Production Part Approval Process Justin Pitts Elements of a PPAP Design Records Authorized Engineering Change Documents Customer Engineering Approval, if required Design Failure Modes and Effects Analysis (DFMEA) applied in special situations Process Flow Diagram Process Failure Modes and Effects Analysis (PFMEA) Control Plan Measurement Systems Analysis (MSA) Dimensional Results Records of Material / Performance Test Results Initial Sample Inspection Report Initial Process Studies Qualified Laboratory Documentation Appearance Approval Report (AAR) Sample Production Parts Master Sample Checking Aids Customer-Specific Requirements Part Submission Warrant (PSW) 过程名 称/操作 零件/ 描述 过程 Process 编号 Name/ art/Pro Operati ess No on Descript ion 机器、装 置 特殊 夹具、工 产品/过程 装 特性Special 规范/公差 Machine Characteristi Product/Pro 检具 产品 & 过程 Gauge c 、Device Product & Process cess jigtools、 Specificatio foreMfg n/Tolerance 毛坯长度 Length 厚度 Thickness 20 热锻机床 锻打 Forging Forging Machine 反应计划Reaction Plan 方法Methods 样本Sample 容量 Size 反应计 控制方法 划 纠正措施 Control Reaction Corrective 频率 Plan Actions Frequency Method 84.84 ± 0.5 检验员检 调整定位块 mm 隔离不合 返工 验 每4个小时 50.8 ± 0.75 卡尺 Checked Adjust 格品 1 次 time Each Four mm (10) Caliper/0 by Quaranti Positioning Hours REF 23.88 .02 Inspector ne Block and (16) Rework 圆角 Radius R 3.3 ± 0.75 (4) R 6.35 ± 0.75 (5) R25.4 (13) R12.7R19.05 mm (6) 毛刺 burrs 无毛刺 No burrs (19) 由模具保证 Control by Pattern 目测 Visual Inspection 100﹪ 调整定位块 隔离不合 返工 格品 Modify Quaranti Tooling and ne Rework 操作员检 隔离不合 验 格品 返工 Checked Quaranti Rework by ne Operator Quality Action Plan Developed as a means of identifying specific historical quality Open a plan ofIn-Transit Date last Estimated Month problems implementing action for each if of necessary. past 6 andQuantity in Qty as of 1/4/13 within Inventory Order to WIP production Available Qty Warehouse run 68 10 58 0 0 1,373 0 1,373 0 0 Nov 20123 0 150 0 230 450 466 0 466 0 n ID lands and side ks 91 0 91 and runout (refer to ts) 60 0 11 0 d, 6.00" Bolt Hole, Bolt hole Porosity ks t to concentricity Oct 2013 WIP parts will arrive Estimated Mo will arrive w repor n/a n/a n/a n/a current April Apri 0 Nov 2013 n/a n/a 0 131 current July July 60 0 0 Mar 2012 n/a TBD, slow 11 0 120 current Feb n/a Thank You