Anil_12 - Prairie Swine Centre

advertisement
To,
Subject:. Application for suitable effective position for contribution in social development.
Sir,
It has been learnt from reliable sources that your premier organization is in search of a few
trained and experienced Civil Engineer for execution of a prestigious major development projects of
our country. My qualification and experience of construction of major hydro-power projects makes
me a suitable candidate for a senior level post, in a leading management and construction
organization of mega projects involving major plant and machinery and heavy earth moving
equipments on Hydro Power Projects works of Rockfill/Concrete Structures, Hill Slope Stabilization
and Underground (Tunnel/Power House) works, Water Conductor System etc.
I am a Bachelor of Technology (Hons.) in Civil Engineering from I.I.T Kharagpur. Since my
graduation in 1979, I have been associated for more than thirty years in execution of large hydropower project construction involving infrastructure development in addition to construction of major
under ground and other important component of hydro-power project (Dam, Tunnel, Spillways and
Power House works etc.).
Details of my association of various projects stages and levels with National Hydro Power
Corporation Limited and Tehri Hydro Development Corporation Limited (both Government
undertaking) at different project location in India (Salal, Dul-Hasti, Tanakpur, Tehri, Koteshwar
Hydro Electric Project and Vishnugad Pipalkoti Project) are enclosed for your kind consideration
and perusal.
At present, I am Additional General Manager (PSP) with THDC Ltd. Engineer-in-charge
1000 MW, Tehri PSP Project,Executing Rs.1850crs EPC contract with Alstom-HCC consortium
agency.I have dealt with project survey and investigation works, preparation of feasibility and
detailed project report, preliminary activities of river diversion schemes and infrastructure for taking
up further construction activities of Dam, Barrages, Spillways, Tunnels and Power House works in
aaddition to cost evaluation and control system of major construction activities.
I Anil Prasad , would now prefer to be associated with various major/ minor project
development on accelerated mode of execution for our society, which is in urgent need of basic
needs and important Infra- structure essentially required for developing society. My experience
and abilities with skill of professional project management acquired shall practically help to
enhance my contribution towards evolving practical mode of implementation .
In consideration of my past experience of major Hydro-Power Project Planning and
Implementation at all following stages-
1:
Investigation & Feasibility: Topographic , Geological, and Hydrological survey,
investigation and Power potential studies for Feasibility studies .
2:
Pre-Construction : Subsequent detail project report and infrastructure planning and
development in addition to detail man power , equipment , planning and scheduling with
estimation of all major components of project.
3:
Construction : Infrastructural development involving Roads, Bridges, Non-residential,
Residential colonies, with Banking and educational facilities at project location. Tender
preparation and award of major contracts as per suitable terms and condition for quality and
timely execution of project .
But now lately after realization of in-ordinate delay and painful slow pace of such mega
project execution due to various intricate and complex problems of techno- economic
consideration and Govt. clearances ( Environmental, Forest, Land transfer, Rehabilitation, etc) is
seriously affecting on ground social development of our present generation/ society .
In view of the above , I would prefer to contribute towards Integrated Infrastructural
development of various sectors (i:e Road network, Pilgrimage, Hill station, Medical Tourism ,
Health care, Communication etc.) in the state to meet aspirations of local , National, and
International Public/ tourists.
In addition to above , I would also prefer to contribute towards Community Shelters ,Toilets and
Foods joints for poorest of our weaker section of society, irrespective of their cast , creed and
religion , who are actually deprived of essential basic needs of human life .
May I add here that , I am a hard working experienced civil engineer with necessary
aptitude , knowledge and concept to evolve practical methodology for project implementation of
projects with participation of larger section of our society ( Public / Privates ) including local
stake holders.
I hope my application will receive your valuable consideration and be given the
opportunity to serve, our nation through our social structural development of backward Areas.
Thanking you, in anticipation,
Yours truly,
Address for communication
144, Old Nehru Colony
Dehradun, Uttranchal
PIN 248001
Hello : (0135) 2676822
Mob. 9412077680
(Anil Prasad)
Additional General Manager (Civil)
THDC Ltd.
BIO – DATA
Name
Father’s Name
Address (Present/Office) :
:
:
(Residential/Communication)
:
Contact No.
