Demonstrating the benefits of energy storage on an 11 kV Distribution Network Matthieu Michel – Technology Innovation and Co-ordination Manager 2012. UK Power Networks. All rights reserved Project Objectives: • Validate the capabilities of a Li-ion Energy Storage System (ESS) • Demonstrate load-shifting and other interventions within the limits of the device 200 kW, 1 hour discharge duration 600 kW, short durations Power rating Duration Real power Reactive power Finite (nom 200 kW) Finite (nom 600 kVAr) Finite (nom 1hr) Unlimited • Evaluate the network benefits: accommodate additional demand and generation • Understand the potential lifetime of the device • Presentation: Early results from Operation of the device Key considerations: Efficiency, Losses, cost of energy 2012. UK Power Networks. All rights reserved Progress Highlights: • The storage device has operated as a STATCOM since commissioning (April 2011) • Exchanges of real power have started (May 2012) • Network diagram Wind farm (10 turbines) 2.25MW Hemsby (Energy Storage System) Martham Primary Site where Additional monitoring is being installed Ormesby Primary 2012. UK Power Networks. All rights reserved 11.1 High Voltage event caused by windfarm output triggering ESS to import reactive power 11.07 10.85 1 11 0.8 Voltage (kV) D E A D B A N D 1.2 10.9 10.8 0.6 Increase in windfarm output resulting in voltage increase 0.4 Low Voltage triggering ESS to export reactive power 0.2 10.7 0 -0.2 10.6 18-Apr-11 18/04 ESS Volts (kV) [Model] 19/04 19-Apr-11 20-Apr-11 20/04 Windfarm (MW) ESS_Q (MVAr) [Data] Windfarm ESS Reactive Output Power ESS Volts (kV) [Model] 2012. UK Power Networks. All rights reserved 21-Apr-11 Reactive Power (MVAr) / Windfarm output (MW) Operation: STATCOM Voltage at Hemsby without ESS (simulated data) Voltage at Hemsby with ESS (Simulated using real data) Operation: STATCOM Settings Change - July 2012 • Tightened under and over voltage targets from 10.96kV ± 0.11kV, to ±0.08kV • kVAr exchanged with the network (Number of occurrences) / Voltage band Week 1 BEFORE SETTING CHANGES AFTER SETTING CHANGES 10.96kV ± 0.11kV 10.96kV ± 0.08kV Week 2 Week 3 Week 4 2012. UK Power Networks. All rights reserved Week 5 Week 6 Week 7 Week 8 Operation: Real Power Exchanges - May 2012 Demand increase due to evening peak Drop in demand due to export from ESS Fluctuations due to Windfarm output or variation in demand 2012. UK Power Networks. All rights reserved Increase in demand due to switching from Export to Import Considerations: Round Trip Efficiency and Losses • The overall round trip efficiency of the installation is quoted to be more than 90% • Several components will impact the efficiency and 48 kW losses AUXILIARIES 1MVA STEP UP TRANSFORMER (2.2kV to 11kV) AND CIRCUIT BREAKER • 49.7 kW delivered by batteries Li-ION BATTERIES 48 kW delivered to network 49.7 kW • SVC Light POWER CONVERSI ON SYSTEM (DC to AC) 50kW discharge scenario: Each component is being assessed individually 2012. UK Power Networks. All rights reserved Considerations: Energy cost and Battery life Financial impact of an example daily operation: 2 full charges / discharges @ 100kW £90 Hemsby import charge • Import chage / Export revenue (£) £80 Export revenue (80% System Sell price) £70 £60 £50 £40 On the current Hemsby tariff Energy import charges will be higher than the revenue that can be generated from Import charge exporting Export revenue £30 a similar amount of energy £20 £10 £0 Scenario 1: Optimised charge / Optimised discharge time • Scenario 2: Example of a worst Worst case case charge / discharge time Battery life will depend on: Number of cycles Depth of discharges • 1 x daily cycle @ 80% depth of discharge: 10 years 1 x daily cycle @ 40% depth of discharge: 20 years • 40% / 10,000 Cycles The impact of each mode of operation on the battery life will be considered 2012. UK Power Networks. All rights reserved 80% / 3,000 Cycles Next steps: Device Operations Control mode 4: Algorithmic control based on real time network measurements and wind farm output Benefit demonstration started Benefit to be demonstrated Management of Peak power flows Control mode 3: Remote operations Now Management of voltages across feeders Reduce reverse power flows Improve Power factor Switching between feeders Control mode 2: On-site Manual Combine Voltage stabilisation + Real power exchanges Control mode 1: Voltage stabilisation (different set points) No intervention Management of peak power flows – Time of day Voltage stabilisation Apr 11 May 12 July 12 2012. UK Power Networks. All rights reserved Jan 13 Oct 13 Conclusions: • The storage device is performing as expected: Reduce voltage fluctuations and manage power flows • The early stages of the project have been challenging: Energy contract, IT connections, troubleshooting issues following commissioning. • Submitted request for extension: October 2013 • More work is to be done but there is learning to be shared: Early learning report published. Copies available at the UK Power Networks stand 2012. UK Power Networks. All rights reserved