kakatiya thermal power project 1x600 mw

advertisement
19.06.2014
KAKATIYA THERMAL POWER PROJECT 1X600 MW
19.06.2014
Shri M V Keshavaraj AGM BHEL Site along with TGGENCO Senior officials
Welcoming Shri D Prabhaka Rao CMD TGGENCO on 19.06.2014
KAKATIYA THERMAL POWER PROJECT 1X600 MW
19.06.2014
Shri M V Keshavaraj AGM BHEL Site explaining the status of Condenser erection
activities to Shri D Prabhaka Rao CMD TGGENCO on 19.06.2014
KAKATIYA THERMAL POWER PROJECT 1X600 MW
19.06.2014
AGM BHEL along with Shri Sachidanadam CE (TPC-II) explaining status of erection activities
at 8.5 M floor to CMD TGGENCO.
KAKATIYA THERMAL POWER PROJECT 1X600 MW
19.06.2014
AGM BHEL along with TGGENCO officials explaining status of floor readiness
at 8.5 M floor to CMD TGGENCO.
KAKATIYA THERMAL POWER PROJECT 1X600 MW
AGM BHEL requesting CMD TGGENCO for Feeder Floors.
19.06.2014
KAKATIYA THERMAL POWER PROJECT 1X600 MW
19.06.2014
CMD TGGENCO reading the presentation h/o by AGM BHEL on overall status of project and
Customer Inputs for Boiler Light Up.
KAKATIYA THERMAL POWER PROJECT 1X600 MW
19.06.2014
AGM BHEL explaining contents in the presentation handed over to CMD TGGENCO
KAKATIYA THERMAL POWER PROJECT 1X600 MW
19.06.2014
CMD TGGENCO along with TGGENCO officials on the way to 17 m TG floor.
KAKATIYA THERMAL POWER PROJECT 1X600 MW
19.06.2014
CMD TGGENCO welcomed by Shri Rajeev Kumar DM/TG & BHEL Staff at 17 m TG Floor.
KAKATIYA THERMAL POWER PROJECT 1X600 MW
19.06.2014
KAKATIYA THERMAL POWER PROJECT 1X600 MW
19.06.2014
AGM BHEL explaining the methodology of Stator Lifting with the help of Portal Crane CMD TGGENCO.
KAKATIYA THERMAL POWER PROJECT 1X600 MW
19.06.2014
Shri K Rajeev Kumar DM/TG BHEL explaining status of erection activities in
Turbine & Generator areas to CMD TGGENCO.
KAKATIYA THERMAL POWER PROJECT 1X600 MW
19.06.2014
CMD TGGENCO appreciated regarding House keeping activities at site.
KAKATIYA THERMAL POWER PROJECT 1X600 MW
Project status being discussed at BHEL bunk office.
19.06.2014
KAKATIYA THERMAL POWER PROJECT 1X600 MW
CMD addressing the group w.r.t. efforts to be made to
achieve the Unit Synchronization by March15.
19.06.2014
KAKATIYA THERMAL POWER PROJECT 1X600 MW
19.06.2014
AGM BHEL explaining the process P-91 welding to CMD TGGENCO.
KAKATIYA THERMAL POWER PROJECT 1X600 MW
Erection of Critical Piping in CD Bay structure
is explained by AGM BHEL Site to CMD TGGENCO.
19.06.2014
KAKATIYA THERMAL POWER PROJECT 1X600 MW
19.06.2014
CMD TGGENCO discussing status of Bottom Ash Hopper with TGGENCO Civil Wing.
KAKATIYA THERMAL POWER PROJECT 1X600 MW
19.06.2014
CMD TGGENCO observing UCB & ESP Control room readiness
KAKATIYA THERMAL POWER PROJECT 1X600 MW
AGM BHEL giving sendoff to CMD TGGENCO.
19.06.2014
Download