Approved by the Government of the Republic of Kazakhstan (Decree No.1328 dated 15 October 2001) Unified Form State acceptance commission certificate of project acceptance for commercial operation dated 27 February 2014 Almaty and Zhambyl Oblasts The state acceptance commission appointed by the First Deputy Minister of the Ministry of Industry and New Technologies of Kazakhstan (Order No.24, dated 31 January 2014. (name of the body, appointed by the commission) composed of: the chairman of the commission: S.B. Shurenov deputy chairman of the commission head of development at the power and coal department of the Ministry of Industry and New Technologies of Kazakhstan. R.N. Kussainov chief project engineer, ASPMK-519; Members of the commission representatives of: the client: A.A. Akmurzin deputy chairman of management board – operations, KEGOC; M.O. Bekenov managing director - branches and affiliates, KEGOC; Ye.T. Atakulov head of the capital construction department, KEGOC; Yu.S. Syzdykov senior manager-coordinator, department, KEGOC; S.G. Zhetpisbayev senior specialist of occupational safety and health, technical control and safety service, KEGOC; G.A. Terechshenko manager of construction and rehabilitation of overhead lines, capital construction operations 1 department KEGOC; A.A. Zhanbirbayev manager of construction and rehabilitation of overhead lines, capital construction department, KEGOC; B.B. Onayev deputy director for capital construction of Almatinskiye MES branch, KEGOC; S.A. Prikhodko managing director Energoinform; L.I. Verkhovod head of telecommunications department, Energoinform; for operations, operation the general contractor: Rakesh Gaur vice president for Central Asia, KEC International Limited; V.M. Sychev general director, ASPMK 519. the bodies of the state architectural and construction control and supervision: L.V. Morgun chief expert construction construction, Ministry of Kazakhstan; of the state architecture and control of the committee for housing and utilities of the the regional development of D.M. Khassenov head of Zhambyl representative office of KazahEnergoEkspertiza; R.T. Kayipov head of architecture and urban planning of Ili Raion of Almaty Oblast; A.M. Zhurunova head of architecture and urban planning of Zhambyl Raion of Almaty Oblast; M.A. Kozhahmetov head of architecture and urban planning of Zhambyl Raion of Almaty Oblast; the state sanitary and epidemiological surveillance bodies Soltanbek Zhambolat chief specialist of the state sanitary and epidemiological supervision of Ili Raion of Almaty Oblast 2 Z.K. Kushtekova head of the state sanitary and epidemiological supervision of Zhambyl Raion of Almaty Oblast A.B. Tokbayev head of the state sanitary and epidemiological supervision of Moyinkum Raion of the Zhambyl Oblast the state fire service Ye.S. Malybaev E.B. Bakhytov head of emergencies Zhambyl Raion, Almaty Oblast, fire service major; acting head of emergencies of Ili Raion. Almaty Oblast, fire service major; Head of emergencies Moyinkum Raion, Zhambyl Oblast, fire service major; the authorized state body in environmental protection K.K. Karibayev environmental inspector, Ili Raion, Almaty Oblast, department of ecology in Almaty Oblast; A.S. Adamin environmental inspector, Zhambyl Raion, Almaty Oblast, department of ecology in Almaty Oblast; Daniyarbek Atauollauly deputy head of department of ecology in Zhambyl Oblast. has established the following: 1. The client (jointly with the contractor): Kazakhstan Electricity Grid Operating Company joint stock company (KEGOC) jointly with КЕС International Limited (name of the organization) 3 presented the constructed project for commissioning: 500 kV YuKGRES - Alma OHTL as a part of Alma Electricity Transmission Project, Phase II (new) (name of facility and type of construction (new, expansion, rehabilitation, technical upgrade) at address: Ili and Zhambyl Raions of Almaty Oblast and Moiynkum Raion of Zhambyl Oblast (oblast, raion, populated area, microdistrict, block, street, number of building (block) 2. The construction was completed pursuant to decision (decree, instruction) to grant the respective land title: No. 137 dated 15 March 2010 and No. 636 dated 27 October 2011 for Zhambyl Raion, No. 3-575 dated 19 April 2010 for Ili Raion of Almaty Oblast and No. 222 dated 26 June 2012 for Moiynkum Raion of Zhambyl Oblast (name of the body that made a decision) and in accordance with the permission for construction and assembly works Notice