4/9/2015 RiskyProject Intaver Institute Inc. 303, 6707, Elbow Drive S.W, Calgary, AB, Canada Tel: +1 (403) 692-2252 Fax: +1 (403) 459-4533 www.intaver.com 2012 Intaver Institute Project Risk Management Software 1 What Is RiskyProject? Project Scheduling Risk Register Quantitative risk analysis using Monte Carlo simulations Project performance measurement 2012 Intaver Institute • • • • 4/9/2015 RiskyProject is Windows-based project risk management software. Risky Project gives you a simple answer to a common question: What will happen to your project if certain risks occur? 2 2012 Intaver Institute Projects consistently fail to meet: • Budget • Schedule • Quality • Safety • Technology • Other measures 4/9/2015 The Project Management Problem 3 • • • • Human psychological limits Inadequate training Poor processes others 2012 Intaver Institute Reasons 4/9/2015 The Project Management Problem 4 • How to estimate project duration or cost? • What are the most critical risks and how to mitigate them? • How to measure project performance? • How to make an informed decision about future course of the project? 2012 Intaver Institute Key Project Management Issues 4/9/2015 The Project Management Problem 5 • RiskyProject is consistent with PMI PMBOK. Risky Project supports the full project risk management process. • RiskyProject is very easy to use. RiskyProject is uses a scheduling interface similar to other project popular project management tools. • RiskyProject has low implementation and support costs. Compared with the comparative products, RiskyProject provides unmatched value 2012 Intaver Institute Project risk management made simple 4/9/2015 The RiskyProject Solution 6 • Provide state of art quantitative project risk management tools • Low cost • Ease of implementation • Limited initial training required • Scalable 2012 Intaver Institute Project risk management for Project Managers 4/9/2015 The RiskyProject Solution 7 Full scheduling engine with costs and resources Full risk register that links to project schedules Quantitative and qualitative analysis Risk+ replacement Easy to use quantitative schedule risk analysis based on risk events Probabilistic cash flow analysis Project tracking with risks and uncertainties Integration with Microsoft Project, Primavera, or other project management software • Optional decision tree analysis • Analysis of critical risk events which need to be mitigated first 2012 Intaver Institute • • • • • • • • 4/9/2015 RiskyProject Features 8 Product lifecycle management Risk templates Probabilistic and conditional branching Managing mitigation plans “What if “ analysis Advanced reporting tools Risk event correlations Multiple statistical distributions and distribution fitting 2012 Intaver Institute • • • • • • • • 4/9/2015 RiskyProject Features (Continued) 9 • • • • WBS Resources Costs Risk Register or Risk Lists 2012 Intaver Institute RiskyProject uses common PM artifacts 4/9/2015 RiskyProject Workflow 10 2012 Intaver Institute 4/9/2015 RiskyProject Workflow RiskyProject’s workflow is compatible with PMI, Prince II, and other risk management processes 11 Enter resources, cost and income for each task Enter complete WBS, as it is done in other project management software You may also import project schedules from other scheduling tools, such as Microsoft Project or Primavera. 2012 Intaver Institute 4/9/2015 Define Project Schedule 12 Risk Register 2012 Intaver Institute 4/9/2015 Risk register view Separate opened and closed risk and issues Separate threats or opportunities Pre mitigation Probability, Impact, and Score Post mitigation Probability, Impact, and Score 13 Risk Form 4/9/2015 Double-click on a risk to view or modify Risk Information Risk description and status 2012 Intaver Institute Management Strategy Cost of Risk Review Timeline 14 4/9/2015 Qualitative Risk Analysis: Define Risk Probabilities and Impacts Outcome Types are now qualitative 2012 Intaver Institute If no schedule is attached, qualitative risk assessments can be performed Outcomes for risk categories are qualitative and are based on risk matrix settings 15 Mitigation Plans 2012 Intaver Institute 4/9/2015 Add mitigation or risk response plans (cost, expected reduction in probability and impact, an descriptions. Plans can have sub-plans 16 Mitigation Waterfall Chart 2012 Intaver Institute 4/9/2015 Track total cost, expected reductions in probability or impact and dates for mitigation plans 17 Risk Reviews and Risk History 2012 Intaver Institute 4/9/2015 All risk reviews with details can be saved and tracked in system 18 Assign Risks to Tasks and Resources 2012 Intaver Institute Risks can be global (for all tasks or resources) or local (for specific tasks or resources) 4/9/2015 If schedule is attached, quantitative risk assessments is performed Define risk chance, outcome and result. Risks can have mutually exclusive outcomes, different outcomes of the same risk 19 If you enter only the low, base and high cost, duration, start time and income, RiskyProject will