Railway Flyover (Narnii Guur)
TA for Sustainable Bridge
Maintenance and Management
Project Period: Aug 2013 – Sep 2015
Project Purpose:
Ministry of roads, transportation's and municipality of
UB's capacity for planning skills of bridge maintenance is
improved.
Targeted Outputs:
1) Concept of "Bridge management cycle" is widely
understood, and guidelines and/or manuals are
developed.
2) Database system to record information of bridges is
developed in nation-wide and UB.
3) National policy on bridge maintenance and
management are developed.
4) Staff members related to bridge / structure
maintenance and management in MRT and MUB are
trained, and trainings are conducted by Mongolian side.
JICA's Experience of Infrastructure Projects
Urban Development Master Plan
• Urban development master plan is one of JICA’s technical
cooperation activities which support 1)analysis of
urbanization trend, 2)planning concepts, 3)development land
use, and 4)formulation of prior project plan.
Country
City
Year
Lao PDR
Vientiane
2011
Indonesia
Surabaya
2011
Afghanistan
Kabul
2009
Mongolia
Ulaanbaatar
2009
Vietnam
Hanoi
2007
Kazakhstan
Astana
2001
JICA's Experience of Infrastructure Projects
Airport
• Activate economic development by enhancing aerial transportation
for the logistics and movements of passengers
Country
Airport Name
Year
Mongolia
New Ulaanbaatar Intl Airport
2016
Kazakhstan
Astana Intl Airport
2011
Thailand
Suvarnabhumi Intl Airport(Bangkok)
2007
Kyrgyz
Manas Intl Airport(Bishkek)
2001
Sri Lanka
Bandaranaike Intl Airport(Colombo)
1999
Malaysia
Kuala Lumpur Intl Airport
1998
JICA's Experience of Infrastructure Projects
Urban Mass Rapid Transit
• Reduce traffic congestion and environmental load
• Revitalize economic activity of the urbanized area
Country
City
Year
India
Delhi
2004
Thailand
Bangkok
2004
Vietnam
Ho Chi Minh
2006
China
Beijing
1995
Korea
Seoul
1974
JICA's Experience of Infrastructure Projects
Disaster Management
• Formulate hazard map
• Construction of evacuation facility
• Emergency assistance (Japan Disaster Relief team)
Country
City
Year
Thailand
Comprehensive Flood Management Plan for the
Chao Phraya River Basin
2011
Indonesia
Self-Sustainable Community Empowerment
Network Formulation in Aceh Province
2009
China
Dispatch of JDR team to Sichuan earthquake
2007
JICA’s Priority Areas in Mongolia
Sustainable Development of
the Mining Sector and
Enhancement of Governance
• Sustainable Mineral Resources
Development
• Enhancement of Governance for
Appropriate Management of Minerals
Revenue and Macro-economy
Assisting Inclusive Growth
• Expansion of Job opportunities through
promotion and development of SMEs
towards industry diversification
• Improvement of basic social services such
as health and basic education
Enhancement of the Capacity
and Function of Ulaanbaatar as
Urban Center
• Improvement of infrastructure
• Improvement of urban planning and
management
JICA’s Infrastructure Projects in Mongolia
Ulaanbaatar
Master Plan
2020
Approval on February 2013
JICA’s Master Plan in 2009
JICA’s Infrastructure Projects in Mongolia
On-going/Planned
□water supply and sewerage Study
Completed
□Seismic Disaster Risk Study
◎Grant Aid
△Yen Loan
□T/A
◎□Narangiin Enger Disposal Site
△Metro Study
◎△□Thermal Power Plant #4
Railway
△Ajilchin Flyover Study
◎Improving the Roads (Narnii Zam)
◎Solar Power Generation
◎Railway Fly-over (Narnii guur)
◎Water Supply Facilities in UB
△New UB International Airport
JICA’s Infrastructure Projects in Mongolia
RAILWAY FLYOVER (NARNII GUUR)
•
•
•
•
•
Grant Aid Project
Project Cost: 3.6 Billion JPY
Bridge Length: 260m
Connecting Road: 630m
First Large Metal Bridge in Mongolia
JICA’s Infrastructure Projects in Mongolia
NEW ULAANBAATAR INTERNATIONAL AIRPORT
• Yen Loan Project
• Solution for demand increase of aviation movements
• Construction of new global gateway to Mongolia as landlocked
country
JICA’s Infrastructure Projects in Mongolia
FEASIBILITY STUDY OF UB METRO
•
•
•
•
PPP-FS Scheme
Proposed by Master Plan 2020
To reduce traffic congestion
To promote underground development in Ulaanbaatar
JICA’s Infrastructure Projects in Mongolia
IMPROVEMENT OF CAPACITY OF 4TH POWER PLANT
• Collaboration of Yen Loan, Grant Aid, TA and Volunteers
• Supporting the economic development as basic
infrastructure since 1990
JICA’s Infrastructure Projects in Mongolia
Water project by WB
under USIP2
New Water Pipe
(18.8km)
New Water Sources (21 wells)
WATER SUPPLY DEVELOPMENT IN GACHUURT
•
•
•
•
Grant Aid project
Scheduled for completion in November 2014
Benefit 390,000 ger area and 40,000 urban area residents
To provide the basic social service to ger area residents
JICA’s Infrastructure Projects in Mongolia
NARANGIIN ENGER DISPOSAL SITE & SOLID WASTE MANAGEMENT
• Collaboration of Grant aid and TA
• Construction of new disposal Site
• Provision of equipment, garbage trucks
• Capacity development for maintenance and management
• First sanitary landfill in Mongolia
JICA’s Infrastructure Projects in Mongolia
TA: Strengthening the Capacity of Seismic Disaster
Risk Management (2012-2013)
To enhance disaster prevention ability by risk mapping ,
formulating disaster prevention planning, and, capacity
development
Grant Aid: Improvement of Capacity of Fire Fighting
Techniques and Equipment(2013)
Provision of 22 units fire truck, water tank car, car lighting etc.
Grant Aid: Improvement of Fire Fighting Equipment
and Maintenance Workshop(2001)
Maintenance of equipment and provision of 17 units fire fighting
vehicle
•Countermeasure against urbanization risks
JICA’s Infrastructure Projects in Mongolia
CAPACITY DEVELOPMENT PROJECT FOR URBAN RE-DEVELOPMENT
•
•
•
•
Technical Assistance Project
Technology transfer the concept of land readjustment in Japan
Formulating urban re-development legal system
To reduce traffic congestion and air pollution in Ulaanbaatar
JICA will support infrastructure development;
-as new solutions for challenges in Mongolia,
-as contribution for people’s life in Mongolia