JICA's Activities for Development of Infrastructure in Mongolia Japan International Cooperation Agency Mongolia Office October,2013 Railway Flyover (Narnii Guur) TA for Sustainable Bridge Maintenance and Management Project Period: Aug 2013 – Sep 2015 Project Purpose: Ministry of roads, transportation's and municipality of UB's capacity for planning skills of bridge maintenance is improved. Targeted Outputs: 1) Concept of "Bridge management cycle" is widely understood, and guidelines and/or manuals are developed. 2) Database system to record information of bridges is developed in nation-wide and UB. 3) National policy on bridge maintenance and management are developed. 4) Staff members related to bridge / structure maintenance and management in MRT and MUB are trained, and trainings are conducted by Mongolian side. JICA's Experience of Infrastructure Projects Urban Development Master Plan • Urban development master plan is one of JICA’s technical cooperation activities which support 1)analysis of urbanization trend, 2)planning concepts, 3)development land use, and 4)formulation of prior project plan. Country City Year Lao PDR Vientiane 2011 Indonesia Surabaya 2011 Afghanistan Kabul 2009 Mongolia Ulaanbaatar 2009 Vietnam Hanoi 2007 Kazakhstan Astana 2001 JICA's Experience of Infrastructure Projects Airport • Activate economic development by enhancing aerial transportation for the logistics and movements of passengers Country Airport Name Year Mongolia New Ulaanbaatar Intl Airport 2016 Kazakhstan Astana Intl Airport 2011 Thailand Suvarnabhumi Intl Airport(Bangkok) 2007 Kyrgyz Manas Intl Airport(Bishkek) 2001 Sri Lanka Bandaranaike Intl Airport(Colombo) 1999 Malaysia Kuala Lumpur Intl Airport 1998 JICA's Experience of Infrastructure Projects Urban Mass Rapid Transit • Reduce traffic congestion and environmental load • Revitalize economic activity of the urbanized area Country City Year India Delhi 2004 Thailand Bangkok 2004 Vietnam Ho Chi Minh 2006 China Beijing 1995 Korea Seoul 1974 JICA's Experience of Infrastructure Projects Disaster Management • Formulate hazard map • Construction of evacuation facility • Emergency assistance (Japan Disaster Relief team) Country City Year Thailand Comprehensive Flood Management Plan for the Chao Phraya River Basin 2011 Indonesia Self-Sustainable Community Empowerment Network Formulation in Aceh Province 2009 China Dispatch of JDR team to Sichuan earthquake 2007 JICA’s Priority Areas in Mongolia Sustainable Development of the Mining Sector and Enhancement of Governance • Sustainable Mineral Resources Development • Enhancement of Governance for Appropriate Management of Minerals Revenue and Macro-economy Assisting Inclusive Growth • Expansion of Job opportunities through promotion and development of SMEs towards industry diversification • Improvement of basic social services such as health and basic education Enhancement of the Capacity and Function of Ulaanbaatar as Urban Center • Improvement of infrastructure • Improvement of urban planning and management JICA’s Infrastructure Projects in Mongolia Ulaanbaatar Master Plan 2020 Approval on February 2013 JICA’s Master Plan in 2009 JICA’s Infrastructure Projects in Mongolia On-going/Planned □water supply and sewerage Study Completed □Seismic Disaster Risk Study ◎Grant Aid △Yen Loan □T/A ◎□Narangiin Enger Disposal Site △Metro Study ◎△□Thermal Power Plant #4 Railway △Ajilchin Flyover Study ◎Improving the Roads (Narnii Zam) ◎Solar Power Generation ◎Railway Fly-over (Narnii guur) ◎Water Supply Facilities in UB △New UB International Airport JICA’s Infrastructure Projects in Mongolia RAILWAY FLYOVER (NARNII GUUR) • • • • • Grant Aid Project Project Cost: 3.6 Billion JPY Bridge Length: 260m Connecting Road: 630m First Large Metal Bridge in Mongolia JICA’s Infrastructure Projects in Mongolia NEW ULAANBAATAR INTERNATIONAL AIRPORT • Yen Loan Project • Solution for demand increase of aviation movements • Construction of new global gateway to Mongolia as landlocked country JICA’s Infrastructure Projects in Mongolia FEASIBILITY STUDY OF UB METRO • • • • PPP-FS Scheme Proposed by Master Plan 2020 To reduce traffic congestion To promote underground development in Ulaanbaatar JICA’s Infrastructure Projects in Mongolia IMPROVEMENT OF CAPACITY OF 4TH POWER PLANT • Collaboration of Yen Loan, Grant Aid, TA and Volunteers • Supporting the economic development as basic infrastructure since 1990 JICA’s Infrastructure Projects in Mongolia Water project by WB under USIP2 New Water Pipe (18.8km) New Water Sources (21 wells) WATER SUPPLY DEVELOPMENT IN GACHUURT • • • • Grant Aid project Scheduled for completion in November 2014 Benefit 390,000 ger area and 40,000 urban area residents To provide the basic social service to ger area residents JICA’s Infrastructure Projects in Mongolia NARANGIIN ENGER DISPOSAL SITE & SOLID WASTE MANAGEMENT • Collaboration of Grant aid and TA • Construction of new disposal Site • Provision of equipment, garbage trucks • Capacity development for maintenance and management • First sanitary landfill in Mongolia JICA’s Infrastructure Projects in Mongolia TA: Strengthening the Capacity of Seismic Disaster Risk Management (2012-2013) To enhance disaster prevention ability by risk mapping , formulating disaster prevention planning, and, capacity development Grant Aid: Improvement of Capacity of Fire Fighting Techniques and Equipment(2013) Provision of 22 units fire truck, water tank car, car lighting etc. Grant Aid: Improvement of Fire Fighting Equipment and Maintenance Workshop(2001) Maintenance of equipment and provision of 17 units fire fighting vehicle •Countermeasure against urbanization risks JICA’s Infrastructure Projects in Mongolia CAPACITY DEVELOPMENT PROJECT FOR URBAN RE-DEVELOPMENT • • • • Technical Assistance Project Technology transfer the concept of land readjustment in Japan Formulating urban re-development legal system To reduce traffic congestion and air pollution in Ulaanbaatar JICA will support infrastructure development; -as new solutions for challenges in Mongolia, -as contribution for people’s life in Mongolia Thank You For Your Kind Attention!