School 8963. WOL Streetlife (Inc) 8964. WOL Smoking Bans Childrens Playgrou 8965. WOL Are You Ready? 6459. Hastings Promotional Fund 6482. Rosebud Activity Centre Struct Plan 6483. Hasting Activity Centre Struct Plan 6496. Business Development Plan for Morni 6502. Community Partnerships 6581. Events 6674. Health & Well Being Plan Implementa 6679. Rosebud Promotional Fund 6680. Mt Eliza Promotional Fund Monthly Report May 2014 20,500 18,288 17,376 31,467 37,500 0 5,395 40,124 24,122 24,529 0 37,500 (10,000) 0 0 0 13,376 18,750 0 20,000 15,000 1,536 16,500 5,000 7,500 7,450 52,438 1,873 17,214 7,500 169 Actual Y.T.D. 0 0 0 27,433 32,089 1,977 5,143 0 0 21,118 0 58,588 (4,000) 86,699 (90,164) 0 0 8,343 (6,510) 0 0 0 0 0 0 0 1,620 0 0 0 Variance Y.T.D 20,500 18,288 17,376 4,034 5,411 (1,977) 252 40,124 24,122 3,411 0 (21,088) (6,000) (86,699) 90,164 0 13,376 10,407 6,510 20,000 15,000 1,536 16,500 5,000 7,500 7,450 50,818 1,873 17,214 7,500 Budget Y.E. 41,000 36,576 34,750 41,955 50,000 0 8,839 80,250 48,244 32,405 46,713 50,000 (10,000) 0 0 200,000 26,750 25,000 0 40,000 30,000 2,050 72,000 10,000 15,000 14,900 105,750 1,873 22,950 15,000 Forecast Y.E. 41,000 36,576 34,752 41,955 50,000 0 8,839 80,248 48,244 27,705 0 50,000 (10,000) 0 0 0 26,752 25,000 0 40,000 30,000 2,050 22,000 10,000 15,000 14,900 105,750 1,873 22,950 15,000 Variance Y.E. 0 0 (2) 0 0 0 0 2 0 4,700 46,713 0 0 0 0 200,000 (2) 0 0 0 0 0 50,000 0 0 0 0 0 0 0 Forecast Y.T.D Program 6716. Interface Research Project 6718. Green Wedge Action Plan 6724. Water Conserv Local Action Plan 6727. Aerial Photography 6736. Careers Expo 6766. Geotechnical Investigations 6779. Flinders Village Landscape Masterpl 6911. Somerville Community Needs Assessme 6915. Men's Shed 6923. Red Hill Character Assessment and D 6926. Parking Precinct Plans 6927. Port Phillip Urban Design Framework 6930. Stream Watch/Water Watch Program 6931. Contract Document Review 6938. WOL Comty Arts-Metro Access Project 8603. Local Housing and Settlement Strate 8606. Character Assessment and Design Gui 8619. Triple Housing Policy 8638. WOL GCTC Planning 8641. Road Safety Program Shire Wide 8642. Sorrento Promotional Fund SCS 8646. Provision - Matching Grant Applicat 8649. Parking Precinct Plan Mornington To 8653. Friends Group Training and Support 8669. Spatial Employment Strategy 8670. Mount Eliza Town Centre Plan 8671. Somerville Town Centre Plan 8674. Biodiversity Action Plan Modelling 8675. Stony Point Coastal Management/Fram 8676. Hastings Port Land Use and Transpor Monthly Report May 2014 0 0 12,933 30,000 25,000 20,000 0 7,500 18,750 3,000 79,397 0 0 1,350 15,000 0 37,500 31,644 20,168 (4,200) 10,000 10,050 85,000 1,500 5,802 0 51,154 30,500 13,140 19,088 161 Actual Y.T.D. 44 6,897 7,416 0 0 28,500 5,283 0 32,734 0 77,575 80,397 (104,917) 0 17,720 24 51,650 1,549 16,997 (4,200) 0 3,512 92,488 0 12,276 (1,925) 40,826 38,789 11,419 8,172 Variance Y.T.D (44) (6,897) 5,517 30,000 25,000 (8,500) (5,283) 7,500 (13,984) 3,000 1,822 (80,397) 104,917 1,350 (2,720) (24) (14,150) 30,095 3,171 0 10,000 6,538 (7,488) 1,500 (6,474) 1,925 10,328 (8,289) 1,721 10,916 Budget Y.E. 0 0 15,000 60,000 50,000 6,000 0 10,000 25,000 7,168 279,195 0 0 1,971 20,000 14,488 50,000 42,192 19,004 0 10,000 13,400 95,000 1,500 23,208 0 68,260 40,000 31,091 26,290 Forecast Y.E. 0 0 13,500 60,000 50,000 20,000 0 10,000 25,000 7,168 279,195 0 0 1,971 20,000 14,488 50,000 42,192 23,204 (4,200) 10,000 13,400 95,000 1,500 24,898 (1,690) 68,260 40,000 27,991 23,690 Variance Y.E. 0 0 1,500 0 0 (14,000) 0 0 0 0 0 0 0 0 0 0 0 0 (4,200) 4,200 0 0 0 0 (1,690) 1,690 0 0 3,100 2,600 Forecast Y.T.D Program 8678. Township Design Guideline Brochures 8679. Heritage Review - Stage 2 Analysis 8681. 3D Visualisation computer model upd 8701. Bittern Traffic Management Strategy 8706. Land Management Overlay Implementat 8711. Validation of Infrastructure Assets 8714. Disability Action Plan 8724. Public Recreation Space Strategy 8726. Dromana Activity Centre Structure P 8728. Review of Coastal Mgt Plans S/Beach 8729. Water Saving Urban Design 8731. Local Coastal Vulnerability Assessm 8732. Climate Change Community Engagement 8742. Community Engagement Policy & Guide 8751. WOL Rosebud West Family Access Proj 8755. Mornington S/Centre Promotional Sch 8757. WOL Iron Bar Project 8758. Peninsula Link Implications Study 8759. WOL Equipment Pilot 8760. Visitor Information Ctre Staffing 8761. M/ton Peninsula Branded Produce 8762. Police Point Houses 8764. Mobility Maps 8767. Review Ticket Machines 8768. Implementation Positive Ageing 8771. Indigenous Playgroups 8777. Arts & Culture Strat Project 8778. Literacy Villages Project 8780. Local History Digitisation Project 8782. Reconciliation Action Plan Monthly Report May 2014 13,377 45,000 30,000 15,000 11,250 22,500 9,000 12,911 24,000 (24,000) 18,750 26,250 0 10,000 61,755 4,725 37,000 10,275 9,222 12,375 11,400 11,400 10,275 12,525 9,804 12,525 12,225 12,525 0 11,000 162 Actual Y.T.D. 10,435 0 0 12,139 0 0 0 6,060 24,648 (27,981) 16,343 35,000 (110,721) 0 35,533 0 31,228 12,200 5,499 5,000 5,960 11,700 10,916 17,200 32,500 0 3,200 17,200 797 5,000 Variance Y.T.D 2,942 45,000 30,000 2,861 11,250 22,500 9,000 6,852 (648) 3,981 2,407 (8,750) 110,721 10,000 26,222 4,725 5,772 (1,925) 3,723 7,375 5,440 (300) (641) (4,675) (22,696) 12,525 9,025 (4,675) (797) 6,000 Budget Y.E. 16,563 60,000 60,000 20,000 15,000 45,000 18,000 25,876 38,645 0 25,000 35,000 0 20,000 82,341 6,300 0 13,700 12,296 16,500 15,200 15,200 13,700 16,700 13,070 16,700 16,300 16,700 0 