ARC DISCOVERY PROJECTS 2015 COMPLIANCE CHECKLIST A Completed Proposal Consists of the Following Section Items to check Yes No Incorrect /Follow up Yes No Incorrect /Follow up Yes No Incorrect /Follow up Eligibility of application has been checked ANU ANU Authority to Apply form complete submission requirement ANU Certification Form complete Partner Organisation letters Email/letter from Centre Director (internal only, not sent to ARC) Application "Submitted to Research Office" in RMS Most recent version of application downloaded Word files received and saved in local drive Proposal Summary Page Most recent PDF generated PART A Mandatory Administrative Summary A1: Administering Organisation completed* A2: Proposal Title (no more than 75 characters approx 10 words). No unnecessary uppercase, quotation marks, acronyms A3: Person Participant Summary** RMS form Auto Mandatory Auto A3: Current Organisation is showing*** Auto A4: Organisation Participant Summary completed* Auto A5: Proposal Summary (750 Char – approx 100 words) Focus on the aims, significance and expected outcomes of the project. Not all in uppercase, no quotation marks, acronyms and limit terminology: must use plain English Must use “The project will…” rather than ‘I will’ ‘We will’ or ‘They will’ Page 1 of 8 Mandatory ARC Discovery Projects 2015 Compliance Checklist A6: Impact Statement Addresses how the project contributes to the Mandatory objectives of the scheme, as per subsection C2 of the Funding Rules. *A1 and A4: must be completed at Draft Proposal Summary ** Ensure the Project Leader is entered first in the ‘Draft Proposal Summary’ page. NOTES *** Ensure PIs match the POs. ****A3 – Position Currently Held in Personal Details must be checked and changed if necessary by them. PART B RMS form Classifications and Other Statistical Information Yes B1: Strategic Research Priority + area and goals completed Mandatory B2: FOR codes entered - incl percentage (sum 100%) highest to lowest* Mandatory B3: SEO codes entered - incl percentage (sum 100%) highest to lowest* Mandatory No Incorrect /Follow up B4: Keywords entered Limit of 3 per proposal, please ensure that they are spelt correctly B5: International Collaboration - Country added Mandatory Optional *Enter a whole number and do not use a percentage sign. *Use no more than three FOR/SEO codes; a maximum of one “Not elsewhere classified”/xxxx99 FOR code which should only be used when there is no other appropriate code within the classification NOTES *The maximum % can only be entered for one FoR code (e.g, 50% cannot be entered for 2 FoR codes) *These are the principal tool used to identify & assign relevant assessor from the ARC database – so ensure most relevant Page 2 of 8 6/02/2016 ARC Discovery Projects 2015 Compliance Checklist PART C Description of Project/Program of Research Additional Text C1: Description of project/program of research (10 A4 pages & required format) C1: Matches headings in order: Project Title; Aims and Background; Research Project; Role of Personnel; Research Environment; Communication of Results; Management of Data. C2: Medical and Dental Research Statement (750 Char – approx 100 words)** Yes No Incorrect /Follow up Mandatory Mandatory Mandatory *Ensure each PI/CI role is discussed, along with any PhDs & RAs mentioned in budget – they must match *All CIs and PIs need to describe their roles on the project in detail, including PIs in a management or an administrative role. NOTES **Proposals which are clearly not related to a medical or dental research area may enter ‘Not Applicable’ at this question. Create PDF from word document. As described in Appendix A - PART D RMS Form All sections 0.5cm margins (sides & top & bottom) and at least 12 point font. (References may be in 10 point font). Project Cost Yes D1: Proposed Budget Completed for each year requested (no indexation). Mandatory D1: All budget items eligible (FR A5.2-5.3, pp 9-11, C5, pp 31-32) Mandatory D1: Correct ANU salary and stipend ($25,406 2014 HDR rate) rates used Mandatory D1: Salary contributions listed for participants/ personnel. [For ANU personnel, correct on costs included. The ANU salary gap of 4.06% must be included as part of the in-kind contribution] Mandatory D1: Total amounts match in each of the Eligible, Other and Partner Organisation columns and the respective Organisation summary tables Mandatory Page 3 of 8 No Incorrect /Follow up 6/02/2016 ARC Discovery Projects 2015 Compliance Checklist D1: ICA funding requested only in the year it is to be taken D1: No amount entered against “unspecified funding” or in years where no support requested Mandatory D1: Costs related to carrying out field or survey research are requested under ‘Fieldwork expenses’ See FR Total funding requested – minimum of $30,000 per year to maximum of $500,000 per year, per project. Notes Travel costs no exceeding $50,000. Costs are at ATO rates PART E Additional text Additional text Budget Justifications Yes E1: Justification of funding requested from the ARC (5 A4 pages) Mandatory E1: Matches headings and order in Budget Table at Part D of Proposal Mandatory E2: Details of non-ARC contributions (2 A4 pages) Mandatory E2: Matches headings and order in Budget Table at Part D of Proposal Mandatory E2: Non-ARC contributions attributed to specific Partner Organisations*. Mandatory No Incorrect /Follow up * Do they match those amounts in