registration number No. 7 dated 30 July 2013 to the committee for construction and housing services and utilities of the Ministry for Regional Development of Kazakhstan (name of the body that made a decision) 3. The construction was completed by the general contractor: КЕС International Limited company (name of the organization) that performed the following: design, delivery of the equipment and material, construction and assembly work for 500 kV OHTL YuKGRES -Alma (type of activity) and subcontracting organizations: Pursuant to Appendix 1 (name of organization, type of activity completed by each organization (if number of organization is more than three, the list of them shall be prescribed in an appendix___ to the certificate) 4. Design (design and estimate) documentation for construction was developed by the general designer: ASPMK-519 LLP (name of the organization) that performed the following: design for construction of 500 kV OHTL YuKGRES SS - Alma SS: Project summary (КХ-810-002-01-т. 1). Explanatory note and drawings (КХ-810-002-01- т.2). Soil survey report (КХ-810-002-01-т.3-1). Hydrometeorological survey report (КХ-810-002-01-т.3-2). Topographic-geodesic survey report (КХ-810-002-01-т.3-2). EIA (Almaty and Zhambyl Oblasts. КХ-810-002-01т.4). Design estimates (КХ-810-002-01-т.5). Drilling and blasting operations design (КХ-810-002-01-т.6). (name of parts or sections of documentation) and subcontracting organizations: No subcontracting organizations were engaged (name of the organization, finished parts and sections of the documentation (if number of organization is more than 4 three, list them in an appendix to the certificate) 5. Initial data for design was issued by: KEGOC JSC (name of research and survey organizations; subject of the initial data (if number of organization is more than three, list them in an appendix to the certificate) 6. The construction was completed in accordance with design (standard, custom, reused): design for construction of 500 kV OHTL YuKGRES SS – Alma SS: Project summary (КХ-810-002-01-Т.1). Explanatory note and drawings (КХ-810-002-01т.2). Soil survey report (КХ-810-002-01-т.3-1). Hydro-meteorological survey report (КХ-810-002-01-т.3-2). Topographic-geodesic survey report (КХ-810-00201-т.3-2). EIA (Almaty and Zhambyl Oblasts. КХ-810-002-01-т.4). Design estimates (КХ-810-002-01-т.5). Drilling and blasting operations design (КХ-810002-01-т.6). (ref number of the design or serial number for standard designs) 7. Design and estimate documentation was approved by: Opinion of Gosexpertisa Project Examination Authority (opinion No. 01-0316/13 dated 21 May 2013) and Order of the Committee for Construction and Housing Services and Utilities of the Ministry for Regional Development of the Republic of Kazakhstan (No. 181-пир dated 25 July 2013). (name of body that approved the documentation for the project as a whole) 8. The timeline of construction and assembly works: work commencement: August 2013; work termination: February 2014; (month, year) (month, year) duration of construction, months: according to the standard or construction method statement - 18 months; actually - 6 months. 9. The following documentation was presented to the state acceptance commission: a) set of working drawings with amendments. b) certificates of hidden work inspection c) logs of: construction and assembly works, concrete works, welding works, design supervision and work logs. d) test report for earth connections, conductor, ground wire and line hardware. e) logs of: construction and installation work, concrete work, welding, designer supervision of works and general work logs. f) certificates of: conformance for reinforced concrete structures (foundations), metalware (towers, earth connections), conductor, ground wire. line hardware, guy wires, coating and waterproof products. g) certificates for all equipment installed under the project. (list of documents) 5 10. The project presented for acceptance for commercial operation has the following main characteristics describing capacity, performance, production area, length, tonnage, volume, capacity, carrying capacity, the number of jobs, etc. (to be completed for all facilities (except residential houses) in units relevant for the target products or basic services): Capacity, Unit of performance, measure Total ment (consideri ng previously accepted) 500 kV OHTL km YuKGRES SS – Alma SS. Designed Actual Including start-up complex or stage Total (consider ing previousl