13,600 Forecast Y.E. 14,963 60,000 60,000 20,000 15,000 45,000 18,000 25,903 62,645 (24,000) 25,000 35,000 0 12,000 82,341 6,300 43,713 13,700 12,296 16,500 15,200 15,200 13,700 16,700 13,070 16,700 16,300 16,700 0 13,600 Variance Y.E. 1,600 0 0 0 0 0 0 (27) (24,000) 24,000 0 0 0 8,000 0 0 (43,713) 0 0 0 0 0 0 0 0 0 0 0 0 0 Forecast Y.T.D Program 8783. Food Access Plan 8785. Music & Social Change Workshops 8787. Legal Advice-Waste Contract Develop 8789. Biodiversity Action Plan 8790. Music Bursary Program 8793. Land Subject to Inundations Overlay 8795. Heart of R/Bud Precinct Plan 8799. Ranelagh Conservation Man Plan Impl 8802. External Website 8803. WOL FREEZA (D&A Free Entertainment) 8805. Youth Services Replace Internet 8806. Community Grant-ArtsStream 8808. Shire Strategic Plan 8809. Marketing MPS to Nat Conference 8810. WOL Bushfire Planning Provision 8811. WOL Universal Access Planning & Cha 8812. WDF - Briars - Cr A.Shaw 8813. WDF - Cerberus - Cr D.Garnock 8814. WDF - Seawinds - Cr G.Pittock 8815. WDF - Briars - Cr B.Colomb 8816. WDF - Briars - Cr A.Dixon 8817. WDF - Red Hill - Cr F.Martin 8818. WDF - Nepean - Cr H.Fraser 8819. WDF - Seawinds - Mayor Cr A.Celi 8820. WDF - Watson - Cr L.Bowden 8821. WDF - Seawinds - Cr D.Gibb 8822. WDF - Nepean - Cr T.Rodgers 8824. WOL Koorie Women Taking Charge 8825. WOL Koories in the Kitchen 8826. WOL Faces in Our Mob Monthly Report May 2014 6,000 22,500 10,719 0 1,302 0 12,270 18,906 0 (60,000) 15,000 0 12,183 25,806 (25,000) 23,154 69,543 17,916 40,000 20,000 6,222 45,000 53,420 46,500 11,523 7,398 4,707 33,750 16,206 18,750 163 Actual Y.T.D. 9,650 12,000 60,256 (49,088) 0 2,000 16,362 20,004 11,950 (60,000) 7,980 0 0 0 0 0 50,390 68,627 39,570 0 9,638 60,017 19,600 73,788 1,509 10,041 2,212 486 10 0 Variance Y.T.D (3,650) 10,500 (49,537) 49,088 1,302 (2,000) (4,092) (1,098) (11,950) 0 7,020 0 12,183 25,806 (25,000) 23,154 19,153 (50,711) 430 20,000 (3,416) (15,017) 33,820 (27,288) 10,014 (2,643) 2,495 33,264 16,196 18,750 Budget Y.E. 9,650 30,000 14,291 0 1,734 0 16,362 25,209 0 0 20,000 8,974 16,243 51,612 0 46,307 92,725 23,887 14,226 40,000 8,298 60,000 23,420 62,000 15,363 9,865 6,277 45,000 21,607 25,000 Forecast Y.E. 9,650 30,000 14,291 0 1,734 0 16,362 25,209 0 (60,000) 20,000 8,974 16,243 51,612 (25,000) 46,308 92,725 23,887 40,000 40,000 8,298 60,000 73,420 62,000 15,363 9,865 6,277 45,000 21,607 25,000 Variance Y.E. 0 0 0 0 0 0 0 0 0 60,000 0 0 0 0 25,000 (1) 0 0 (25,774) 0 0 0 (50,000) 0 0 0 0 0 0 0 Forecast Y.T.D Program 8828. Smart Phone App 8829. Local Landcare Facilitators Initiat 8830. WOL Community Safety Fund 8831. WOL Community Transport Network 8832. WOL Get Me To Class 8841. Rye Recreational Boating Precinct P 8842. Olympic Park Master Plan 8844. WOL Flamingo Road Project 8845. WOL History of Rosebud West 8847. Peninsula Planning Statement 8848. Port Strategy Implications Study 8849. Tootgarook Wetland Management Plan 8850. Boating Capacity & Facilities Revie 8851. Mornington Harbour Precint Plan 8852. Coastal Geotechnical Risk Assessmen 8853. Best Bites 8854. Marine Industry Land Use Planning 8856. Biodiversity Surveys 8857. Bushland Contracts Review 8858. Tidy Town Awards - Gala Dinner 8859. Peninsula Wide Sus Community Engage 8862. Bulk Energy Tender - Comm Groups 8863. Climate Adaption Plan Priorities 8864. Street Lighting Upgrade Investigati 8865. Park Lighting Pilot Project 8867. Ten Year Kindergarten Strategy 8868. Rosebud West Comm Hub Cntr Mmnt 8869. Indigenous Artefacts Assessment Pro 8870. Human Rights Arts & Film Festival 8871. Sus Communities Planning Framework Monthly Report May 2014 21,798 20,000 11,250 6,861 10,125 21,000 0 0 1,400 (7,273) 16,720 (16,720) 67,112 (34,490) 6,453 0 7,500 37,500 33,542 141,000 (180,000) 3,918 33,807 0 1,746 0 51,012 (50,000) 2,500 4,500 164 Actual Y.T.D. 17,735 20,000 0 9,431 400 22,528 107 (455) 3,853 (8,000) 18,148 (16,270) 84,185 (62,217) 0 (2,679) 0 17,264 33,805 146,258 (180,129) 3,052 37,199 8,500 5,417 (3,482) 46,602 (160,508) 48 4,340 Variance Y.T.D 4,064 0 11,250 (2,570) 9,725 (1,528) (107) 455 (2,453) 727 (1,428) (450) (17,073) 27,727 6,453 2,679 7,500 20,236 (263) (5,258) 129 866 (3,392) (8,500) (3,671) 3,482 4,410 110,508 2,452 160 Budget Y.E. 21,798 20,000 15,000 8,000 13,500 28,000 0 0 5,600 0 0 0 35,826 0 8,605 0 10,000 50,000 33,805 0 0 5,224 45,075 0 2,328 0 102,026 (50,000) 5,000 6,000 Forecast Y.E. 21,798 20,000 15,000 7,200 12,150 28,000 0 0 12,873 (7,273) 16,720 (16,720) 70,316 (34,490) 8,605 0 10,000 50,000 33,805 141,000 (180,000) 5,224 45,075 0 2,328 0 102,026 (161,000) 5,000 6,000 Variance Y.E. 0 0 0 800 1,350 0 0 0 (7,273) 7,273 (16,720) 16,720 (34,490) 34,490 0 0 0 0 0 (141,000) 180,000 0 0 0 0 0 0 111,000 0 0 Forecast Y.T.D Program 8872. Arts & Culture Facilities Audit 8874. WOL Backyard Blitz (DPCD) 8875. WOL Postcards from the Mton Peninsu 8877. WOL Smalltalk Program 8878. WOL Willum Warrain 8880. WOL Fire Information Message Traile 8881. Packaged Liquor Licences Research 8882. Road Safety Initiative Research an 8884. WOL Hastings(Hub) Neighbourhood Ren 8885. Archibald Prize Exhibition 8886. Econ Benefits - Port of Hastings 8887. WOL PEN-Step 8888. WOL SPARCS 8889. Fire Services Property Levy-Imp 8892. WOL Metro Access Inclusive Respite 8893. WOL Equine Industry Study 8894. WOL MP Food Industry Reference Grp 8895. WOL Indigenous Health and Wellbeing 8896. WOL - Mornington Beach Water Assess 8897. Climate Discussion Presentation 8899. WOL Schoolies Week Project 8900. Oral History Preservation Project 8901. Mornington Structure