Welcome to the information pages of the LIST linear fire detection system Sensor Control Unit SCU 3000 Control and evaluation unit, with total front-panel control, for fire detection in special applications. © LISTEC® GmbH Sensor Control Unit SCU 2000 Control and evaluation unit with all the necessary control for fire detection in special applications. © LISTEC® GmbH Sensor Control Unit SCU 800 Control and evaluation unit for digital sensors in applications such as covered parking, false ceilings etc. © LISTEC® GmbH Sensor Control Unit SCM 4000 Master control unit controls up to 8 slave units as far as 4km apart. © LISTEC® GmbH Sensor Control Unit SCS 4010 Slave control with up to 2 500m sensor cable for connection to the LIST star network. © LISTEC® GmbH Differential Alarms Freely adjustable differential alarm threshold, e.g. 3,4º ºC Temperature 4 Differential alarm 3 2 Pre-alarm at 50 % of the threshold 1 0 10 20 30 40 50 Measuring cycle no. © LISTEC® GmbH 60 t Reference Profiles °C Actual ambient temperature Temperature 40 30 20 Reference value 10 0 10 20 30 40 Time (minutes) © LISTEC® GmbH 50 60 t Maximum Temperature Alarms FreelyAbsolutalarmschwelle adjustable absolutefrei alarm threshold, 50ºC definierbar, z.B. e.g. 70,0 °C ºC Temperature 80 60 Absolute alarm Pre-alarm at 90% of the threshold 40 20 0 1 2 3 4 Measuring cycle no. © LISTEC® GmbH 5 6 t Frost Alarms ºC Measuring cycle no. 10 Temperature 0 1 2 3 4 5 6 t -10 -20 Pre-alarm at 5° over threshold UT-Alarm (frost alarm) -30 Freely adjustable minimum temperature threshold, e.g.. - 25,0 °C © LISTEC® GmbH Software LISTgraph II LISTgraph II: Graphic program for WINDOWS™ incl. LISTTERM LISTterm: Terminal- and commissioning program for PC‘s,. Alarm / Fault No fault Fire Legend: 1/5 1/6 2/11 3/21 2/12 2/13 1/4 1/7 3/20 FTS Fire terminal station SCU Sensor control unit 3/22 Sensor cable with measuring point 2/10 Path for fire brigade 2/14 1/3 3/19 3/23 Entry / Exit 1/8 2/9 Current position 2/1 5 1/2 3/18 3/24 4/37 2/16 1/1 FTS 3/17 3/25 4 = Alarm section 37 = Sensor no. LIST® Fire Detection 4/32 4/33 4/34 4/35 4/36 4/37 SCU 4/27 4/28 4/29 4/30 4/31 4/26 © LISTEC® GmbH Covered parking LISTEC® GmbH Münchenerstr.58 84424 Isen Test Fire in a Tunnel © LISTEC® GmbH Test fire in a tunnel with 10m/s wind speed © LISTEC® GmbH Cold Storage at - 28° C © LISTEC® GmbH SEC 20 Sensor Cable Measuring range: Operating temp. range: Resolution: Measuring cycle: -40°C ... +200°C -40°C ... +85°C 0,1° 10 sec / 312 sensors Diameter: Bending Radius: Cable Length: Marking: approx. 18 mm min. 30 cm < 2500 m / SCU each sensor © LISTEC® GmbH Reference List Tunnels: Germany Tunnel Length in m Emstunnel Schürzebergtunnel A44 Düsseldorf B61n Bielefeld M11 Oberhaching Arnsberg Hausachtunnel Lämmerbuckel Bürgerwaldtunnel Burgbergtunnel Bad Wildbad Etterschlag Allacher Tunel Engelbergbasistunnel Tunnel Hemberg Königshainer Berge Engelbergtunnel, 2nd tube Tunnel Bonn Tunnel Füssen Gottlob-Grotz-Tunnel Riedbergtunnel Tunnel Farchant Elbtunnel, 2nd tube 2 x 1.000 m 510 m 2 x 1.050 m 1.000 m 240 m 350 m 1.100 m 600 m 1.400 m 540 