MANAGEMENT OF HILL TORRENTS Management of hill torrents crossing the Kachhi Canal to reduce the peak flows to safeguard the canal and to increase the agricultural production in Pachad Area Review alternatives to; i. ii. iii. Adopt hill torrent management to reduce the peaks or; Remodel existing X-Drainage / Hill Torrent Structures of D.G. Khan Canal and Dajal Branch from RD 0 to RD 531 as per criteria to be adopted for Kachhi Canal Review various modern alternatives for hill torrent management D.G.Khan Hill Torrents MAP OF KAHA HILL TORRENT GENERAL TYPES OF STRUCTURES FOR MANAGEMENT OF HILL TORRENT Storage Dams Delay Action Dams Check Dams Flood Distributors Dispersion Structures Diversion Dykes Cross Dykes Flood Irrigation Channels Flood Disposal Channels KAHA HILL TORRENT SCHEMATIC DIAGRAM FOR MANAGEMENT OF FLOWS IN BALOCHISTAN SCHEMATIC DIAGRAM FOR MANAGEMENT OF FLOWS IN PACHAD AREAPUNJAB Cost of Schemes – RS 130 Million Potential Area – 36,253 HA MAP SHOWING MANAGEMENT WORKS ON KAHA HILL TORRENT IN PUNJAB PROJECT IMPACT FLOOD PEAK EVENTS/INUNDATION PRE-PROJECT YEAR 1973 FLOOD PEAK BREACHES - DAJAL BRANCH DISTYS. DAMAGED - NAUSHERA - ZAMZAM - ISLAM - ABE-HAYAT AREA INUNDATED 56,000 CFS (1,586 CMS) 148 Nos. 45,000 ACRES (18,220 HA) POST-PROJECT YEAR 2003 FIRST PEAK SECOND PEAK THIRD PEAK 2ND JULY, 2003 10TH JULY, 2003 14TH JULY, 2003 BREACHES DISCHARGE AT CANAL CROSSINGS AREA INUNDATED 60,000 CFS (1,700 CMS) 60,000 CFS (1,700 CMS) 51,900 CFS (1,470 CMS) 5 No - Relief Cuts 9,000 CFS NOMINAL PRE & POST-PROJECT ATTENUATION OF FLOOD PEAKS FOR KAHA HILL TORRENT Discharge - CFS PEAK AT DARRAH FLOOD PEAK AT HILL TORRENT CROSSINGS PRE-PROJECT POST-PROJECT 40,000 15,000 0 50,000 23,000 2,500 60,000 31,000 4,500 70,000 39,000 9,000 80,000 48,000 14,000 CROPPING PATTERN AND INTENSITIES UNDER PRE AND POST PROJECT CONDITIONS CCA = 36,253 HA Crops Pre Project Cropped Area (HA) Post Project Intensity (%) Cropped Area (HA) Intensity (%) Kharif Sorghum 1,817 5.0 8,983 24.8 277 0.8 1,864 5.1 Cotton 0 0.0 1,831 5.1 K.Total 2,094 5.8 12,678 35.0 Wheat 465 1.3 1,926 5.3 Gram 141 0.4 591 1.6 Oilseed 199 0.5 6,597 18.2 R.Total 805 2.2 9,114 25.1 Annual 2,899 8.0 21,792 60.1 Bajra Rabi PROPOSED AND ACTUALLY BENEFITED AREAS AGAINST VARIOUS PEAK FLOODS CCA = 36,253 HA Proposed at Feasibility Level Achievement under Post Project Period Return Periods - Years Return Periods - Years Crops 2.33 5 10 25 2.33 5 10 25 Jawar 9,769 18,788 23,349 23,595 7,214 13,874 17,242 17,424 Bajra 1,489 2,863 3,559 3,597 1,100 2,114 2,628 2,656 Wheat 1,760 3,386 4,209 4,699 1,300 2,501 3,108 3,470 Gram 534 1,028 1,275 1,425 394 759 942 1,053 Oilseed 753 1,446 1,800 2,011 556 1,068 1,329 1,485 14,306 27,512 34,192 35,328 10,564 20,316 25,250 26,088 Total: COMPARISON OF ECONOMIC INDICATORS Sr. No. 1 Item Unit Pre-Project in Feasibility Report 1990 Post-Project in Evaluation Report 2003 Financial Project Cost Rs. Million 190.26 - Balochistan Works Rs. Million 60 - Punjab Works Rs. Million 130.26 364.9 2 Economic Project Cost Rs. Million 171.23 329.91 3 Implementation Period Years 3 5 4 Project Annual Benefits Rs. Million 33.8 84.03 - Agriculture Benefit Rs. Million 14.72 25.5 - Flood Damage Saving Rs. Million 19.08 58.53 - Economic Interval Rate of Return Percent 17.38 19.99 - Benefit Cost Ratio at 10% Discount Ratio 1.63:1 1.91:1 - Net Present Worth at 10% Discount Rs. Million 108.3 263.21 5 364.9 - Economic Parameters FUTURE STRUCTURAL IMPROVEMENTS A. PROP WALL CONSTRUCTED UNDER THE CREST ON D/S SHOULD BE PLACED UPSTREAM UPTO CREST LEVEL TO ENSURE B. ORDER OF CONSTRUCTION C. Construction must start from Darrah