y accepted) Including start-up complex or stage 321.7 321.7 321.7 321.7 including: У2к towers pcs. 35 35 35 35 У2к+5 towers pcs. 12 12 12 12 У2к+5т towers pcs. 3 3 3 3 У2к+12 towers pcs. 4 4 4 4 ПП500-3 towers pcs. 428 428 428 428 ПБ4 towers pcs. 407 407 407 407 У220-3 and ПБ220-1 pcs. towers 5 5 5 5 У110-3 и ПБ110-15 pcs. towers 3 3 3 3 35-10 kV OHTL towers pcs. 1 1 1 1 Total 898 898 898 898 3хАС 330/43 conductor tonne 3743 3743 3743 3743 6 installation of fibre km optic cable built-in into the ground wire 343.775 343.775 343.775 343.775 ТК-11-Г-Ж-Р370(140) ground wire tonne 204 204 204 204 Polymer insulators pcs. 3879 3879 3879 3879 Glass insulators pcs. 980 980 980 980 Damper spacers pcs. 26175 26175 26175 26175 kV km 321.7 321.7 321.7 321.7 Total for 500 OHTL, length (capacity, performance, processing area, length, loading space, etc.) 11. The project has the installed equipment in quantity according to the certificates of its acceptance after the individual test and comprehensive testing (a list of specified certificates is listed in the Appendix to this certificate). 5:39 P.M. 25 December 2013 (specify the date and time (hour, min.)of the integrated testing of the energized equipment) 12. Labour protection, explosion protection, fire safety, environmental protection and anti-seismic actions envisaged by the project. fulfilled (information about progress) 13. Greening works; construction of pavement on access roads to buildings, sidewalks, households sites, playgrounds and sports fields, including finishing of elements of building facades shall be completed: Type of activity Unit of measure Scope of works Implementation Period Not applicable 14. The estimated cost in accordance with the approved design of the estimate documentation: total - 13,296,659.97 thousand tenge, including: construction and assembly works - 10,269,524.90 thousand tenge, equipment, instrument and inventory - 844,850.99 thousand tenge, 7 other - 2,182,284.08 thousand tenge. 15. The estimated value of assets accepted for commercial operation: total - 10,001,815.730 thousand tenge, including: construction and assembly works - 8,040,543.005 thousand tenge, equipment, instrument and inventory - 668,889.835 thousand tenge, other - 1,292,382.890 thousand tenge. 16. On the basis of examination of the object and the relevant documentation the technological design evaluation score is: good The decision of the state acceptance commission: presented for commissioning: 500 kV YuKGRES - Alma OHTL under the Alma Electricity Transmission Project, Phase II. (name of the object (complex) SHALL BE ACCEPTED FOR COMMERCIAL OPERATION. 27 February 2014 The chairman of the state acceptance commission S.B. Shurenov (signature) 17 February 2014 The deputy chairman of the state acceptance commission R.N. Kussainov (signature) (date) The members of the state acceptance commission (signature) 26 February 2014 (date) A.A. Akmurzin M.O. Bekenov (date) 26 February 2014 (signature) (date) 26 February 2014 Ye.T. Atakulov (signature) (date) 8 Yu.S. Syzdykov 26 February 2014 (signature) (date) 26 February 2014 S.G. Zhetpisbayev (signature) (date) 25 February 2014 G.A. Terechshenko (signature) (date) 25 February 2014 A.A. Zhanbirbayev (signature) (date) 18 February 2014 B.B. Onayev (signature) (date) 26 February 2014 S.A. Prikhodko (signature) (date) 26 February 2014 L.N. Verkhovod (signature) (date) 17 February 2014 Rakesh Gaur (signature) (date) 17 February 2014 V.M. Sychev (signature) (date) 25 February 2014 L.V. Morgun (signature) (date) 25 February 2014 D.M. Khassenov (signature) (date) 18 February 2014 R.T. Kayipov (signature) (date) 9 19 February 2014 A.M. Zhurunova (signature) (date) 20 February 2014 M.A. Kozhakhmetov (signature) (date) 20 February 2014 Zhambolat Soltanbek (signature) (date) 20 February 2014 Z.K. Kushtekova (signature) (date) 25 February 2014 A.B. Tokbayev (signature) (date) 20 February 2014 Ye.S. Malybayev (signature) (date) 25 February 2014 E.B. Bakhytov (signature) (date) 25 February 2014 K.T. Kashkinbekov (signature) (date) 20 February 2014 K.K. Karibayev (signature) (date) 25 February 2014 A.S. Adamin (signature) (date) 25 February 2014 Daniyarbek Atauollauly (signature) (date) Appendix No. 1 to the state acceptance commission certificate for Construction of 500 kV YuKGRES - Alma OHTL under the Alma Electricity Transmission Project, Phase II. No. 1 2 Name of the subcontracting organizations Departmental affiliation ASPMK-519 LLP Kerneu Limited LLP