2510-FM-BWM0057o 4/2009 COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF WASTE MANAGEMENT BONDING WORKSHEETS FOR HAZARDOUS WASTE DISPOSAL AND POST-CLOSURE CARE FACILITIES BONDING WORKSHEET O LANDFILLS AND DISPOSAL IMPOUNDMENTS 1. For impoundments only: a. Total volume of waste to be stabilized (amount of liquid/sludge that must be dewatered by adding soil or other material) CY b. Type of stabilizing material: c. Unit cost to mix in stabilizing material: $/CY (Provide documentation from third parties for this cost. Include material purchase, transportation and labor costs. Labor costs should conform to US Dept. of Labor, Bureau of Labor Statistics most recent rates) d. Total cost of stabilization (line 1a x line 1c): $ 2. Volume of fill required for area not at final/intermediate grade, but would require filling prior to capping: CY 3. Maximum area to be capped and covered (including all areas at final grade and not capped, intermediate grades and areas to be filled to get to intermediate grades then capped): $ 4. Closure design, surveying and development of construction drawings (use $750.00/acre or line 3): $ a. Construction and maintenance of access roads: $ Material Volumes/Areas: 5. Earthen Materials a. Structural Fill CY (Specification1) b. Intermediate Cover CY (Specification1) c. Clay Cap Material CY (Specification1) d. Final Cover Material CY (Specification1) e. Sand/Stone CY (Specification1) f. Other CY (Specification1) 1 6. Provide brief description of the material specification (i.e. ¾” minus, 12” minus, 12” lifts, etc.) Synthetic Materials a. Geotextile Sq.Ft. (Type) b. FML Sq.Ft. (Type) c. Drainage Layer Sq.Ft. (Type) d. Other Sq.Ft. -1- (Type) acres LS 2510-FM-BWM0057o 4/2009 7. Cap Penetrations: Estimate the number of cap penetrations that will need to be installed for closure of the facility including, but not limited to gas or leachate extraction wells, cleanouts, valve pits, etc. Material Unit Cost: 8. Unit cost to place or regrade material to reach final grades (this may include additional waste placement to reach grade): $/CY Are sufficient soils available in permitted on-site borrow areas to complete job? (Attach maps that identify sources and stockpiles) Yes No Processing Required? 9. Earthen Materials Stockpile Borrow Onsite Offsite Yes No a. Structural Fill Unit cost to place2 $/CY b. Intermediate Cover Unit cost to place2 c. $/CY Clay Cap Material Unit cost to place2 $/CY d. Final Cover Soil Unit cost to place2 $/CY e. Sand/Stone Unit cost to place2 f. Other Unit cost to place2 2 $/CY $/CY Unit costs should include all associated costs including, but not limited to, cost of material, excavation, transportation, processing, and placement. Labor costs should conform to US Dept. of Labor, Bureau of Labor Statistics most recent rates. 10. Synthetic Materials 3 a. Geotextile (unit cost to place3) $/Sq. Ft. b. FML (unit cost to place3) $/Sq. Ft. c. Drainage Layer (unit cost to place3) $/Sq. Ft. d. Other (unit cost to place3 $/Sq. Ft. The unit price should include the material, transportation, handling and installation costs. Labor costs should conform to US Dept. of Labor, Bureau of Labor Statistics most recent rates. 11. Cap Penetration Unit Cost List the unit cost to fabricate and install each penetration Unit cost to place (Provide documentation from third parties for this cost. Labor costs should conform to US Dept. of Labor, Bureau of Labor Statistics most recent rates) -2- $/Acre 2510-FM-BWM0057o 4/2009 12. Cost to construct/install E&S control structures: $ (Silt fencing, channels, etc. Provide documentation from third parties for this cost) 13. Revegetation cost (Seeding rate used: lbs/acre) (Lime rate used: tons/acre) (Fertilizer used: tons/acre) (Mulch rate used: tons/acre) Unit cost to revegetate: $/acre (Provide documentation from third parties for this cost) 14. Cost Summary a. Stabilization (line 1d) b. Fill (line 2 x line 8) c. Construction Drawings (line 4) d. Construction Roads (line 4a) e. Structural Fill (line 5a x line 9a) f. Intermediate Cover (line 5b x line 9b) g. Clay Cap Material (line 5c x line 9c) h. Final Cover (line 5d x line 9d) i. Sand/Stone (line 5e x line 9e) j. Other (line 5f x line 9f) k. Geotextile (line 6a x line 10a) l. FML (line 6b x line 10b) m. Drainage Layer (line 6c x line 10c) n. Other (line 6d x line 10d) o. Penetrations (line 7 and line 11) p. E&S Structures (line 3 x line 12) q. Revegetation (line 3 x line 13) Subtotal CQA Costs (5% of subtotal) Total -3- $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $