Expression of Interest for Short listing of firms for implementation monitoring of Biomass based integrated gasification power plants at village level in Madhugiri taluka of Tumkur district. Background: Govt. of Karnataka has signed an agreement with International Funding agencies - UNDP and ICEF and GoI (MNES) to implement the project “India: Biomass Energy for Rural India” in Tumkur district and intends to utilize part of the payments to engage agencies for implementing, managing and monitoring biomass energy related activities envisaged under the project. Objective of the proposed assignment: Biomass gasifier based electricity generation system is one of the feasible options to meet the rural energy needs utilizing the locally available biomass. A pilot project with 500 KW capacity biomass gasified based electricity generation system to cater the energy requirement of a cluster of 5 villages (i.e. Kabbigere, Chikkarasanahallii, Chikkannanahalli, Ajjenahalli and Obenahalli) near Kabbigere village in Koratagere taluk is under construction and is expected to be commissioned shortly. In the second phase of the project implementation, PMU – BERI proposes to set up similar gasifier plants of 2 x 100 KW capacity each in K.T.Halli and Boregunte villages to cater to the energy requirement of a cluster of 5 villages in Madhugiri taluka (i.e. K.T.Halli, Hanumantharayanapalya, Seebaiahnapalya, Boragunte and Veerannanahalli). In this context, PMU-BERI invites proposals from consulting agencies/firms to submit “Expression of Interest” (EOI) to take up planning, supervision and monitoring of project implementation for installation and commissioning of biomass gasifier based power generation and distribution in a cluster of 5 villages of Madhugiri taluk of Tumkur district. The scope of the work, period of assignment and other terms are detailed in the enclosed TOR. Interested firms/Agencies are requested to submit the profile of the organisations along with the EOI to the Project Coordinator, clearly indicating the Technical and Financial terms and conditions, on or before 20th June 2005. Project Coordinator PMU-BERI TOR – Gasifier System in Madhugiri cluster BIOMASS ENERGY FOR RURAL INDIA PROJECT Terms of Reference for providing Technical support during implementation of Bio Energy System in Madhugiri cluster 1. Project Background: Govt. of Karnataka has signed an agreement with International Funding agencies - UNDP and ICEF and GOI (MNES) to implement the project “India: Biomass Energy for Rural India” in Tumkur district and intends to utilize part of the payments to engage agencies for implementing, managing and monitoring biomass energy related activities envisaged under the project. 2. Introduction: Electrical power plays an important role for overall economical development of the state and country. The rural population in the country is about 70% and consumes about 30% of the energy. This energy requirement is presently being catered from the hydel, thermal and nuclear power generating plants located at far places from the load centres. There is considerable strain on the network due to remotely located rural roads. The lengthy transmission and distribution network including evacuation lines have resulted in high-energy losses as well as unreliable and poor quality of poor supply. The broad goal of the project is to develop, implement, demonstrate and disseminate a bio energy package to meet all the rural energy needs in a sustainable and participatory way to promote rural development. One of the major objectives of the project is to meet the requirement of electricity for lighting, drinking water supply, irrigation and small agro based industries (flourmill) by operating decentralized biomass energy production system. It is also proposed to install community borewells of appropriate size for irrigating half an acre of dry land for each household. 3. Project objective and Concept: Biomass gasifier based electricity generation system is one of the feasible options to meet the rural energy needs utilizing the locally available biomass. A pilot project with 500 KW capacity biomass gasified based electricity generation system to cater the energy requirement of a cluster of 5 villages (i.e. Kabbigere, Chikkarasanahallii, Chikkannanahalli, Ajjenahalli and Obenahalli) near Kabbigere village in Koratagere taluk is under construction and is expected to be commissioned shortly. In the second phase of the project implementation, PMU – BERI has proposed to set up similar gasifier plants of 2 x 100 KW capacity each in K.T.Halli and Boregunte villages to cater to the energy requirement of a cluster of 5 villages in Madhugiri taluka (i.e. K.T.Halli, Hanumantharayanapalya, Seebaiahnapalya, Boragunte and Veerannanahalli). TOR – Gasifier System in Madhugiri cluster In this context electrical infrastructure and distribution study for the above 5 villages of Madhugiri cluster has already been completed. The power generated by the plants will be transmitted and distributed through a distribution system which will be inter-connected with the currently available BESCOM distribution and also for use in islanded mode whenever necessary. Presently it is proposed to establish one 2 x 100 KW biomass generating plant near Boregunte village and another 2 x 100 KW biomass generating plant neat K.T.Halli village to develop distribution network, partly utilizing the BESCOM distribution network for catering the existing and future loads of 3 and 2 villages respectively. The capacity of the plants could be increased at a later stage by installing additional generating units in the above plants. 