State of Israel The English version is a non-binding, unofficial translation from the original, binding, Hebrew version and is posted here exclusively for the convenience of the Public. Only the Hebrew version, as officially published in the official gazette (Reshumot) shall be binding. THE NATURAL GAS UTILITY (WORK PLAN FOR DISTRIBUTION NETWORK) REGULATIONS, 5767-2006 By virtue of the power vested in me under Section 25 of the Natural Gas Utility Law, 5762-2002 (hereinafter - the Law), and with the approval of the Economics Committee of the Knesset, I make the following Regulations: Definitions 1. In these Regulations "Qualified Surveyor" - means the holder of a licence under the Surveyor's Ordinance; "Defence Installation" - as defined in Section 159 of the Planning and Building Law, 5725-1965 (hereinafter The Planning and Building Law) "Infrastructure Installations"- roads and railways of all kinds, infrastructure lines and including electricity lines, lines for hydrocarbon gases, or for chemicals and fuel of all kinds, dangerous substances, communications lines, water pipes, sewage and drainage pipes and installations serving them; "Combustion source"- an act that is likely to cause the ignition of a natural gas cloud, including overhead electricity installations, combustion engines and surface areas whose internal temperature exceeds 300 degrees centigrade; "District Planner" - as defined in Section 8 of the Planning and Building Law (hereinafter - the Planning and Building Law); "The Safety Order" - the Gas (Safety and Licensing) (Installations for the Distribution of Natural Gas) Order, 5759-1999; "The Natural Gas Authority"- as such is defined in Part 6 of the Law; "The Gas Licensing Authority" - the authority for the licensing of natural gas installations, as defined in Section 119F of the Planning and Building Law; "Streams Authority" - as defined in Section 2 of the Streams and Springs Authorities Law. 5725-1965; "Drainage Authority" - as defined in the Drainage and Flood Control Law, 5718-1957; "Scheme" - as such is defined in the Planning and Building Law; "Local Scheme" - a local outline scheme or detailed scheme or scheme including provisions of such a scheme. Submission of 2. work plan A work plan shall be submitted to the Licensing Authority by one of the following: (1) The State of Israel, or whoever is appointed for such purpose on its behalf; (2) A license holder; (3) A natural gas consumer, in respect of a gas installation for personal consumption; Scale and survey map 3. (a) A drawing of a working plan shall be submitted in a scale of not less than 1:250; provided that the Licensing Authority may fix a different scale, having regard to local conditions and the level of detail required, in its opinion. (b) The work plan drawing shall be prepared on a situation map prepared by a qualified Surveyor; the Surveyor may certify on the plan that the details contained in it, were examined by him six months, at the earliest, prior to submission of it to the Gas Authority. Area covered by work plan 4. A work plan shall apply to an area that shall not be less than the area in respect of which limitations are placed on the use of the land as provided in Regulation 6 (2). Zoning marking of the land and limitations 5. In a work plan, the zoning of the land comprised within it shall be marked as detailed hereinafter: (1) The area designated for the gas pipeline strip for the distribution network shall be marked in yellow and its width shall be noted in the plan; (2) The area that is subject to limitations as to use of the land as provided in Regulation 6 (2) shall be marked by a broken red line; circles shall also be marked on the work plan divided into four parts (rosettes) on which the distance shall be marked from the edge of the gas pipeline strip to the edge of the area that is subject to limitations as aforesaid. Provisions of 6. The drawing and provisions of the work plan shall the work plan include all the following: (1) The permitted usages in the area designated for the gas pipeline strip; (2) Limitations under any law on uses of land that are imposed because of the work plan on the areas marked on it including the limitations imposed on a defence installation, and the steps taken to minimize the limitations; (3) The conditions for the grant of building permits for the establishment of the distribution network as stated in Regulation 9; (4) Provisions as to protection of the system as stated in Regulation 10. (5) Provisions concerning the prescribing of operating procedures and emergency procedures approved in accordance with the Natural Gas Authority's requirements as a condition for the issue of the building permit or as a condition in the building permit; (6) Provisions regarding restoration of landscape as stated in Regulation 11; (7) Provisions with regard to signboards and marking of the distribution network; (8) Provisions concerning safety and reduction of environmental and scenic nuisances as a result of the establishment of the distribution system; (9) Provisions of the specification as approved under Section 24 of the Law. Accompanying 7 documents All the following shall be marked on the drawing referred to in Regulation 3 or on a separate drawing that shall be prepared as part of the work plan; (1) All the sources of combustion within an area of 10 meters from the distribution system; the District Planner may require, for special safety reasons, that marking of sources of combustion shall be made in respect of a larger area; where no sources of combustion have been found in an area as aforesaid, an expert opinion of the person who prepared the working plan shall be submitted to the Gas Authority, certifying that no sources of combustion exist within the said area; 'the Distribution System'- for the purposes of this section, means with the exception of pipelines for the transmission of natural gas by low pressure; (2) All existing usages of the land within a radius of 10 meters from the distribution network, which are permitted within the area thereof under approved local schemes; where there are no approved local schemes in respect of the said area, uses of the land as aforesaid shall be noted in accordance with district