Current initiatives
1
Tender for:
• the development of Resource Management Plans
(RMPs) for prioritised Government Waterworks
(GWWs) in Southern, Eastern and Central Operations
• including the supporting Business Plans (BPs).
2
Name Province Operational Unit
1. Allemanskraal
2.
Vanderkloof (P.K. Le
Roux)
3.
Gariep
FS
FS
FS
4.
Boskop
5.
Vaal
6.
Vygeboom
NW
GP
MP
Central
Central
Central
Central
Central
Central
7 Grootdraai
8 Craigieburn
9 Hazelmere
MP
KZN
KZN
Central
Eastern
Eastern
√
√
√
√
√
RMP
√
√
√
√
√
√
√
√
√
BP
√
√
Timeframe
2012
2012
2012
2011/12
2013/Apr
2014
2011/12
2012
2011/12
Name Province Operational
Unit
Eastern 10 Inanda KZN
11 Midmar
12 Pongolapoort /Lake
Jozini
13 Wriggleswade
KZN
KZN
EC
Eastern
Eastern
Southern
14 Mtata
15 Theewaterskloof
16 Greater Brandvlei
17 Vo ëlvlei
EC
WC
WC
WC
Southern
Southern
Southern
Southern
√
√
√
√
RMP BP Timeframe
√
2011/12
√ 2012
√
√
√
√
√
√
2011/12
2011/12
2012
2012
2013
√ √ 2013 4
GWWs RMP BP
Central Operations
1 Allemanskraal
2 Vanderkloof
3 Gariep
4 Boskop
5 Vaal
6 Vygeboom
7 Grootdraai
Eastern Operations
8 Craigieburn
9 Inanda
10 Hazelmere
11 Midmar
12 Pongolapoort x x x
Southern Operations
13 Wriggleswade
14 Mtata
15 Theewaterskloof x
16 Greater Brandvlei x
17 Voelvlei
TOTAL x x x x x x x x x x x x x x x x x x x x x x x x x
2011/12 2012/13
R550 000
R600 000
R550 000
R50 000
R550 000
R550 000
R50 000
R50 000
R50 000
R550 000
R550 000
R550 000
R550 000
R1,850 000 R3,350 000
2013/14 Subtotal
R600 000
R700 000
R550 000
R550 000
R2,400 000
R550 000
R600 000
R600 000
R550 000
R700 000
R 50 000
R550 000
R550 000
R 50 000
R 50 000
R550 000
R 50 000
R550 000
R550 000
R550 000
R550 000
R 7,600 000
Process Stage Deliverables
Project Outline and
Encumbrance Survey
Project Initiation and Mobilisation
Encumbrance Survey Report
Draft Project Plans
Final Project Plans
Objective Identification Consultation with Interested and Affected Parties (I&APs) and key stakeholders
Objectives Matrix Report
Baseline Information Document Research and Information
Generation
Integrated Planning First Draft RMPs (including Public Participation-PP)
Final draft RMPs (including PP)
Draft and final BP Business Plan
Project Management
Project Closure
Process file and monthly progress reports
Project Closure Report
6
The project team will comprise of three project teams as per the Operational
Units:
Southern Operations
Steven Nhlabathi (RMP Unit – Project Leader)
Anet Muir (Environmental Impact Monitoring (EIM) Unit)
Margaritha Cox (Southern Operations)
Eastern Operations
Steven Nhlabathi (RMP Unit – Project Leader)
Anet Muir (Environmental Impact Monitoring (EIM) Unit)
Abdulla Sayed (Eastern Operations)
Central Operations
Steven Nhlabathi (RMP Unit – Project Leader)
Anet Muir (Environmental Impact Monitoring (EIM) Unit)
Marinus de Wilde (Gauteng – Central Operations)
Dries Visser (Free State – Central Operations)
7
IEE staff member to be included for intensive training include the following:
Boskop Dam (Steven Nhlabathi)
Wriggleswade Dam (Margaritha Cox)
Grootdraai Dam (Lucky Mzanywa)
Vaal Dam (IEE staff member to be confirmed)
8
Public private partnership process for Pongolapoort dam, KZN
-Review Pre-feasibility Study of Zululand DM
-Feasibility Study
-EOI
-Contracting of PPP
-Financial Closure
9
• BOTH TENDERS ADVERTISED 2/9/11
• COMPULSORY BRIEFING SESSION FOR RMPs
HELD 16/9/11 AND PPP HELD 19/9/11
• TENDERS CLOSES 4/10/11 AT 11H00
10
• Lake Matsamo;
• Pongolapoort Dam;
• Vygeboom Dam;
• Hazelmere Dam;
• Inanda Dam;
• Inyaka Dam;
• Buffelspoort Dam; and
• Roodeplaat Dam.
11
Through consultation with the National Water Resource
Infrastructure (NWRI) Operational Units of Southern,
Central, Northern and Eastern Operations, a list of
Government Waterworks (GWWs) where such nonconsumptive use is not allowed due to the operational constraints is listed below.
12
The desire to prohibit and control access to these dams is for public safety and / or resource protection due to:
Flood attenuation dams
Dams located in mountainous area associated with steep slopes and no safe public access to water surface
Balancing dams with water fluctuating water levels
Small reservoir surface area
Diversion weirs/reservoirs
Gauging weirs/reservoirs with small surface area
Servitude for storage only no public access
Protected areas with no public access
Absence of operational staff to control access – public access becomes a liability to the Department 13
• Bospoort Dam , Hex River, North West Province;
• Klipvoor Dam , Pienaars River, North West Province;
• Kromellenboog Dam , Marico River, North West Province;
• Lindleyspoort Dam , Elands River, North West Province;
• Loskop Dam , Olifants River, Mpumalanga Province;
• Madikwe Dam , Tholwane River, North West Province;
• Mankwe Dam , Mankwe River, North West Province;
• Marico-bosveld Dam , Marico River, North West Province;
• Molatedi Dam , Marico River, North West Province;
• Roodekopjes Dam , Crocodile River, North West
Province;
• Vaalkop Dam , Elands River, North West Province; and
• Wolwedans Dam, Grootbrak River, Western Cape
Province.
14