EPO – Principal Directorate Business Services – Directorate Classification Project: C476 Subject: Control or safety systems for ventilation or air-conditioning Comments IPC: F24F 11/00 30 October 2015 Ref.: Annexes 16 to 21 of the Project File Background In Annex 20 the Rapporteur has made a scheme proposal for a complete restructuring of main group F24F11. The proposal includes four new one-dot classification groups, based on the aspects mentioned in Annex 16, and an associated indexing scheme with four main groups, based on parameters measured or sensed. A fifth one-dot classification group has also been included for F24F11/02 following the solution proposed by RU in Annex 17. In short the proposal reads as follows: I) Five main trunk classification sets: 1) Application, types of systems: New set of groups F24F 11/10 – F24F 11/26 2) Monitoring, safety, ensuring correct operation: New set of groups F24F 11/30 – F24F 11/47 3) Interfaces, processing, communication: New set of groups F24F 11/50 – F24F 11/66 4) Constructive details and control systems characterized by their output: New set of groups F24F 11/70 – F24F 11/88 5) Arrangement or mounting of control or safety devices: New group F24F 11/90 (former IPC/CPC F24F 11/02) II) An associated indexing scheme further sub-divided into four sets a) Control inputs relating to air properties: b) Control inputs relating to users or occupants: c) Control inputs relating environmental factors: d) Control inputs relating to system states: F24F 110/00 + F24F 120/00 + F24F 130/00 + F24F 140/00 + In Annex 21 the US has given his agreement to the Rapporteur proposal and has proposed two minor additions to the new scheme. Comments EP thanks SE for the last Rapporteur Report (Annex 19) and the new Scheme Proposal (Annex 20), which it finds comprehensive and very well structured. EP agrees in principle with the new scheme and in particular with the proposed Indexing Scheme which appears to be clear, helpful and detailed. However, EP does not agree with the inclusion of the fifth one-dot classification group and respective set into the scheme, since EP experts are of the opinion that “Arrangement or mounting of control or safety devices” should be seen as “Constructive details” and as such be part of the fourth set. Furthermore the actual CPC classes corresponding to new classes F24f 11/72 - 11/76, 11/86 of the proposed fourth set are depending from F24F 11/02. EP proposes therefore to move F24F 11/90 between F24F 11/70 and F24F 11/72, and have it renumbered. This would imply a rearrangement of the indents of the depending subgroups. A clarification of the title of present F24F11/02 would be beneficial. Concerning the proposed group F24F 11/74, EP finds firstly that the title “for controlling air velocity” is vague and would prefer “for controlling air flow rate”, which is the title of present CPC F24F 11/04. Secondly, EP experts are of the opinion that present CPC 11/043 should not be incorporated into proposed 11/74, but be in a different new subgroup below 11/74, in analogy to current , similar but antithetic, CPC 11/047 which becomes 11/75 in the proposed scheme. EP proposes the following title for this new subgroup: “by varying the air flow rate proportionally to the air currents or wind pressure”. As regards the proposed subgroup F24F 11/83, “for controlling the supply of heat-exchange fluid”, it does not refer anymore to the air but to the heat-exchange fluid, and as such cannot be considered to be dependent from new 11/72. The indent level should therefore be amended. Proposed subgroup F24F 11/86, “secondary treatment of air in distributing unit”, relating to air and not to the heat-exchange fluid, cannot be considered as dependent from new 11/83. EP experts think that it would be preferable to position this new group between 11/19 and 11/25, which relates to treatment of primary air, as a 2 dots