generate statistical distribution based on this data 2012 Intaver Institute In addition to risk events you may define uncertainties as statistical distributions for: • task cost • task start time • task duration • income associated with task 4/9/2015 Statistical Distributions 20 When your project schedule and risk breakdown structure is ready, click here to perform Monte Carlo simulations 2012 Intaver Institute 4/9/2015 Monte Carlo Simulation 21 White bars represent original project schedule (no risks) Blue bars represent project schedule with risks 2012 Intaver Institute Compare original project schedule and result of analysis 4/9/2015 Result Gantt Chart 22 Results of Risk Analysis Results of analysis for project cost, finish time, and duration Double click on any chart to view detailed information 2012 Intaver Institute 4/9/2015 Project Summary: project duration, cost, and finish time with and without risks 23 Detailed results can be shown for each task or project for cost, duration, start time, finish time, and income. Move the slider to determine the chance that project will be within budget 2012 Intaver Institute 4/9/2015 Detailed Results of Analysis Get detailed statistical data Data can be exported as an image or text 24 4/9/2015 Cost vs Schedule Scatter Plot 2012 Intaver Institute Move the slider to determine the chance of meeting both schedule and budget Base Estimate indicated by yellow dot This plot is often referred to as the “Bull’s eye” or “Football” chart 25 Cost chart is generated based on fixed and variables cost and income associated with tasks and resources Compare forecasted project costs with (blue line) and without (red line) risks 2012 Intaver Institute 4/9/2015 Cost, Income and Revenue 26 2012 Intaver Institute 4/9/2015 Probabilistic Cash Flow Analysis Cash flow is generated based on fixed and variables cost and income associated with tasks and resources Compare cash flows with (blue bars) and without (red line) risks 27 Prioritize critical task or risks Tornado chart shows risks or other parameters that have the most affect on the project schedule 2012 Intaver Institute 4/9/2015 Sensitivity Analysis 28 2012 Intaver Institute Crucial tasks for project cost and duration can be different 4/9/2015 Crucial Tasks Crucial tasks have the most effect on the project schedule 29 This task has low duration but high risk These tasks have balanced risk versus duration ratio. 2012 Intaver Institute Risk chart shows task duration and versus risk, associated with task 4/9/2015 Risk Chart 30 2012 Intaver Institute 4/9/2015 Risk Matrix Risk Probability, Impact and Score for the current schedule 31 3 most important project parameters (cost, duration, and finish time) 3 most crucial tasks 2012 Intaver Institute Project Dashboard 3x3 is a condensed view of the most important results of analysis 4/9/2015 Project Dashboard 3x3 32 3 most critical risks For each task at any moment you may enter how much work has been completed Risky project automatically adjusts the probability of risks for partially completed tasks 2012 Intaver Institute This task is 100% completed (green bar) 4/9/2015 Project Tracking This task is partially completed (yellow bar) 33 New project forecast is done each time actual project data is entered. 2012 Intaver Institute Low, base, and high forecast 4/9/2015 Tracking Results Original (baseline) project duration Actual project performance 34 Advanced Project Risk Management • Risk register allows you to compare pre and post mitigation risk scores Select pre and post mitigation baselines to view on risk register Pre and post mitigation risk scores 2012 Intaver Institute 4/9/2015 View mitigation efforts 35 • View results for each baseline • Select the working schedule that you will use to manage the project Select the current schedule Compare results for each baseline 2012 Intaver Institute Compare different baselines 4/9/2015 Advanced Project Risk Management 36 • Model different scenarios when project activities are uncertain • Gives EV of project given uncertainties in project activities Run alternative project branches probabilistically 2012 Intaver Institute Conditional and Probabilistic Branching 4/9/2015 Advanced Project Risk Management 37 Integration with Project Management Software 2012 Intaver Institute 4/9/2015 Risk tab installed on Microsoft Project ribbon allows users move projects seamlessly into RiskyProject RiskyProject can import schedules from Oracle Primavera and other project management software. 38 Intaver Institute performs project risk management, risk analysis, and decision analysis training and consulting 4/9/2015 Intaver Institute’s Services • Project management: theory and best practices • Introduction to project risk management: theory and case studies • Project decision analysis • Quantitative methods in project management 2012 Intaver Institute Popular Intaver’s training courses include: • Introduction to RiskyProject: basic RiskyProject workflow and features • Advanced features of RiskyProject Professional 39