Plan 8902. Tyabb Airfield Precinct Plan 8903. Heritage Review - Area 3 8904. Harrap Creek Cultural Heritage Mgt 8905. David Collings LC Business Plan 8906. Slope Stability Inclinometers 8907. Management of Closed Landfills 8908. Green Innovations Monthly Report May 2014 22,500 7,500 18,700 0 6,722 (11,400) 11,250 60,000 15,000 45,000 15,000 15,000 15,000 75,000 7,500 75,000 12,500 22,500 37,500 15,700 51,000 9,000 4,500 18,750 26,700 46,000 9,000 2,000 (1,000) 40,400 165 Actual Y.T.D. 16,092 0 2,240 10,173 4,550 (11,400) 13,636 0 0 0 13,832 8,970 0 0 170 60,732 0 6,559 296 10,988 47,579 2,917 5,603 1,025 15,086 24,713 2,680 0 (1,000) 66,908 Variance Y.T.D 6,408 7,500 16,460 (10,173) 2,172 0 (2,386) 60,000 15,000 45,000 1,168 6,030 15,000 75,000 7,330 14,268 12,500 15,941 37,204 4,712 3,421 6,083 (1,103) 17,725 11,614 21,287 6,320 2,000 0 (26,508) Budget Y.E. 30,000 15,000 20,000 0 6,296 0 15,000 80,000 30,000 90,000 20,000 20,000 20,000 100,000 10,000 100,000 25,000 30,000 50,000 20,000 60,000 10,000 6,000 25,000 28,700 50,000 10,000 0 0 0 Forecast Y.E. 30,000 15,000 20,000 0 7,863 (11,400) 15,000 80,000 30,000 90,000 20,000 20,000 20,000 100,000 10,000 100,000 25,000 30,000 50,000 19,000 60,000 9,000 6,000 25,000 28,700 50,000 9,000 3,000 (1,000) 97,000 Variance Y.E. 0 0 0 0 (1,567) 11,400 0 0 0 0 0 0 0 0 0 0 0 0 0 1,000 0 1,000 0 0 0 0 1,000 (3,000) 1,000 (97,000) Forecast Y.T.D Program 8909. Bay Trail Missing Links 8910. Safety Beach CMP - Stage 2 8911. Relief & Recovery Centre Plan 8912. Mton Park Local Area Traffic Strate 8913. Prevention of Violence Charter & AP 8914. Place Planning 8915. Let's Talk About Alcohol 8916. Heritage Postcards Travelling Exhib 8917. Emergency Management Training 8918. Community Playgroup Initiative 8919. Community Arts Project 8920. Access & Equity Policy Implementati 8921. ANZAC Commemorative Naming Project 8950. WOL Tourism Brochure Development 8951. WOL Tourism Public Relations 8952. WOL Tourism Exhibitions & TS 8954. WOL Tourism Design & Artwork 8955. WOL Tourism Advertising 8956. WOL MPT Industry 8957. WOL Tourism Directional Signage App 8958. WOL Tourism Brochure Freight & Dist 8959. WOL Destination Mornington Peninsul 8960. Low Income Energy Efficiency Prgm 8961. WOL Adopt A Hot Spot - Hastings Monthly Report May 2014 (12,495) 24,990 (3,000) 37,695 (1,500) 25,215 (18,975) 69,153 (25,764) 154,654 (206,610) 5,748 (415) 10,497 164,959 (178,800) 0 0 9,000 (13,926) 7,520 (10,000) 8,500 (8,500) 166 Actual Y.T.D. (50,645) 53,763 (8,582) 42,204 (11,690) 26,432 (74,832) 185,387 (95,231) 105,167 (374,095) 10,164 (225) 31,725 164,951 (170,708) 32,969 (22,572) 1,442 (13,926) 7,880 (10,000) 10,307 (17,000) Variance Y.T.D 38,150 (28,773) 5,582 (4,509) 10,190 (1,217) 55,857 (116,234) 69,467 49,487 167,485 (4,416) (190) (21,228) 8 (8,092) (32,969) 22,572 7,558 0 (360) 0 (1,807) 8,500 Budget Y.E. 0 0 0 0 0 0 0 0 0 277,840 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Forecast Y.E. (59,000) 95,000 (7,000) 90,500 (10,000) 88,900 (81,000) 286,000 (100,500) 228,381 (405,000) 27,400 (1,000) 42,000 164,959 (178,800) 0 0 17,408 (17,408) 10,000 (10,000) 8,500 (8,500) Variance Y.E. 59,000 (95,000) 7,000 (90,500) 10,000 (88,900) 81,000 (286,000) 100,500 49,459 405,000 (27,400) 1,000 (42,000) (164,959) 178,800 0 0 (17,408) 17,408 (10,000) 10,000 (8,500) 8,500 ASSET CONVERSION PROGRAM 2013/2014 Approved Asset Sales Property Type of Sale 10 Knox Road, Blairgowrie 192 High Street, Hastings 31 Marine Drive, Safety Beach 1 Kerry Avenue, Mount Martha 21a Thomas Street Baxter (part of discontinued road) Foreshore Aveune Hastings 2A Murray-Anderson Road, Rosebud Land Land Land Roads Land Roads Land Total Monthly Report May 2014 Status Date of Sale 24 Oct 2013 31 Jul 2013 31 Jul 2013 23 Dec 2013 31 Dec 2013 28 Feb 2014 12 May 2014 Net Sale Proceeds $'000 358 17 8 5 23 20 16 447 167 STANDARD FINANCIAL STATEMENTS INCOME STATEMENT COMMENTARY The year to date favourable variance is due to a number of variances across the organisation. The tables below list some larger items (generally over/under $50k) that have contributed to the year to date variances. REVENUE Rates and Charges • Year to date variance is favourable, by $37k primarily due to: Item YTD Variance Fav / Unf General Rates/Supplementary Valuations + $37k Fav Reason Additional Supplementary Valuations. Statutory Fees • Year to date variance is unfavourable, by $106k primarily due to: Item Planning Applications Statutory Planning Fees Environmental Health Animal Control Fire Preventions Subdivision Plan Checking YTD Fav / Unf Reason Variance Unf Less applications received than forecast -$197k Unf Fav Fav Fav Number of fines issued to date. Additional income from fines Additional fines Plan checking income DAA Subdivision Certification -$27k + $21k + $13k + $17k + $17k Fav Directional Sign Applications + $21k Fav Additional certificitions, above year end forecast. Additional income Monthly Report May 2014 168 User Fees • Year to date variance is unfavourable, by $36k primarily due to: Item Pelican Park YTD Fav / Unf Reason Variance Unf Reduced Income Pelican Park membership - $244k School Holiday Fees Family Day Care - $52k - $50k Unf Unf Animal Registrations Valuations Fees + $73k + $65k Fav Fav Waste Disposal Tipping + $203k Fav Customer Services + $81k Fav income/Pelican Park W et and Learn Program/ and Pelican Park Gymnasism School holiday program - timing Reduced demand over holiday period Additional registrations over budget. Valuation fees above forecast budget. No bottom line change at year end