subgroup. In regard to the additions proposed by the US in Annex 21, EP notes that proposed Indexing Code group 110/82, “Other properties not provided for”, is not IPC compliant, since it is not compliant to add a residual subgroup when the main group can fulfil such a role. An amended scheme proposal which takes into account the above observations, and shows a slightly amended numbering of some groups, is included hereby. Coordinator : Roberto Righetti; rrighetti@epo.org F24F D M 1/00 Dots Title Air-conditioning <Guidance heading before F24F 1/00> 0 Room units, e.g. separate or self-contained units or units receiving primary air from a central station (control or safety arrangements F24F 11/00) M 3/00 0 M 5/00 0 D M 6/00 0 M 7/00 0 M 9/00 0 D C 11/00 N 0 D 11/02 D D D D D N 11/04 11/047 11/053 11/06 11/08 11/10 1 CPC Redundant, see below! In view of the proposed 11/10 and its subgroups this and similar references appear necessary. See 1/00! Air-conditioning systems in which conditioned primary air is supplied from one or more central stations to distributing units in the rooms or spaces where it may receive secondary treatment; Apparatus specially designed for such systems (room units F24F 1/00; control or safety arrangements F24F 11/00)) Air-conditioning systems or apparatus not covered by group F24F 1/00 or F24F 3/00 (control or safety arrangements F24F 11/00) <Horizontal line before F24F 6/00> Air-humidification (control or safety arrangements F24F 11/00) Ventilation (control or safety arrangements F24F 11/00) Use of air currents for screening, e.g. air curtains (control or safety arrangements F24F 11/00) Common features or details <Guidance heading before F24F 11/00> Control or safety arrangements Note In this group, it is desirable to add the indexing codes of groups F24F 110/00 – F24F 140/00 (transferred to F24F 11/72, F24F 11/74, F24F 11/81, F24F 11/90) (transferred to F24F 11/74) (transferred to F24F 11/75) (transferred to F24F 11/76) (transferred to F24F 11/86) (transferred to F24F 11/25, F24F 11/26) . specially adapted for a particular application or for a particular type of system Comments See 1/00! Redundant, see below! See 1/00! See 1/00! See 1/00, but is the reference necessary in this main group? In view of 11/10 and its subgroups this guidance heading is clearly not appropriate. Moving it down to before 12/00 makes little sense. 11/00 New head group F24F N 11/12 Dots Title 2 . . for air-humidification CPC 11/0008 N 11/15 2 . . for ventilation 11/0001 N 11/16 N 11/17 N 11/18 3 4 4 11/0002 11/0004 11/0005 N 11/19 3 N 11/23 2 . . . for admission of outside air . . . . for pressurising a room . . . . while maintaining a pressure below the ambient, e.g. for keeping contamination inside . . . . using low temperature outside air to assist cooling . . for secondary treatment of air in distributing units N 11/25 2 11/08 N 11/26 N 11/30 3 1 N N N N N N N N N N N N 11/32 11/33 11/34 11/35 11/36 11/39 11/41 11/42 11/43 11/46 11/47 11/50 2 3 4 4 3 3 2 3 3 2 3 1 N 11/52 N 11/54 2 2 N N N N N N N N N 2 3 3 3 2 2 3 3 4 . . for controlling treatment of primary air in central stations . . . in independent units . Safety arrangements; Monitoring; Ensuring correct operation . . Responding to malfunctions or emergencies . . . to fire, excessive heat or smoke . . . . by opening air passages . . . . by closing air passages . . . to leakage of heat-exchange fluid . . . Monitoring filter performance . . Defrosting . . . of outdoor units . . . of indoor units . . Improving electric energy efficiency or saving . . . Displaying or monitoring energy costs . characterised by user interfaces, communication or processing, e.g. using fuzzy logic, adaptive control or estimation of values . . Display arrangements . . Using one central controller connected to several sub-controllers . . Remote control . . . using telephone networks . . . using internet