:
Qualification/Institute/Year
:
Present posting
:
Anil Prasad (anil.thdc@rediffmail.com)
Late Sh. Jagdish Prasad
Additional General Manager
T.H.D.C.INDIA Ltd. RISHIKESH
144, Old Nehru Colony
Dehradun 248001 (U.A.)
Mob. 9412077680
Res. 0135 – 2676822
Bachelor of Technology (Hons) in Civil
Engineering from I.I.T. Kharagpur
in 1979
AGM ( Engr-In-Charge) for Tehri Pump
Storage project (1000MW), EPC project
for Civil ,HM & EM works
Brief background/Experience
:
After graduating (B. Tech. (Hons) in 1979, the
undersigned have been associated mostly in Hydro Power Project implementation/development
since last+30 years with N.H.P.C. & T.H.D.C. Ltd. Execution of mega Hydro Power Projects
components (Dam, Tunnels, Power Channels, Power House etc.) in addition to detailed planning,
scheduling, cost estimation, resources planning for development of Hydro Power Project. Survey
& investigation and preparation of feasibility report, detailed project report etc. have also been
dealt during association with THDC Ltd.
Area of Interest/Strength (Implementation co-ordination
:
In
addition
to
execution of large projects (Salal, Dulhasti, Tanakpur, Tehri Dam & Koteshwar Dam), the
undersigned had been associated in detailed interaction & deliberation with Design Engineers,
consultants and executing agencies for proper appreciation and appraisal of Project field
conditions. Appropriate planning, scheduling, infrastructure, resources planning & development,
tendering and fixing of agencies with effective cost engineering etc. have been part of above
project execution, development/implementation. Survey and investigation also of New Projects
for preparation of feasibility and detailed project report for Govt approval involving Stage I & II
(Preliminarily & Detailed), Topographical, Geological, Hydrological, Power Potential and
environmental studies in association with Design Engineer, consultant, of premier institutions in
addition to Survey of India, Geological Survey of India and other expert agencies.
Language Known
:
Hindi, Bengali, English and other North
Indian Languages.
(Anil Prasad)
Additional General Manager( Tehri PSP.)
T.H.D.C.INDIA Ltd.
POST HELD AND WORK EXPERIENCE IN N.H.P.C. & T.H.D.C. Ltd.
S.N.
Post held Deptt
Pay Scale
Hydro Elect.
Project
State
Work Responsibilities
From
To
June 80 Oct. 84
1
Engineer(Civil)
N.H.P.C.
SALAL H.E.
Project J&K
2
Asstt.Mgr.(Civil)
N.H.P.C.
TANAKPUR Oct.84
H.E. Project
U.P.
3
Dy. Mgr. (Civil)
N.H.P.C.
DUL-HASTI
H.E. Project
J&K
Jul. 87
4
Manager (Civil)
T.H.D.C.
TEHRI
DAM
Project
Jan. 91
Concrete Dam works
a) Planning, Mix design and
production of quality concrete
for placement in concrete dam.
b) Drilling & Grouting, Stripping
& concreting work of concrete
dam bases & foundation.
c) Abutment stabilization work of
concrete dam side hill slope.
d) Planning,
scheduling
and
execution of plunge pool works
(Energy dissipation).
Jul. 87 a) Control survey and quality
control works of all the major
component of project.
b) Planning scheduling estimation
and tender preparation of power
channel & silt ejector works of
project.
c) Construction of infrastructure
work, project office complex,
guest house, colony works and
high
storage
sheds
for
generating plant equipments.
Jan. 91 a) Construction
management,
planning and scheduling of
project works.
b) Cost
control,
budgeting,
Personnel and administration
works of project.
c) Execution
of
underground
works of pilot tunnel for head
race tunnel works-departmental
works.
d) Power
house
construction
works of the project through
French consortium (DSB).
Aug.92 a) Road
construction
&
maintenance of all the roads of
Tehri Dam Project.
U.P./U.A.
b) Realigned
roads
submergence area
UPPWD & DGBR.
above
through
c) Project and colony roads,
planning,
scheduling
&
execution works.
d) Planning,
estimation
and
tendering of various nature of
road works (i.e. village,
approach, alternate roads etc).
5
Manager (Civil)
T.H.D.C.
TEHRI
Aug.92
DAM Project
U.A.
Jul.94
6
Sr. Manager
T.H.D.C.