Waste income during the months of April/May have increased. The outcome of which will be favourable to forecast budget. Increased animal registrations Contributions • Year to date variance is favourable, by $780k primarily due to: Item Priority Projects Priority W orks Recreation Land Contribution YTD Fav / Unf Variance + $630k Fav - $97k Unf + $257k Fav Reason Mornington S/Centre Promotional Scheme/ Electoral Review/Fire Services Levy Timing of work completion/carry forward works. (Martha Cove Fisher ladder) Greater than expected contribution, recreation land contributions. Grants - Recurrent • Year to date variance is favourable by $617k, primarily due to: Item YTD Fav / Unf Comment Variance HACC Funding - $133k Unf School Crossing Subsidy Beach Cleaning Subsidy After School Hours Program + $114k - $36k - $41k Fav Unf Unf Roads (Schedule of Rates) + $301k Fav Priority W orks + $240k Fav Priority Projects + $235k Fav Monthly Report May 2014 Timing difference, no bottom line effect year end Annual grant funding received in full, timing. Annual funding not yet received, timing Fee relief income is below forecast due to the entitlement of families being less than expected Disaster relief funding received towards storm damage. Additional expenditure incurred as part of schedule of rates Unbudgeted funding received from Melbourne Water Various projects includng MPT Industry/ Local Landcare Facilitatior/ Freeza Program/Roadsafety Program 169 Grants - Capital • Year to date variance is unfavourable by $90k, primarily due to: Item YTD Fav / Unf Variance Reason R2R 3 Bungower Rd - $224k Unf Bungower Road works not yet progressed, timing Hodgins Road, work not yet commensed, timing Mens Shed, income received Mens Shed, income received Additional funding received towards traffic management issues in and around schools Additional funding towards pre school age childrens books Subdivisonal contribution towards footpath and kerb construction in High Street Hastings R2R 3 Hodgins Rd - $88k Unf Mens Shed Somerville Mens Shed Mornington Tyabb Primary School + $51k + $51k + $20k Fav Fav Fav Premiers Reading Challenge + $17k Fav Activity Centre Structure Plan + $27k Fav Mt Martha Junior Football Lights + $10k Fav Department of Transport Planning and Local Infrastructure Upfron payment Sport Lighting Boneo Primary School + $20k Fav Additional funding received towards traffic management issues in and around schools Interest • Year to date variance is unfavourable by $5k, primarily due to: Item Rates Interest Monthly Report May 2014 YTD Fav / Unf Variance - $5k Unfav 170 Reason Timing difference EXPENDITURE Employee Costs • Year to date variance is unfavourable by $180k primarily due to: Item YTD Fav / Unf Variance Employee Overheads + $604k Fav Fringe Benefit Expenditure + $499k Fav Project Management- Capital Recovery Tourism - $140k Unf - $119k Unf HACC Program Salaries - $111k Unf Employee Overheads (Maternity) Councillor Support - $52k Unf - $58k Unf Financial Adminstration Project Management- Casual Salary Library - $44k - $52k Unf Unf - $119k Unf After School Program Pelican Park Aboriginal Cultural Heritage Priority W orks (Employee Cost - $95k - $75k - $69k - $81k Unf Unf Unf Unf Priority Projects (Employee Cost Briars Salaries - $194k Unf - $66k Unf Reason Employee overhead cost favouable due to timing and phasing of budget Timing of payment, the year end position will be unfavourable due to statutory changes Timing of capital works project recovery, no year end effect Budget phasing, year end expenditure will match forecast Additional cost of hours supplied, offset from additional income/grant funding support Additional cost of maternity leave,, over the year end forecast Agreed additional hours, and additional cost of back fill for long term sick leave position Redundancy cost Additional cost of salary offset from capital project works Phasing of budget issues, across Libarry General, Rosebud and Mornington Libarry Increased salary costs Increased salary costs Capital recovery to be journalled in June Direct labour cost, offset from within the program budget, no bottom line effect Direct labour cost, offset from within the program budget, no bottom line effect Additional cost offset Materials and Services • Year to date variance is favourable by $1.573m, primarily due to: Item Governance - Equipment Hire YTD Fav / Unf Variance + $75k Fav Priority W orks + $1.51m Fav Priority Projects State Government Fire Levy Safer Local Roads - Crushed Rock Waste Disposal Tipping Contract + $802m - $278k - $215k Fav Unf Unf - $355k Unf Reason Equipment hirer, favourable due to timing of budget phasing Variety of projects/Timing difference/No bottom line effect/Proposed Carry Forward Program 2014-15 Program progressing, budget on track Payment made ahead of budgeted forecast Timing difference, program role out ahead of forecast budget Additional cost to be offset from savings in reduced levy/due to reduced volumes Finance Costs • Year to date variance is unfavourable by $217k, primarily due to: Monthly Report May 2014 171 Item Loan interest YTD Fav / Unf Variance - $217k Unf Reason Loan schedule/timing Other Costs • Year to date variance is unfavourable by $27k, primarily due to: Item YTD Fav / Unf Variance Reason Community Renewal Program - $138k Unf Timing difference/Prepayment 2014-15 Community Grant CAB HR/Training Support Plant Insurance Family Support Services - $93k + $51k + $42k + $24k Unf Fav Fav Fav Timing difference/no year end impact Training and Support Timing of payments