m 1.770 m 2 x 480 m 2 x 1.040 m 2.500 m 2 x 400 m 2 x 2.300 m 2.500 m 4.480 m 1.300 m 650 m 790 m 2 x 2.300 m 2.900 m Operation 1989 1992 1992 1994 1994 1995 1995 1996 1997 1997 1997 1998 1998 1998 1999 1999 1999 1999 1999 1999 1999 2000 2000 © LISTEC® GmbH Tunnel Length in m Schönbuchtunnel Dortmund Wambel Volkardey Fahrlachtunnel Bad Abbach B295 Feuerbach Tunnel Eching Pellinger Berg Gernsbachtunnel Agnesburgtunnel Fellbachtunnel Oerlinghausen Behringen Kiesbergtunnel Tunnel Olpe Tunnel Hohentwiel Tunnel Vaihingen Hofbergtunnel Saukopftunnel Tunnel Grötzingen Pfaffensteintunnel Elbtunnel, 1st tube 2 x650 m 2 x 1.630 m 2 x 720 m 2 x 480 m 600 m 1.100 m 2 x 380 m 2 x 600 m 1.500m 2 x 700 m 840 m 460 m 2 x 430 m 2 x 860 m 2 x 500 m 2 x 800 m 1.400 m 1.500 m 2.700 m 880 m 2 x 860 m 2.900 m Operation 1992 1992 1993 1994 1995 1995 1995 1997 1997 1997 1997 1998 1998 1999 1999 1999 1999 1999 1999 1999 1999 2000 Reference List Tunnels: Austria Tunnel Length in m Selzthaltunnel Langener Tunnel Pretallerkogel Achbergtunnel Falkenbergtunnel Ehrentalerberg A22 Donaucity, Wien Katschbergtunnel Tauerntunnel Selzthaltunnel, 2nd tube Umfahrung Landeck 1.020 m 2 x 2.400 m 2 x 550 m 1 x 1.480 m 2 x 1.120 m 2 x 3.350 m 6.800 m 5.600 m 6.850 m 940 m 6.900 m Operation 1989 1991 1992 1993 1995 1995 1996 1997 1997 2000 2000 © LISTEC® GmbH Tunnel Length in m Roppener Tunnel Voitsberg Tunnel Tunnel Wald Lärchbergtunnel Lendorftunnel Schmittentunnel Passürtunnel Lainbergtunnel Schönbergtunnel Ebelsbergtunnel, Linz 5.100 m 800 m 2 x 2.800 m 1900 m 2 x 800 m 6.600 m 1.800 m 2.300 m 3.000 m 430 m Operation 1990 1991 1992 1994 1995 1996 1996 1997 1999 2000 Reference List Tunnels: Switzerland Tunnel Length in m J10 La Clusette J20 Boudevilliers J20 Les Hauts Geneveys J20 Vue des Alpes N16 Métairie de Nideau N2 Grancia Melide Gstaad Tunnel Urten Tunnel Sierre Galleria Bisone 1 x 1.100 m 2 x 550 m 1. 250 m 3.250m 2 x 560 m 2 x 1.750 m 420 m 350 m 2 x 2.500 m 2 x 550 m Operation 1993 1994 1994 1994 1995 1996 1997 1999 1999 1999 © LISTEC® GmbH Tunnel Length in m Traversée de Neuchâtel J20 Malvilliers J20 Mont Sagne N16 La Heutte Traversée de N'tel II Vispertal Cheseaux J18: Eggflue-Tunnel Tunnel Linter-Fluhtingen Schänzlitunnel 2 x 5.450 m 2 x 370 m 1.600 m 2 x 320 m 2 x 1.650 m 2 x 1.630 m 520 m 3.000 m 640 m 1.000 m Operation 1993 1994 1994 1995 1995 1996 1998 1999 1999 1999 Reference List Tunnels: Benelux Tunnel Length in m Zeeburgertunnel Vlaketunnel Margriet Tunnel Wijkertunnel Line 94, Halle Schiphol Tunnel 650 m 1.150 m 2 x 80 m 760 m 420 m 750 m Operation 1990 1992 1994 1995 1997 1998 © LISTEC® GmbH Tunnel Length in m Coentunnel Grouw Velsertunnel Line 96, Halle HSL, Halle 650 m 330 m 1.200 m 400 m 400 m Operation 1990 1992 1995 1996 1998 Reference List Further Tunnels Tunnel Length in Operation 6.600 m 1997 2.180 m 800 m 540 m 1996 1996 1997 Sljeme Vrsek 800 m 860 m 1996 1997 2 x 300 m 1998 Klaratunnel, Stockholm 1.850 m 2000 2.500 m 1991 Valldoreix Tunnel 2 x 860 m 1991 480 m 1997 Brno II 2 x 570 m 1998 Taiwan Nankung Tunnel no. 1 2 x 400 m 2000 Nankung Tunnel no. 22 