TEHRI
Jul. 94
DAM Project
U.A.
Jun. 97
a) Coffer Dam excavation and
impermeable core treatment
work through M/S JIL.
b) Planning,
scheduling
and
stockpiling of impervious clay
core material through Deptt.
resources.
c) Excavation in Dam base (coffer
dam) through deptt. resources.
d) Planning & protection of RipRap material (Dobata), mining
lease permission from U.P.
Govt.
e) Coffer Dam construction works
through Lanco Construction
Company.
f) Spillway
excavation
work
through deptt. resources/ major
agencies.
a) Planning,
estimation
&
execution of balance coffer dam
& spillway works.
b) Raising of coffer dam from El.
615m to El. 667m through M/S
Lanco Construction Company.
c) Excavation & slope stabilization
part work in chute spillway –
Approx.
20.0
lacs
cum
excavation completed in one
year through M/S JIL.
d) Estiamtion
and
tender
preparation for main chute &
shaft spillway works – package.
e) Excavation & stabilization in
7
Dy. General
TEHRI
Jul. 97
Manager T.H.D.C. DAM Project
U.A.
8
Dy. General
Manager
T.H.D.C.
Koteshwar
H.E. Project
U.A.
9
Dy. General
Manager
T.H.D.C.
Cost Engg.
Deptt.
T.H.D.C.
18500-23500
10
Addl. General
Manager
T.H.D.C.
Cost Engg.
Deptt
11
Addl. General
Cost Engg.
May 99
right bank shaft spillway –
Approx. 6.0 lacs cum of
excavation completed.
a) Excavation & stabilization of
shaft spillway work area from
El. 840.0 m to El. 1000.0 m
b) Detailed planning estimation &
scheduling & tender preparation
of main chute & shaft spillway
package works.
c) Preparation of revised project
cost estimate of Tehri Dam
project stage-1 along with
essential and emergent works of
pump storage scheme (stageII)and Koteshwar Dam Project.
d) Construction of main chute &
shaft spillway works under
main works package.
May 99 Nov.01 a) Construction of diversion tunnel
works for Koteshwar Dam
Project diversion scheme.
b) Planning & execution of
infrastructural
work
at
Koteshwar Dam Project for
taking up major construction
work.
c) Tender preparation for Dam,
Spillways & Power House of
Koteshwar Dam Project.
Nov.01 Apr.02 a) Construction,
planning,
methodology & estimation of
Koteshwar H.E. Project (civil
works).
b)Planning & detailed project
report (cost estimate) of Pump
Storage Scheme of Tehri H.E.
Power Comples.
Apr.02 Apr. 03 a) Cost updation of Tehri Hydro
Power Plant, Koteshwar H.E.
Project & Tehri pumped storage
plant and revised cost estimate.
b) Cost control measures for
Hydro Power of major structure.
Apr.03
Sept 07
a) Project survey & investigation
Manager
T.H.D.C.
& FR &
DPR
preparation
of VPHEP &
New Projects
on works for VishnugadPipalkoti
Hydro
Electric
Project.
b) Survey & investigation &
preparation of feasibility report
of the project completed and
clearance for implementation by
Govt. of U.A
c)Topography,
Geology,
Hydrology & environmental
studies along with FR & DPR
preparation of New Projects
through SOI, GSI, Expert
Agencies,
Consultants
&
Design Engineers.
12
Addl. General
Manager
T.H.D.C.
Services
deptt.
T.H.D.C
Sept 07 Apr-09
13
Addl. General
Manager
T.H.D.C.
Cost Engg.
& FR &
DPR
May09
14
Addl. General
Manager
T.H.D.C.
Tehri Pump
Storage
project
Aug-11 Till
date
July-11
Administration Hospitality along
with Infrastructure planning,
development and maintenance.
a) Cost up gradation of
Koteshwar
Hydroelectric
project
b) Cost up gradation of Peepal
koti Hydroelectric project
c) DPR of various upcoming
HydroProjects of THDC
Working as Engr-In_charge
for Tehri Pump Storage
project (EPC project ) Four
units of 250 MW each with
Tehri Dam as upper
reservoir and koteshwar
Dam as lower reservoir. The
project
involves
construction of underground
power house,surge shafts,
TRT and reversible type
Francis turbines to work in
generation and pumping
mode.
ANIL PRASAD
Download