made. Timing of payments made. Monthly Report May 2014 172 Standard Statement of Financial Performance (Income Statement) For the period ending May 2014 Forecast Month $'000 Actual Variance Forecast Month Month Y.T.D $'000 $'000 $'000 Actual Y.T.D. $'000 Variance Budget Forecast Variance Y.T.D Y.E. Y.E. Y.E. $'000 $'000 $'000 $'000 Revenue from ordinary activities Rates and Charges Statutory Fees and Fines User Fees Contributions Contributed Assets Grants - Recurrent Grants - Capital Interest 2 285 1,400 150 0 2,211 71 205 3 210 1,670 343 5 2,669 27 104 2 (75) 270 193 5 459 (44) (101) 132,096 3,898 21,793 2,799 1,221 15,336 622 1,383 132,132 3,793 21,756 3,579 1,239 15,952 531 1,378 Total revenues 4,323 5,031 6,636 6,866 1,856 8 250 0 6,574 7,215 1,856 1 217 0 15,616 15,863 0 (1) (1) 0 180 180 0 0 0 11,293 10,833 460 18,118 20,661 2,543 11,924 15,802 3,878 (11,293) (10,833) 460 18,118 20,661 2,543 11,924 15,802 3,878 708 179,146 180,360 37 (106) (36) 780 18 617 (90) (5) 131,708 3,916 24,623 2,827 6,500 18,188 1,450 1,700 132,296 4,259 25,520 4,238 6,500 19,841 4,181 1,568 588 343 897 1,411 0 1,653 2,731 (132) 1,213 190,912 198,402 7,491 Expenses from ordinary activities Employee Costs Materials and Services Depreciation and Amortisation Finance Costs Other Expenses Asset Revaluations and Adjustments Total expenses Net Gain/(Loss) on Sale/Disp Assets Surplus/(deficit) for the year 62 (348) 0 7 33 0 57,594 77,692 20,416 1,301 4,025 0 57,774 76,119 20,416 1,518 4,052 0 (247) 161,028 159,878 (180) 1,573 0 (217) (27) 0 60,738 88,887 22,281 2,480 4,603 0 62,862 90,335 22,281 2,480 4,642 0 (2,125) (1,448) 0 0 (39) 0 1,150 178,988 182,600 (3,612) Other comprehensive income Other Total comprehensive income for the year Monthly Report May 2014 173 Income Statement (Net Cost) For the period ending May 2014 Unit Forecast Month $'000 Actual Month $'000 Variance Month $'000 Forecast Y.T.D $'000 Actual Y.T.D. $'000 Variance Y.T.D $'000 Budget Y.E. $'000 Forecast Y.E. $'000 Variance Y.E. $'000 Recurrent Strategic Planning (204) (190) 14 (1,594) (1,525) 69 (1,815) (1,745) 70 Statutory Planning (557) (550) 7 (3,798) (3,878) (80) (3,990) (3,892) 98 EPACS (771) (590) 181 (4,555) (4,197) 358 (5,262) (5,072) 190 Economic Development (103) (216) (114) (1,394) (1,553) (160) (1,652) (1,643) 9 (46) (50) (3) (412) (424) (11) (458) (457) 2 (156) (204) (48) (2,070) (2,041) 29 (2,279) (2,273) 6 (3,531) (3,474) 57 (37,548) (37,661) (113) (40,707) (40,731) (24) (207) (172) 35 (1,186) (1,162) 24 (1,258) (1,265) (7) (1,450) (1,262) 188 (11,247) (11,079) 168 (13,514) (14,072) (558) Director Sustainable Infrastructure (60) (60) 0 (489) (482) 6 (551) (540) 11 Child Youth and Family Care (90) (107) (16) (4,447) (4,573) (126) (5,137) (5,062) 75 Aged and Disability Services (601) (819) (218) (4,856) (5,131) (275) (5,131) (5,146) (15) Recreation and Leisure (647) (823) (176) (4,437) (4,769) (332) (5,031) (4,979) 52 Libraries Arts and Culture (440) (657) (217) (4,628) (4,754) (126) (5,288) (5,255) 33 Director Sustainable Communities (136) (160) (24) (1,147) (1,317) (170) (1,289) (1,271) 18 Governance and Corporate Support (430) (427) 2 (4,615) (4,534) 80 (5,132) (5,084) 48 436 400 (36) 4,247 4,143 (104) 4,925 4,898 (27) Information Services (232) (187) 44 (2,121) (2,028) 92 (2,672) (2,548) 124 Finance (564) 442 1,005 (1,682) (1,257) 425 (2,369) (2,466) (98) (46) (30) 15 (505) (466) 39 (528) (527) 1 Communications (166) (98) 68 (1,006) (955) 50 (1,153) (1,148) 4 Team Support and Development (124) (239) (115) (1,690) (1,828) (138) (1,542) (1,888) (346) Corporate Planning & Projects (63) (63) 0 (572) (522) 50 (606) (628) (22) The CEO's Office (44) (48) (4) (514) (499) 15 (553) (568) (15) (10,230 ) (9,585 ) 646 (92,264 ) (92,493 ) (229) (102,992 ) (103,361 ) (370) 0 846 0 846 0 (0) 129,846 3,383 129,875 3,383 30 0 129,531 6,466 130,046 6,610 515 144 (1,856) (1,856) 0 (20,416) (20,416) 0 (22,281) (22,281) 0 0 0 0 0 0 0 500 0 (500) 198 104 (94) 106 1,745 1,639 (755) (887) (132) (11,043 ) (10,491 ) 552 20,655 22,095 1,440 10,470 10,126 (343) 71 26 27 0 (44) (26) 622 342 531 (19) (90) (362) 1,450 1,354 4,181 1,518 2,731 164 139 250 111 2,592 2,850 258 2,651 3,901 1,250 0 (1) (1) 0 180 180 0 0 0 Priority Projects (Net) (140) (403) (263) (3,239) (1,612) 1,628 (5,381) (4,938) 442 Priority Works (Net) (328) (126) 201 (4,311) (2,922) 1,389 (5,395) (5,536) (141) Non-Recurrent Surplus / (Deficit) (231 ) (253 ) (21) (3,995 ) (992 ) 3,003 (5,321 ) (874 ) 4,446 (11,274 ) (10,744 ) 530 16,660 21,103 4,443 5,149 9,252 4,103 0 (19) 5 (94) 5 75 1,221 238 1,239 181 18 57 6,500 275 6,500 50 0 225 (11,293 ) (10,833 ) 460 18,118 22,523 4,405 11,924 15,802 3,878 Director Sustainable Environment Infrastructure Strategy Infrastructure Maintenance Infrastructure Project Management Renewable Resources Property and Valuation Director Sustainable Organisation Unit Budgets Rates Grants Commission Depreciation Efficiency Savings Interest (Net) Recurrent Surplus / (Deficit) Non-Recurrent Capital Grants Special Charge Schemes Contributions Profit/(Loss) on Sale of Assets Surplus / (Deficit) before Adjustments New Subdivisions Transfers From / To Reserves (Net) Surplus / (Deficit) Priority Projects (Net) and Priority Works (Net) include internal expenditure. Monthly Report May 2014 174 CASH FLOW STATEMENT COMMENTARY In summary, the total cash used on a year to date basis for Operating Activities is $4.4m favourable to forecast. This is primarily as a result of a favourable variation in net cash flows operating activities, due to income received