to down stream DEGREE OF PROTECTION D. Uniform flow Check washing of fines Safety Against Scour Down stream works need more protection as compared to the upper ones STRCTURAL IMPROVEMENTS Upper end of Salai should be semi circular instead of rectangular Terminal end should be similar to that of guide bund Off-take should be located >10 H above the cross structure For H < 2 meter falls with glacis be adopted instead of drop falls COST OF STRUCTURAL INTERVENTIONS RS.MILLION PUNJAB PROVINCE SCENARIO - 1. WITHOUT DISPERSION STRUCTURES • Cost of 40 Cross-Drainage Structures on Kachhi Canal RD: 0 – 990 (Punjab) 2,184 • Cost for increasing Flood Carrying Capacity Against 40-Year Return Period on D.G.Khan Canal System: (a) Excluding cost of flood carrying channels (b) Including cost of flood carrying channels 813 1,194 Sub Total (a) Sub Total (b) 2,997 3,378 SCENARIO - 2. WITH DISPERSION STRUCTURES • Dispersion Works in Pachad Area and Flood Carrying Channels RD: 0 – 990 • Constructing Drainage works on Kachhi Canal Corresponding to Existing X-Drainage Structures on D.G.Khan Canal System 1,363 Total BALOCHISTAN PROVINCE Cost of flood management for Nallahs Orignating from Marri Bughti Hills & Mountainous Regions upto Gandava/Badra Nallah 1,920 3,283 750 FINDINGS & CONCLUSIONS Efficacy of existing cross-drainage structures on DG Khan & Dajal branch be evaluated. Flood peak attenuation at cross-drainage structures through dispersion structures is significant. Suggested improvement in the design of structural interventions be taken into account in future hill torrent projects. In spite of shortcoming in design, diversion of flood flows in Pachad area has been reasonable during post-project environments. Construction of dispersion structures in Pachad area is technically and socially more attractive than disposal of flows into Indus River. Ensure the availability of funds for O&M at proper time. Existing & future users of canal water on the right bank through lift pumps be duly considered for planning & design of Kachhi Canal. RECOMMENDATIONS Dispersion Structures in Pachad Area on SoriLund, Sakhi Sarwar,Vidore, Chachar, Zangi & Shori Janubi and Flood Carrying Channels in Command Area be constructed. Carrying Channels leading to Indus River for Pitock and Shori Shumali be constructed. Cross drainage Structures on Kachhi Canal be constructed as per D G Khan & Dajal Canal System. Dispersion Structures would facilitate in the irrigation of additional area of about 80,000 HA. Provision may be made for Channelization of water along the right-bank through embankments constructed water course crossing Pipelines. STUDIES PLANNED TO BE CARRIED OUT BY CONSULTANTS Frequency analysis of flood flows of nallahs/rivers at darrah(s) and at canal drainage structures. Study the adequacy of existing cross draining structures on DG khan system in the light of frequency analysis. Remodeling of existing cross drainage structures if inadequate and additional structures if required on DG Khan canal / Dajal Branch. Consultants should advise for alternative strategies to irrigate Pachad area in lieu of proposed construction of 400 water course crossings on Kachhi Canal Consultants will probe that after construction of dispersion structures the flood peak will be reduced in accordance with the existing capacity of cross drainage structures on DG Khan system. Consultancy proposal for flood management of hill torrents originating from Suleiman Range and Marri Bugti hills from Taunsa Barrage to tail of Kachhi Canal. Revision of PC-I to accomodate hill torrent works in Punjab & Balochistan Provinces. THANKS