APPLICATION FOR APPROVAL OF WORKS AFFECTING PUBLIC SEWERAGE SYSTEM [FORM CLR OVER SEW] [UNDER SECTION 14(1) AND 33(1) OF THE SEWERAGE AND DRAINAGE ACT (CHAPTER 294)] Date: Director Water Reclamation (Network) Department PUB 40, Scotts Road #14-01 Environment Building Singapore 228231 Instructions 1. This form is to be digitally signed by the Qualified Person responsible for the works. 2. This form is to be accompanied by the relevant attachments. Particulars of Project Project Reference Number Project Title Location Description [Include Lot/Plot, MK/TS, House No, Building Address and Road information] Particulars of Application Application for approval is required only for the following works (as shown in a) that are within the corridor distance of concern (as shown in b). (a.) Select type of works 0 Excavation works for any building, structure, road, railway, bridge, viaduct, flyover, drain or sewer works 0 Building/structure works 0 Pipe or cable laying works 0 Boring, dredging, jacking, leveling, piling or tunneling works 0 Driving or sinking of any earth rod, casing or tube into the ground 0 Storage or placement of large construction equipment, construction materials and stockpiling of earth or heavy objects. (b.) Select the corridor distance:0 Work is within the 25m corridor of sewer or/and 0 Work is within the 36m corridor of DTSS Tunnel & Facilities Stage of Development Submission : 0 Pre-consultation/planning stage 0 NEA (CBPU)'s DC Clearance obtained 0 NEA (CBPU)'s BP/DP Clearance Certificate obtained 0 BCA's Permit to Commence Building/Structure works obtained NA File Ref. No. / Case ID SIP Reference Number 0 from CBPU (if applicable) DC Clearance Reference Number from CBPU 0 (if applicable) Department File Reference 0 No (if applicable) Particular of Qualified Person Name Role In Project Registration No Firm Name UEN Firm Address Telephone No. Extension Fax No. Email Address Dated Declaration by Qualified Person I confirm that: (1) I am the qualified person for the project/works. I hereby apply for approval for carrying out the above-mentioned works which are likely to affect the public sewerage system within or in the vicinity of the development /work site. I confirmed (2) All the existing and proposed buildings/structures, piling works including temporary works for excavation and all the proposed & existing sewers are shown in the plans submitted with this application. I confirmed (3) The exact position and levels of all the existing sewers as indicated in the original copy of SIP attached to this submission and as shown in the submitted plans have been checked and verified on site. I confirmed (4) The proposed development/works *do not involve/involve building/ structure directly over or above any sewers or encroach on any minimum clearance distance between structure and sewer as stipulated in the Code of Practice on Sewerage and Sanitary Works or published in the PUB Internet Website. I confirmed I will comply with PUB’s requirements on “PUB (WRN) Advisory NotePrevention of Damage to the Sewerage System” and can be found in the PUB website: http://www.pub.gov.sg/general/Pages/PreventionofDamage.aspx#Prevention I confirmed I also declare that I will take every practical measure to ensure that the proposed development/works will not disrupt or affect any existing public sewers. I will not commence any temporary works/piling works/building works within the required setback for the existing sewer until a written clearance from Water Reclamation (Network) Department, PUB has been obtained. I confirmed I hereby confirm that the details of the proposed *Sewerage Work/Sanitary Work/Sewerage M&E Works/sewage Treatment Plant/Nil will be submitted separately I confirmed Attachments This application is accompanied by: (a) For all sewers within and in the vicinity of the development site as per PUB consultation requirements All the below documents as attached: (1) Sewerage Interpretation Plan (SIP) showing the existing sewers near or within the site. (2) Pre-condition survey plan endorsed by a Registered Surveyor showing the position, sizes, top and invert levels of the sewers and manholes (horizontal and vertical) in relation to the existing buildings/structures (including wall, drains, etc) and boundary lines. (3) Layout plan endorsed by QP showing the proposed buildings/structures (including retaining and boundary wall and footings, drains etc) overlaid on the survey plan mentioned above. The plan shall indicate the minimum setback for the existing sewers. (4) Piling layout plan endorsed by QP showing details of the proposed piling works including the horizontal and vertical clearances between the piles and the existing sewers. (5) 1 set of Pre-Condition CCTV inspection survey reports together with CCTV video in accordance with PUB (WRN)'s CCTV inspection requirements posted on PUB's Internet Website. The CCTV reports and DVD discs are submitted in an envelope labeled "PRE-CONDITION CCTV INSPECTION REPORT" & "Project Ref No.". The CCTV inspection survey was carried out for all existing sewers and manholes within and in the vicinity of the development site as per PUB (WRN) CCTV requirements. (6) Other relevant documents- please specify: *I confirmed/ Not Applicable (b) For all sewers of > 900mm diameter and/or DTSS Tunnel/ Structures within and in the vicinity of the development site as per PUB consultation requirements *I confirmed/ Not Applicable All the below documents, in addition to the above (a) are submitted: (1) Plan for development works; (2) Construction Impact Assessment Report, complete with plan for engineering works; (3) Instrumentation and Monitoring Proposal; (4) Certified Survey Plan; (5) Construction Method Statement; (6) Protection Measures; (7) Contingency Measures; (8) Monitoring of construction activities above the DTSS tunnel/structures (9) Other documents as requested by PUB (WRN) * Delete where it is not applicable **Signature and Stamp of QP ** This MS Word form is to be digitally signed by the Qualified Person if it is to be submitted via email to PUB (WRN). Alternative to digital signing, QP may scan the hardcopy of the MS Word form duly signed and stamped by the QP and send the pdf document via email to PUB (WRN).