the Project Cost section. * If no direct funding then explanation why. Notes Create PDF from word document - All sections 0.5cm margins and at least 12 point font - Justify each person/item in terms need and cost. (eg why full-time/part-time; why specific salary level etc) Page 4 of 8 6/02/2016 ARC Discovery Projects 2015 Compliance Checklist PART F RMS form ADDITIONAL TEXT Personnel Yes F1: Personal details auto populated Auto F2: Postal address auto populated Auto F3: Member of ARC or selection/ advisory committee Auto F4: Centre association (CIs only) Optional F5: Are you an Indigenous Participant Mandatory F6: PhD awarded? (YES/NO) Mandatory F6: Date of award of PhD* Optional F7: Qualifications (most recent first) Auto F8: Current and previous appointments (most recent first) – 10 years, select start & end date, select an Org Auto F9: Organisational affiliations Mandatory F10: Time commitment (%FTE) to this Project Mandatory F11: International Collaboration Award (YES/NO) Mandatory F12: Research Opportunity and Performance Evidence (ROPE) Mandatory F12.1: Career and opportunities for research over the last 10 years – 2004 onwards (5250 char/approx 750 words) F12.1: Provides and explains: i. Number of years since graduation with highest qualification; ii. Research opportunities in the context of employment; iii. Whether you are university or industry based etc; iv. Any career interruptions; v. Research mentoring and research facilities available; vi. Any other aspects of career or opportunities for research that are relevant and not detailed elsewhere*** F12.2 (1): Recent significant publications (20 A4 pages max) F12.2 (1): Listings are limited to the last 10 years ONLY (2004 onwards) Page 5 of 8 No Incorrect /Follow up Mandatory Mandatory Mandatory Mandatory 6/02/2016 ARC Discovery Projects 2015 Compliance Checklist ADDITIONAL TEXT F12.2 (1): Items are numbered continuously Mandatory F12.2 (1): Asterisks next to publications relevant to proposal Mandatory F12.2 (1): Publications are split into the five categories of: (i)scholarly books;(ii) scholarly book chapters; (iii) refereed journal articles;(iv) refereed conference papers (only when the paper was published in the full proceedings); (v)other (e.g. major exhibitions, compositions or performances) Mandatory F12.2 (2): ARC Grants awarded in last 10 years on which been a CI, PI or Fellow - grants/publication table (Template table ITA p27) Mandatory F12.3: Ten career-best publications (five A4 pages) Mandatory F12.3: Must provide full reference for each Mandatory F12.3: Next to each provide information on any ARC grant scheme on which were CI or Fellow from F12.2 table) Mandatory F12.3: Includes 30 word max summary on each Mandatory F12.3: Asterisks next to publications relevant to proposal Mandatory F12.4: Research impact and contributions – 10 years – 2004 onwards (7500 char – approx 1000 words)**** Mandatory F12.5: Contributions to the research field of this proposal (3750 characters – approximately 500 words) Mandatory RMS FORM * If a PhD has been awarded then date of award. If not been awarded/conferred yet, provide the date when the thesis was or is to be submitted. ***Headings are not necessary, but the points should be addressed NOTES: ****Research output other than publications (patents/policy advice/consultancies etc); evidence for quality of all research (citations, prizes etc). Create PDF from word document - All sections 0.5cm margins and at least 12 point font Page 6 of 8 6/02/2016 ARC Discovery Projects 2015 Compliance Checklist PART G RESEARCH SUPPORT Yes No Incorrect /Follow up G1: Complete for all participants 2013-2017 incl for ARC and other agencies. Mandatory Includes projects/proposals/fellowships awarded or requests submitted Additional Text G1: Includes current proposal first Mandatory G1: Others in descending date order Mandatory G1: Proposal/Project ID only applies to ARC/NHMRC projects R=requested, C=current and P=past Mandatory Create PDF from word document - All sections 0.5cm margins and at least 12 point font Notes - Must be in table as per template on page 37 ITA (can be altered from horizontal to vertical) - Details should be provided for all sources of funding not just ARC funding - Funding amounts to be in $1000’s and in AUD PART H Additional Text STATEMENTS ON PROGRESS OF ARC-FUNDED PROJECTS H1: For each participant attach a statement of progress for each project/fellowship involving that participant awarded funding for 2013* (1 A4 page for each funded project) Yes No Incorrect /Follow up Mandatory if applicable Check conducted in ARIES for current proposals involving each participant *Only for ARC Discovery Projects, Discovery Indigenous, Discovery Early Career Researcher Award, Linkage Project or any ARC Fellowship scheme. - Only for projects that were allocated funding in 2013 (not carry forward funding only). Notes - Must be done for each project indicated in H1 whether reports are up to date at the ARC or not Create PDF from word document - All sections 0.5cm margins and at least 12 point font Page 7 of 8 6/02/2016 ARC Discovery Projects 2015 Compliance Checklist PART I RMS form ADDITIONAL DETAILS Yes I1a: Submission of similar proposal to any other agency Mandatory I1b: If yes - organisation selected. Mandatory if applicable I1c: Agency name entered if I1b is “other” Mandatory No Incorrect /Follow up if applic Page 8 of 8 6/02/2016