communication . . . for programming . . Using timers . . Electronic processing . . . using pre-stored data . . . for selecting an operative mode . . . . Sleeping mode 11/56 11/57 11/58 11/59 11/61 11/63 11/64 11/65 11/66 Comments CPC precedence reference removed CPC precedence reference removed 11/0006 11/06 The precedence reference to 11/08 has been removed 11/085 New head group 11/0052 11/0095 11/0097 11/0098 11/0084 11/0093 11/0087 11/0089 11/009 11/0075 11/0094 11/006 11/0091 11/0067 11/0068 11/0069 11/0071 11/0072 11/0073 11/0061 11/0063 11/0064 11/0065 F24F N 11/70 N 11/71 N 11/72 N 11/74 Dots Title 1 . Constructive details; Control systems characterised by their outputs 2 . . Arrangement or mounting of control or safety devices 3 . . . for controlling flow conditions, e.g. pressures 4 . . . . for controlling air velocity for controlling air flow rate N 11/75 5 N 11/76 N 11/77 5 5 N 11/78 N 11/79 5 4 N 11/81 4 N 11/83 3 N 11/84 N 11/85 N 11/86 4 4 4 N 11/88 N 11/90 2 1 Comments 11/02 11/022 11/025, 11/04, 11/043 . . . . . by varying the air flow rate proportionally to the air currents or wind pressure . . . . . maintaining a constant air flow . . . . . by means responsive to temperature, e.g. bimetal springs . . . . . by controlling the speed of ventilators . . . . for controlling the angle of the supplied air stream . . . . for controlling the air supply to a heatexchanger or its bypass (F24F 11/08 takes precedence) . . . for controlling the supply of heat-exchange fluid . . . . using valves . . . . using variable flow pumps . . . . for secondary treatment of air in distributing units 11/043 . . Electrical aspects, e.g. circuits . Arrangement or mounting of control or safety devices 11/0009 11/02 The precedence reference to 11/08 has been removed. CPC 11/043 should be converted to IPC 11/74 and 110/32. CPC 11/043 should be converted to IPC 11/74 and 110/32. 11/047 11/053 11/0079 11/0078 11/027 The precedence reference to 11/08 has been removed. 11/008 11/0082 11/0083 11/06 The precedence reference to 11/08 has been removed. Indexing scheme associated with group F24F 11/00, relating to control inputs, e.g. measured or estimated values or parameters N 110/00 110/10 110/12 110/20 110/22 110/30 110/32 0 1 2 1 2 1 2 Control inputs relating to air properties . Temperature . . of the outside air . Humidity . . of the outside air . Velocity . . of the outside air N 110/40 1 . Pressure N N N N N N N CPC 11/0076 11/001 11/0012 11/0013 11/0015 11/0016 11/0038 11/0039, 11/043 11/0042 New head group N N N N N N N N N N N N F24F Dots Title 110/50 1 . Air quality properties 110/52 2 . . of the outside air 110/60 2 . . Odour 110/62 2 . . Tobacco smoke 110/64 2 . . Airborne particle content 110/66 2 . . Volatile organic compound [VOC] content 110/68 2 . . Radon content 110/70 2 . . Carbon dioxide content 110/72 2 . . Carbon monoxide content 110/74 2 . . Ozone content 110/76 2 . . Oxygen content 110/80 2 . . Electric charge N 120/00 0 Control inputs relating to users or occupants N N N N 120/10 120/12 120/14 120/20 1 2 2 1 . . . . N 130/00 0 N N N N 130/10 130/20 130/30 130/40 1 1 1 1 Control inputs relating to environmental factors not covered by F24F 110/00 . Weather information or forecasts . Sunlight . Artificial light . Noise N N N N N N N N 140/00 140/10 140/12 140/20 140/30 140/40 140/50 140/60 0 1 2 1 1 1 1 1 Control inputs relating to system states . Pressures . . Heat-exchange fluid pressure . Heat-exchange fluid temperature . Condensate . Damper positions, e.g. open or closed . Load . Energy consumption Occupancy . Position of occupants . Activity of occupants Feedback from users CPC 11/0017 11/0019 11/002 11/0024 11/0023 11/0032 11/003 11/0026 11/0027 11/0021 11/0028 11/0031 Comments New head group 11/0034 11/0035 11/0036 11/0057 New head group 11/0058 11/0049 11/005 11/0053 New head group 11/0041 11/0043 11/0045 11/0054 11/0056 11/0046 11/0047