earlier than anticipated and lower expenditure payments to date than anticipated. Further detail can be found in the Standard Statement of Financial Performance Section (operating result) of this report. A number of variances between Year to Date forecast and actual have arisen as a result of: General Rates Year to date General Rates is $36k more than year to date target, primarily due to more rate revenue being received than anticipated. User Charges and Other Year to date user charges is favourable to budget with a $1.7m favourable variance primarily due to the timing of income received. Cash Contributions Year to date contributions is favourable to budget with a $780k favourable variance, primarily due to additional funding received for priority projects. Government Grants Year to date Government Grants is favourable to budget with a $526k variance due to additional grant funding received for funded projects. Interest on Investments Year to date interest is unfavourable to budget with a $5k variance due. This is merely a timing issue. Employee Costs Actual payments made to employees is $179k unfavourable to forecast. Materials and Contracts Payments to suppliers is less than anticipated by $1.6m mainly due delays in priority works and priority projects programs. Other Expenses Payments to suppliers is less than anticipated by $28k. CASH FLOWS FROM INVESTING ACTIVITIES In summary, total cash used on a year to date basis for investing activities is favourable $5.5M to forecast. Expenditure on some capital works projects has occurred as anticipated at this point in time. CASH FLOWS FROM FINANCING ACTIVITIES Year to date finance costs are $216k unfavourable to budget. This is attributed to phasing of the budget. For the period ending 31st May 2014, the reported cash/investments balance was $38.953m. Refer to the Balance Sheet Section Commentary of this report for more detail. It is anticipated that at year end cash and investments will total $23.702M. Monthly Report May 2014 175 Standard Statement of Cash Flows for the period ending 31 May 2014 Cash Flows from Operating Activities Receipts (inclusive of GST, wherever applicable) General Rates 7,711 User Charges and Other 2,921 7,711 3,115 194 125,732 29,940 125,768 31,659 36 1,719 131,708 28,539 132,296 29,779 588 1,240 150 1,916 257 807 13,762 343 2,331 156 807 14,463 193 415 (101) 701 2,799 17,448 1,347 6,628 183,894 3,579 17,974 1,342 6,628 186,950 780 526 (5) 3,056 2,827 19,638 1,700 8,000 192,412 4,238 24,022 1,568 8,000 199,903 1,411 4,384 (132) 7,491 Payments(inclusive of GST, wherever applicable) Employee Costs 6,965 Materials and Contracts 8,336 Other Expenses 246 15,547 6,902 8,684 214 15,800 63 (348) 32 (253) 59,542 96,874 4,018 160,434 59,721 95,300 4,046 159,067 (179) 1,574 (28) 1,367 60,738 95,996 4,603 161,337 62,863 97,444 4,642 164,949 (2,125) (1,448) (39) (3,612) (1,785) (1,337) 448 23,460 27,883 4,423 31,075 34,954 3,879 964 1,418 49 25 2,456 1,143 1,169 166 25 2,503 (179) 249 (117) (47) 8,478 18,372 1,678 (5) 28,523 8,885 10,954 1,365 (5) 21,199 (407) 7,418 313 7,324 42,791 42,791 47,355 47,355 (4,564) (4,564) - 16 (3) 13 2,243 32 428 11 2,275 439 (1,815) (21) (1,836) 13,270 50 13,320 13,730 50 13,780 (34) (26,248) (20,760) 5,488 (29,471) (33,575) (8) (1,840) (2,056) (2,480) (2,480) - 11,865 (4,885) (515) (10,865) - 11,865 (4,885) (515) (10,865) - - (6,880) (6,880) - (5,276) (5,501) 29,203 29,203 23,927 23,702 Cash Contributions Government Grants Interest Net GST Refund Net Cash Inflows / (Outflows) from Operating Activities Cash Flows from Investing Activities Payments for Land and Buildings Infrastructure Assets Plant, Furniture and Equipment Sundry Payables Proceeds from Sale of Land and Buildings Sale of Plant, Furniture and Equipment Sundry Receivables Net Cash Inflows / (Outflows) from Investing Activities (16) 3 (13) (2,469) (2,503) 460 460 (4,104) Cash Flows from Financing Activities Finance Costs Proceeds from Borrowings Repayment of Borrowings Repayment of Finance Leases Repayment of Unfunded Superannuation Movement in Deposits and Bonds (8) - (216) (45) 635 (44) 635 1 - 11,865 (4,224) (471) (10,865) 276 11,865 (4,224) (471) (10,865) 276 582 591 9 (5,259) (5,475) 423 (8,047) 1,648 9,695 Cash at Beginning of Period 33,305 33,305 - Cash at End of Period 25,258 34,953 Net Cash Inflows / (Outflows) from Financing Activities Net Increase / (Decrease) in Cash Held (3,672) (3,249) - (216) 9,695 (225) - (225) Monthly Report May 2014 176 BALANCE SHEET COMMENTARY Current Assets As at the end of May the balance of current assets was $78m including: • Cash/Investments $38m and includes: Item Balance Investments $36m Cash ($1.2)m Reason General $35.6m and Hillview Quarries $477k. Cash $(1.2)m Cash Floats and Petty Cash $17.6k. Total Cash/Investments has decreased by $3.2m during May. • Receivables $19.4M and includes: Item Balance Rates Debtors Other Debtors $15.1m $867k Special Charge Schemes Sundry Debtors $303k $2.2m GST Land Sales $895k $16k Reason Rates. Perin Court $927k less provision for doubtful debts $743K, and Pensioner Rates $805k Various Special Charge Schemes. Grants & Subsidies $1m, Aged Care $52k Tipping $220k, and Infrastructure Maintenance $116k and General $167k GST Various Property Sales. Refer to Asset Conversion Program for more detail. Total Receivables have decreased by $8.2m during May. • Other Current Assets $12M and includes: Item Balance Inventories $122k Other $960k Assets Held for Sale $10.9m Reason Delivered Meals $26k, Nursery $69k, Golf Course $26k. Valuations $390k, Tipping $160k, Sport and Leisure $15k and Interest $138k Properties ready for sale. Total other has decreased by $45k during May. Non-Current Assets As at the end of May the balance of Non-Current Assets was $1.978m Item Investments - Non-Cash Receivables Land and Buildings Plant Furniture and Equipment Reason $8k Shares in MAPS $2k and Rye Community Bank $5.5k Special Charge Schemes. Land and Buildings. Plant, furniture, library bookstock, Artworks and IT equipment. Roads, Drains and Other Infrastructure Assets. $614k $952m $6.6m Infrastructure $1,018m Intangibles Monthly Report May 2014 Balance $1.3m 177 Information Technology. Current Liabilities As at the end of May the balance of current liabilities was $24.8m including: Item Balance Reason Payables $12m Employee Costs ($347)k,Creditors Control $1.4m, Fire Services Levy $3m, Deposits and Bonds $4.2m and expenditure accruals $3m Interest - Bearing Liabilities $822k Provisions $11.4m Borrowings Loans $265M, Waste Leases $88K and Unfunded Superannuation $469K Long Service Leave $7.1M, Annual Leave $4.1M and other Provisions $181K. Non-Current Liabilities As at the end of May the balance of non-current liabilities was $43million. This amount represents Council’s long term liabilities including borrowings leases and employee provisions that are not required to be repaid during 2013/2014. Item Balance Interest Bearing Liabilities Provisions $38m $5m Reason Borrowings $37.8m, and Bins Lease $74Kk Long Service Leave $3m, Cell Capping $1.5m and Net Gain $605k Equity As at the end of May the balance of equity was $1.988M. This amount is represented by: Item Accumulated Surplus Asset Revaluation Reserve Other Reserves Monthly Report May 2014 178 Balance Reason $897m $1,079m $931m Accumulated Surplus. Asset Revaluation Reserve. Sustainable Energy Fund $181k Recreation Land Reserve $350k and Municipal Emergency Fund $400k Standard Statement of Financial Position (Balance Sheet) as at 31st May 2014 as at Jun 12 $ '000 as at Jun 13 $ '000 as at Feb 14 $ '000 as at Mar 14 $ '000 as at Apr 14 $ '000 as at May 14 $ '000 Month Movement $'000 Budget Y.E. $'000 Forecast Y.E. $'000 Current Assets Cash and Cash Equivalents 30,242 33,305 59,087 47,663 38,202 34,953 3,249 23,927 23,702 Trade and Other Receivables 11,824 12,840 42,568 30,007 27,673 19,378 8,295 10,686 10,686 146 122 122 122 122 122 - 184 184 Other 1,684 1,399 643 729 1,005 960 45 1,225 1,225 Assets Held for sale 7,871 11,121 10,904 10,904 10,904 10,904 - - - 51,767 58,787 113,324 89,425 77,906 66,317 11,589 36,022 35,797 8 8 8 8 8 8 - 8 8 1,318 887 892 892 614 614 - 787 787 937,693 945,422 947,530 950,340 951,091 952,012 (921) - - 7,395 7,086 6,850 5,992 6,768 6,634 134 - - 974,320 1,021,850 1,018,226 1,019,194 1,017,973 1,017,776 197 1,961,531 1,961,531 1,263 1,333 1,273 1,265 1,258 1,250 8 1,200 1,200 Total Non-Current Assets 1,921,997 1,976,586 1,974,779 1,977,691 1,977,712 1,978,294 1,963,526 1,963,526 Total Assets 1,973,764 2,035,373 2,088,103 2,067,116 2,055,618 2,044,611 1,999,548 1,999,323 13,884 22,735 22,981 13,525 12,186 12,754 (568) 13,777 13,777 5,207 16,339 2,268 951 822 778 44 5,186 5,186 Provisions 11,527 12,469 11,598 11,564 11,430 11,269 161 11,814 11,814 Total Current Liabilities 30,618 51,543 36,847 26,040 24,438 24,801 (363) 30,777 30,777 42,991 26,060 37,925 37,925 37,925 37,925 32,883 32,883 3,092 3,599 4,762 4,875 4,993 5,088 (95) 2,763 2,763 Total Non-Current Liabilities 46,083 29,659 42,687 42,800 42,918 43,013 (95) 35,646 35,646 Total Liabilities 76,701 81,202 79,534 68,840 67,356 67,814 (458) 66,423 66,423 856,720 874,333 928,457 918,164 908,150 896,779 11,371 898,062 897,837 1,038,830 1,079,087 1,079,087 1,079,087 1,079,087 1,079,087 - 1,035,063 1,035,063 1,513 751 1,025 1,025 1,025 931 94 - - Total Equity 1,897,063 1,954,171 2,008,569 1,998,276 1,988,262 1,976,797 11,465 1,933,125 1,932,900 Total Liabilites and Equity 1,973,764 2,035,373 2,088,103 2,067,116 2,055,618 2,044,611 11,007 1,999,548 1,999,323 Inventories Total Current Assets Non-Current Assets Other Financial Assets Receivables Land and Buildings Plant, Furniture and Equipment Infrastructure Intangibles (582) 11,007 Current Liabilities Payables Interest-bearing Liabilities Non-Current Liabilities Interest-bearing Liabilities Provisions - Equity Accumulated Surplus Asset Revaluation Reserve Other Reserves Monthly Report May 2014 179 Standard Statement of Capital Works For the period ending May 2014 Forecast Month $'000 Actual Month $'000 Variance Forecast Month Y.T.D $'000 $'000 Actual Y.T.D. $'000 Variance Budget Y.T.D Y.E. $'000 $'000 Forecast Variance Y.E. Y.E. $'000 $'000 Capital Works Area Internal Expenses Land Buildings Infrastructure - Roads Infrastructure - Drainage Infrastructure - Other Plant Information Technology Artworks Library Bookstock 0 0 931 965 219 234 1 0 0 11 0 1 1,113 730 284 156 22 7 0 118 0 (1) (182) 235 (65) 78 (21) (7) 0 (107) 0 532 7,970 12,536 2,897 2,706 392 3 15 1,007 1 497 8,596 6,607 2,576 1,538 146 63 0 1,036 (1) 35 (626) 5,929 321 1,168 246 (60) 15 (28) 0 50 14,167 18,570 3,989 4,018 406 0 20 1,320 0 532 16,310 20,275 4,032 4,173 410 3 20 1,341 0 (482) (2,143) (1,704) (43) (155) (3) (3) 0 (21) 2,398 2,450 (52) 28,306 21,181 7,125 42,791 47,354 (4,563) 120 681 258 1,339 24 666 213 1,546 96 15 45 (208) 2,489 8,380 3,675 13,762 849 4,445 2,962 12,924 1,640 3,935 712 839 2,901 10,011 3,918 25,961 2,975 11,377 4,858 28,144 (74) (1,367) (940) (2,183) 2,398 2,450 (52) 28,306 21,181 7,125 42,791 47,354 (4,563) Total Capital Works Types of Capital Works