and national approved outline schemes in respect of that area; the District Planner may require, for special reasons of safety, planning or engineering, that a note of uses of the land shall be prepared in respect of a larger area; (3) A survey of natural landmarks and landscape within the area of the work plan; (4) Marking of infrastructure installations and the water wells within the area of the work plan, including infrastructure installations whose relocation is necessary as a result of establishment of the distribution system; (5) Approval of the Commissioner, as he is defined in Section 61 of the Law, to the effect that the engineering and safety characteristics of the distribution network proposed in the work plan meet the requirements of the Safety Order. Manner of submission 8 (a) Where one of the matters specified in Column A of the table set out below has been included in one of the drawings as stated in Regulation 7, the plan shall be submitted with the addition of the comments of the body specified alongside it, in Column B. Column A The item included in the Plan 1. Existing or planned infrastructure installations 2. Connection to Gas Station 3. Crossing of a stream 4. Any scheme 5. Defense installation or an area under control as such is defined in Regulation 149 of the Defense Regulations (Emergency) 1945 Column B The Commenting Body The owner of the infrastructure installation and the body charged by law with responsibility for the infrastructure installation The Holder of the License for operation of the gas installation that is the subject of connection to the gas station, in so far as the station is not owned by the party submitting the work plan The relevant Drainage Authority and the Streams Authority The relevant Fire Authority A representative of the Minister of Defense on the District Planning and Building Committee as defined in the Planning and Building Law, within whose district the work plan applies 6. Archeological Sites 7. A National Park or Nature Reserve or landscape reserve under a scheme or protected natural landmarks 8. A forest under a National Outline Scheme 9. A declared port 10. An airfield or landing strip The Antiquities Authority The Nature and National Parks Preservation Authority The Jewish National Fund The Agency managing the land on which the port is situated The Civil Aviation Authority (b) Where a body has not made any comments within 30 days of the date of receipt of the work plan, the plan shall also be submitted to the Gas Licensing Authority without any comments. (c) Where the Party submitting the plan has forwarded the plan for the comments of the bodies as detailed in sub-regulation (a) the Gas Licensing Authority shall submit with the work plan, a copy of the referral to such bodies and their comments, in so far as any have been received. (d) The Licensing Authority's decision shall be sent to all those bodies whose comments were required as detailed in sub-regulation (a) Conditions for grant of building permits 9 (a) The work plan shall include provisions and in accordance with them, the application for a permit for the erection of the gas installation as provided in the Planning and Building Regulations (Licensing of Natural Gas Installations) 5763-2003 (hereinafter - the Natural Gas Installations Licensing Regulations) accompanied by a detail specification of the work in which all the following shall be stated: (1) The work site; (2) The manner of construction of the distribution system; (3) The means of reducing nuisances and harm to natural landmarks and landscape at the time of construction; (4) The means of access, to the effect that use will be made in so far as is possible, of existing roads; in the absence of such existing roads, roads will be surfaced governing means of access in a manner that will minimize, as far as is possible, damage to the environment and to the landscape; (5) The organization area of the operating contractor; (6) The available areas for the storage of equipment and working materials; (7) The area in which the distribution system will be laid; (8) Reference to the method of excavation and the depth thereof, the materials covering the site following the laying of the system and removal of surplus material from the excavation works (b) The work specification including the section in respect of which the work plan has been forwarded for the comments of any body as stated in Regulation 8, will require coordination with such body before the work in that section is carried out. Protection of the system 10. A work plan shall include provisions as to the examinations that must be carried out on the subject of the establishment of the distribution system, in accordance with the Standards specified in Section 2 of the Safety Order, including inspection on the subject of stability of the land, as a condition for the grant of a permit for the laying of the distribution system. Landscape restoration 11. A work plan shall include provisions for landscape restoration of the area covered by the plan following construction of the distribution system; these provisions shall be prescribed having regard to the natural landmarks and landscape that exist within the area covered by the work plan and shall make reference, inter alia, to the following matters; (1) Drainage of the land in order to prevent flooding; (2) Flow channels of streams above and below ground level; (3) Recycling of ground level and its restoration, as far as is possible, to its original state. (4) Rehabilitation of plant life, including by means of cultivation befitting the original environment. Other documents 12 The Gas Licensing Authority may require from the Parties submitting the work plan, further information and documents in so far as they are required by it for the purposes of examination of the work plan and making a decision on it. Saving of Laws 13 Nothing in the provisions of these regulations shall prejudice other laws including the obligation of obtaining a permit under the Natural Gas Installations Licensing Regulations, or the duty to act in accordance with the specification under Section 24 of the Law. The 14th day of Cheshvan, 5767 (November 5, 2006) Ronny Bar-On Minister of the Interior.