4. Scope of work of Technical Consultant: Sl. Activity No . 1. Preparation of detailed project report for biomass gasifier based power generation system 2. Construction of building for power plant Description Role of Agency 5 villages (K.T.Halli, Hanumantharayanapaly a, Seebaiahnapalya, Boragunte and Veerannanahalli) Buildings for the installation of 2 x 100 KW gasifier at Boregunte and K.T.Halli plants to meet the energy demands of 5 villages of Madhugiri cluster 3. Power distribution system Development of detailed design Plant layout drawing List of equipment List of manufacturers Cost estimate, cost of generation, unit cost, energy rates and recovery Preparation of detailed project report and its adaptation for application to MNES for subsidy. Preliminary planning – Building plan/BOQ/ Estimation Preparation of Tender specification with bid purpose drawings, procedures for review and analysis of bid and recommendations for the selection of contractor(s). Issuing of Tender enquiries and receiving offers/evaluation of tender/ coordination during award of contract. Construction supervision and scrutiny of bills for payment. Tender floating/issuing enquiries and receiving offers/ evaluation of tender/ coordination during award of contract. Supervision during erection and commissioning of power distribution lines and infrastructure and scrutiny of bills for payment. Preparation of tender document for TOR – Gasifier System in Madhugiri cluster 4. Installation of Gasifier plant for power generation and commissioning of power distribution system 5. O&M of plant and distribution system All 5 villages in Madhugiri cluster 5. Assignment fee / Terms and conditions: - 6. gasifier system with gas engines. Calling for tender, processing and evaluation of tender and recommendation for selection of suitable firm. Providing technical support during implementation of bio energy systems at Madhugiri cluster at the time of installation, assembly, commissioning and testing of entire system aspects. This includes integration of generation and distribution system with BESCOM grid interface. Design, development and engineering for the installation of biomass handling system including preparation of tender specification, evaluation and selection vendors. Developing models for long-term O&M contract and selection of O&M contractor. Explore the possibility of BOOT contracts for future installation. BERI shall provide the free transport facility to site and back along with BERI project staff for site visit. BERI shall provide accommodation facility to consultant personnel during supervision of construction of building and commissioning of plant/ distribution system. Review Committee: The performance of the assigned work will be reviewed quarterly by the following review committee: 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. TOR – Gasifier System in Madhugiri cluster Project Coordinator Secretary, KSCST Chairman, ASTRA Director (Technical), BESCOM Chief Executive, ABETS, CGPL Suptd. Engineer, BESCOM, Tumkur Prof. P.J. Paul, CGPL Director, REP, RDPR Dept. Project Officer (F) Project Officer (E&O) Associate Project Officer (En) Chairman Member Member Member Member Member Member Member Member Member Convener 7. Deliverables: The assignment fee indicated above includes submission of following types of documents: o o o o Detailed project report Tender specifications Purchase recommendations Drawing and documents - 3 copies 3 copies 3 copies 3 copies All the original copies of the floppies containing above shall also be submitted. 8. Funds release stages: - 9. BERI would release 30% of the assignment fee after submission of detailed project report. 60% of the assignment fee will be paid on the basis of monthly progress. 10% of the assignment fee will be paid after commissioning and testing of plant and distribution system. Duration and output: Technical consultant involvement in the project would be for a period of 12 months from the date of acceptance of work order issued by PMU-BERI for providing technical support during implementation of Bioenergy system in the first cluster. Sl. No. 1. Time T=1 Output 2. T=2 3. T=3-12 months TOR – Gasifier System in Madhugiri cluster Detailed project report with plant layout drawing, list of equipments, manufacturers list, cost estimate, cost of generation, energy rates and recovery. Building plan for power plant/BOQ/ estimation/tender specification with bid purpose drawings and recommendations for the selection of contractor(s). Tender floating/issuing enquiries and receiving offers/evaluation of tender/award of contract for building and power distribution system. Design and engineering for the installation of biomass handling system including technical specification, evaluation and selection of vendors. Supervision during building construction, erection and commissioning of power distribution line and infrastructure. Providing technical support at the time of installation, assembly, commissioning and testing of biomass based gasifier plant along with distribution system. 10. Developing models for long term O&M contract and providing recommendations for the selection of O&M contractor. Exploring the possibility of BOOT contracts for future installation. Technical details and CVs required from interested organisations: - Details of similar project work carried out in the past 3 years. Technical report titles and organisations for which works were carried out. CVs of personnel which are proposed to be engaged for this activity. TOR – Gasifier System in Madhugiri cluster