x 2.600 m 2000 Turkey Gültepe Tunnel Tunnel Adana P3 1993 2000 Korntepe Tunnel Tunnel Adana P4 1993 2000 France Mont Blanc Tunnel (french part) Croatia Tuhobic Sopac Lucice Sweden Häggvik Tunnel Spain Vallvidrera Tunnel Czech Republic Radiale, Brno I 2 x 600 m 2 x 2.820 m © LISTEC® GmbH Tunnel Length in m Operation 2 x 1.030 m 2 x 1.230 m Reference List Conveying systems Project Location Hamburger Stahlwerke Hamburg UNA Amsterdam / NL QIT. Titan et Fer Montreal / CAN BASF Ludwigshafen Power station HKW Cottbus Power station MIBRAGSchleenhain Operation Project 1989 1993 1994 1995 1998 1999 Neckarwerke IKW Wählitz Saarbergwerke Isar Amperwerke Power station RVA Peres © LISTEC® GmbH Location Stuttgart Wählitz Völklingen Zolling Boxberg Schleenhain Operation 1991 1994 1994 1998 1998 1999 Reference List Metro Marshalling Yards Project Location Station Duissern Duisburg Station Waldring Bochum Heinrich-Heine-Allee Düsseldorf Metro Leiden Leiden/NL Metro Gerlingen Gerlingen Operation Project 1991 1993 1995 1995 1997 Station Rathaus Duisburg Main station Düsseldorf Station HandelszentrumDüsseldorf SSB bus depot Stuttgart Tunnel Waldau-WernhaldeStuttgart © LISTEC® GmbH Location Operation 1992 1995 1995 1997 1998 Reference List Cable Trays Project Location Operation EVS Power station Heilbronn EPON Montfoort / NL AKZO Nobel Groningen, NL Concert hall Freiburg Sozialkasse Berlin Cement plant Bernburg Museum der Europ. Künste Berlin Alexander Television Tower Berlin Bayer. Vers. Kammer München DASA Ulm Supermarket St. Augustin Power Station Pournary Arta, GR UNA NL Admin. Building, RWE Wesel PPC Power Station Amynteo, GR Treptowers Berlin Bank Korbach Admin. Building Frankfurt PPC Power Station Aliveri, GR PPC Power Station Lavrio, GR © LISTEC® GmbH 1989 1994 1995 1995 1995 1996 1996 1996 1996 1996 1997 1997 1997 1997 1998 1998 1998 1998 1999 2000 Reference List Further References Project Location Operation Dillingen District heating Ingolstadt Petroleum tank Hann. Münden Assembly hall Domdier, CH Geothermical appl. Wien, A Bakery Gasoline filling station Rancate, CH Vernier, CH Gasoline filling station Moerdijk, NL Composting plant Wasserburg Covered Parking Verden Cold storage Viernheim Covered Parking Stuttgart Covered Parking Berlin Wall display Kehl Fodder dehydrator Bremen Coffee roasters Neckarsulm Assembly hall, Audi Hamburg Petroleum depot Bremerhaven Garbage incinerator Hasle, CH Wooden Bridge Aschaffenburg Covered Parking Luzern, CH Wooden Bridge Lenzburg, CH Cold storage depot Östringen Air shaft Bremen Petfood plant Reichenbach Recycling plant Munich Covered parking Hüfingen Timber storage Ehingen Covered parking Taipei, ROC Autom. parking tower Utrecht, NL Covered parking Erasmusburg, NL Covered parking © LISTEC® GmbH 1986 1993 1994 1994 1995 1995 1995 1995 1995 1995 1996 1996 1996 1996 1996 1996 1997 1997 1997 1997 1997 1998 1998 1998 1998 1998 1998 1999 1999 1999 2000 Good Bye We hope that this presentation has awakened your interest in this unique fire detection system for special applications. Give your LISTEC team a call! © LISTEC® GmbH