19.06.2014 KAKATIYA THERMAL POWER PROJECT 1X600 MW 19.06.2014 Shri M V Keshavaraj AGM BHEL Site along with TGGENCO Senior officials Welcoming Shri D Prabhaka Rao CMD TGGENCO on 19.06.2014 KAKATIYA THERMAL POWER PROJECT 1X600 MW 19.06.2014 Shri M V Keshavaraj AGM BHEL Site explaining the status of Condenser erection activities to Shri D Prabhaka Rao CMD TGGENCO on 19.06.2014 KAKATIYA THERMAL POWER PROJECT 1X600 MW 19.06.2014 AGM BHEL along with Shri Sachidanadam CE (TPC-II) explaining status of erection activities at 8.5 M floor to CMD TGGENCO. KAKATIYA THERMAL POWER PROJECT 1X600 MW 19.06.2014 AGM BHEL along with TGGENCO officials explaining status of floor readiness at 8.5 M floor to CMD TGGENCO. KAKATIYA THERMAL POWER PROJECT 1X600 MW AGM BHEL requesting CMD TGGENCO for Feeder Floors. 19.06.2014 KAKATIYA THERMAL POWER PROJECT 1X600 MW 19.06.2014 CMD TGGENCO reading the presentation h/o by AGM BHEL on overall status of project and Customer Inputs for Boiler Light Up. KAKATIYA THERMAL POWER PROJECT 1X600 MW 19.06.2014 AGM BHEL explaining contents in the presentation handed over to CMD TGGENCO KAKATIYA THERMAL POWER PROJECT 1X600 MW 19.06.2014 CMD TGGENCO along with TGGENCO officials on the way to 17 m TG floor. KAKATIYA THERMAL POWER PROJECT 1X600 MW 19.06.2014 CMD TGGENCO welcomed by Shri Rajeev Kumar DM/TG & BHEL Staff at 17 m TG Floor. KAKATIYA THERMAL POWER PROJECT 1X600 MW 19.06.2014 KAKATIYA THERMAL POWER PROJECT 1X600 MW 19.06.2014 AGM BHEL explaining the methodology of Stator Lifting with the help of Portal Crane CMD TGGENCO. KAKATIYA THERMAL POWER PROJECT 1X600 MW 19.06.2014 Shri K Rajeev Kumar DM/TG BHEL explaining status of erection activities in Turbine & Generator areas to CMD TGGENCO. KAKATIYA THERMAL POWER PROJECT 1X600 MW 19.06.2014 CMD TGGENCO appreciated regarding House keeping activities at site. KAKATIYA THERMAL POWER PROJECT 1X600 MW Project status being discussed at BHEL bunk office. 19.06.2014 KAKATIYA THERMAL POWER PROJECT 1X600 MW CMD addressing the group w.r.t. efforts to be made to achieve the Unit Synchronization by March15. 19.06.2014 KAKATIYA THERMAL POWER PROJECT 1X600 MW 19.06.2014 AGM BHEL explaining the process P-91 welding to CMD TGGENCO. KAKATIYA THERMAL POWER PROJECT 1X600 MW Erection of Critical Piping in CD Bay structure is explained by AGM BHEL Site to CMD TGGENCO. 19.06.2014 KAKATIYA THERMAL POWER PROJECT 1X600 MW 19.06.2014 CMD TGGENCO discussing status of Bottom Ash Hopper with TGGENCO Civil Wing. KAKATIYA THERMAL POWER PROJECT 1X600 MW 19.06.2014 CMD TGGENCO observing UCB & ESP Control room readiness KAKATIYA THERMAL POWER PROJECT 1X600 MW AGM BHEL giving sendoff to CMD TGGENCO. 19.06.2014