Expansion Upgrade New Renewal Total Capital Works Monthly Report May 2014 180 CORPORATE PERFORMANCE STATEMENT COMMENTARY The Corporate Performance Statement is a hybrid of the Standard Statement of Financial Performance and Standard Statement of Cash Flows. This statement is designed to assist in understanding the cash implications of budget decisions, and therefore, excludes non-cash items such as depreciation and income by way of new subdivision assets passed to Council. We stress that this reporting is our own ‘layman’s’ approach and is designed to assist those who may not totally understand accounting practice to come to generally understand our budget. For those more financially inclined, the budget according to Australian Accounting Standards is also included in this report. The results of the normal operations of Council are shown as Funds Available. Following the third quarter review, there have been no changes to report in May. The bottom line remains balanced at third quarter. Reported in the April report, income was revised by $1.953m, a favourable change in Rates (Green Waste) $72k, Priority Works $327k (Grant income) and Priority Projects (Grant Income) $164k, Capital (Contributions) $366k in addition to User Fees and Changes $449k. Expenditure was also revised by $1.953m, reflecting an increase to salaries $953k, priority works $444k, contract expenditure $242k and infrastructure assets $198k. The additional expenditure has been matched to additional income receipts and offset savings identified. As can be seen on the Corporate Performance Statement following, Council has a $9.516m favourable result to budget as a result of normal operations. This is primarily due to timing of expenditure across the Groups Capital expenditure is $7,126m favourable to date as projects are deferred or payments not made in line with budget phasing. Monthly Report May 2014 181 Corporate Performance Statement For the period ending May 2014 Forecast $'000 Income Rates Grants and Subsidies User Charges Grants Commission Interest Income Expenses Sustainable Environment Sustainable Infrastructure Sustainable Communities Sustainable Organisation The CEO's Office Efficiency Savings Interest Expense Actual $'000 Variance $'000 Forecast $'000 Actual $'000 Variance $'000 Budget $'000 Forecast $'000 Variance $'000 2 1,328 1,660 846 205 3 1,713 1,811 846 104 2 385 151 (0) (101) 132,096 11,552 24,877 3,383 1,383 132,132 11,693 24,894 3,383 1,378 37 140 18 0 (5) 131,708 11,712 27,198 6,466 1,700 132,296 12,481 27,603 6,610 1,568 588 769 405 144 (132) 4,041 4,477 436 173,290 173,480 189 178,783 180,557 1,774 1,728 5,749 3,117 2,147 478 0 8 1,782 6,044 3,729 1,052 544 0 1 (54) (296) (612) 1,095 (66) 0 7 15,270 60,778 32,391 17,812 4,667 0 1,301 15,231 61,739 32,933 16,961 4,730 0 1,518 39 (961) (542) 851 (63) 0 (217) 16,268 67,356 34,947 20,713 4,769 (500) 2,480 16,704 67,552 35,469 20,760 5,185 0 2,480 (436) (196) (522) (46) (416) (500) 0 13,228 13,153 74 132,220 133,112 (892) 146,033 148,150 (2,117) (9,187) (8,676) 511 41,071 40,368 (702) 32,751 32,407 (343) 0 0 (44) 0 (140) (346) (2,398) 71 139 26 0 19 0 0 (44) 0 (399) (183) (2,450) 27 250 0 0 94 0 0 0 0 (259) 163 (52) (44) 111 (26) 0 75 11,865 (4,213) (471) (10,865) (3,239) (4,349) (28,306) 622 2,592 342 0 37 11,865 (4,224) (471) (10,865) (1,574) (2,773) (21,180) 531 2,850 (19) 0 94 (0) (11) 0 (0) 1,665 1,576 7,126 (90) 258 (362) 0 57 11,865 (4,886) (515) (11,335) (5,381) (5,395) (42,791) 1,450 2,651 1,354 0 311 11,865 (4,886) (515) (11,335) (4,938) (5,761) (47,354) 4,181 3,901 1,518 0 536 0 0 0 0 442 (366) (4,563) 2,731 1,250 164 0 225 (2,674) (2,705) (31) (35,984) (25,766) 10,219 (52,671) (52,788) (117) (11,861) (11,381) 480 5,086 14,603 9,516 (19,920) (20,380) (460) 3 15 12 2,294 457 (1,837) 13,270 562 13,730 562 460 0 (11,858) (11,366) 492 7,380 15,059 7,679 (6,088) (6,088) (0) (19) (94) 75 0 (37) (94) 57 0 (311) 2,925 (536) 2,925 225 0 (11,876) (11,460) 417 7,343 14,965 7,623 (3,474) (3,699) 225 Funds available Capital and priority works and services New Borrowings Debt Servicing Principal Lease Payments Defined Benefits Superannuation Lia Priority Projects (Net) Priority Works (Net) Capital Expenditure Capital Grants Capital Contributions Special Charge Schemes Special Charge Schemes Transfers from reserves Operating Result Non-operating Asset Sales Projects funded in previous years Result Transfers from reserves Other non-cash adjustments Cash surplus/(deficit) Monthly Report May 2014 182 KEY FINANCIAL STATUS INDICATORS BORROWINGS Debt Principal Debt Loan Financial Principal New Paid Principal No. Institution 1 July 2013 Borrowings 2013/2014 31 May 2014 $'000 $'000 $'000 $'000 5 National Australia Bank 2,030 - 1,318 712 6 National Australia Bank 436 - 187 249 7 National Australia Bank 344 - 114 230 8 National Australia Bank 1,270 - 144 1,126 9 National Australia Bank 1,402 - 428 974 10 Commonwealth Bank 1,439 - 111 1,328 11 Commonwealth Bank 5,206 - 616 4,590 12 Commonwealth Bank 5,147 - 516 4,631 13 Commonwealth Bank 3,391 - 310 3,081 14 Commonwealth Bank 2,133 - 180 1,953 15 Bendigo Bank 2,385 - 165 2,220 16 Bendigo Bank 2,527 - 71 2,456 17 18 National Australia Bank Commonwealth Bank 2,765 11,865 64 2,701 11,865 30,475 11,865 4,224 38,116 LEASES Debt Principal Debt Lease Financial Principal New Paid Principal No. Institution 1 July 2013 Leases 2013/2014 31 May 2014 $'000 $'000 $'000 $'000 North CBFC 210 - 174 36 South1 CBFC 116 - 106 10 South2 CBFC 126 - 70 56 South3 CBFC 140 - 110 30 592 - 460 132 Monthly Report May 2014 183